Vea
eS
MINISTRY OF TRANSPORT (MOT)
| ECONOMIC DEVELOPMENT COOPERATION FUND
|
a
BỘ GIAO THONG VAN TAI
|
QUY HOP TAC PHAT TRIEN KINH TẾ
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
_ (CUU LONG CIPM)
VAM CONG BRIDGE CONST:
UNDER CENTRAL MEKONG DELTA RE
|
|
|
|
|
JOINT VENTURE
OF
DASAN CONSULTANTS CO., LTD.,
KUNHWA ENGINEERING & CONSULTING CO., LTD.
AND PYUNGHWA ENGINEERING CONSULTANTS LTD.
DASAN
fe
kunhwa®
[ “@CvuNeHwA
HOCHIMINH CITY, May 2013
|
A.
GENERAL
PHAN CHUNG
GIÁO TL 847
Lo:
ee
`
¬
DOAN NOI TL. 943 - QL. 91
CONNECTING ROAD PR. 943 - NH. 91
COMPONENT 5 (CONNECTING ROAD PRO43-NHS1)
THANH PHAN 5 (DOAN NÓI TL, 943 - OL
Ỉ
END POINT OF COMPONENT 6
Thác
Mee
we
,
BEGINNING POINT OF COMPONENT 4]
DIEM CUO! THANH PHAN 6
DIEM DAU THANH PHAN 1
KM0+000
DIEM CUO! THANH PHAN 1
END POINT OF COMPONENT1
.
DIEM DAU THANH PHAN 2
Ẳ
~| BEGINNING POINT OF COMPONENT2
cone
KM7+800
:
“XS
CAO LANH BRIDGE
CÂU CAO LÃNH
—
TAN MY INTER.
"NUT GIAO TAN MY
È¿
END POINT OF COMPONENT 2
BEGINNING POINT OF COMPONENT 3
DIEM CUO! THANH PHAN 2
DIEM DAU THANH PHAN 3
KM23+450
* [LAP VO INTER.
~~ NUT GIAO LAP VO}
NH54 INTER.
ANUT GIAO QL54].°
ge he"
DOAN NOI QL. 86
CONNECTING ROAD NH. 86
CHINA
%|
THOT NOT BYPASS
“| TUYEN TRANH THOT NOT
3[.
END POINT OF COMPONENT
DIEM CUO! THANH PHAN 3
KM 28+843 95
PROJECT NAME - TEN DU’ AN
CENTRAL MEKONG DELTA
-
¬
CONNECTIVITY PROJECT (CMDCR) - VIET NAM
DỰ° ÁN KẾT
NĨI KHU aren
VỰC TRUNG TÂM
So
DONG BANG MEKONG - VIETNAM -
S35.
OWNER - CHU DAU TU
MINISTRY OF
MINISTRY
TRANSPORT (M
OF TRANSPORT
(M.0.T}
FOR Nưgeng
INVES
VELOPME}
CUU ị LONGiG CORPORATION
sonsoRa TON ron
ne DEVELOPMENT
AND PROJECT
TRUCTURE
TA MANAGES
TY n3 xin
auÁ~5
:
TONG CONG TY BAU TU. PHAT TRIEN VA
QUAN LY’ OU AN HA TANG GIAC THONG CUU LONG
.
ˆ
DASAN
“Yolointen
wt
Venture o
ee
rộ
THIÊN.
TR
sun
*
:
ae
An
j
-oviTRIDUAN
j¬—.......
S18 CAN
/
DRAWING TITLE - TÊN BẢN VẼ
WE | PU/QuangHèn | ou,seow | cHO.Namcn | YAM CONG BRIDGE / CAU VAM CONG
NAME
co
4
oy
LTD
—
KUNHWA ENGINEERING
AND CONSULTING CO., LTD.
and PYUNGHWA ENGINEERING CONSULTANTS LTD. |
ATUI
SIGNATURE
CHỮ KỲ
DATE
xoay
7"
GF
x
a
27.
-|N.c.@&e
PROJECT
MAP
Ä
Ầ
BAN ĐÔ DỰ ÁN
5
ˆ
“NGA |
ˆ
THAILAND
DETAILED DESIGN
THIET KE KY THUAT
-
SoA :
DRAWING No / BẢN VỆ SỐ:
300-010
GENERAL
NOTES
1. GENERAL
5. REINFORCEMENT
1.1. UNLESS OTHERWISE NOTED THESE NOTES ARE APPLIED TO ALL DRAWINGS.
51. REINFORCEMENT, ACCORDING TO TCVN 1651-2008, INGLUDE 2 TYPES AS FOLILOWS:
1.2 THE SCALE INDICATED ON THE DRAWINGS IS FOR "A3" SIZE.
TYPE
1.3. ALL STATIONS, COORDINATES AND ELEVATIONS ARE IN METRES.
1.4. ALL DIMENSTIONS ARE MILIMETERS UNLESS OTHERWISE INDICATED.
15. THE ELEVATION SYSTEM IS REFERRED TO THE MEAN SEA DATUM ELEVATION AT HONDAU ISLAND
COORDINATES REFER TO THE NATIONAL GRID SYSTEM (VN2000)
9. STRUCTURAL STEEL
YIELD STRENGTH |
CODE
(MPa)
91. STRUCTURAL STEEL USED FOR THE STEEL GIRDER SHALL BE AS FOLLOWS
TENSILESTRENGTH | ELASTIC MODULUS
(MPa)
(MPa)
PLAN BARS | CB240-T
240
380
200000
RIBBED BAR | CB400-V
400
570
200000
M270M
AASHTO
(1)(2)
2.1. EXPRESSWAY - DESIGN REQUIREMENTS TCVN 5729-1997, REFERENCE TO TCVN 4054-2005
(3)
LEGEND:
(4)
6)
(1) NUMBER OF BARS (JF INDICATED)
(2) BAR IDENTIFICATION CODE
(3) BAR DIAMETER
(4) SPACING OF BARS
(8) LOCATION AS FOLLOWS (IF INDICATED}
NF: NEAR FACE
T: TOP
FF : FAR FACE
B: BOTTOM
8.3. ALL REINFORCEMENTS ARE SHOWN AS
IN DRAWINGS.
2.2. SPECIFICATION FOR BRIDGE DESIGN : 22 TCN 272 - 05
2.3, AASHTO LRFD BRIDGE DESIGN SPECIFICATION: SI UNIT, 4TH EDITION, 2007
2.4, RECOMMENDATION FOR STAY CABLE DESIGN, TESTING AND INSTALLATION: PTI, 5TH EDITION, 2007
2.5, A REFERENCE TO THE DESIGN CRITERIA.
3. DESIGN LOADS
5.6.WHERE LAPS ARE NOT SHOWN ON THE DRAWINGS THE LAPS SHALL BE STAGGERED SO THAT NOT MORE THAN 50% OF BARS ARE
~ BITUMINOUS WEARING SURFACE
: 2250 KGIM3
LAPPED IN ANY ONE CROSS SECTION.
~ STRUCTURE STEEL
: 7850 KGIM3
~ STAY CABLE
: 7880 KGIM3
- COMPaCTED SOIL.
; 1950 KGIM3
5.7. A REINFORCING BAR INDICATED AS VARIED LENGTH SHALL BE LAP SPLICED AS NECESSARY SUBJECT TO THE FOLLOWING
CONDITIONS:
A) LAP SPLICES IN ADJACENT BARS SHALL BE STAGGERED
-WATER
+ 1000 KG/M3
4.1 CONCRETE GRADE BASED ON SPECIFIED COMPRESSION STRENGTH OF CONCRETE AT 28 DAYS
CONCRETE
STRENGTH
G50
.
s0
fe (MPa)
40
STRUCTURE ELEMENTS IN USE
345
345
485
PILECAP OF PYLONS, ANCHOR PIERS
DRILLED SHAFT OF STAY CABLE BRIDGE
PIER'S HEADSTOCK OF APPROACH BRIDGE
35
30
30
DRILLED SHAFT OF APPROACH BRIDGE
Co
25
APPROACH SLAB, SUPPORTING SLAB
CURB, MEDIAN
c20
20
cio
10
57-75
:
960
1080
207000
835
1085
207000
TYPE
DY AN KET NOI KHU VU'C TRUNG TAM
14. SPECIAL NOTES
14.1. THE CONTRACTOR SHALL VERIFY THE BEARING ELEVATIONS INDICATED ON THE DRAWINGS AND SET UP THE FINISHING
AFTER TAKING THE ELASTIC SHORTENING OF CONCRETE, FRICTION LOSSES, RELAXATION AND ANCHORAGE SET
ELEVATION ACCURATELY WITH THE ENGINEER'S APPROVAL.
ELEVATION CONSIDERING THE FINISHING GROUND LEVEL AT THE LOCATION. THE FINAL ELEVATION SHALL BE SUBJECT TO
FORM AN AND WATERTIGHT BARRIER To THE TENDONS AND SHALL BE FABRICATED FROM CORRUGATED GALVANIZED SHEET
THE ENGINEER'S APPROVAL.
14.3. IF A BRAND NAME OF A PRODUCT IS SHOWN ON THE DRAWINGS, IT IS MERELY A SAMPLE. THE CONTRACTOR MAY
PROPOSE AN ALTERNATIVE EQUIVALENT TO THE SPECIFIED PRODUCT. THE FINAL SELECTION SHALL BE SUBJECT TO THE
ENGINEER'S APPROVAL.
14.4. BORED PILES’ CASING PENETRATION DEPTH INTO THE GROUND INDICATED ON THE DRAWINGS ARE TENTATIVE. THE
CONTRACTOR
STEEL OR
74. GROUTING MATERIAL SHALL BE NON-BREEDING TYPE AS SPECIFIED IN THE TECHNICAL SPECIFICATION.
AND ENSURE THE PILE FOUNDATION ON THE ASPECT OF STRUCTURAL STABILITY AND ECONOMY APPROACH ACCORDING TO
DONG BANG MEKONG - VIET NAM
LOCAL PRACTICE.
8. ACCESSORIES
THE FOLLOWING ACCESSORIES SHOWN IN THE DRAWINGS OR EQUIVALENTS
FOR INVESTMENT, DEVELOPMENT
CONSULTANTS - TU VAN THIET KE
a
DASAN
rant
Tec encom
THE APPROVAL
na.
Joint Venture of DASAN
14.7. THE CONTRACTOR SHALL PROVIDE WATERTIGHT MEASURES AT THE JOINTS OF PRECAST PANEL FOR PILE CAP'S SKIRT.
| PREPAREDBY | CHECKEDBY | APPROVED BY
DRAWING TITLE - TEN BAN VE
“an | neay | DENGAN
~
“Ten | BAE-Sangwoon | LEE. YorgJn | cHO,Namcn | VAM CONG BRIDGE /CAU VAM CONG | 9 |2293] APEROAVA
mec Rives
CO., LTD.,
CONSULTANTS
|S!cnature oe
CHỮ KÝ
KUNHWA ENGINEERING AND CONSULTING CO.. LTD
QUẦN LÝ DỰ ÁN HẠ TẦNG GIAO THONG CU'U LONG
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | Nosy
TONG CONG TY DAU TU, PHAT TRIEN VÀ
HYDRATION HEAT OF MASS CONCRETE OF PYLON’S PILE CAP. THE PROPOSAL SHALL 8E SUBMITTED TO THE ENGINEER FOR
ANCHORAGE OF STAY CABLES, DAMPING DEVICE OF STAY CABLES, BEARINGS, EXPANSION JOINTS, HANDRAILS, ROAD
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
.
14.6. THE CONTRACTOR SHALL STUDY AND PROPOSE APPROPRIATE MEASURES TO CONTROL THERMAL CRACKS DUE TO
BE USED SUBJECT TO THE ENGINEER'S APPROVAL,
LIGHTING, OBSTRUCTION LIGHTING AND LIGHTING ROADS, NAVIGATIONAL BRIDGE LIGHT AND MARKER BUOYS.
OWNER - CHU DAU TU
OT
nO GIAO THÔNG VẬN TÀI
SHALL VERIFY THE DEPTH WITH CONSIDERATION ON THE CONSTRUCTION CONDITION. THE FINAL DEPTH |S
SUBJECT TO THE ENGINEER'S APPROVAL
:
14.5. IN CASE OF APPLYING THE TIP GROUTING METHOD AT PILE FOUNDATION IN PYLON, THE CONTRACTOR SHOULO VERIFY
SEMI-RIGID CONDUIT.
INCLUDING:
.
14.2. PILE CAPS’ ELEVATION INDICATED ON THE DRAWINGS ARE TENTATIVE, THE CONTRACTOR SHALL PROPOSE THE FINAL
7.3. DUCTING FOR INTERNAL TENDONS SHALL BE FULLY COMPaTIBLE WITH THE PROPOSED PRESTRESSING SYSTEM THE DUCTING SHALL
-
M 253M
6.3, THE TENSILE FORCE APPLIED TO THE PRESTRESSING STRAND AT TRANSFER SHALL BE DETERMINED TO BE THE REQUIRED VALUES
USE ON SIMILAR WORK , DEMONSTRATING PROPER FUNCTIONING AND DURABILITY.
CUU LONG CORPORATION
AASHTO
CLASS OF BOLTS AND NUTS
A416-99 OR EQUIVALENT;
LEAN COCNRETE, BLINDING CONCRETE
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
STANDARD
HIGH STRENGTH BOLTS AND NUTS
7.2. ALL ANCHORAGES SHALL BE DESIGNED FOR THE ACTUAL TYPE OF TENDON TO BE EMPLOYED. THEY SHALL HAVE PAST RECORDS OF
MINI
197000
BOLTS AND NUTS SHALL BE SUPPLIED IN ACCORDANCE WITH AASHTCI/ASTM STANDARD OR SIMILAR (KS).
ABUTMENTS, PIERS
PROJECT NAME - TÊN DỰ ÁN
CENTRAL MEKONG DELTA
1880
13. BOLTS AND NUTS
7.1, ALL PRESTRESSING SYSTEM AND ANCHORAGE ASSEMBLIES APPLIED FOR THE SAME STRUCTURAL PARTS SHALL BE SUPPLIED FROM
4.4 ALL CONSTRUCTION JOINTS ARE TO BE LOCATED AS SHOWN ON THE DRAWINGS OR AS THE ENGINEER'S APPROVAL
180
ELASTIC MODULUS
(MPa)
12.3, SHEAR STUDS SHALL BE IN ACCORDANCE WITH AASHTO/ASTM STANDARD OR SIMILAR (KS).
THE SAME APPROVED MANUFACTURE.
4.3, ALL EXPOSED EDGES OF CONCRETE SHALL BE CHAMFERED 20x20MM UNLESS OTHERWISE NOTED.
187
TENSILE STRENGTH
(MPa)
12.2, SHEAR STUDS SHALL HAVE A MINIMUM YIELD AND TENSILE STRENGTH OF 345 MPa AND 420 MPa, RESPECTIVELY.
C.LP DECK SLAB (INCLUDE LINK SLAB) AND
CROSSBEAM OF SUPER-T GIRDER
4.2. UNLESS FORMS ARE NOT USED REINFORCED CONCRETE SHALL BE PLACED ON 100MM THICKNESS OF LEAN CONCRETE.
SECTION
(MM2)
12. SHEAR STUDS
12.1, SHEAR STUDS SHALL BE MADE FROM COLD-DRAWN BARS.
7. ANCHORAGES AND DUCTS
SEAL CONCRETE
DIAMETER
(MM)
11.3. WELDING DETAILS REFER TO THE DRAWING NO. 119-020 “WELDING AND PLATE CONNECTION DETAILS"
6.2. PRE-STRESSING STRAND TYPE 15.2MM SHALL BE MADE OF LOW RELAXATION STRAND GRADE 270 AND SHALL CONFORM TO ASTM
SUPER-T GIRDER.
PRECAST BRIDGE DECK SLAB OF THE STAY
CABLE BRIDGE, PYLON LEG & CROSSBEAM .
C35
18-47
PRESTRESSING BAR
{CYLINDER SPECIMEN, 15 CM DIAMETER, 30CM HEIGHT}
.
250
(MPa)
11.2 LOCATION OF ERECTIONISECTION WELD SHALL GENERALLY NOT BE CHANGED. IF A CHANGE OF LOCATION IS REQUIRED,
THIS SHALL BE APPROVED BY ENGINEER.
