UNIT 6
:QUALITY AND
SAFETY
DURING
CONSTRUCTIO
N
Group 1
Work in groups and
name these safety
READING
equipments
GRAMMAR FOCUS
Words and
prepositions that go
together
LISTENING
WRITING
QUALITY AND SAFETY
DURING
CONSTRUCTION
01
02
03
04
05
STARTER
01.STARTE
R
Work in groups and
name these safety
equipments
Protective
clothing :
Áo bảo hộ
Safety
goggles: Kính
bảo hộ
Safety
goggles :găng
tay bảo hộ
Safety shoes: Giầy bảo hộ, giầy an
toàn
Hard hat : Mũ bảo
hộ
Safety harness : Dây đai bảo vệ
toàn thân
Earplugs : Bịt tai
congratulat
e
Safety
helmets
must be
worn in this
area
Protective footwear
must be worn in this
area
High visibility
clothing must be
worn in thí area
Ear protectors
must be worn in
this area
Eye protectors must
be worn in area
Put these words anh
pharses into correct
signs
Sound horn
02.READIN Quality control and safety represent increasingly
important concerns for project managers. Defects or
G
failures in constructed facilities can result in very
large costs. Even with minor defects,
reconstruction may be required and facility operations
impaired. Increased costs and delays are the result.
ABOUT
THEpersonal
In the worst case, failures
may cause
injuries
or
fatalities.
Accidents
during
the
PROJECT
construction process can similarly result in personal
injuries and large costs. Indirect costs of insurance,
inspection and regulation are increasing rapidly due
to these increased direct costs. Good project
As with cost control, the most important decisions regarding the quality of
managers try to ensure that the job is done right the
a completed facility are made during the design and planning stages
first time and that no major accidents occur on the
rather than during construction. It is during these preliminary stages that
project.
component configurations, material specifications and functional
performance are decided. Quality control during construction consists
largely of insuring conformance to these original designs and planning
While conformance to existing design decisions is
the primary focus of quality control, there are
exceptions to this rule. First, unforeseen
circumstances, incorrect design decisions or
changes desired by an owner in the facility
function may require re-evaluation of design
decisions during the course of construction.
While these changes may be motivated by the
concern for quality, they represent occasions
for
re-design with all the attendant
objectives and constraints. As a second case,
some designs rely upon informed and
appropriate decision making during the
construction process itself. For example,
some tunneling methods make decisions
about the amount of shoring required at
different
locations
based
upon
observation of soil conditions during the
With the attention to conformance as the measure of quality
during the construction process, the specification of quality
requirements in the design and contract documentation
becomes extremely important. Quality requirements should be
Fontsso&that
colors
used
clear and verifiable,
all parties
in the project can
presentation has beenfor
madeconformance.
using the following fonts: Safety during the
understand the This
requirements
construction project is also influenced in large part by decisions
made during the planning and design process. Some designs or
construction plans are inherently difficult and dangerous to
implement, whereas other, comparable plans may considerably
reduce the possibility of accidents. For example, clear separation
of traffic from construction zones during roadway rehabilitation
can greatly reduce the possibility of accidental collisions. Beyond
these design decisions, safety largely depends upon education,
vigilance and cooperation during the construction process.
Workers should be constantly alert to the possibilities of
accidents and avoid taken unnecessary risks.
vocabulary
separation
N
[,sepə'rei∫n]
Tách
biệt
alert
N
[ə'lə:t]
Sự báo
động
constraints
N
[kən'streint]
Hạn chế
collisions
N
[kə'liʒn]
conformance
N
[kən'fɔ:m]
sự phù
hợp
Sự va
chạm
preliminary
N
[pri'liminər
i]
Mở đầu
decisions
N
[di'siʒn]
Giải
quyết
material
specification
s
N
,/mə'tiəriəl
,spesifi'kei
∫n/
vật liệu
đặc trưng
impairer
N
[im'peə]
Suy
nhược
functional
performance
N
/'fʌηk∫ənl
pə'fɔ:məns
/
Hiệu suất
chức
năng
inspection
N
risks
N
component
configurations
N
[in'spek∫n]
[risk]
Điều tra
Sự mạo
hiểm
/
kəm'pounən
t
kən,figju'rei
∫n/
cấu
hình
thành
phần
vigilance
N
['vidʒiləns]
Cảnh
giác
insurance
N
[in'∫uərəns]
Bảo
hiểm
Exercise 1. Use dictionary to find the meaning of
these words in ENGLISH
Quality
The standard of something as measured against other things of a similar kind; the
degree of excellence of something.
