EnMS
BY
RAHUL MUMALIA
CI/TTC
INTRODUCTION TO EnMS
• ENERGY
• TYPES OF ENERGY
• FORMS OF ENERGY
1. Electricity
2. Heat
3. Steam
4. Fuel – Petrol , Diesel ,
5. Compressed air , Gases
6. Water and other like media
Intl unit of measurement - Joules
•
•
•
•
•
LAW OF CONSERVATION OF ENERGY
ISO
ISO 50001:2011
NEED FOR ISO 50001:2011
STRUCTURE OF ISO 50001:2011
What is 50K all about
ENERGY
Saving / conservation
Energy
What are the Energies used in RCF Kapurthala ?
• Electricity
• LPG
• Diesel
• Water
• Air
• Oxy acetylene
•CO2, Argon, Oxygen, Nitrogen
Who is responsible ?
Result of coordinated effort of
“Everybody”.
The coordinator at RCF - Kapurthala is MR for 50K.
Mgt Rep – Mr Ramesh Kumar Jain
Energy Core Group ( ECG )
Energy
Energy identified for control
•
Electricity
• LPG
•Diesel
?
Where is Electricity used ?????
• Lighting , A/C , Fans
• Motors /Pumps , Compressor
• Welding , etc
Activities - Planned 50K - Specific
Energy
Energy use
use Identification
Identification
Deriving
Deriving of
of SEUs
SEUs
Identify
Identify Opportunities
Opportunities
EnPIs
EnPIs ,as
,as applicable
applicable
Control
Control ,monitor
,monitor &
& Improve
Improve
Depts under EnMS
1. All Workshops
2. SEUs
Clarity - required
1. What to manage ?? Types of SEU
2. How to Manage ?? Method
3. How much to manage? Controls
4. Where to manage ? Areas
5. Measurement - Direct /Indirect ?
6. Need for meters ??
7. How to demo/Sat ? Measure ?
Role of Associates
Identify Energy , Use and Qty
Identify Opportunities
Determine controls to save En /Waste
Primarily assist MR / DMR in EnMS
Be convinced to convince others
Ensure compliance in own Dept / Area.
Ensure closing of NCs/Obs – Int & Ext
Assist the Dept ,HOD and RCF
Ensure correct inputs to MRM.
Help Org , you, Society ,Country, world
Activity & records
R/EnP-02/01 in all Depts /Functions
R/EnP-02/-02 in all Depts /Functions
Apply consideration & Potential
Register of opportunities
Base line - Policy - Obj - Targets- EnPI
Derive Action plan - EnAP
Implement - Monitor / Measure – Improve
Review – reset
4.0 ENERGY MANAGEMENT SYSTEM
4.1
General
Requirement
4.2
4.3
4.4
4.5
Mgt Responsibility
Energy Policy
Energy Planning
Imp & Operation
4.2.1
4.4.1
Top Mgt
General
4.2.2
Mgt Rep
4.5.1
General
4.5.2
4.4.2
Comp,Trg &
Awareness
Legal Req and other Reg
4.4.6
4.5.3
En Obj,Targets,Energy Mgt
4.4.3
action plans
Energy review
Communication
4.5.4
4.4.5
4.4.4
Energy Perf Indicaor
Energy baseline
4.5.7
Procurement of En Services,Pdts,Eqpt & En
4.5.6
Design
Doc & Doc control
4.5.5
Ops Control
4.0 ENERGY MANAGEMENT SYSTEM
Contd
4.6
4.7
Checking
Mgt Review
4.6.1
Monitoring , Measurement
4.7.1
& Analysis
General
4.6.2
Evaluation and compliance with Legal and
other Reg
4.7.2
Input to Mgt Review
4.6.3
Internal audit of EnMS
4.6.4
4.7.3
NC , Correction & CAPA
Output from Mgt review
4.6.5
Control of records
Annual Energy Consumption data of RCF
S. No
1
Particulars
Unit
Annual Energy Consumption
Year
2013-14 2014-15 2015-16
1.11 Grid Electricity Consumption
Million kWh
18.73
17.89
18.47
1.12 Own Generation (DG Set)
Million kWh
0.0020
0.02
0.09
(KL)
486.66
479.56
509.87
kCal/ kg
11840
11840
11840
1.15 Gaseous Fuel Consumption (LPG, Million SCM
etc)
0.0218
0.0393
0.051
1.16 Gross Calorific Value of Gaseous
Fuel
kCal/SCM
23625
23625
23625
1.13 Diesel used
1.14 Gross calorific value of Diesel
2
Unit Coach produced
E.C.U
1987.17
2042.22
2189.2
3
No of Units Produced
Number
1701
1582
1616
4
Total Energy Consumption
MTOE
2138.79
2101.86
2215.47
5
Specific Energy Consumption
KgOE/ units
1076.29
1029.20 1012.00
(-4.37%) (-1.67%)
MANUALS
Energy Manual
•
•
•
•
•
Scope for EnMS:“Energy related activities related to Design, development,
manufacture, and commissioning of railway coaches, related
products and accessories”.
The scope for certification :
“Design , development, manufacture and commission of Railway
Coaches , related products & accessories and activities of LLR
hospital & electrical services.”
The scope for EnMS in this manual is to provide a reference
document for the establishment, Implementation, maintenance and
continual improvement of Energy Management System adopted by
Rail Coach Factory, Kapurthala, in-line with its stated Energy policy
and as per the Standard ISO 50001:2011.
Energy Procedure Manual
•
•
•
•
•
•
ENP-01 PROCEDURE FOR ENERGY LEGISLATION/OTHER
REQUIREMENTS CONTROL & COMPLIANCE PROCESS
ENP-02 PROCEDURE FOR ENERGY REVIEW PROCESS
ENP-03 PROCEDURE FOR
ENERGY BASELINE AND
PERFORMANCE
ENP-04 PROCEDURE FOR CONTROL PROCESS OF ENERGY
OBJECTIVES,
ENERGY
TARGETS
AND
ENERGY
MANAGEMENT ACTION PLANS
ENP-05 PROCEDURE FOR ENERGY OPERATIONAL CONTROL
AND RELATED PROCESS
ENP-06
PROCEDURE
FOR
ENERGY
MONITORING,
MEASUREMENT & ANALYSIS PROCESS