§. PRESTRESSING STEEL _
6.1. NOMINAL DIAMETER YEILD AND TENSIL STRENGTH OF PRESTRESSING STEEL ARE SPECIFIED AS FOLLOWS:
TPE
DIAMETER
YIELD STRENGTH
TENSILE STRENGTH
ELASTIC MODULUS
(MM)
(MPa)
(MPa)
(MPa)
PRESTRESSING STRAND
182
1870
1860
197000
4. CONCRETE
C40
MINIMUM YIELD STRENGTH
ANSUAASHTO/AWS BRIDGE WELDING CODE D1.5
THAN 40 TIMES BAR DIAMETER.
1000 DWT FOR ANCHOR PIERS AND APPROACH PIERS.
CLASS
620
11. WELDING
5.8. SPLICES MADE WITH MECHANICAL COUPLERS SHALL BE USED ONLY IF DETAILED ON THE DRAWINGS OR PREVIQUSLY APPROVED
BY THE ENGINEER
5.9, WELDING OF REINFORCEMENT IS NOT PERMITTED UNLESS SPECIAL APPROVAL OF ENGINEER,
5.10. UNLESS OTHERWISE INDICATED ON THE DRAWINGS, THE MINIMUM COVER TO ANY REINFORCEMENT SHALL BE IN ACCORDANCE
WITH 22 TCN 272 -05,
-
5000 DWT FOR PYLONS
A709M
CLASS 485W
11.1. BASE METAL, WELD METAL AND WELDING DETAILS SHALL CONFORM TO THE REQUIREMENT OF THE LATEST EDITION OF ,
B) MINIMUM LAP LENGTHS SHALL BE IN ACCORDANCE WITH 22TCN 272-05. LAP LENGTHS FOR CIP PILES SHALL NOT BE LESS
- BASIC WIND VELOCITY: VB=38 M/S (BASIC 3 SECOND GUST WIND VELOCITY WITH 100 YEARS RETURN PERIOD)
A708M
CLASS 345W
485
STRAND
ETC., SHALL BE PROPERLY REINFORCED WITH THE ENGINEER APPROVAL
-DESIGN VESSEL:
AT09M
CLASS 345
460
PE
:2400KG/M3
+ EARTHQUAKE ACCELERATION COEFFICIENT: A=0.144
CLASS 250 |
400
FOR CATCH PIT, SLAB DRAIN,
: 2450 KG/M3
3,3, OTHER LOADS
CLASS 485W
STAY CABLE SHALL BE AS FOLLOW:
~ PLAIN CONCRETE
«NUMBER OF LOADING LANES: 3 LANES / DIRECTION
CLASS 345W
10. STAY CABLES
+ REINFORCED CONCRETE
+ DESIGN VEHICULAR LIVE LOADS: HL-93
CLASS345
92 STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH AASHTO/ASTM STANDARD OR SIMILAR (K).
5.5. UNLESS OTHERWISE INDICATED IN THE DRAWINGS, ALL OPENINGS IN CONCRETE, SUCH AS THOSE
3.2. LIVE LOADS
M270M
MINIMUM TENSLE STRENGTH (MPa}
5.4. STANDARD HOOKS AND MINIMUM BEND DIAMETER SHALL BE iN ACCORDANCE WITH 22TCN-272-05
3.1. DEAD LOADS
M270M
AT09M
SIMILAR ASTM
5.2. REINFORECEMENT IS NOTED IN THE DRAWINGS AS FOLLOWS:
XX AA- 88 - CC
- DĐ
2. SPECIFICATIONS
CLASS 250 |
M270M
.
DATE
Ae
e
2/2013
Á
bye
02/2014
N
c Che
Cc.
02/2013
DETAILED DESIGN
KY THUAT
Le ---„c
THIET KE
SCALE /TY LE: AS SHOWN
GENERAL
NOTES
DRAWING No / BAN VE SO:
100-020
QUY DINH CHUNG
5. CỐT THÉP
4. TONG QUAN
9. THEP KET CAU
5.1. CỐT THÉP THEO TCVN 1651 - 2008, GỐM 2 LOẠI NHƯ SAU:
1.1. TRỮ KHI CÓ CÁC GHI CHỦ KHÁC, CÁC GHI CHU NAY DUNG CHO TOAN 80 CAC BAN VE
LOẠI
1.2. TILE SU DUNG TRONG BAN VE DUNG CHO KHỔ GIẦY "A3"
KÝ
,
1 3. CÁC LÝ TRINH, TỌA ĐỘ, CAO ĐỘ DŨNG ĐƠN VỊ MÉT
HIEU
THEP TRONTRON
1.4, KÍCH THƯỚC DŨNG ĐƠN VỊ MILIMET
GIỚI HẠN BỀN
(MPa)
| C8240-T
THÉP CÓ GỠ
1.5. CAO 80 THEO MYC NƯỚC BIỂN TẠI ĐẢO HÒN DẤU: TOẠ ĐỘ THEO HE TOA BỘ QUỐC GIÁ (VN2000)
GIỚI HẠN CHẢY
UB400V |
-
9.1 THEP KET CAU DUNG CHO DAM THEP TUAN THEO BANG SAU
MÔĐUN ĐÀN HỒI
(MPa)
(MPa)
240
380
200000
400
570
200000
KỶ HIỆU ASTM TƯƠNG ĐƯƠNG
5.2 KY HIEU CỐT THÉP TRONG BAN VE
2. TIÊU CHUẨN THIẾT KẾ
XXAA - 88 - CC - 0D
2.1. QUY TRÌNH THIẾT KE DUONG CAO TOC TCVN 5729-97, THAM KHẢO TCVN 4054 - 2005...
2.2 TIEU CHUAN THIET KE CAU : 22TCN 272.05
(1) 2
3
@
23. TIEU CHUAN THIET KE CAU AASHTO LRFD, SI, PHIEN BAN 4, 2007
(3) BƯỜNG KỈNH CỐT THÉP
2.4. HUONG DAN THIET KE CAU DAY VANG, THU NGHIEM VA LAP BAT: PTI, PHIEN BAN 5, 2007
(8) VI TRI (NEU CÓ GHI}
,
: 2480 KGIM3
- BE TONG KHONG CỐT THÉP
:2400 KG/M3
CƯỜNG BO ana
(4) KHOẢNG CÁCH GỐT THÉP
NE: MAT GAN
T: MAT TREN
FF: MAT XA
B MAT DUGI
5.3 TAT CA COT THEP ĐƯỢC THỂ HIỆN DANG
3.1. TĨNH TẢI
- BÊ TÔNG CỐT THÉP
CƯỜNG ĐỘ CHỊU KÉO NHỎ NHẬT
(MPa)
@
TRONG ĐÔ: _ (1) SỐ LƯỢNG THANH THÉP ( NẾU CÓ GHI) (2) TÊN THANH CỐT THÉP
3. TẢI TRỌNG THIẾT KẾ
TRONG BAN VE
TĂNG CƯỜNG COT THÉP VỚI SỰ CHẤP THUAN CUA TU VAN.
5.6 TẠI VỊ TRÍ MỐI NỐI KHÔNG ĐƯỢC CHỈ RÕ TRÊN BẢN VẼ, MỐI NỔI PHẢI ĐƯỢC BỐ TRÍ SO LE SAO CHO TONG SỐ MỐI NỐI KHÔNG VƯỢT
- NƯỚC
: 1000KG/M3
l
QUÁ 50% SỐ LƯỢNG THANH THÉP TRÊN 1 MẶT CAT
5.7. CÁC THANH THÉP PHÁI NỐI CHỒNG VÀ CÔ CHIỀU DÀI PHẢI TUÂN THỦ CÁC ĐIỀU KIỆN SAU
- XE TẢI THIẾT KẾ: HL-93
8) CHIEU DAI DOAN NOI CHONG TOI THIEU TUAN THEO TIEU CHUAN 22TCN-272-05, CHIEU DAI NOI CHONG CUA COT THEP Coc
- SỐ LÀN XE THIẾT KẾ: 3 LÀN / HUONG XE CHẠY
KHOAN NHOI KHONG NHO HON 40 LAN ĐƯỠNG KÍNH THANH.
3.3, CAC TAI TRONG KHAG
- TỐC ĐỘ GIÓ : V8=38 M/S (VẬN TỐC GIÓ GIẬT CƠ BẢN TRONG 3 GIẦY VỚI CHU KỲ XUẤT HIỆN 100 NĂM)
- TẢI TRỌNG VA TÀU: 5000 DWT CHO TRỤ THÁP
:
LOẠI
Be TONG
C80
50
C40
40
C35
36
c30
cas
BE COC CỦA TRỤ THÁP;TRỤ` NEO .
CỌC KHOAN NHƠI CÀU CHINH; XA MU CAU DAN
BẢN MẶT CÂU ĐĨ TẠI CHỦ (CẢ BẢN LIÊN TỤC NHIỆT)
DAM NGANG CUA DAM SUPER-T
30
3
;
C20
20
c10
10
ĐƯỜNGKÍNH | GIỚI HẠN CHẢY
(MM)
(MPa)
CÁP CƯỜNG BỘ CAO
162
THANH CƯỜNG ĐỘ CAO
DAM SUPER-T. THAN VA DAM NGANG TRU THAP
BAN MAT CAU DUC SAN CUA CAU DAY VANG
GIG HAN BEN
(MPa)
1670
1880
_ 197000
18-47
950
1050
207000
57-75
835
1038
207000
DONG BANG MEKONG - VIET NAM
15.7
150
GIỚI HẠN BỀN
(MPa)
MO BUN DAN HOF
(MPa)
1860
197000
TIEU CHUAN.
CAP HANG
AASHTO
M 253M
,
THIÊN NHIÊN TẠI VỊ TRÍ ĐỎ. CAO ĐỘ NAY PHAI DUOC CHAP THUAN CUA TU VAN.
44.3 NEU CO TEN MOT SAN PHAM CU THE XUAT HIEN TREN BAN VE, BO BON THUAN CHI LA Vi DY, NHA THAU CO THE BE XUAT
SAN PHẨM.CĨ TÍNH NĂNG TƯƠNG ĐƯƠNG. LỰA CHỌN CUỐI CÙNG PHẢI ĐƯỢC CHAP THUAN CUA TU VAN.
7.3 ỐNG GHEN CHO CÁP DỰ UNG LUC PHAI PHU HỢP VỚI HỆ THỐNG CÁP ĐƯỢC ĐỀ XUẤT SỬ DỤNG. ỐNG GHEN PHÁI ĐẢM BẢO KÍN NƯỚC,
14.4 CHIẾU DÀI CỌC KHOAN NHỎI CHỈ RA TRÊN BẢN VẼ CHỈ LÀ DỰ KIẾN. NHÀ THAU PHAI XAC BINH CHIEU DAI CHINH XAC DUA
VÀO ĐIỀU KIỆN THỊ CÔNG THUC TE VÀ PHAI DUGC CHAP THUAN CUA TU VAN
14.5 TRONG TRUONG HOP AP DUNG PHU'ONG PHAP BOM VLA MULCOC TẠI MONG CỌC TRỤ THÁP, NHÀ THAU PHAI XAC NHAN
VA DAM BAO MONG COC BUC ON 2 {NH VE MAT KET CAU VA BAT HIEU QUA KINH TE.
14.6 NHA THAU PHAI NGHIEN CUU VA DE XUAT BIEN PHAP THICH HOP BE KIỂM SOÁT NUT DO NHIET TRONG QUA TRINH HYDRAT
CÁC KẾT CẤU PHỤ TRỢ CÓ THỂ SỬ DỤNG THEO BẢN VE THIET KẾ HOẶC TƯƠNG ĐƯƠNG VÀ PHẢI BƯỢC SỰ CHAP THUAN CUA TU VAN, BAO
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
QUAN LY OV’ AN HA TANG GIAO THONG CU'U LONG
sol
:
7.2 NEO PHAI ĐƯỢC THIET KE CHO LOẠI CÁP THỰC TẾ SỬ DỰNG, PHÁI CƠ TÍNH NẴNG VÀ BO BEN THÍCH HỢP.
OWNER - CHỦ ĐẦU TỰ
MINISTRY OF TRANSPORT (M.O.T)
AND PROJECT MANAGEMENT
OF INFRASTRUCTURE
TONG CONG TY BAU TU, PHAT TRIEN VA
DIỆN TICH MCN
(MM2)
14.2 CAO BỘ BE COC CHI RA TRONG BAN VE LA GAN DUNG NHA THAU PHAI DE XUAT CAO ĐỘ CHÍNH XÁC OUA TREN CAO ĐỘ
HOA BE TONG KHOI LON CUA BE TRỤ THÁP. BIỆN PHÁP ĐỀ XUẤT PHAI DUGC BE TRINH CHO TU VAN PHÊ DUYỆT
GỒM: NEO CAP VANG, THIET 81 GIAM CHAN, GOI CAU; KHE CO GIAN; LAN CAN; CHIEU SANG, BẢO HIỆU ĐƯỜNG THUỶ....
BQ GIAO THONG VAN TAI
BUONG KINH
(MM)
CỦA TƯ VẤN
8. CÁC KẾT CẤU KHÁC
CENTRAL MEKONG DELTA
LOẠI
°
14.1 NHÀ THẤU PHẢI KIỂM TRA LAI CAO ĐỘ GỐI CẦU BƯỢC CHÍ RA TRONG BẢN VẼ VÀ LẬP CAO ĐỘ CHINH XÁC ĐƯỢC CHAP THUẬN
SAT, TY CHUNG VA CAC THIET Bj NEO.
4.3. CÁC CANH LỘ RA NGOÀI PHAI UGC VAT GÓC 20X20MM TRỪ KHI CÓ CÁC QUY ĐỊNH KHÁC
CONNECTIVITY/ PROJECT (CMDCP) - VIET_ NAM
DỰ ÁN KẾT NÓI KHU VỰC TRUNG TÂM
485
ị
14. GHI CHÚ ĐẶC BIỆT
6.3. LỰC KÉO CỦA THÉP DUL TAI LUC TRUYEN LUC SE ĐƯỢC XÁC BINH PHU THUỘC VÀO MẤT MAT UNG SUAT DO GO NGÓT BAN HOI, MA
7.4 VAT LIU VUA LAP ỐNG GHEN LA LOẠI KHONG CO NGÓT ĐƯỢC QUY ĐỊNH TRONG CHI DAN KỸ THUẬT.
PROJECT NAME - TEN DU’ AN
348
BU LÔNG VÀ ĐẠI ÓC CƯỜNG ĐỘ CAO .
VÀ PHẢI BƯỢC CHẾ TẠO TỪ ỐNG THÉP DẠNG SÓNG MẠ KẼM HOẶC ỐNG NỬA CỨNG.
TU VAN
345
LOẠI
ASTM
A416 - 99 HOẶC TƯƠNG ĐƯƠNG;
4.2. BE DAY TỐI THIẾU LỚP BÊ TÔNG BEM LA 100 MM
4.4. CÁC MỐI NỐI THỊ CÔNG PHÁI ĐƯỢC BỐ TRI TAI CAC Vi TRI CHI RA TREN BAN VE HOAC THEO SỰ HƯỚNG DẪN CỦA
280
NHAT
620
13. BU LONG VA DAI OC
CHAP THUAN
BE TONG DEM, BE TONG TAO PHANG
485
12.3. CHOT CHONG CAT THEO TIEU CHUAN AASHTOIASTM HOAC TUONG DUONG.
7.1 TAT CA HE THONG CAP DU UNG LỰC VÀ NEO SỬ DỤNG CHO CÙNG BỘ PHAN KẾT CAU PHAI BUCC CUNG CAP TU MỘT NHÀ MÁY ĐƯỢC
BE TONG BIT DAY
450
BU LONG VA Dai GC THEO TIEU CHUAN AASHTO/ASTM HOAG TƯƠNG ĐƯƠNG:
6.2. THEP DUL ĐƯỜNG KỈNH 15.2MM ĐƯỢC LÀM TỪ CÁC TẠO THÉP CÔ ĐỘ TỰ CHÙNG THAP CAP 270, PHU HOP VOI TIEU CHUAN
BẢN QUA BO, BAN 80
LAN CAN, GO PHAN CACH
400
12.2. CHOT CHONG CAT PHÁI CÓ GIỚI HẠN CHAY VA GIGI HAN BEN TOI THIEU 345 MPa AND 420 MPa
MO DUN BAN HOt
(MPa)
7. NEO VA ONG GHEN
MO, TRU CAU DAN
uo
CỌC KHOAN NHÒI CÀU DẪN
CÁP 485W
12.1, CHỐT CHONG CAT ĐƯỢC LAM TU THEP CAN NGUOL
LOẠI
.
