LOTTE MALL HANOI PROJECT LOTTE MALL HANOI PROJECT WET WORKS PACKAGE

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (13.45 MB, 50 trang )

LOTTE MALL HANOI PROJECT
WET WORKS PACKAGE (ZONE
B)

2021. 05. 10


CONTENTS

1.1 Project Summary

1. Outline

1.2 Organization Chart
1.3 Scope of Work

2. Method of Work
3. Quality Plan

4. HSE Plan

1.4 Master Schedule


1.1 Project Summary
Project

LOTTE MALL HANOI PROJECT

Client


LOTTE PROPERTIES HANOI Co.,Ltd

Project Engineer
/ CM Consultant

LOTTE CM Division

Construction
Supervision
Consultant

IBST and 4M

General Contractor

LOTTE E&C

Sub Contractor

647 Construction and Investment Joint Stock
Company

Scope of Work

-

Construction Period

May 20th. 2021 ~ August 31st. 2022


Trench work
Cement Brick and Block works
Plastering Works
CRC Partition (MEP room)
Anti-slip stair treads


1.2 Organization Chart

Project Manager
Mr. Quyền
HP: 098 699 6912

Safety Engineer
Mr. Thịnh
HP: 0975 203 417

Site Manager
Mr. Nam
HP: 0984 310 958

QS/ Planning

Shop Dwg.

Mr. Huy

Mr. Chanh

HP: 0983 139 136


HP: 0987 267 837

Site Engineer

Site Engineer

Admin

Mr. Lực

Mr. Duy

Ms. Trang

HP: 0968 598 156

HP: 035 442 5148

HP: 092 117 8286


1.3 Quality Management Plan

647 MAIN OFFICE

647
SITE
647
SITE


LOTTE E&C
MAIN OFFICE PURCHASE AND QC
MANAGER

SUBMIT THE APPROVAL REQUEST
OF MATERIAL AND WORK

MONITORING OF IMPORT MATERIAL
COMPANY

CHECK FOR QUALITY OF MATERIAL

CHECK FOR MATERIAL QUALITY AND
SCHEDULE

WORK TO FOLLOW STANDARD

IBST & 4M
REPLY IMMEDIATELY

INSPECTION


1.4 Scope of Work
No
I
 
 
 

 
II
 
 

Description
B1 - Steel reinforced Cement Block works (4 inch)
BASEMENT (B2F-B1F)
MALL (1F-6F)
OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)
D. MLCP (2F-6F_8floors) (OFFICE TOWER)
B2 - Steel reinforced Cement Block works (6 inch )

Unit Quantity Note
m2
3.117 
 
2.938 
 
103 
 
76 
   
 
m2
69.101 

BASEMENT (B2F-B1F)

 


14.451 
27.594 

MALL (1F-6F)

 

 

OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)

 

24.198 

 

D. MLCP (2F-6F_8floors) (OFFICE TOWER)
B3 - Steel reinforced Cement Block works (8 inch)

 

2.858 
479 

III

m2


 

BASEMENT (B2F-B1F)

 

62  

 

MALL (1F-6F)

 

111  

 

OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)

 

133  

 

D. MLCP (2F-6F_8floors) (OFFICE TOWER)
Brick Wall stiffener

 


173  

m

328 

IV
 

BASEMENT (B2F-B1F)

 

 

MALL (1F-6F)

 

211 

 

OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)

 

117 


D. MLCP (2F-6F_8floors) (OFFICE TOWER)
BR - Cement Brick works

 

 
V

 

 

 

 
1.496 

 

 

m2

 

BASEMENT (B2F-B1F)

 

 


MALL (1F-6F)

 

1.315 

OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)

 

181 

 
 

D. MLCP (2F-6F_8floors) (OFFICE TOWER)

 

 

 

No
VI
 
 
 
 

VII
 
 
 
 
VIII
 
 
 
 
 
X
 
 
 
 
XI
 
XII
 
XIII
 
 
 
 

Description
Cement mortar
BASEMENT (B2F-B1F)
MALL (1F-6F)

OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)
D. MLCP (2F-6F_8floors) (OFFICE TOWER)
Cement mortar to Stair's slab and steps
BASEMENT (B2F-B1F)
MALL (1F-6F)
OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)
D. MLCP (2F-6F_8floors) (OFFICE TOWER)
CRC Partition
BASEMENT (B2F-B1F)
BASEMENT (B2F-B1F)
MALL (1F-6F)
OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)
D. MLCP (2F-6F_8floors) (OFFICE TOWER)
Anti-Slip stair treads
BASEMENT (B2F-B1F)
MALL (1F-6F)
OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)
D. MLCP (2F-6F_8floors) (OFFICE TOWER)
Trench work
BASEMENT (B2F-B1F)
Trench Plastering
BASEMENT (B2F-B1F)
Lintel
BASEMENT (B2F-B1F)
MALL (1F-6F)
OFFICE (B2F-ROOF), EXCEPT MLCP (2F-6F)
D. MLCP (2F-6F_8floors) (OFFICE TOWER)

Unit
m2

 
 
 
 
m2
 
 
 
 
m2
 
 
 
 
 
m
 
 
 
 
m
 
m
 
m
 
 
 
 


Quantity
 
52.251 
4.721  
21.930  
23.764  
1.836  
7.132 
1.266  
3.126  
2.060  
680  
2.937 
2.937 
2.834 
1.936 
1.592 
168 
8.022 
1.955 
2.700 
2.618 
749 
528 
528 
864 
864 
2.582 
364 
634 

