CURRICULUM VITAE
1. PERSONAL DETAIL
- Full name: Nguyễn Văn B
- Date of birth:
- Gender: Male
- Tel: 091……
- Email:
- Address:
- Nationality: Vietnamese
2. EDUCATION BACKGROUND
- Name of university: Ho Chi Minh University of Technology
- Major: Industrial System Engineering
- Range of time: 2002 - 2007
Training about - Production Management
- Quality Control and Management
- Optimization and Simulation in Manufacturing
- Facility layout design
- Scheduling in manufacturing and service
- Inventory Management
- Work Design and Measure
- Production Planning
- Probability and Statistics
- Project Management
- Forecasting
…
Thesis
Apply line balancing and simulation engineering to improving
and increasing capacity of ATV assembly line at Vietnam
Precision Industrial Co.,Ltd.
Foreign language
- Can read major document well
- Good English communication
Computer skills
- Microsoft Office tools: Word, Excel, Power point, Visio…
- Graphic: Auto cad 2D, Sketch up 3D
- ERP software: Microsoft Dynamic
Other skills &
competences
- Responsibility
- Discipline
- Term Work
- Organizational skills
- Creativity
3. PROFESSIONAL EXPERIENCES
COMPANY ANP VIETNAM
Company type Multinational company
Location Saigon Hi-Tech park
Product
Electronic
Company size 1500
Duration
03/2010 until now
Position Production Line Manager
Jo description
-Ensure Weekly, monthly output.
-Maintain, improve yield, Min/pc, Productivity.
-Maintain 5S program and Lean Production.
-Organizing and controlling the production resources.
-Aim at decreasing of the production costs.
-Close cooperation between and open communication with
production, maintenance and quality departments as well as
other departments in the company.
-Achieving the company goals.
COMPANY MNT CO.,LTD
Company type Joint – venture company
Location Ho Chi Minh city
Products Electronics
Company size 500
Duration 08/2007 to 03/2010
Position Fabrication Section Manager
Job description
*
FROM 06/2009 TO 07/2010:
Fabrication Section Manager
- Control, maintain, develope operation of Fabrication Section.
- Analyze, improve, optimize to efficiently use material, labor,
equipment to finish orders on time, increase productivity, save
cost.
- Monitor products standard and implement quality control
program.
- Train, encourage, motivate happiness, fervor and creation of
staffs.
- Plan and monitor Fabrication Operation Weekly Plan,
Fabrication Operation Monthly plan.
- Plan and monitor Fabrication Yearly Action Plan (increase
capacity, quality, reduce material cost, develop new products,
improve production line, recruit labors, buy machines and
equipments…)
* FROM 08/2007 TO 05/2009: Production Planning Staff
- Receive Technical Drawing, check and prepare material
follow Bill Of Material.
- Check production line situation, arrange orders to production
line to ensure delivery time.
- Control material level in warehouse, determine Safety
Inventory Level to minimize material in stock.
- Periodically order material from parent company in Thailand.
4. GOALS IN NEXT 2 YEARS
- Cultivating major knowledge.
- Attempt to build and develop company.
5. HOBBIES
- Listening to music, swimming, jogging, reading news paper.