,
LOAI KET CAU SỬ DỤNG
CÁP 345W
12. CHOT CHONG CAT
6.1 ĐƯỜNG KÍNH DANH ĐỊNH, GIỚI HẠN KÉO VÀ GIỚI HẠN CHẢY CỦA THÉP DƯI. ĐƯỢC XÁC ĐỊNH NHƯ SAU:
CƯỜNG BỘ
Fe (MPa)
CÁP 345
11.3. CHÍ TIẾT HÀN THAM KHẢO BẢN VỀ SĨ 119-020 "CHÍ TIẾT HAN VA BAN NOI"
5.10. TRỪ KHI ĐƯỢC CHÍ RÕ, CHIẾU DÀY TỐI THIẾU LỚP PHỦ BÊ TÔNG PHẢI TUÂN THEO TIEU CHUAN 22TCN-272-05.
4.1 CƯỜNG ĐỘ BÊ TÔNG, MÁC BE TONG 28 NGÀY : (MAU HINH TRU, ĐƯỜNG KÍNH 15CM, CAO 30CM)
CÁP 250
41.2, VITRI LAP DUNG) MAT CAT HÀN KHÔNG ĐƯỢC THAY ĐỔI. NẾU CÓ YÊU CẦU THAY ĐỔI PHẢI ĐƯỢC SỰ CHAP THUẬN CỦA TƯ
8. THÉP DỰ ỨNG LỰC
4. BE TONG
AT098M
VẤN.
5.9, KHÔNG ĐƯỢC PHÉP HÀN COT THEP TRU KHI DUOC SU CHAP THUAN ĐẶC BIỆT CỦA TƯ VẤN.
1000 DWT CHO TRY NEO VA TRỤ CẤU DẪN
A7098M
44.4. THÉP CO SO, VAT LIEU HAN, CHI TIET HAN TUAN THEO YEU CAU GUA QUY PHAM HAN CAU ANSVAWS Dt 5M/01.5
5.8. MỐI NỔI CƠ KHÍ ĐƯỢC SỬ DỤNG NẾU DUCC CHI RO VI TRI TREN BAN VE HOẶC ĐƯỢC CHẤP THUẬN CỦA TƯ VẤN.
~ GIA TỐC ĐỘNG ĐẤT A=0.144
A709M
11. HAN
A) DOAN NOI CHONG GUA CAC THANH GAN NHAU PHAI DUGG BO TRI SO LE
3.2. HOAT TAI:
CÁP 485W
-
M270M
CAP DAY VANG TUAN THEO BANG SAU:
5.5 TRU KHI DUOC CHI RO TREN BAN VE, TAT CA CAC VI TRIMG LO TREN BE TONG NHƯ LỖ BỔ BÊ TÔNG, LỖ THOÁT NƯỚC, . . PHẢI ĐƯỢC
:2250 KGIM3
: 1880 KG/M3
M270M
~
CAP 345W
10. CAP DAY VANG
5.4 MOC TIEU CHUẨN VÀ BƯỜNG KÍNH UỐN CỐT THÉP TỐI THIẾU PHẢI TUÂN THEO TIÊU GHUẨN 22TCN-272-06
: T850 KGIM3
: TB50KGIM3
M270M
Ƒ
CAP 345
9.2 THEP KET CAU PHAI TUAN THEO TIEU CHUẨN AASHTO/ASTM HOẶC TƯƠNG BƯƠNG (KS}
- BÊ TÔNG ASPHALT
- CÁP DAY VANG
A709M
=>
a,
~ KẾT CẤU THÉP
- BẤT DAM CHAT
M270M
CAP 250
KY HIEU AASHTO
CONSULTANTS - TU VAN THIET KE
5
DASAN
GAM
‹
;
kuniwa’
=
[EC EYUNGHUIA
Joint Venture of DASAN CONSULTANTS CO,,LTD.,
KUNHWA ENGINEERING AND CONSULTING CO, LTD.
ee
and PYUNGHWA
ENGINEERING
CONSULTANTS
LTD.
NAME
TÊN
-
|S'GNATURE|
KL UATE
NGAY
14.7 NHÀ THẦU PHÁI CUNG CẤP BIỆN PHÁP NGẮN NƯỚC TẠI CÁC MỐI NỔI GIỮA CAC TAM VAN KHUÔN BÚC SAN CUA BE COC,
TT UCHEN | Kewire | over
DRAWING TITLE - TEN BAN VE
,
| PAE. SangWoon | LEE.Yongdn | CHO.Namchl | VAM CONG BRIDGE / CÂU VÀM CĨNG
ayy 2
s
sonora
@
đy,
canara
N.c.cáø
—caw
9
| near | DERGA, «| DETAILED DESIGN
|02z2013| APPROAVAL |_ THIẾT KẾ KỸ THUẬT
SIZE! KHỎ GIÁY :A3
SCALE /TỶ LE: AS SHOWN
QUY DINH
CHUNG
GRAWING No’jo / BAN
BAN VEVỀ SỐ:
SO:
100-024
ALIGNMENT OF BRIDGE
MẶT BẰNG
HƯỚNG
TUYẾN CAU
_ TO CAN THỌ _
TO DONG THAP
—=—————————
SCOPE OF COMPONENT 38
CONNECTING ROAD
VAM CONG - CAO LANH
PHAM VI HOP PHAN 3B
DOAN NOI VAM CONG - CAO LÃNH
VAM VONG BRIDGE, L = 2969.40M (SCOPE OF COMPONENT 34}
SCOPE OF COMPONENT 38
APPROACH ROAD
CAU VAM CONG, L = 2969.40M (PH AM VI HOP PHAN 3A)
PHAM VI HOP PHAN 38
INTERSECTION WITH NATIONAL HIGHWAY NO.54
DUONG DAN
8
Dw
=
Đ
NểI
ơ
=
244272 4:
KM?4+147 4
TA
STA. KM24+0:
#83106
Fy
NUT GIAO QUOC LO 54 |
~_-
if
GPS4CTD
Al
pelo
3.248
ih
i
i.
1H-
(| aa
Nit
at
im
Ti
„
2.806
v
DC-03
' |
tims
DC-04°T'2
Osa
-⁄2
Ñ
i
iit
ie,
i
ie
Ỷ
A GPS01
934
ce
,
>
⁄
NATIONAL HiGHWAY NO.54
QUỐC LỘ 54
COORDINATE AND ELEVATION-OF CONTROL
BẢNG THÓNG
P.NAMES
COORDINATES - TOA BO
TENDIEM
POINT
TABLE OF CURVE
KẾ TOA ĐỘ ĐCC2 VÀ ĐCKT
lo TNGRIHNG|
BANG THONG
ELEVATION
Name
VmEASINS | TH
A
D1
R(m) |
Tím)
556059530
3.248
DC-01
555911.562
2.806
COORDINATE
¡ 1141690.614 | 555712.225
2.293
BANG
3.547
sỐ | TÊN BIÊM
DC-02
DC-03 .| 1141546.371 | 558533598 |
DC-04 | 1141489.144 | 555369.200 |
GPS01 | 1141408.092 |
555321.497
GPS02 |
D2 | 177°43'44"
3.685
|12000.0)
THONG
2.834
554563.562
2.417
2.182
2.964
DC-07 | 1140015.207 | 554074,422
2.200
GPSSC | 1140454.941 |
554398.713
3.464
3.261
NCT
GPS03 | 1140050.413 |
553956.584
2.348
1140246.488 | 554376.611 |
387.87 |
Total length
2.67 | 300.00 | 300.00
775.67
AND ELEVATION
no] PNAMES |
DC-05 | 1140467.799 | 554646.115
DC-06 ¡ 1140099845 | 554244.892
F1
1140496.019 |
CONG
P(m) | Let (in) | Lect (out)}|
|174°16'13.4'|5000.00] 375.23 | 6.78 | 250.00 | 250.00|
GPS4C | 1141870.580 |
1141792.746 |
PARAMETER
SO DUONG
:
ˆ
OF CURVE
KE TOA BO ĐƯỜNG
CONG
GOORDNAISS.TOASO
O-NGRTHNGT-YinEES
Dt.
1141718.830 |
555919.485
NDI
4121992419 |
5561/6.286
TO
E1
4141911577 |
4141723.710 |
556003.661
555914761
qc
1141636.092 |
555823.710
—92
ND2
1140146.092 |
1140400.982 |
552115 569
554407.925
TD2
1140204.780 |
554180.982
P2
1140148.139 |
554113:855
.
1
2
750.00
|11214/2243 | 555636652
TC2 | 1140091.990 | 554046.315
NC2
PROJECT NAME - TÊN DỰ ÁN
CENTRAL MEKONG DELTA
OWNER - CHỦ ĐẦU TỰ
MINISTRY OF TRANSPORT (M.O.T)
CONNECTIVITY PROJECT (CMDGP) - VIET NAM
CUU LONG CoRcoaeniou tor Nwestenn DEVELOPMENT
DỰ AN KET NỘI KHU VỰC TRUNG TÂM
ĐÔNG BẰNG MÊKÔNG - VIET NAM
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
TONG CONG TY BAU TU, PHAT TRIEN VA
QUẦN LÝ DỰ ÁN HA TANG GIAO THONG CUU LONG
CONSULTANTS - TỰ VÂN THIẾT KÉ
DASAN
aS
of Se
eee
1139902.994 | 553813.336
TTHỤCHIẾN | CKEMTRA | DUYẾT
DRAWING TITLE - TEN BAN VE
Raw’ | NGÀY | DIEN GIA
DETAILED DESIGN
NAME | ou, aveng ign | on,seou | cHo.Namct | YAM CONG BRIDGE/CAU VAM CONG | © [022013] apeRovaL | THIETIKE KY THUAT
LTD
KUNHWA ENGINEERING AND CONSULTING CO, LTD,
`
,
SIGNATURE!
LẺ TT
DATE
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | Aare
4
‘
02/2013
a
⁄ pe
02/2013
[NS
rho
02/2013
ALIGNMENT
MAT
:
.
BẰNG
OF
.
HƯỚNG
BRIDGE
TUYẾN
à
CẦU
souls rue ne sou
DRAWING No/ ° BAN VE SO: ‘
100-030
GENERAL ARRANGMENT
OF VAM CONG BRIDGE
BO TRI CHUNG CAU VAM CONG
SCALE 1:10000
TO DONG THAP
_TO CAN THO _
PIER No. OOOO
POOOOS
—_
61 OOS OOOOE
BBE
i
i
SCOPE OF COMPONENT 38
(va
CONG CA O LANE)
Be @
oo
L=1099700
APPROACH BRIDGE ON DONG THAP SIDE
;
39700+10@40000=439700
|
_2@30000=60000
|
NG THAP PROVINCE
:
|:
Âu
210000
450000
L= 400, Di =008
=
2
&
sa
Se
Ge
as
Sẻ
==
ow [Be SIEISIEIEIEIEIEIETEiEiiErl E3 E3 Eri EllỆ Bi Đ] BIBI Em Bì mì BI BỊ
|
P1-P17- 10 DRILLED PILES D1500
12 GỌC KHOAN NHÔI D800
—- O0 DONG THAP
6S) (3:
|
L=999700
24@40000+39700=999700
SCOPE OF COMPONENT 38
APPROACH ROAD
|
L=200 00 Dị=0 03
30%
.
L=80.00 00.01
=
25%
2
———
uì
SST
re
sẽ
zs
gs
i
12 DRILED PRES 01501
|
NAVIGATIONAL CLEARANCE
ls
8s
Ze
sẽ
Fa Padtao
.
fia —
|
s
3
ị
Ị
15% fhouly}: #2 090 EI
„
HVE: B74
tt
40) S@OSOEE
Ỉ
of
APPROACH BRIDGE ON CAN THO SIDE
;
(°)+44.378m
j
2
‘
|
210000
S4
#
i
:
CABLE STAYED BRIDGE
.
|
¬
e SOS® BOE
OVERALL LENGTH OF BRIDGE, L=2969400
MAIN SPAN, L=870000 (COMPOSITE SECTION)
|
15@40000=600000
258%
-
_
vì
:
`
|
P†-P17 - 10 CỌC KHOAN NHOI 01800
NH. 54 INTERSECTION
P18~P27 - 12 DRILLED PILES D1800
sả
55
ae
_|
7 DRILLED PLES 01500
P18~P27 - 12 COC KHOAN NHỎI D1500
Ge
es
ae
alg
mẽ.
‘
le
z5
wie
27 DRILLED PILES Dt500
27 CQC KHOAN NHÔI 01800
Sie
Sig
2ze
4:
| P30-P38 - 12 DRILLED PILES 01800
|
P39~P53 - 10 DRiLLED PILES D1500
P30~P28 - 12 COC KHOAN NHỊI D1500
‘
a
h
GE, L Z2969.40M`¬,
G,L=2969.40M)
`
\
/
¿
N
tA
⁄
SE
mm
ý
lị
\ TỒN
uy\
f
ĐC
,
“Z
i
mm
12 0RILED PLES 01508
12 CỌC KHOAN NHÒI D1800
TO CAN THO
ay
rt
>
8
G522
OX,4 39
to ghat! ROY ` x>
Â
<9 <<"
.
Za
Fan
ơ
3
1
P39-P53 - 10 CC KHON NHễI D1500
.
z
=
a
lg
Bs
EiBIEI EEjEi Bi EiBii Si E3Ei Bi] EiEI E1 EiE3 E] EiES
BỊ S]E3 BI,
27 COC KHOAN NHƠI D1500
HAURIVER
\SƠNG HẬU
ie
sls
ƒ
é
/
RALLY
rR
Chi
VN
©
QUỐC LỘ 91
NOTES:
1. FOR GENERAL NOTE, PROFILE OF BRIDGE, GENERAL ARRANGEMENT OF SEGMENTS REFER OTHER DRAWING
2. EJ: DENOTES EXPANSION JOINT
3. (*) DESIGN SURFACE LEVEL.
GHI CHU:
1, PHAN GH! CHU CHUNG, TRAC BOC CAU, BO TRI CHUNG TUNG PHAN DOAN XEM CAC BAN VE KHAC
2. EJ: KY HIEU KHE CO GIAN
‹
'8. (9) CAO ĐỘ THIET KE MAT CAU
PROJECT NAME - TÊN DỰ ÁN
CENTRAL MEKONG DELTA
CONNECTIVITY PROJECT (CMDCP)- VIETNAM
DỰDONG
ÁN KẾTBANGNÓI MEKONG
KHU VỰC - TRUNG
VIET NAMTÂM
OWNER - CHỦ ĐẦU TƯ
J
MINISTRY OF TRANSPORT (M.O.T}
i
long conten — THONG VAN Tal oveLopMENT
:
_ AND PROJECT
MANAGEMENT
INFRASTRUCTURE
TONG CONG
TY OAU TU, OFPHAT
TRIEN VA
QUẢN
LÝ Dự AN
HA TANG
GIAO THONG
CL
LONG
CONSULTANTS - TU’ VAN THIET KE
DASAN
oni
oint
Venture œ
Jen
J
eee cae
NAME
PYUNGHWA
ENGINEERING
a
DRAWING TITLE - TEN BAN VE
TÊN | 0U-GuangHién | OH, SeOuk j CHO.NamCh | VAM CONG BRIDGE / CAU VAM CONG
es
.,
CONSULTANTS
LTD.
KUNHWA ENGINEERING AND CONSULTING CO.,LTD,
ee
and
“THƯCHIEN | RIEMIRA | DUVET
{SIGNATURE
-=——
Sate
NGAY
B=
02/2013
2⁄2.
