Reactor Internals Design
Faculty of Mechanical Engineering
Ljubljana University (May 30, 2019)
Korea Atomic Energy Research Institute
Kyeong-Hoon Jeong
1
Hydro Electric Power Plant in My Home Town
Chilbo Hydroelectric Power Plant
Constructed in1945, Net Capacity : 30MWe
3% of Korean Standard Nuclear Power Plant Single Unit
2% of Korea APR1400 Single Unit
2
Korean Commercial Nuclear Power Plants in Operation
Reactor
Kori 1, 2
Type
Net capacity
Supplier
PWR
563 MWe
612 MWe
Westinghouse (USA)
Operation
4/78 ~ 6/17
7/83
Kori Unit 2 is a sister plant of Krško nuclear power plant in Slovenia. This plant is more advanced
plant than Kori Unit 2 nevertheless its operation on Jan. 1983.
Wolsung 1
4/83, Shutdown for
Estimation of
Life Extension
PHWR (CANDU)
629 MWe
AECL (Canada)
Kori 3, 4
PWR
903 MWe
Westinghouse (USA)
9/85, 4/86
Hanbit 1, 2
PWR
900 MWe
Westinghouse (USA)
8/86, 6/87
Hanul 1, 2
PWR
920 MWe
Framtome (France)
9/88, 9/89
Hanbit 3, 4
PWR (OPR)
950 MWe
Wolsung 2, 3,
4
PHWR (CANDU)
650 MWe
Hanul 3, 4, 5,
6
PWR (OPR)
960 MWe
Hanjung,
6/98, 6/99,
KOPEC, KAERI (Korea) 1/04, 12/04
Hanbit 5, 6
PWR (OPR)
950 MWe
Doosan, KOPEC (Korea)
5/02, 12/02
Shin Kori 1,2
PWR (OPR)
950 MWe
Doosan, KOPEC (Korea)
2/11, 3/12
Hanjung, KAERI (Korea)
12/95, 3/96
CE (USA)
Hanjung (Korea)
AECL (Canada)
6/97, 6/98 , 6/99
3
Korean Nuclear Power Plants under Construction or on Order
Reactor
Type
Net capacity
Start-up
Shin Wolsung 1, 2
PWR (OPR)
950 MWe
3/12, 1/13
Shin Kori 3, 4
PWR (APR)
1350 MWe
3/16, 9/18
Shin Hanul 1, 2
PWR (APR)
1350 MWe
Under Test
Shin Kori 5, 6
PWR (APR)
1350 MWe
Under Construction
Shin Hanul 3, 4
PWR (APR)
1350 MWe
Suspended
Total
(24 plants in operation)
22,500 MWe
17.5% in Total
Electric Power
Production (2018)
4
Nuclear Power Plant
Reactor Types
PWR : Pressurized Water Reactor
BWR : Boiled Water Reactor
PHWR (CANDU) : Pressurized Heavy Water Reactor
Graphite Moderated Reactor (PBMR)
5
CANDU Reactor
Natural uranium
(0.7% U-235 + 99.3% U-238)
Zirconium alloy cladding
Heavy water (D20) moderator
6
Nuclear Steam Supply System
WH-type
Krško NPP
7
Nuclear Steam Supply System
8
Nuclear Steam Supply System
Manufacturing
Cost
Transportation
Structural Integrity
of Reactor Vessel
9
Nuclear Steam Supply System
Nozzle /Fuel
Location
ICI Locations
Hot Leg & Cold
Leg Change??
10
Main Components of NSSS
Reactor
Steam
Generator
11
Manufacturing of Reactor Pressure Vessel
reactor vessel forging.mp4
Key for Operating Life Extension of NPP
Krško NNP (40+10+10)
Exchange MCP & SG, PZR, Closer Header
Degradation of RV by Increase of Brittleness due to
Irradiation, Impurity Control
Surveillance Program – Charpy Specimens
What does NPP capacity decide?
Manufacturing Equipment for Forging, Heat
Treatment, Handling
Transportation and Handling in Construction Site
12
Main Components of NSSS
Pressurizer
Reactor Coolant Pump
13
Reactor Vessel Assembly and Fuel Assembly
300°C Tem.
15 MPa Press.
Initial Heating ??
Why 300°C ??
Why 15 MPa ??
Natural Uranium
(Approximate 4%~5% U-235 + U-238)
14
Westinghouse Reactor Vessel Assembly and Fuel Assembly
15
Comparison of Fuel Assembly
CE Type
WH Type
16
Fuel Assembly and Control Element Assembly
17
Control Element Assembly of CE Type
18
Arrangement of Control Element Assembly in Core (1)
19
Arrangement of Control Rod Assembly in Core (2)
20