Safety
The condition of being protected from or unlikely to cause danger, risk, or injury.
Observation
The action or process of observing something or someone carefully or in order to
gain information.
Personal
injuries
Physical injury inflicted to a person's body, as opposed to damage to property or
reputation.
Regulation
A rule or directive made and maintained by an authority.
Involve
Involve(of a situation or event) include (something) as a necessary part or result.
Mechanical
safeguards
A measure taken to protect someone or something or to prevent something
undesirable.
Soil
condition
The state of something with regard to its appearance, quality, or working order.
Exercise 2. Read each statement below carefully and decide
whether it is TRUE (F) or FALSE (F)
1. Defects or failures in constructed facilities cannot result in very large costs
2.
3.
4.
Accidents during the construction process cannot similarly result in personal injuries
and large costs
AWESOM
The specification of quality requirements
in the design and contract documentation
E
WORDS
becomes extremely important with the attention to conformance as the measure of
The most important decisions regarding the quality of a completed facility are made
during the design and planning stages rather than during construction
F
F
T
T
quality during the construction process_
5.
Quality requirements should not be clear and verifiable, so that all parties in the
project can understand the requirements for conformance_
F
T
6.
Quality control should be a primary objective for all the members of a project team .
7. Owners should not promote good quality control and seek out contractors who
maintain such standards
.
F
03.GRAMMAR
FOCUS
Words and prepositions that go
together
Be similar to
Be regarded as
Be liable to
Exercise 1. Put a preposition into each gap
from
1. The bungalow is different...........the terrace house.
as
2. Many people regard concrete.............one of the best construction materials.
to
3. I prefer the cottage.......the modern house.
as
4. A concrete mix may be regarded.............being made up of aggregates, water and cement.
5. The young engineer is very pleased...
his plan of the house.
with
6. . The cementing material is formed by the water and cement combining together....... with
7. Reinforced concrete is not the same..............pre-stresses concrete.
as
8. In case............fire,
of please leave the building as quickly as possible.
9. If you have any problem with the equipment, ask.... ...our help
for
Exercise 2.
Choose the best
answer
1. Concrete is
produced by mixing
together cement,
water and......
A. Sand
C. Clay
B. Sized
stone
2. Concrete gains its
strength through a
process called..
A.Hydration
B. Curing
C. Portland
cement
D. water
3. Portland cement is
manufactured by burning clay
and............in a large rotary kiln
A.Limestone
A. C. silt
B.Aggragete
D.
Masonry
04.LISTENIN
G
2. Listen to the CD and put the words in the blanks
preparing
When you arrive on the first day in aplanning
site, it won't be the
first day for everyone. Before any work begins,
the site management have been(1)safely
and
(2)
the site for your arrival. It's their job to
efficiently
make sure you can do your job (3)
and.
So what are 5 key things the site should do for you?
When you arrive, you should be creative and welcomed by someone on site. And if you're not, then
working
visiting
make your present
known to site management.
You need to know who is in charge and they need to
know who is (5)
on or (6)
their site. You may be asked to sign name or report to someone in
charge when you arrive. You should also let someone know all sites now if you're late
introduce
Once (7)
yourself, you will be given the site induction.This is the legal requirement to give basic
presentation so you can work safely on site. You may be asked to watch a video or it could be a(8) . It's
information
important for you to understand what they said in the induction. If there is something you're not sure
about, don't be afraid to ask for more information. If you have not been to the site for a while, you need to
be sure that you're at today. Check the site management when you need a brief or farther induction.
When you are just starting out, or have indicated your experience, every job is different. So it's very
important that the site induction is specific to your site. You should be told about any specific areas of (9)
danger
and what site you're in place to (10) .these.You
control will be told by the managers who are on site.