=
BOTS. | N.C. Chap-| GENERALBO ARRANGMENT
VAM CONG
CONG BRIDGE
TRI CHUNG CAUOF VAM
„02/2013
02/2013
“lun | sey | one, | DETAILED DESIGN
9
|o22g13]
APpPRovaL | THIẾT KẾ KỸ THUẬT
SIZE/ KHÓ GIẢY : A3
SCALE
/TỶ
—
DRAWING
LỆ: AS SHOI
No/ BẢN VỀ SỐ:
400 - 040
BRIDGE STRUCTURE GENERAL ARRANGEMENT
PYLON / TRU THAP
f
SEALE W700
BO TRI CHUNG KET CAU CAU
FRONT VIEW/ MẬT TRƯỚC
_—
CROSS
ầ
SECTION AT ANCHOR
SIDE VIEW / MAT BEN
F
0p
|
/\
†
T
tT
MIXED LANE
NX
||
PIER / MAT CAT NGANG CAU TAI TRU NEO
SCALE 1/300
STAGE 1/ GIAIDOAN 1
STAGE 2/ GIẢI ĐOẠN 2
24800/2 = 12250
2450/2 = 12250
,
4000
246350027000
ôito
3@3500= 10500
1000
VEHICLE LANE
LAN XE HON HOP
CABLE STAYS
i
i
DAY VANG
34
|
AIR
|
2i
i
22
|
|
gn
-
FE
T
 OF BRIDGE
LAN XE CHAY
i
-
sett
¬
NEE
Šo
š
Oz
⁄Z
|I
T
Z
|
DO
Z2!
z
Og
“AIRS
'
+ÀN XE CHẠY
Šg
tft
r
|
!
{
Ị|
`
wiz
|t
i
1 |
ols
nh
11d
oe
UW
1
op
(|
=z
ite
E 5
x
|
Ì
VEHICLE LANE
r
1
ỊI
|
L|
1
.
|
/\\\
1
1
|
|
i
:
|
nh
!
|
|
CROSS
nh
SECTION
i
AT APPROACH
STAGE 1/ GIẢI ĐOẠN 1 ˆ
24500/2 = 12250
MIXED LANE:
Ii
ị
Ch
|
1
LÀN XE CHẠY
2@3500=7000
:
2%
me
_
|
| . ae
i
x
|
te
| | TT
|
IT
0
PROJECT NAME - TÊN DỰ ÁN
il
|
-
Tm
lÌ
TETRIS
lÌ
¬
OWNER - CHU BAU TU
CONNECTIVITY PROVECT (CMDCP) - VIET NAM
”
DỰ ĐỒNG
ÁN KẾTBẰNGNÓI MÊKÔNG
KHU VỰC - TRUNG
VIỆT NAMTÂM
MINISTRY OF TRANSPORT (M.0.T)
BỘ GIAO THONG VAN TAI
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
TTHỰCHEN | CKEMURA | buver.
Bean
a
NAME
kuphoa
Joint Venture of DASAN CONSULTANTS CO,, LTD.,
AND PROJECT
MANAGEMENT
INFRASTRUCTURE
| KUNHWA ENGINEERING AND CONSULTING CO., ee
LTD.
TONG CONG
TY DAU TU, OFPHAT
TRIEN VA
QUẦN LÝ DỰ ÁN HẠ TANG GIAO THONG CU'U LONG
and PYUNGHWA
ENGINEERING CONSULTANTS
LTD.
TÊN |
|Elewarune
Lo
Toate
NGÀY
DU, Quang
Am”
B=
sana
Hiển
EE, Yong Jin
“evens
Hay
KH
CHO, Nam Chul
PIER/ MAT
hh
CAT
NGANG
VERICLE CANE
500
'
DAN
LAN OUNG XE KHAN Ci
2500 $
iw!
z
5
2
Zl
A
Eig
ễ 2
Ola
ly
.
re
Te +
“ahs
DRAWING TITLE - TEN BAN VE
À
VAM CONG BRIDGE / CAU VAM CONG
N.C. C4us-| BRIDGE STRUCTURE GENERAL ARRANGEMENT
—nam
TAI TRU
EMERGENCY LANE
+ÀN XE CHẠY
3@3500=10500
500
Ũ HT
w
SS
CAU
Mm
8
É,
Et
a
m@
STAGE 2/ GIẢI ĐOẠN 2
28500/2 = 14250
,
oo
4.
1
|
ff
ae
1
|
fi
SCALE 1/300
VERICLE LANE
LẦN XE HỒN HỢP
4006
&
|
EL. 1.550
oe
al
. CAU
BO TRI . CHUNG KET CAU
TAA
ĐỀN | ve | one) | DETAILED DESIGN
0
|02/2013|
APPROVAL
THIET KE KY THUAT
SIZE/ KHO GIAY :A3
SCALE /TỶ LỆ: AS SHOWN
DRAWINGGNo/BẢN
No/ BẢN VỆ VỀ SỐ: SỐ.
100 - 050
PLAN JOIN APPROACH BRAND CABLE STAYED BR.
MẶT BẰNG TIẾP NÓI CÂU DẪN VÀ CÀU CHÍNH
PLAN OF DECK SLAP
- MAT BANG MAT CAU
SCALE 1/500
CAU DAY VANG
CABLE STAYED BR. >
24500
25800
CAU DAN
APPROACH BR.
P26-P30
SECTION A-A-MAT
SCALE 1/150
2a500/2 = 12260
500
4000
2@3600=7000
MIXED LANE
ñẠ
h ;
ĩ
—
TẾT
VHOEUAE
2.00%
-U /0
T
-
4000
LAN XE HON HOP
MIXED LANE
ĐĐ
5@2200=11000
500
;
|
"
650 500,
“ena
3000
500,500,
mm
/\
2h
:
1250
¡|
_
TIE DOWN CABLE
CAP NEO
{
140
ì
1450
1450
3500
—
25800
3600
500,500,500
oP aT CAY TOM
LÍ
uJ
2@2100=4200
I
OWNER - CHỦ ĐẦU TƯ
MINISTRY OF TRANSPORT (M.0.7)
CENTRAL MEKONG DELTA
CONNECTIVITY
PROJECT (CMDCP) - VIET NAM
sa
Kết NĨ
:
DỰ AN KET NOU KHU VỰC TRUNG TÂM
ĐƠNG BẰNG MÊKÔNG - VIỆT NAM
.
CONSULTANTS - TƯ VẤN THIET KE
BO GIAO THONG VAN TAI
DASAN
.
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
TONG CONG TY DAU TU, PHAT TRIEN VA
QUAN
LY DỰ ÁN
HẠ TANG
GIAO THONG
CLPU LONG
DASAN
4
Ke
cage
Senos
:
2@2200=4400
“ae
(Bec eum
Joint Venture of DASAN CONSULTANTS CO., LTD.,
KUNHWA ENGINEERING AND CONSULTING CO., LTD.
and
PYUNGHWA
ENGINEERING
CONSULTANTS
LTD.
NGAY
+“
800, 680
+
| |g ence caper
ñ
LJ
2@2200=4400
3000
Di
UW
|
TIE DOWN CABLE
CÁP NEO
2@2100=4200
1450
1450
BAE,Sang Woon |
02/2013
LEE, Yong Jin
DRAWING TITLE - TEN BAN VE
CHO, NamChut | VAM
đyt,
N.c
C.Che-
02/2013
02/4013
CONG
BRIDGE
1400
†
25800
[SiGnaTURE| ay + 2~
DATE
§00 800,
200%
wy,Z
—
3500
i
2
KHUNG GĨI CHÔNG GIỎ
“THỤCHIEN | KIEMTRA | - DUYẾT -
on
2xoueninmomm
(e WIND BEARING BRACKET )
3
PROJECT NAME - TÊN DỰ ÁN
3500
Lid
TOMM PAVEMENT
—=—
L
B -B
- MAT CATB-B
SCALE 1/180
245002 = 12250
2.00%
1250
KHE CO GIẦN
_ SECTION
a
i
` ĐEENSIN IDNT
P27-P30
CATA-A
2@3500=7000
neeANE
LAN XE HON HOP
Ễ
L
/ CAU
VAM
CONG
PLAN JOIN APPROACH BRAND CABLE STAYED BR
T TU
.
.
MAT BANG TIEP NOI CAU DAN VA CAU CHINH
REYNo] DATE | DESCRIFTION
0
02/2013)
APPROVAL
DETAILED DESIGN
THIET
KE
KY THUAT
SIEE KHO GIAY 3
SCALE /TỶ LE: AS SHOWN
ORAWING No/ BAN VE SO:
100 - 060
PROFILE OF VAM CONG BRIDGE
TRAC DOC CAU VAM CONG
SCALE X_1:10000, Ơ_4:1000
299
@
đ
đ
=ô
re, ok
+Oo
ag
N
2*m
hỏi
<
â
@
{
oO
eekS
on oN Zo ử
cee
BSBByY
a3
a &
te N
N
2
+ mH
zt
N
Fi
wy oN
S6&
@
+
r
zal
N
ean
;
oO
âye
on
oP
ieee eggs
đ e8 efSsskersa
5
s88)
gó ề
O82 =
6
on on Fok
&
+ Â+ A1 Q
?
â fe
ssanu
on
Ee ©
* =
OR
© tĐ Soo ` G 2APt
oe
Fo
Ble
eta
an
oft or oer
tye
san
a ye Oo
geese?
=
5
thở®
@
`,
on
<
wo
=
+
šS
x#+o di
.
W
+
HIGH POINT
STA = 25+365 76
PVI STA == 26+365 76
(_Km_264900
đ
wo
Oo
=
HIGH POINT ELEV =44 378
z
T â
o
-
SFSSRELw
Pe
?o
w
RESEL
SEF
S862
238
5R
2 w 5KG
N
0
Nn â
+ ử `ẹ 6@s me
SZz
of
rPe
â
~~
oOo
âan
=
ot
ẹ
â
KFch&
YASSor
# 6
a2
S
8s
N
đ
PP5 B8SsH
Pw
đ
+
w#
#
os
m
â
S@ộ
FFPSgGHroQg
ú0 fete
+ # W esto
ỉ
h â wo
A
PVI ELEV =46.878
ah
&
SĐĐghÊe
&
ử
#
BS
gR
â
oe
2
Segeelsegg
@ @ + h & tz
ow
a
o+rn
N
â
+
.
Od
DHE
@
+â 5
N
â
a
H5% {hourly}: +2.090
sal
8
i3
E
|
Ñ |
VERTICAL
ALIGNMENT
3
ae
HAU RIVER
|ị
P255 L= M6638
SHRP
GROUND
THT
FINISHED GRADE
NNO
am
TESSSSRSSRSSSSSRT
GAA
NNN
A
NRK
KH
KR
eK
SL
SEES
KAN
:
LSESESR
AN đi
c
ý
= sức 8038
STATION
;
FER
sa
NN
g8
0ø
NNN
ARR
qe
=
(aq
NAR
ya
8g
ARRE
RR
RNR
RRR
RRR
5
3—]
ALIGNMENT
am]
A
Di
gsgššššSššŠŸšŠš3
NNN
NNN
NNN
NNN
1Ù]
PT
li
NN
| Rịm | lịm | Pịm |Ldi)[l(@i0aileghj
f174°46'13.475000.001375.23 | 6.78 | 250.00 [250.001
TYPICAL SECTION ON APPROACH
RR ORR
sess
sẽ
5š NNN
SŠšỀ5ỀŠ§šš#š#Š
NNN
NNN
G@
bệNON
D
BRIDGE
`
.
(a
p
T
60 |
A
Tut
“noe 20%
T
TT
5@2200=1 1000
PROJECT NAME
- TEN DỰ ÁN
CENTRAL MEKONG DELTA
CONNECTIVITY PROJECT (CMDCP)
- VIET NAM
DỰ ÁN KÉT NÓI KHU VỰC TRUNG TÂM
HU
Vt
DONG BANG MEKONG - VIỆT` NAM
HT
HN
"
ị
wo
CHITIETA
"
/
2.00%
bự
m
3
m
6@2200=13200
m
TT
OWNER
- CHU DAU TU
MINISTRY OF TRANSPORT (M.O.T)
J oui ong cơefedtouroe Nees
SCH
'
MAG
BSK
KE
n
Ke
DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
"
.
TONG CONG TY BAU TU, PHAT TRIEN VÀ
QUAN LY DU ÁN HA TANG GIAO THƠNG CÙU LONG
11080.
.
Lee
Be,
LEVEL
<
DASAN
kem
¬ Onti “sVenttIre 0 jee
:
ác
RARER
SNRRS
RRS
RRR
RRRAR
oes
CO..LTD.,
»
,
and
PYUNGHWA
ENGINEERING
CONSULTANTS
LTD.
S
Š
ame]
102
A
PỆ —
102
là
| Rami | Tim) | Pim) [Let Gn) (oct (oul Total lengih
267
1300.00 300.00)
É
7/567
TYPICAL SECTION ON CABLE STAYED BRIDGE
,
\
AM
ALITY
WA
MAT CAT NGANG BIEN HINH PHAN CAU DAY VANG
SCALE 1:200
ra,
24500 J2 = 12280
m”
| _ð0Q
3W00
_S00 S00
24.5z7000
hội
pet
LAN XE CHAY
© LAN XE HONG HOP
MIXED LANE
VEHICLE LANE
EE
ñ
2%
STAGE 2/ GIAI DOAN 2
24500/ 2 = 12250
3@3500=10600
LÀN XE CHẠY
VEHICLE LANE
500
500 500
pir
ig
OF BRIDGE
HO
"¬
1000 —=
2%
/⁄
|sienature
ATUF
CHỮ KÝ
DATE
NGAY
RRR
BSBBBSSESESESESESSESESEEESEBESBS
NNNNNNNNNNN
NNN
NNN
NNN
NN
NN
NN
SUPER
T GIRDER
DAM SUPER T
“THỰCHEN | CKEMIRA | - DUYẾTi
DRAWING TITLE
- TEN BAN VE
TÊN | DỤ QuangHin | OH,seouw | cHO,Namcml | VAM CONG BRIDGE
/ CÀU VÀM CONG
KUNHWA ENGINEERING
AND CONSULTING CO., LTD.
G
CSRS
Ha,
NAME
5
KN
SSSS885SSRESSESSSSSSSEESS§ẩEE£E§
—
Lf
CONSULTANTS
- TU VAN THIET KE
KK
RR
ih
ft.
KK
56SS5SS5Sỏðưs6sass6sasSð
AN
>
NK oat
§8s88s8845SR§&§sfs§ðS#Sts$Sggsree°
STAGE 1/ GIA] DOAN 1
=
tơ.
tìm
P=z-30% L=359.24
535585555
SCALE 1:50
„2800
_. | 500
|
bị
Lae
XE KHAN GAP
LAN DUNG
_ EMERGENCY LANE.
Sg|4Š
MU | a
=
DETAILA
295002= 14250
3/02500=10500
LAN XE CHAY
VEHICLE
_
=668 |
as |
Ê85&ẹủ5Đấ9885585%ẩđ8#&S88
YRSDPGRPCNNDK
STAGE 2/ GIAI DOAN 2
500. S0) .800
tid
bid
OF BRIDGE
c6
DETAILA
Dis0.005}
02 |1/74344ˆ1120000138/8/|
SCALE 1-200
245002 = 12250
500 —,
4000
;
. 2@2600=7000
LÍoF — 3080 — 800 a500
LÀN XE CHẠY
VEHI
PRICE LANE
_ LÂNXE HỒN HỢP
... MIXED LANE
L=g0.005
1=755.00
750.00
MAT CAT NGANG DIEN HINH PHAN CAU DAN
STAGE 1/ GIAI BOAN 1
935
â
ÊfPSÊĐ&ẹRRSSSRRSSSsSS58ọ888
SESBSSLSSSSESSSSESSEsss
P=25%
8
a
BYBRSRSERSRHRARRASESSESSRESRRSRSSESESS
(FG)
L=400.00 D=005
3
@
s | e
gr
&
ị
KA
- HORIZONTAL __
B
SONG HAU
tzi0000
|
EXISTING
A
QF
02/2013
OOS.
02/2013
z
\N.C.Che-|
02/2013
PROFILE OF VAM CONG BRIDGE
4
à
TRAC DOC
CAU VAM CONG
7
T ND
o
xeay | ones | DETAILED DESIGN
|022013|
APPROVAL | THIẾT KẾ KỸ THUẬT
sau
0
CALE ae
/TY te
LE: sa
AS
SHOWN.
DRAWING
No BẢN VỀ 8O:
a
106 - 070
B.
CABLE STAYED BRIDGE
PHAN CAU DAY VANG ©
"`
GENERAL
_ PHÀN CHUNG
GENERAL ARRANGMENT OF CABLE STAYED BRIDGE
BO TRI CHUNG CAU DAY VANG
SCALE 1-3000
MAIN SPAN, L = 870000 (COMPDSITE SECTION)
_390
210000
DONG
se
<
THA
\
'
450000
210000.