1.344 
240 

Note


1.6 Master Schedule


1.7 Manpower Schedule
No

1
2

Block Work
Tet Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22
Manpower Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22 Holiday
1
2
3
4
5
6
7
8
9
10
11
12

13
14
15
16
Manager
man
Block
worker

9

9

9

9

9

9

9

9

 

9

9


9

9

9

9

9

36

90

140

140

140

90

90

90

 

90


90

50

50

50

50

50

Manpower sched ule
Manager man

140

140

Block worker

140

90

90

90


90

90

90
50

36

50

50

50

50

9

9

9

9

9

9

9


9

9

9

9

9

9

9

9

1

2

3

4

5

6

7


8

9

10

11

12

13

14

15


1.8 Supply of Materials
No
1
2

Material
Cement
Block
Cemment

Time line


Quantity
937274 ea
250 ton

Jun-21

Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22

104142 104142 104142 104142 104142 104142 104142 104142
18

18

18

18

18

18

1
0.9

18

18

Tet
Holiday


18

18

18

18

18

18

18

Chart Material
18

18

Feb-22 Mar-22 Apr-22 May-22 Jun-22

 

104142

 

18


 

 
18

Jul-22 Aug-22
 

18

18

18

18

18

20
18

18

18

18

18

18


18

0.8

16

0.7

14

0.6

12

0.5

10

0.4

8

0.3

6

0.2

4


0.1

2

0

0
1

0
2

0
3

0
4

0
5

0
6

0
7

0
8


Cement Block 937274 ea

0
9

0
10

0
11

Cemment 250 ton

0
12

0
13

0
14

0
15

0


1.9 Supplier

information

No

Material

Source

Specifications 

Brand name

Country Origin

PHUOC AN CONSTRUCTION AND
SERVICE TRADING CO., LTD
BIKEN VIETNAM COMPANY LIMITED

390x190x190;
390x190x150;
390x190x100

BIKEN, PHUOC AN,
GREEN BLOCK

VIET NAM

COMPANY LIMITED HUONG LY 

PCB30


HOANG LONG,
VICEM

VIET NAM

3 STEEL

TRUONG PHAT

D8, D10, D16

HOA PHAT,
VINA AU STEEL

VIET NAM

4 SAND

COMPANY LIMITED HUONG LY 

 

RED RIVER

VIET NAM

1 CEMENT BLOCK

2 CEMMENT



1.5 Schedule for beginning stage

4.9
Team 1: Trench+Trench Plastering = 8 labour
Team 2: Water block = 5 labour
Team 3: Cement Block = 15 labour
Team 4: Cement Block = 15 labour

4.4

4.3


Mock-Up Schedule

1 Manager man
15
10
5
0

12
6

12
6

1


12
6

2

12
6

3

12
6

4

12
6

5

2 Block worker
12
6

6

12
6


7

6

8

6

9

10

9

11

9

12
Time line


Mock-Up Schedule
Working process

1.
-

Shop drawing


-

Testing of Input
materials

7.
ACCEPTANCE

2. PREPARING:
3. APPROVAL

4.

- Manpower

- Shop drawing

CONSTRUCTION

- Machines

- Materials

- Input materials

6.
CURING WORK

5.
CLEAN



CONTENTS

1. Outline
2. Method of Work
3. Quality Plan
4. HSE Plan

2.1 Working process
2.2 Construction methods detail


2.1 Working process


2.2 Construction methods detail
No

Description

1

Master plan

2

Mobilization materials, equipment

3


Trench work

4

Cement Brick Work

5

Block Work

6

Plastering

7

CRC partition


2.2.1 Master Plan
Floor B2 basement plan

material transfer
path

Kato
Kato

Sand


Machine
Cement
Block
water connection

Cemment

Machine
way
Cement
Block

Cement
Block


2.2.1 Master Plan
Floor B1 basement plan

Working platform
Working
platform

Safety nets

Cement
Block
water
line


Machine

Machine way

Cemment

Cement
Block

Sand

Safety nets

Cement
Block

Safety nets

Safety nets

Safety nets


2.2.1 Master Plan
Construction area 4.9+4.4+4.3


2.2.2 Mobilization materials, equipment
Prepare material

-

Tiles must be of specified strength, size, and specifications.

-

Tiles must be clean and have the necessary moisture

-

Cement mortar must ensure the specified grade (graduation).

Brick

Sand

Site Clean
-

The surface should be cleaned before laying the first course of blocks
Clean water is stored in drums
Under the grout mixing chute, it is necessary to spread canvas to avoid the mortar sticking to the floor.
Tidy masonry brick with brick edge 1.5m-2m

Cement


2.2.2 Mobilization materials, equipment
Basement wall construction Diagram


Move materials to B2 floor by
Forklift and Wheelbarrow

Construction Brick work for
Basement wall B2

Move materials to up B1 floor
by Kato machine and Forklift

Construction Brick work for
Basement wall B1

Materials Area:
Cement; Cement
Block; Sand,…


2.2.2 Method for moving material
Moving material from B2F to B1F by using mobile crane & working platform

Step 1: Install Working Platform

Working platform


2.2.2 Method for moving material
Moving material from B2F to B1F by using mobile crane & working platform

1F


Step 2: Use mobile crane to lift material from B2F to B1F
Working platform

B1F

B2F
1F
Working platform

B1F

MOBILE CRANE KATO 25TON

B2F


2.2.2 Method for moving material

Move materials from gathering Material to
workplace by folklift

Brick

Sand

Cement


2.2.3 Trench work


 Step 1: Chemical anchor comply with
the structure drawing

 Step 2: Install formwork for curb.



Step 3: Casting concrete for curb of
trench.


×