PYLON 1
TT
Km25+140.760
P
FT
PYLON 2
Km25+590.760
4
k
CAN THO
io
>
€
si
+
SỈ+
zs
S
uw
3
Š
x
1 ee
+36.0034
:
155m
;
Ng i
-
\_ SCOUR DEPTH
lạ
` XưCựE SG
Ln
iu
‡
736...
:
©
"
zs
|
uss-t1.00m | "22
VERTICAL ALIGNMENT
S
š
8
EXISTING GROUND
DISTANCE
`
:
RAB... eit
‡m
ts
u
elt.
32 DRILLED SHAET DỊA 2500
32 COC KHOAN NHO! OK 2500
~110.68m,
se z 14076
58
8
=
3
Co
s
"
s
[ 29.24 |
Esg
40
SS
5
STATION
;š
40
S
a
=
‘
Đx
we
>
=
=
>
os
Đ
°
l
=
J
=
8
[20,76]
=
40
S
40
2
§
=
=
=
s
Š
&
a
&
a
Pe8
63
65
67
69
71
Š
s
&
oT
39.24
40
oC
=
$
2s
=
=
40
DONG THAP SIDE MAIN BRIDGE - CAU CHINH PHIA BONG THAP
SETTNG GUT PONT COORDINATES
VỊ TRỶ
.20
| CHAINAGE
LÝ TRÌNH
PIER P28
24+930.60
PIER PY1
25+140.760
7
XM)
VỊ TRÍ
LÝ TRÌNH
Š
40
Ss
=
=š
$
|
Rg
40
CS
=
[|
40
=>
=
§
oe
as
=
[40
5
&
a
8
&
a
&
768
78
80
82
84
=
3
=
s
=
L
40
49
23
‘
Đ
6
a
5 32. DRILLED SHAFT DIA.2500
73°32 COG KHOAN NHOI BK 2500
0
82
5
i
|
g
Co
3S
SA 21159076|
=
s
8
a
113.85my
40
oS
Đ
|
=1
=
5
#
5079
os
=
.
_
â.
-
aa
n
-78.45m,
z8
39.24 J
z
s
40
=
|
=
30
)
=
oS
3
&
&
ẹ
a
&
a
a
89
95
9z
PY2
108
110
113
3
_
8a
88
a-
Ce
LC
es
ing)
i
8
ie
8-37
25%
sọ
S
STa.25+800.76|!"
8
:
@đ
Đ
3
as
LOCAL SCOUR _/
XI CC B
106
=
g
-
ơơ....:
07
Gee
nar oa
'C KHOAN NHI K 1600
.
=
| 40
wet
LOCAL SCOUR
s ` XụCUcBo
7
&
3
et
~~)
@đ
ẹo
'
tigx
3
Đa
i
s
A
a
~
i
=
2
g
:
Đ
3
400.00 DE0.05
74
5
=
a
ANH
8
40
E
g
Gì
|
oF
=
a
8
8B
eo
40
§
]2078]
qo
=
=
oF
oS
=
&
=
&
§
115
117
P29
a
PLAN OF CABLE STAYED BRIDGE
MAT BANG CAU DAY VANG
\
\
TOA BO TM
xm™)
YM
UZ
555 328 . 862
PIER P29
25+800_780
† 14 632.
170
554 673 . 096
558 170.573
PIER PY2
5+590.760
† 140770.
173
554 831,
T
>
i
a
1 141
-818
>
T
PYI1
† 141 203.897
065. 894
83
‘
tịĐ
z
§
/ LOCATION | CHAINAGE
YM
X
Ñ=
_
Ñ|
6
=
CAN THO SIDE MAIN BRIDGE - CAU CHINH PHIA CAN THO
SETTING OUT POINT COORDINATES
TOA BO TIM
N
a8
.
a8
3
zy
8
“a
nN
Sol.
+
s
TABLE OF FOUNDATION SETTING OUT DATA
BANG TOA BO TIM TRU
LOCATION
@
Al
a
Lit
S
=
:
Đš
a
i
&
96,000
+
S
§es
110,000
"
7
s5
s
sử
- 300,000
ụ
Ỹ
Š
s
+
u
7
&
3
Š
8
a
'
Đ3
.
Š
§
3
oe
+
t
——
°
H5% (hourly): +2.090
~~ NAVIGATIONAL
CLEARANCE: ° |
1
._
â
8al.
si.
nm
5i...
2
3
,
ẹ
=
"og
|
cal
+
a
@
9
đ
=
6.003m
:
+
Qo
Qo
"
=
og
ô+
ẹ3
al
8
Ss
s
o
=
gi
`
Đ
=
ơ
8
is
fu
fr
i
m6
leo
8-3
25%
GRADE FINISHED
- KễI CC B
"5
TT 27 CểC KHOAN NHễI K 1600
isg
3
Xà‘
70
e
p†
41PP3
Q
ao
ư
95,000
R
¬
STL
LOCAL SCOUR
rma
371 27 DRILLED SHAFT DIA 1500
"H.Emi
POLE NAME
@
-XƠICHUNG --
f ZA
`
H1%: +2.740
TT
Ke a7
st
t
A
£29
Lae
+44.378m
E3EJ
7P1Z.8U
À
SCALE 1:2500
\
Ề
„x2
384.
ce
ị
¬
~14ÿ1
:
\
.⁄
T
\
\
~
j
869
-5.87
T
i
~
|
-Tn
7839
`
|
PROJECT NAME - TÊN DỰ ÁN
CENTRAL MEKONG DELTA
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
.
.
DỰ ÁN KET NOI KHU-VU'C TRUNG TAM
ĐÔNG BẰNG MEKONG - VIỆT NAM
13.23
8.79
: `Ố
we
‡
`
OWNER - CHU DAU TU
MINISTRY OF TRANSPORT (M.0.T)
BQ GIAO THONG VAN TAI
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
Po
t8,
12.83
i
i
7
718.1
14.60
-14.80
-
:
—15.82
Ề
i
18-28
Seaver
(ec ena
CONSULTANTS
455.000
|
CO.
i
\
\
15.80
†
ĩ
I
-16.65
:
18.29
48.29
A
X
ị
~17.27
-16.60
04
ị
\.210,000 10.86
À
13.75
A
\
Ầ
ý
7
J-t.ộ
3.08
Ầ
iị :
¡
ì
f
N may ay
{ 1.6:
wee
ằ
:
i
°
i
“THƯCHIEN | Kiewrea | ouver
DRAWING TITLE - TEN BAN VE
THAY | CEScRIPTION | DETAILED DESIGN
THIET KE KY THUAT
NAME | BAE,SangWem | LEE.Ymgin | cho.wamcml | VAM CONG BRIDGE / CÀU VÀM CÓNG | 9 |922013| APPROVAL
LTD.,
{SIGNATURE
LTD,
è
ou | OW 4-8
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
KUNHWA ENGINEERING AND CONSULTING CO.
QUAN LY DY AN HA TANG GIAO THONG CUU LONG
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | PATE
TONG CONG TY BAU TU, PHAT TRIEN VÀ
~18.61
.
15.89
:
Joint Venture of DASAN
i
870,000
CONSULTANTS - TU VAN THIET KE
DASAN
ác
¬
fears 3]
z
Mã
Lro,
|
LẺ #
ĐATE
°
2/2013
YL
m
02/2013
N.C. C&-|
oh
aot
mg
GENERAL VIEW OF CABLE STAYED BRIDGE
:
e
ae
BO TRI CHUNG CAU DAY VANG
SIZE) KHO GIẦY :A3
SCALE /TY LE: AS SHOWN
RA
DRAWING
No/BANÁN VEVỀ SO: SỐ;
130-001
|
B.2
ANCHOR PIER
TRU NEO
GENERAL VIEW OF ANCHOR PIER - BO TRI CHUNG TRU NEO
SCALE 1:400
FRONT VIEW - CABLE STAYED
MAT CHINH TRU
4000
Z,
DETAIL ‘AY /
eb. 26.279
|
§
s
+—
2
8
=
a
T
1
8
S
8)
R|
_|$qĐ ]2800
i
8000
7
Am
|
LỊ
EL. 4.550
28
|
|
t
8
HH
sa
8ø
mm
mm
mm
narra
;
gi
Sĩ
g
5
NY
S|
|
inh)
H=73m, 27EA (Pier 28)
H=80m, 27EA (Pier 29)
PRECAST SKIRTING PANELS
TAM BT KHUNG CHE DUC SAN
|
:
r_ 3800
a
S|
a
a
g|
1062200 = 22000
:
25800
a
a
S|
+—"
sl 8Bo
8.
a2
sẽ
bá
[1200
An
š
4000__| |
Z3
a
&
(
&
—_
AC f
|
"ma
9850
|
N
A
&
'
B5
Bị
8
=8
‹—
fs
f
„|
DETAI“AR
&
CHTIẾTA"
.
0900
|| soo
2500 ||
'
|
'
By
ay
HH
HH
HH
te
7800
am
si
ee
fm
|
:
33000
|
T——
&
f
|
L,
» 9650age
GB
8
_ Ị
+e
sỊ
——
man
||
,2000
f
|
600
Lá. 3800
8
gì
Oh
4x?
?
2
(Oy
|
|
—”
tƠI
EL -1.450
;
=
-+
ch
<
Sz
| |
| |
5h
h
2
NS
ots
rity
+”
`
+”
oh
wee
rp.
rt
50g
||_ 4090
ots
OWNER - CHỦ DAU TU
MINISTRY OF TRANSPORT (M.O.T)
+
Ti
led
BỘ GIAO THÔNG VẬN TẢI
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
4
TONG CONG TY BAU TU, PHAT TRIEN VA
QUẦN LÝ DỰ ÁN HẠ TÀNG GIAO THÔNG CỬU LONG
Bonar
-
im
4250
o
s
| mj
a3 =Ol
8
BỊ
=
5
|
ad
_ 40
TIEDOWNANCHOR
THANH NEO
| 28
8
s
1&8
ag
TẾ
H=73 15m, 27EA (Pier 28)
H=60.15m, 27EA (Piet 29)
ưa
hà
#2
ob
x2
⁄
Z
T
0|
5
.
3
=£t
w
as
200x200
lob-2400 | 240040
SECTION C-C
MAT CAT C-C
PRECAST SKIRTING PANELS
TAM BT KHUNG CHE BUC SAN
.
8000
_đũ0
2S
3
| .
-——
4800
`N
ZI
.
x
3
\ 150x150
SECTION B-B
MAT. CAT B-B
Ss
i
4250
COC KHOAN NHOI BK.1500
-
1
«7
| __ PRONG NGaNG
.
8@3750=30000
-
xE
⁄
t†7
°
a
rts
*x+#
4800
@0
200x200
=
8
=
=
~\ ——
$00
`
g
3
SECTION D-D
MAT CAT D-D
PRUGNGNGANG
;
6000
©
=
_fop,
4800
a
a
sl
|
1500
T
8
|
S—
~
kunnwa3
PTHƯCHEN | KEMTRA’ | DUVET.
ee
ec sua
AND
CONSULTING
co.,
LTD.
and PYUNGHWA ENGINEERING CONSULTANTS LTD
|SiGNATURE
CHỮ KỶ
DATE
NGÀY
CHO, Kang Yeon |
⁄
hor
m
LEE, YongJin |
đ\#L
mm
DRAWING TITLE - TEN BAN VE
CHO,Namcht | WAM
N.¢.Che-)
02/2013
PLAIN
LEN Kl
BE TONGCONCRETE
al
.
-
60
—
33000
Joint Venture of DASAN CONSULTANTS CO., LTD.,
KUNHWA ENGINEERING
83
a]
R
®*%
LATERAL
rere eerie
g|el
al“|
TT8
eT
.
1X
(1400x1100)
0›
DRILLED SHAFT DIA 1500
| |
+
CONSULTANTS - TU VAN THIET KE
DASAN
600
19
t+?©
LATERAL
_— ——————t—>
.
CENTRAL MEKONG DELTA
dob if 3300_ dob
DETAIL"A" - CHI TIẾT "A"
SCALE 1:100
_,(_ — 7500
a
chy
Tt
`
oT
Tr
4300
PROJECT NAME - TÊN DỰ ÁN
600
A 43800
3Q | 1800
CUA CONG TAC
+
Sỉ=
—%P
312
BIS]
Sig}
E
3/8
|
Š
1
` K
200x200
N
“gl„ 8=
ra
ý — _ 8000
5Ð
8
oo DOORWAY š
†
'
|
|
soo
1600.
⁄
8000
—+
—
€0
2
oS
—
v2in |Ệ app™ |Ả D0,
EL 4.080
800
so
S|
2]|
3
Ssol
4x
Đ
\
sn
c5
gs
:
ơ
8
8
al
8
Sat.
1.550
=
T
~
k3
Us
5
ig
8@3750=30000
7800
3
_
BI
|
g|wl
|
FORMWORK TUBE __| nin
pe
8
=w
THANH NEO
PP
(B)
S003800 | 80D
[aul]
team
TIEDOWNANGHOR _
ONG GEN CHO SAN
PLAIN CONCRETE
|
50
„_ 3800
.
DỰ ÁN KÉT NÓI KHU VỰC TRUNG TAM
š
DONG BANG MEKONG - VIET NAM
1
8000
oo
|
-† | BẼ TÔNG LIÊN KHÔI
8000
|
1
29800
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
|
5400
460x150
*
o
—e5
go
&
_]
|
Oy
By
cAUOAN
{4900x1000}
PLAN VIEW OF FOUNDATION
MAT BANG MONG
5
52
Sq 2
2
&
*
500
VU
ˆ| |
.
4200
G1
BEGAIKRANG
“onda
SHOE BASE PLATE
sl = THEE BAN Ee ..
|
*
2m
|†
|
1
a
7506
|
MAT CẮT A-A
RTq
—Đ|
=
“Tf
oh 3800
i
|
-
4800
=
3
|
¬
1
`
|i
ei1.ss0
eS
~
DRILLED SHAFT DIA.1500
50
xi
†
COC KHOAN NHOLBK.1500 | iS
| d
,
SỈ
aos
a
+
i
achoT
600,
omg
s
SI= |
EL. 4.550
oF
Us
500
|
|7 op _ 3800
1bø0, / T8)
.
ffl
5400
t
z
7500
3
em
|
SECTION A-A
APPROACH BR
MES
3.
EL 33.488
4r
Lif rT
;
,
PLAN VIEW
MAT BANG
¿ạ
TT DẠY YANG
„_ 3800
|
sey.
2=
BE TONG LIEN KHOI
33000
3900,
CABLE STAYED BR.
pee
aH
SPahoe
etme
eset)
3
zo sl
i
=
SIDE VIEW
MAT BEN
SS [
]
1
ag
PLAIN CONCRETE
¡|
8@3750=30000
t
fa
EL.28279
%
140
t3
3
uj
SH)
CỔ
[au
HL312Z9
. 31,
aT
2
gỊ
=OF
am 3800 | fe
80D0
1
7
\100e
|
|
5400
3=
DRILLED SHAFT DIA. 5 1500
Eg
COCKHOANNHOLK 1600 || Fa
302240 - 19800
10@2200= 22060
‘i
S[a
Ñ
3
Bs S|
>
LỊ
TT]
+)
s00
EL.—“Œ
1.550
=
H=73m, 27EA (Pier 28)
H=80m, 27EA (Pier 29)
3
ị
i]
Uk
ị
[_—Sn5800
7500
ị
r
|T
74800.
vf
|
_
:
0P |3800
\ƒ A
{
450x150!
ti
\
uu
|h
ron
|
||[—TƑ|—||0o
\009
|
10
8
—— =
— |
8
soo} |
a
==
3I
i
TIE DOWN ANCHOR
THANH NEO
EL, .38,33,489
=
|_|
|_| T
Hf
.
ñ
S
|
5400
f
aly
$000
:
h
=
3900__„
CHITIET "A"
[am
Bs S}
ol
41002200, 3300 , 4000
ie
a
31.
= poo EL EL. wats
“+
§
§
BR. WAY
29800
EL, 36,00
4
e
FRONT VIEW - APPROACH
MAT CHINH TRU
si
29800
4100, 2600,
„ 3300 ,2200,
BR. WAY
CONG
BRIDGE / CAU
-
VAM
CONG
GENERAL VIEW OF ANCHOR PIER
H
BĨ TRÍ CHUNG TRỤ , NEO
Mian | NGÀY | OENGIAL
Q
|022013|
APPROAVAL
:
DETAILED DESIGN
THIET KE KY THUAT
SIZE/ KHO GIAY :A3
SCALE /TY LE: AS SHOWN
DRAWING No/ BAN VE SO:
111-001
:
GENERAL VIEW OF ANCHOR
FRONT
|i
|
Try
DETAL ‘A
3
NI.
2
ị
CHITIET
18500
¬
"AT \
EL. 4.560
/[Ằ
⁄
8
EL1Bã
|
| 4
2
8
\
|
:
`
|
4
À__
| :
ILL
ị
ị
|
i
-
oO
(4
bY
“s5
4
33000
||
|
|
|
OU
cD
PRECAST SKIRTING PANELS
SU
CxS
⁄
an
T
ĩ
-
+
|
M0
%
300
J
Ow,
—
|
c1 _/
TE
:
m
“
..
v
rx
EL-1.450
PRECAST SOFFIT PANELS
EL 4.850
a
| 4500
|
w
|
+.
Is740
———” |
8L
_— ==+
ex 1.560
{
7
xp
\
COT)
|
.
sa
1
`
: |
LD
300
EL. 4.050
TT”———_
ƒ
§
|
i
!
Uo
NN)
cy
ve
200 |
1780
100
|
4@2000=8000
| 1750
m
8
irs)
EL-1.450
PRECAST SKIRTING PANELS
TAM BT LOT BAY BE BUC SAN
200
=
—+
š
PRECAST SOFFIT PANELS
TAM BT KHUNG CHE DUC SAN
5000
TỰ
5ƒs0!
PRECAST SKIRTING PANELS
18@2000=30000
BEN
00
g| ee =
g
3
TAM BT LOT DAY BE BUC SAN
1500 |
11
300
JEL 4.080
.
-
Tr
|
’ TAM BT KHUNG CHE DUC SAN
200
[
1
i
KU
YO
Tỉ
16500
|
|
- MAT
TT
aw
i1Í
ị
||
TRU NEO
||
7
T
- «hsL1.
MONG
SIDE VIEW
|
-
Ặ
C} _/
\
T
SCALE 1:200
CHINH
Ty
]
+
300
VIEW - MAT
PIER FOUNDATION - BO TRI CHUNG
TAM BT KHUNG CHE DUC SAN
|
100
200
PLAN VIEW - MẶT BẰNG
s30
300
| 4500 ,
DETAIL "A" - CHI TIET "A"
15@2000=30000
„4500
|
300
3
g8
rt
+
IT
T1
``
£
4
~
NJ
++
†}
I
+
-+
z
]L
i
i
T
L_
I
TL
LL
\
¬+
+ tf
4
Z
Ti
1
`
+
1
TL
Ĩ+
1
1<
L
7
}
`
+
T
i
;
£
7
+
`
tt
[
+
4
Ẹ
‡
4
z7
|
t
1
obs
a
+
4
T1
7
th
4
⁄
`
`+-
58
4
”
FT]
Li”
Qo
=
-~
a
s
8
yy
7T»
“7T
f | \
` NL
4 ⁄
^~
rq
f
\
XS 4 2
+
“Tt
f
S
` -—- /
g
g|
ets,
+
L
|
|
1500 |
T
[
“1
` `. ⁄
BONG BANG MEKONG - VIET NAM
†
i
4
I
{
{
TÂM BT KHUNG CHE DUC SAN
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
DỰ* ÁN KÉT NÓI KHU VỰC TRUNG TÂM
otf,
H=73,15m (Pier 28)
H=80. 15m (Pier 29)
i
+
\ NZ /
ots,
đ)
PRECAST SKIRTING PANELS
PROJECT NAME - TEN DU AN
CENTRAL MEKONG DELTA
otf,
its
[XD
_
DRILLED SHAFT DIA.1500
COC KHOAN NHO! DK.1500
+
i
|
1
{
+
T
+
t
T
T
i
i
Ă
L
,
#
/
a
|
|
g
i
tụi
,
Đa
eT
T
5
NE
+.
lR
`
PCN
`
ơ
;
+
7
i
`
PRECAST SOFFIT PANELS
L
PRECAST SKIRTING PANELS
`
__...
:
SN
i
o
8
VY,
_t
|
oss
.
¬—
=]
\
ots
cy
{
.
et
H-
HS
PIN
rTt™
UL
—
⁄
⁄
——.
ew
3
=
“th
/
T1
/
~
- “
2
‘
|
eee
/
TAM BT LOT DAY BE AUC SAN
oo
_//
8@3750=30000
OWNER - CHU BAU TU’
MINISTRY
TRANSPORT
BO GIAOOF THONG
VAN
(M.O.T
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
DAU TU, PHAT TRIEN VA
QUAN TONG
LY DYCONG
AN HATYTANG
GIAO THONG CU'U LONG
1800 |
CONSULTANTS - TU VAN THIET KE
DASAN TS)
_
Joint
Venture of
tam
ae
DASAN
i
4
Go
eC CARS
CONSULTANTS CO., LTD.,
NAME
PNNUCHEN | Kewip | power oY
DRAWING TITLE - TEN BAN VE
;
Ten | CHO/KengYeon | tEE.Yogdm | cHo,Mamchi | VAM CONG BRIDGE / CẦU VÀM CÓNG
{si@nature
KUNHWA ENGINEERING AND CONSULTING CO., LTD. -— CHữ
KÝ <#z>~-
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | DATE
PATE
02/2013
b) by
N.C.C4
02/2014
02/2013
-¬
GENERAL VIEW OF
ANCHOR
BO TRI CH
RI
PIER FOUNDATION
CHUNG
Mc
MONG TRU NEO
RON | nee | eee eon
|_°
_|022013| APPROAVAL
DETAILED DESIGN
THIET KE KY THUAT
DOAN AS
SE KHÓ
GIẦY:
SCALE /TỶ LỆ: A8 SHOWN
DRAWING No. BAN VE SO:
111020
PRECAST SKIRTING FOR ANCHOR PIER (1/2)
TAM CHE DUC SAN CHO TRU NEO (1/2)
SCALE 1:50
GENERAL VIEW (NONE SCALE)
5 1490
10
1990
1p
1990
1p
1980
b
41990
10
1990
10
#1980
10
1990
19
1990
19
1990
19
1900
17
1990
19
1990
1)
1990
1p
1990
19
1990
1490
$
TYPE2
LOẠI 2
`
1
1
KY
foot
,
NL
ne
ttt
SỊ
L/
“q5
ae
fet
1-1
TYPE
1 /LOẠI
300,
oe
Le
FT]
oe
LL
(Ty
EL
Là.
TA
tr
BU
L
rx
+
ix
tr
ch.
L_
|,200, | 50
45 142
Cả
LA
he
SECTION
200,
1 (30EA)
TYPE 2/ LOẠI 2 (4EA)
1990
s0
801-012-450
7
8
Bg
Seu
Bo
88
re
8
g
~T
2
g8
11@180 = 1650
125 | 45
48lq0g
â
|e
la
i
B@150= 1200
08
"
N
2
a
32
k4
?
MTF
8
*
N
8
ơ
|
8
2
57
8
ơ
AN
XI
ANE
8
8
CH TIT "A"
K
s
8
8
=
ee
s
002-D16 -
s
Đ S8
3
[
`
8
1990
1490
11@150 = 1650
PROJECT NAME - TEN2 DU AN‘
DELTA
am
P08a-D12-150
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
DỰ
ÁNAN
KẾTKET
NÓINO
KHU VỨC TRUNG
DONG BANG MEKONG - VIET NAM
TÂMA
125| 45
128 | 45
45
1400
_ P1019
== OL
P02-D16-180
|
8@150 = 1200
1001
45
sĩ.
Br St
\ 4
°
8
BI). |
m
8
P08a-D12-150
©—P02-D18-150
Já5 S
—tt
OWNER - CHU V BAUx TY
MINISTRY OF TRANSPORT
(M.0.T)
BO GIAO THONG VAN TAI
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
=~
_ TONG CONG TY BAU TU, PHAT TRIEN VA
QUAN LY DU AN HA TANG GIAO THONG CU'U LONG
5/ LOẠI 5 (4EA)
1740
|
4
11@150 = 1650
Bf =
&
[8
lä
|&
Š
3
3)
&
8
9
s
|
1 —
|
t
1
&S
:
LÍ
Tier
x
8
#5
CT
T1
8
=
3g
se
ee
ga
CCAIR
i
Ti
88 | 88
Se
aS | $e
5
dere
PP
(Bec case
2
8
=
se | 23
44
ae | @y
»
s
—
st
1980
200
2a
CT
Be
50 [109] 50
lễ
sỹ
88
sẻ
38
8
Mi
45
|125
=Št
Ss
1890
11@150 = 1650
1251.45
45 | 125
1740
11@150 = 1650
128 | 45
45
11@150 = 1650
i
i
8
ga 3
8
CONSULTANTS - TU’ VANẦ THIET KE
DASAN
|
|
||
99
|My
=
M4
A
rr
aa
~
8
88
_
es= | =Be
$8
F+4
e265)
32
aee| 66
đ
88
Be
ae
a:t6
3
[
=
#8SI
..
NI
VN
2
ẹ=&
3S
s
Din
8
8
23 |
al
#L
$5
tr
3
en
ĐSa
&
ta
8
Ssa
8
&BE
8
aẹ
2
8
ộ5
8
8|cd gs
_
1
8
5
aa
I)
- F
Bi
2
f
ve
S02-012-450
ol
VA
TT
5
*#, Hee
au2x
5&
aa
1
SCALE 1:25
>
MEKONG
3a
gia
S5
mg
S
ad
cry
DETAIL "A"
500
| Eaeosim.
TYPE
rT
s
8
Ni
G
=
8
38
Be
th
83)
se
a6
Co
88)
s
ae
CENTRAL
NY
$5
a
fe
nia
b3
oie]
s
1425
f
i
ew
45
8
3sa
oo
s
200
_
1
8. | 88
~
eo
a8
xr
Pe
_d
11@150 = 1650
LOẠI5
>
an
DETAIL "A"
Kế
és
96
50
7
Be
so
+
P
a $| 88
stB
a
š
25] 45 48 |128
TYPE 5
TYPE4
. LOI4
TYPE 4/ LOI 4 (4EA)
1990
Be
ae
ơ=
ee
J
| 88
CT
Tè
109)
MZ
88
se
aa
N
Re
~
11@150 = 1880
đ
S
8
88
Ly
45 (425
&
FT
H
0
x
s
M
302-012-460
=
| 88
TT TT
sỉ
8
5Ì sẻ
uN
cama
2
5
._—
#|
8
|| ee
3/ LOẠI 3 (4EA)
1980
140
‘
L1
TYPE
ss
ae
a8
as
or
-
i}
=
S$
1Ð,
Corl)
$01-012-450
4
8a
x
&
a
Ĩ
mm
1
TYHE 3
LOẠI 3
Uk
>5
2-2
ww
8
Ễ
N
Lj
8
a
3
|,
NL
|.200, | 50
10
|
i
22
#a
°
8
&"
2
s
1990
_——
TYPE4
LOẠI 4
oa
8
$5
©
l0
i
8
g
8
HS | 88
a2
1990
1480
2 | ae
4+)
10
—-
2c
8
sz mm
|
LOẠI 5
1990
4
TT
.
SECTION
TYPES
LOẠI2
10
#
TYPE 1
LOẠI †
r
50
TYPE 2
/
1740
|
P08a-D12-150~I
P08a-D12-150
=
|
Pract
| mm.
A
Joint Venture of DASAN CONSULTANTS CO., LTD., _ [stnature
CHỮ KỲ
KUNHWA ENGINEERING AND CONSULTING CO., LTD.
DATE
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | Seay
CHO, Kang Yeon
LEE, Yong Jin
by
2/2013
m
CHO, Nam Chut
N.c Ah,
;*+
qua
|
SESE)
mi P02-D16-180
P08a-D12-150
K
THƯCHIENB | KEMTRA
| cover
PREPARED
.MI
TL
P02.D16-150
8
SE
s8
DRAWING TITLE - TEN+ BAN VE=
VAM
CONG
BRIDGE
/ CAU
VAM
PRECAST SKIRTING FOR ANCHOR
P08b-D12-180~
CONG
PIER (1/2)
Ầ CHE DUC, SAN CHO TRU NEO (1/2)
TAM
SEES”
“|
0
;
rr Posb-016-499
:
P0§t-D12-180)
TT
NGÀY | peNGa, |
02/2013 |
APPROAVAL
P02-16-180
2
Se
88
DETAILED DESIGN
THIET KE KY THUAT
SIZE KHO GIAY :A3
SCALE /TY LE: AS SHOWN
DRAWING Na/ BAN VE SO:
414-060
PRECAST SOFFIT PANEL FOR ANCHOR PIER (1/3)
TAM DUC SAN TAI MAT DAY CHO TRỤ NEO (1/3)
SCALE 1:100
PLAN VIEW - MAT BANG
33200
100
3370
:
3
3740
40
:
TYPE 1
LOẠI 1
TYPE 2
LOẠI 2
10
3740
|
TYPE 2
LOẠI 2
10
3740
TYPE 2
LOẠI 2
.
|
DETAIL "A"
CHỊ TIẾT "A"
'
|
|
TYPE 3
LOAI3
TYPE 4
LOẠI 4
TYPE 4
LOẠI 4
TYPE 1
LOẠI 1
TYPE 2
LOẠI 2
TYPE 2
LOẠI 2
i
/
\
⁄
10
\
/
.
3740
4g
3740
ị
10
3370
TYPE 2
LOẠI 2
TYPE 2
LOẠI 2
TYPE 1
LOẠI 1
109
\
!
¬.
a
f
3740
TYPE 2
LOẠI 2
>N
\
XƯA
\
10
=
TYPE2
LOẠI 2x”,
i
:
al
3740
DETAIL "B" - CHÍ TIẾT "B"
ị
3
°
10
[| TYPE 4
` | LOẠI 4
TYPE 4
LOẠI 4
TYPE 4
LOẠI 4
TYPE 4
LOẠI 4
TYPE 4
LOẠI 4
TYPE 3
LOẠI 3
TYPE 2
LOẠI 2
TYPE 2
LOẠI 2
TYPE 2
LOẠI 2
TYPE 2
LOẠI 2
TYPE 2
LOẠI 2
TYPE 1
LOẠI †
t
23
|
i
ị
oh
|
ị
ịị
1à
„
Ì
'
:
TYPE
LOẠI 1
_400'
1
TYPE
2
TYPE
LOẠI 2
3370
400
it
3740
†
|
3g
:
I
§
%.
ị
sỉ
Sị
i
4
.
LOẠI 4
3370
:
ĩ
S——
|
|
TYPE
DETAIL "B" - CHI TIET "B"
3740
|
i
:
1
At
3
+
i
5
3
40
T222,
HA
|:
|
VỮA
:
vì
A
>
8 MORTAR
+
et
:
vờ "`
NY
SECTION M-M - MAT CAT M-M
SCALE 135
ị
"DRILLED PILES DIA1600_.
:
i
| TIET
,
Ị
||
Cc
h :
:
ị
DETAIL "A’ = CH
SCALE 1:50
:
i
i
i
=|
3
LOẠI 3
CỌC KHOAN NHỊI ĐÍ.1500
t
có
4
.
8
__MORTAR
VỮA
=
ie
10
|
a
MORTAR
TP...
1
vữa
=
NOTES - GHI CHÚ:
ee
i
~ALL CLEARANCE AMONG PANEL BASTARD POINTING AFTER CONGRETE WORK
- TẮT CÁ CÁC KHE HỞ GIỮA CÁC TẮM ĐƯỢC TRÉT VỮA TRƯỚC KHI ĐÔ BÊ TÔNG,
PROJECT NAME - TEN DỰ ÁN
CONNECTIVITY PROJECT (CMDGP). VIET NAM
DY AN KET NOI KHU VỰC TRUNG TAM
BONG BANG MEKONG - VIET NAM
OWNER - CHỦ ĐẦU TƯ
MINISTRY OF TRANSPORT (M.O.T)
BO GIAO THONG VAN TAI
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
TONG
CONG TY BAU TU, PHAT TRIEN VA
QUẦN LÝ DỰ ÁN HA TANG GIAO THONG CUU LONG
CONSULTANTS - TU VAN THIET KE
BASAN ti
PREPAREDSY | CHECKEDBY | APPROVED BY
Fe
EAN
Bec covena
Joint Venture of DASAN CONSULTANTS
CO., LTD.,
| KUNHWA ENGINEERING AND CONSULTING CO.,LTD.
a
and PYUNGHWA
ENGINEERING CONSULTANTS
LTD.
NAME | Guo, kang Yeon |
TN
| SIGNATURE
LS
Toate
NGAY
“oe
⁄
gang
LEE.Yongin | CHO,
sew
ñØ\⁄}
tang
N
Nam Chu
DRAWING TITLE - TEN BAN VE
retemcnt | VAM CONG
C.0 f,
—sa.
PRECAST
;
BRIDGE / CAU VAM CONG
SOFFIT PANEL FOR ANCHOR
PIER (1 3)
| TAMBUC SAN TAI MAT ĐÁY CHO TRỤ NEO (1/3)
TÊN | NGÀY | DENG
0
|022013|
DETAILED DESIGN
APPROAVAL | THIẾT KE KY THUA
SIZE/ KHO GIAY
: A3
SCALE /TY LE: AS SHOWN
DRAWING Nod > BAN VE S6: l
411-080
PRECAST SOFFIT PANEL FOR ANCHOR PIER (2/3)
TAM BUC SAN TAI MAT DAY CHO TRU NEO (2/3)
SCALE 1:50
TYPE 1 (4EA) - LOẠI 1 (4EA)
©:
sĩ
si
TYPE 3 (2EA) - LOAI 3 (2EA)
TYPE 2 (14EA) - LOI 2 (14EA)
=
=gt
i
zi
E
is
Lp
8
/
2
=
\
/
\
88s
;
=ss
|
sĐ
Fe
Td
8 4
Đ,@
`
T
s
as
REF
A
1\
:
82
#2
/
a:
aA
esse
to
x
3
Đ:
2
PB
55
o
Oo:
s8
ae
BS
Bo
\
/
BS
|i
7
i
T11-016-200
cK ch è
WoC
P12-020
ru
#đ
g8
aè
'
al
ứ
i6
Lễ
s8
=
St.
T12-016-200
tỏ
15 @ 200 = 3000
on
190:
A
=
:
LÍ
a
†
E
Ịuaa|TAĐIĐAU
“1901
`
112-016-200
¬
i
ị
al
¬
iw
LL
~ THOA
SF
P42-020
.
15 @ 200 = 3000
‘nga!
i
ị
H
j
-
T
i
i
—
1120
"4g
Qi
-
LIFTING HOOK
MĨC CẤU
P12-020
w
Hd
te
8
8
:
|
g
.
T24-016-200
41
8
I
nN
ot
t;
8
an:
sỡ
ủ
s
s
A
-;
a
l
.
{7
5
457
:
16-200
Ơ
ti
=F
,
ie:
i
):
|i
=
P1209
ơ
x
'S
|
721-016-200 -
g=
:
am
123-016-200 =
=
#8
4)
al
eI
e,_
2
ứ
ki |
8os
|
|
1? @ 200
= 3400
120,
0
+7
Sy Fe
1901;
18 @ 200 = 3000
2
¬
a
e
T22.016-200
T44D16200
—i
=
`
_i 90:
|
TL]
t
— T21-D16-200
”
i
i
¿
i
LIFTING HOOK
MĨC CẢU
P12-020
722-016-200
ị
120
'
|
Cl
Poe
=
17 @ 200 = 3400
a
8
714-016-200
iL
H,
190):
ry
= |
Kf
:
4
ọ;
T
j
i
ơ
I
1
H
8Đ
ee
;`
|
[
TRBOIB200
732-016-200
-
~
:
_
T3HI20 -
1904
P12020
18 @ 200 = 3000
1
éA_._
i
|j
|
ĂS)
`4
j8
:
s
hou
sl
TYPE 4 (7EA) - LOẠI 4 (7EA)
478
4a
19 @ 200 = 3800
I,
!
7 T44016-200
I
:|
i
4124
\40
T43-D16-200
:
emai
P12-020
475
:
i
ị
ee
8
Bộ
:
° i
g
52
`,
"|
=
:
:
OWNER - CHỦ ĐÀU TƯ
CENTRAL MEKONG DELTA
MINISTRY
OF THÔNG
TRANSPORT
2O GIÁO
VĂN ay(M.O.T )
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
CUU LONG CORPORATION FOR INVESTMENT, › DEVELOPMENT
DỰ ÁN KÉT NÓI KHU VỰC TRUNG TÂM
DONG BANG MEKONG - VIET NAM
t
CONSULTANTS - TU VAN THIET KE
DASAN
g:<
@
QUAN LY DỰ AN HA TANG GIAO THONG CU’'U LONG
and PYUNGHWA ENGINEERING CONSULTANTS LTD
TONG CONG TY DAU TU, PHAT TRIEN VA
s
ị
162
a
o
ie
j
(eo:
:
1
iS
cCH
PREPAREDBY | CHECKEDBY | APPROVED BY
Jointoint Venture
LTD
Venture œ of DASAN CONSULTANTS CO LTD,
KUNHWA ENGINEERING AND CONSULTING Co. LTD.
— St
Hà
=
:
si
H4 |
5
s
lị
_
:a
`,
Í
:
t
S
Tp
DRAWING TITLE - TEN BAN VE
NAME
3 CONG
Tên |+ CHO.KangYeon | LEE.Yonglmn, | cHo.Namc | VAM CONG BRIDGE / CAU VAM
"
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
ị
4
=
:
T
|Ị
Ị
3
t
:
2
|
|
Ị|
i
§
Le
|
a
ị
os
Ị
sl
.F<]ˆ
&a,
:
|
ig:
a
i
22
Ss
| +
TTY
7
i
LỰ
Py
I
si
|
+
PROJECT NAME - TÊN DỰ ÁN
“|
2
SIGNATURE
ATUF
ane
Lo“
ree
NGAY
Da
02/2013
"
N.C.Che
02/2013
PRECAST SOFFIT PANEL FOR ANCHOR PIER (2/3)
TAM BUC SAN TAI MAT BAY CHO TRU NEO (2/3)
MIAN | noay | viene | DETAILED DESIGN
0 | 02/2013 | APPROAVAL
THIẾT rene
KÉ KỸ THUẬT
:
SCALE
/T¥ LE: AS SHOWN
DRAWING No/ BAN VE SO:
111-081
B3 PYLON
THAP
GENERAL VIEW OF PYLON - BO TRI CHUNG TRU THAP (1/4)
SCALE 4:1000
OUT VIEW
FRONT VIEW
NHIN BÊN NGOÀI
MAT CHINH
SIDE VIEW
INNER VIEW
FRONT VIEW
MAT BEN
NHIN BEN TRONG
MAT CHINH
SIDE VIEW
MAT BEN
(2000,
42500
|
—
3
TT
200
Vay
:
EL.+138.471 (TANGENT POINT)
BE
i
tị
EHI-
o>
wi
vở
les
B20
BI S5
2 s
5
Ì
1
|
w
|\
|
8 = =8
Bia
tO|
fe
EL.
M
41.254
\_
1
\
Ị
4
JIPE— =_—LÌ\ -
"—...........`
ca+27. su
\
=
a
-
VV
stan
eS
B295
i
2
=
nh
HET
ee
ee
Ce
i
PRO.JECT NAME - TÊN DỰ ÁN
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
DỰ ÁN KÉT NÓI KHU VỰC TRUNG TÂM
ĐƠNG BẰNG MÊKƠNG - VIỆT NAM
lÌ
|
|
|
SLs
_ư_
5
|
CUU LONG coRrosarou FOR INVESTMENT, DEVELOPMENT
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
TONG CONG TY BAU TU, PHAT TRIEN VA
GIÁO THƠNG
CỬU
—.”
ã
| |
LONG
DASAN
7
PYUNGHWA
&8
i
28=)
t
Ị
4
32
|
TP
|
`
I1
| |
7
| |
"
=
ge
.
skunbwa?
ENGINEERING
b
\
\
L
\
6
Ê.
s
a
C
HOE% ® EEL.
-1.07.
DRILLED SHAFT ©2,500
H=113M, 32EA(PYLONT)
H=116M, 32EA(PYLON2)
NAME
;
TEN
CONSULTANTS
”
LTD.
—
NGÀY
\
1
AI
†
\
_
,
02/2013
nan
by
02/2013
N.€.
che
02/2013
A 3B
al =&
a8
oO
Ss.
—r
R2 Z
es
nan.
2 a
=
sj}
S
=
.
Zz
1
SỈ
3
2
EL +3601
........
I
RA
eG3
|
HH
tử
y
=
VIEW OF PYLON
TRI CHUNG
THAP
TRU
+
(1⁄4)
(1/4)
g
;
„ 13
Si
“S
B
a
ReyNo] DATE]
BO
sh
3225
4000
3215
SH
Oy
bas eerie
| |
|02/2013]
| |
|
DESCRIPTION
APPROAVAL |
:
3
8 8
5
EL.+7.35
eee
bas
0
PLAIN CONCRETE
BE TONG LIEN KHOI
TT
225
al,
=
et
brẢn
DRILLED SHAFT 02,500 II
=113M, 32EA(PYLONT)
H=116M, 32EA(PYLON2)
DRAWING TITLE - TEN BAN VE
GENERAL
er
š z
2
EL+725
—
1
|
——-—-See
EL+2.35
Pei
..
|EL.+20.354 8 š =
4000
7275
@- HH
^^...
als 9
BE TONG LIÊN KHOI
WT
Ủ
we
es
E
ey
=
BO
.
Ze
=|
/
:
LEE.Yongdin | CHO,NamChl | VAM CONG BRIDGE / CÀU VÀM CĨNG
Ø)
©8
~T†
=
53
eee
ee ef
PLAIN CONCRETE
\
12775
-
"THUCHEN | KiEMTRA | DUYẾP
.
=
Se
5
:
lÏ
CHO, Kang Yeon |
So
~
._IEL.+40.989
SSS
SSS
in
@|_
s
‘
E
>|
J5
ga
7
1
\
LiL
—
8
a
Đ
38
SF
s==
-IEL.†41.254RÐ
do
Heo 1% EL. 2.74
Hite (HOURLY:
{
VEL 209
s
ete
oF
s41 .789
FETT
ee a an
=A50.000
i
8
—>
SP
<4
⁄2
ễ
a
\
I
$
2.
TT
EL.+77.904
.
h
24|s00
oo
fooy
\t
8500)
Joint In of DASAN
ns
SIGNATURE
KUNHWA ENGINEERING AND CONSULTING CO.. LTD
CHU KY
and
â
2
0
E
5
Rea47.760
2slgco
s
\
=
i
iL...
I
aT
|
8
et
/
form
ot
-ẹ.
'
đ
8
1
o7hoo
ole
5 th
d
sg
BRS
CONSULTANTS - TU VAN THIET KE
BO GIAO THONG VAN TAI
LÝ DỰ ÁN HẠ TÀNG
+
Lá]
5 TT
I
L
1000
ANCHOR POINT/DIEM NEO
R=452.250
‡
|
¬
7A
`)
e
+
VI
Ị
4
ca
1400
62
ls
\
|
Ho
Offi,
2 z= z
|
š 3 =
OWNER - CH U T
QUN
â
~
`
i
đ|||
OO)!
=
'
DRILLED SHAFT 2,500 | |
H=113M, 32EA(PYLON1)
H=116M, 32EA(PYLON2)
MINISTRY OF TRANSPORT (M.O.T)
CENTRAL MEKONG DELTA
1|
ge
‡
'
ễ 3 fAoCd 322! gửp
ö |
375
wt
:
=
i 9
:
|
|
Ft
©
‡
t
\
0<
4000
ELA735
:
th
8Ì 88
|
-
ea3
z
DRILLED SHAFT ©2500
H=113M, 32EA(PYLON1)
H=116M, 32EA(PYLON2)
+
EL.+36.014
'
2
z
lễ Z2
†
{
Ị
| ị
‡
`
5
\
4000,
s
_”
\y
‘3
\
2.
H95%BL. nl-1.07
5 s
5
9
a
3
S—
s
Eig =
xe
Số
= a
@
Š
=
gaz
Biết
ET TT21.404
\
I
all
†
HÌ VÌ
wo
šẽ
B| S5
Bao
a
°
Q
| ie
EL.+128.404
°
_ N
`
G)
\
28
2
|
OE3
.
g
<
zZ =
Ha I% EL 274
H5% (HOURLY) EL. 209)
wo iui
—
CAINS
BS
450.009
ỗ 8
+
Z3
KR
ị `
5s
“-
=_
:
=
5
77 77
|, ,}
tooo _ i
ANCHOR POINTIT
ANCHOR
P
eg
EL.+138.471 (Tangent Point)
+
gy
=
`
2
7)
Ho
R=541789
\
6
+
thon
+
+
. RS
2
AiR
Đ
EL.+77.004
.
.
\
241500
IN
QI
|
I
Đ
rTù
3
S
i ob.
Ho eS
ai...
ste
;
i
oD
hơ
:
T
EL.+151.284
wo
+o
3
4i
S11<.
ne
4A7 750
|
h 2
oy
g#
EL.+121.404
\
25èa0g
| a
&
\
|
S 8
Z
Z2
1400
3—
1
|
+—
5
am
:
=462.259
\\
'
|
OFF
65 2
‡
\
12500
man
T—
es
ã=ẽ
EL.+125.404
!
|
see
¬
200
es
= _—
8
'
'
>
EL.+181.254
ïm
j
5000,
_14600)
EL+2.35°
8
Bt &
-laF
3
==gv
DETALep DESIGN
THIẾT KẾ
KỸ THUẬT
wae An
DRAWING No/ BAN VE SO:
112-001
GENERAL VIEW OF PYLON / BO TRI CHUNG TRU THAP (4/4)
SCALE 1:500
PLAN VIEW / MAT BANG
10900
26100
85000
11000
;
|
CROSS SECTION / MAT CAT NGANG 8-8
LONGITUDINAL/ PHUCNG DOC
>
4000_,
sị lễ.
¬—¬
5 3
c—¬
C3
° | 5000 |
| 5500
| 5000
-
|
w
000
27800
|
~~
gio
—
als
giai š| Š
c-
C3
2
5
,_4000
CJ
So
QO
Q
27500
19500
000
\1šä
.
tìwe
31.
B8
| 4960
Oo
6000
| s27s_|__
4500 |
7500
1
:
Rt-+>|——
[g8
| #
|
7500
|
|
ea7s_| T
7500
sp |— — ơ
L at
đ
J
7500
-t
.
g
=
3
+)
ogi JE
ag
|
27500
19800
4000_,
:
@đ
[Ă
i
TT
oy
i
| eee
1:
~
đ
@
đ
â
L_
36550
18009
|
7500
|
6475 | 8475
7500
| 7500
__4000
an
3
>
|
@
|
Le
|
â
CROSS SECTION / MAT CAT NGANG 9-9
LONGITUDINAL / PHUONG DOC
Sr
OTe
A
|8
đ
â
J
Leni
â
6475
GO
Q +>
[5
40900
đ
3
L8
\.
|
-
CF)
:
=
@
Ê
R
a
|
â
I@SS [| @
bt
s
`
â
DI
26100
|
T
TTT]
T
ain
T
cc
3AL
bsoo|
|t 5275 | 6000
7500
| 4500
7
a)
>
|
3@7500 = 22500
bsod
†
27500
SECTION / MAT CAT NGANG
LATERAL/ MAT BEN
>
SECTION 1-1 / MAT CAT 1-1
4500
2800
8
h
Qo
1000
|700
GZ
00x20
N
â
3
2
đ
alo
i
4100
4500
3100
8
a
ST
4500
og
8
~
SECTION 2-2/ MAT CAT 2-2
ato
e
4500
704
2
°
A
“
ato
T
1
2
,
2]
2
8]
&
Si
3
|
6800
3800
LLL
6
,1500
|
Qo
Q
a
8
ol
A
4139
4841
*
du
4103
4503
†
SECTION 7-7/ MAT CAT 7-7
2
alo
21500
BO GIAO THONG VAN TAI
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
TÔNG CÔNG TY ĐẦU TƯ, PHÁT TRIÊN VÀ
QUẦN LÝ DỰ ÁN HẠ TẦNG GIAO THÔNG CỪU LONG
+t
4200
SJ
2
a|
_—_—~
&
8800
3500 _, 1500
CSS
‘ames
,
Joint Venture of DASAN CONSULTANTS
Ea
CO., LTD.,
| UNHWA ENGINEERING AND CONSULTING CO., LTD,
TNHƯCHEN | CKIÊM AC | BUYỆP
L>
"lặn
| pate
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | PAZ
oon
HAL
tao
N
0.0. /
sang
| | 2
00
X5ad
ERAL
â
450x150
=
5
4600
5000
240
[Đ
Q
5]
32
8
=r
.
8100
6800
ato
DRAWING TITLE - TấN BẢN VẼ
GEN
ire}
—
- CONG |
NAME | clo, Kang Yeon | LEE,Yonguin | cHO,Nemcm | YAM CONG BRIDGE/CAU VAM
{SIGNATURE
7
70
200x200
150x150
_ 20
CONSULTANTS - TỰ VẤN THIẾT KÉ
3800
240
}
5
5
abt
2
q
ato
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
ato
1500,
S|
DASAN
a
“Sl
T
3
OWNER - CHỦ ĐẦU TƯ
3
at.
w
“sr
8100
8500
5000
[0Q
200x200
“=e
3
ato
SECTION 6-6/ MAT CAT 6-6
°
K
KK
704
(A
"or
=
3200
a
3
MINISTRY OF TRANSPORT (M.O.T)
ĐỒNG BẰNG MÊKÔNG
- VIỆT NAM
Qo
e
=
Ay
3
-al.
og
4600
fdQ_
| | _ mmøm -
&
⁄2 1
CENTRAL MEKONG DELTA
DỰ AN KET NOI KHU VỰC TRUNG TÂM
N
704
2
PROJECT NAME - TÊN DỰ ÁN
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
sf
sr
a
alo
4500
N
2
ì
200x200
3103
SECTION 5-5 / MAT CAT 5-5
200x200
VI
allo
4100
⁄Z
4803
f0Q
3
=
%
OWN
21500
450x150
aa
=
abo
Ny
°
K=
*
N
SECTION 4-4 / MAT CAT 4-4
4541
3129708
XE (
=r
⁄⁄
f
†0§_
200x200
N
;
=
SECTION 3-3' | MAT CAT 3-3"
5
s
NEN
atl
4500
1800,
Q
rod
(Z
wel
i,
4100
S
š
—Tr
ot
yoo__3100
200x200
⁄⁄
a
SECTION 3-3 / MAT CAT 3-3
VIEW
OF
PYLON
(4/4)
BĨ TRÍ CHUNG TRỤ : THÁP; (4/4)
RAN
NGÀY |: UẾN GAY
2 | 022073]
APPROAVAL
DETALED DESIGN
THIẾT KÉ KỸ THUẬT
SIZE KHO GIAY: AS
SCALE /TY LE: AS SHOWN
ORAWING
BẢN VỀYE SỐ:
WING No/112-004
Nod BON
SC:
PRECAST SKIRTING FOR PYLON (1/3)
TAM CHE BUC SAN CHO TRU THAP (1/3)
SCALE 1:280
PLAN VIEW - MAT BANG
29@10+30@1990=80000
_.
,
1
1890,
2
PRECAST SKIRTING PANELS
TAM CHE BE TONG BUC SAN
4
f
a xà
2>.
1840,
1990 _ 1849
D
4
28@110+3061990=59990
SECTION VIEW - MAT CAT
NONE SCALE
1900
4450
300,
3350
x
T
800
8800
PROJECT NAME - TEN DỰ ÁN
co
CENTRAL MEKONG DELTA
NNECTIVITY PROJECT (CMDCP) - VIET NAM
aay CN Na HÔNG c0
ĐÀM
CONSULTANTS - TU3 VAN THIET KE
OWNER - CHU BAU TƯ
MINISTRY OF
TRANSPORT (M.O.T)
BO GIAO THONG VAN TAI
GUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
0 TT He TỪ CÀ TỰ, PHÁT rRIến VÀ
QUÂN LÝ DỰ ÂN HẠ TẦNG GIAO THONG CU'U LONG
|
DASAN
3
ma
(Sec romans
#anuea
DASAN
"
Joint Venture of DASAN CONSULTANTS CO.,LTD.,
DRAWING TITLE - TEN BAN VE
PHƯCHEN | REM TRA’ | buYET.
“ee
CHO, Kang Yeon
|sicnature
⁄
KUNHWA ENGINEERING AND CONSULTING CO.,LTD, —C
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | may |
0220
LEE, Yong Jin
ớt.
02019
CHO, Nam Chui
N.C.Che
02/019
VAM
CONG
BRIDGE
/C. AU
`
VAM
CONG
PRECAST SKIRTING FOR PYLON (1/3)
TAM CHE DUC SAN CHO TRU THAP (1/3
REV No] DATE | CESCRIPTION
0
02/2013]
APPROAVAL
DETAILED DESIGN
THIET
KE
KY
THUẬT
SIZE! KHÔ GIẦY : A3
SCALE [TY LE: AS SHOWN
GRAWING Na/ BAN VE SỐ:
2.180
PRECAST SKIRTING FOR PYLON (2/3)
TAM CHE BUC SAN CHO TRỤ THP (2/3)
SCALE 1:50
|
ơ..
:
$01-012-450
te
t
Nể
=
Lt
J
.
=
ộ9
+
tO
8
7
â"
H
LH
M
hid
=
2.
Mi
3
oO
?
Th
eS
2
S
=
5
5đ
=s
|W
=|=
-
50
802012480
9`
|
100! 50
ar
Q
N
a
,
:
Nema
th
1h
8"+
TH:
vy
+
a
&
+
a
a
2
FT
s
Ba
c
s|
8
Sr
8
POSa-D12-160
P05a-D12-150
TT
=>
c P01-D16-150
x
*
s
8
bỏn
sr
+
â
đ
L P02.016-180
s|
j
8
GE-
sc
3
POSb-D12-4 501
[(r:-
45
| 45
[ P01-D16-150
na
Sa
post-012-150-1
1840
P02-D16-180
[128
9@150 = 1350
[125
45
1291.45
10@150 = 1500
125|
45
|
:
s
gs
1697
10@150 = 1500
|,
45
&
fT
‘e
45
125|
9
2Š
ad
E—
- 1890
11@150= 1650
a
58
8E—
°
8
ge
28
sẻ
8S
=
=
Ầ°
1990
|125
TAVN
t
a
RỂ
w
2
a!
KA
®ẽ
4a
8
~l
ca
i
8
5
ề
[T
ee
8
8
aS
ee
88
ee
&
f
aad
og
BE
8
58
58
3
sẽ
8`
do
8S
sẻ
a5
=
lại
SS
se
46
TT
2
4
RA
AH
cy
8Lg @
Al
a)
a
=u
:
8
NA
@
a
‘
8a
sẻ
49
3
i
ch
1
ø
=
48
16
⁄
⁄
Yi
=
50
ot
c
S|
/
8
oo
si
a
Bt - mscprztso -
8
S
[ P01-D16-150
"P0ọc-D12-150 7
L P02.016-180
Ss
3
g
/
Bi
rc 701-016-150
P05a-D12-150
[E
P05a-D12-180-è
ren
L p02.016-150
v^
Q
AN
2
=
ae
|
5
[
8
002-018 1
`
8
8
=
FT
8s
s
[
s
ee
==
8
EY
ơ1:^
2
BS
s
55
Sủ
8a
SCALE 1:25
500
@Đ
;
[T
8
"A"
DETAIL
&
25| 45
g
8
c8
3
aa
~
50 | 1001
5
10@150 = 1500
=
2
8g
22
aS
EN
§
bì
1125
g—
+
rT
CHI TIET "A"
| |
Ea
2
sỹ
ale
| |
8
8
bộ
88
sẻ
Sẽ
m—L“i
yy
2
+
ti
8—
~—
.-
902012480
cS
g
đ | DETAIL "A
45
129' 45
es
g
2
7
Bi
9@150 = 1350
ae
im
Sẽ
=
=
AY
al
58
sẻ
55
sa
sọ
Ltd
$
¬
=
‡
|
ct
|
88
8
3°
J
s
M4
c
2
2
a3
|
MH
8
=
3
H
8
=
iMG
2]
2
8 8
j
rh
8°
Š
58
ụ
s
38
9
28
zeae
45 |128
4
10@150 = 1500
5
25| 45
8
basa
L
2
HH
aaa
gear | |
rere
zeae | |
t
5o5a
aaaa
aa
8888
li
8888|
weed
8888
cụ
sa
|
se88L
aang
®=——
—-
>
|
i
$01-D12-450
t7
—-
>
a
iị
11@150 = 1650
Ì125
45
50
50 , 200.,
50
50. 200,,
1840
1697
1590
1990
L = 1.840M (4EA)
L = 1.697M (8EA)
L = 1.590M (4EA)
L = 1.990M (86EA)
SECTION 2-2
1-1
SECTION
8
N
8
—sr
1©.
L oo fb
200
PROJECT NAME - TÊN DỰ ÁN
CENTRAL MEKONG DELTA
CONNECTIVITY PROJECT (CMDCP) - VIET NAM
DỰ ÁN KET NOI KHU VỰC TRƯNG TÂM
ĐỒNG BẰNG MÊKÔNG - VIET NAM
5
OWNER - CHU BAU TU
MINISTRY OF TRANSPORT (M.O.T)
VAN TAI
BO GIAO THONG
FOR INVESTMENT, DEVELOPMENT
CUU LONG CORPORATION
AND PROJECT MANAGEMENT OF INFRASTRUCTURE
TONG CONG TY BAU TU, PHAT TRIEN VA
QUẦN LÝ DỰ ÁN HẠ TANG GIAO THONG CL/U LONG
CONSULTANTS - TU VAN THIET KE
DASAN 5
G6
đc
ieee
=
EtBioira
Joint Venture of DASAN CONSULTANTS CO.,LTD.,
| UNA ENGINEERING AND CONSULTING CO., LTD.
HƯU DEN |
KeMTRa | DUvET.
Row | neay | SENGÁC
DRAWING TITLE - TEN BAN VE
~
NAME | Ho, kang Yeon | LEE, Yong.in | cHO.Nanceul | VAM CONG BRIDGE / CÂU VÀM CÔNG | 0
|S'GNATURE
LTD, | PTE
C
and PYUNGHWA ENGINEERING CONSULTANTS LTD. | neày
⁄
02/2013
b) by
02/2013
N.C
—
rh
02/2014
PRECAST SKIRTING FOR PYLON
(2/3)
TÁM CHE ĐÚC SẴN CHO TRỤ y THÁP (2/3)
|922013|
ApEROAVAL
DETAILED DESIGN
THIET KE KY THUAT
SIZE/ KHO GIẦY : A3
SCALE /TY LE: AS SHOWN
DRAWING No/° BAN VE SO:
112-181
PRECAST SOFFIT PANEL FOR PYLON (1/5)
TÁM ĐÚC SẴN TẠI MẶT ĐÁY CHO TRỤ THÁP (1/8)
SCALE 1:250
100 Đ——_
:
|
et
S==—
:
ali
TYPE 1
-—
|
~
|
|
|
Ị
TYPE 3
LOAI 3
TYPE 4
LOẠI 4
TYPE 5
LOẠI 5
TYPE 4
LOẠI 4
TYPE 3
LOẠI 3
TYPE 3 | TYPE 2
LOẠI 3 | LOẠI 2
TYPE 6
TYPE 6
TYPE 6
TYPE 7
TYPE 8
TYPE 7
TYPE 6
TYPE 6
TYPE6 |
TYPE 1
LOẠI 6
LOẠI 1
TYPE6 |
LOẠI 8 |
TYPE 1
LOẠI 1
al
DETAIL"B' —|—,
At
“rẽ.
ýi
CHÍ TIẾT °B'
1
T
TYPE6
LOẠI 6
TYPE 6
LOẠI 6
TYPE 6
LOẠI 6
TYPE 7
LOẠI 7
TYPE 8
LOẠI 8
TYPE 7
LOẠI 7
TYPE 2
LOAI 2
TYPE 3
LOẠI 3
TYPE 3
LOẠI 3
TYPE 4
LOẠI 4
TYPES
LOẠI 5
TYPE 4
LOẠI 4
Qf
LOẠI 6
LOẠI 6
LOẠI 7
LOẠI 8
LOẠI 7
LOẠI 8
LOẠI 6
⁄
=
|
N
_ 100
8248
10
TYPE3
LOAI 3
:
TYPE 1
LOẠI 1
|
;
7490
j
T49) -
10
7490
40
T740
10
7990
48
T740
10
7490
TYPE2
LOAI 2
LOẠI 6
LOẠI 1
10
7490
19
7490
10
8245
PLAN VIEW - MẶT BẰNG
`
⁄
N
Se
PE6
LOẠI 6
TYPE 6
- LOẠI 6
TYPE 3
LOẠI 3
TYPE 3 | TYPE 2
LOẠI 3 | LOẠI 2
TYPE 1 -LOAI 1
F
ú|
:
al
óc
Tee
.
.
TYPE 5-LOAI5
Ị
/ |
s669,206
.
245
I
TYPE 7 - LOẠI 7
TYPE 6 - LOẠI 6
T740
|
-
'
7990
|
10
an... a
> MORTAR
2
Vira
arr erode
SECTION M-M - MAT CAT M-M
SCALE 1:5
.
| DRILLED PILES DIA.2500,
|
| COC KHOAN NHOIBK.2500
|
_
:
i
wat
-
pc
TYPE 8 - LOẠI 8
:
TIET
=
7492,929
ị
|
1
+—
7490
`
.
i
PRECAST SOFFIT PANEL - TAM BUC SAN TAI MAT DAY
222222
@
8240
s
a.
.
|
- CHI
SCALE 1:5
™,
:
4
_ 9240_......1.Ồ
{
"A"
à
|
|
!
DETAIL "B" - CHI TIẾT "B"
SCALE 1:50
|
uv
xx*
|
DETAIL
T10
ene age
4886.421
ˆ
,
7490
oF -
4479269
TYPE 4 - LOẠI 4
TYPE 3 - LOẠI 3
TYPE 2 - LOAI 2
fot
ị
TT
3
|_MORTAR
VỮA
=
‘0
LÍ
—
`
MORTAR
|
VỮA
—
:
NOTES - GHI CHÚ:
7
i
I
PROJECT NAME - TEN DY’ AN
CONNECTIVITY PROWECT. (CMDCE) - VIET NAM
TAM
KHU VỰC - TRỤNG
ÁN KẾTBANGNỘI MEKONG
DỰ BONG
VIỆT NAM
OWNER - CHỦ ĐẦU TƯ
MINISTRY OF TRANSPORT (M.O.7)
BO GIAO THONG VAN TA\
CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT
Be
amie
=
NAME | cu kang
.
”
lec rama
Joint Venture of DASAN CONSULTANTS CO., LTD., _ |Sienarure
INFRASTRUCTURE =— | ici waa ENGINEERING AND CONSULTING CO., » LTD. LTD. ———
-———
MANAGEMENT
AND PROJECT
TY ĐẦU TỪ, OFPHÁT TRIÊN VÀ
TÔNG CÔNG
QUAN LY DY AN HA TANG
GIAO THONG GLU LONG
and PYUNGHWA
- TẮT CẢ CÁC KHE HỞ GIỮA CÁC TÁM ĐƯỢC TRÉT VỮA TRƯỚC KHI ĐÔ BÊ TÔNG.
ENGINEERING
CONSULTANTS
DRAWING TITLE - TEN BAN VE
PREPAREDBY | CHECKEDBY | APPROVED BY
CONSULTANTS - TƯ VẤN THIẾT KÉ
ĐH
-ALL.CLEARANCE AMONG PANEL BASTARD POINTING AFTER CONCRETE WORK
1
i
LTD.
NGAY
—=
Yeon | LEE, YengJn | CHO,NamC
<-|
mn
—
DVL
Han
272013
snout | VAM CONG BRIDGE / CAU VAM CONG
_|N.c.Ches
:
02/2013
PRECAST SOFFIT
TAM
BUCveSAN
TẠI
PANEL FOR
PY!
PYLONTHÁP(tS)(1/5)
FOR TRỤ
T PANELDAY CHO
MAT
Roan | neay | oneal | DETAILED DESIGN
9
|g22013)
APPROAVAL |_ THIẾT KẾ KỸ THUẬT
SIZE! KHO GIAY : A3
SCALE (TY LE: AS SHOWN
DRAWING No./ BẢNANvềVỀ SÓ: 66.
412-160