FOR CONSTRUCTION
0
Rev
24/01/2019
Date
N.Q.HUY Y.H.KANG
Prepared
Checked
Y.H.KANG
Approved
FOR CONSTRUCTION
Details of Revision
Owner
Owner’s Engineer
Contractor
DOOSAN HEAVY INDUSTRIES VIETNAM
Sub-Supplier
Project
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 X 600 MW)
Title
INSPECTION AND TEST PLAN FOR EARTHING
AND LIGHTNING PROTECTION SYSTEM
Document No.
NS2-DH01-P0ZEN-140001
Rev. 0
Rev.
Page-No.
0
6 pages
CONTENTS
1. Inspection and Test Plans for earthing system
2. Inspection and Test Plans for lightning protection system
3. Inspection Report for earthing System
4. Inspection Report for lightning protection system
Detailed Legend
S:
Surveillance Point : A point where Contractor and others may carry out surveillance of
work in progress and documentation associated on an unscheduled basis, with no
notification required by any party and without amendment to the scheduled program
R : The documents are to be submitted to the appropriate inspectorate for review by Owner.
Note that work shall not proceed until Owner approval has been received.
W : A point beyond which work may proceed without formal documented approval by any of the
inspectorate. An Inspection Request to inform Owner is required; however work may
proceed should Owner fail to respond to the Inspection Request
H : A point beyond which work shall not proceed without formal approval by the appropriate
inspectorate.
Rev. 0
NS2PC
DVN
Nghi Son 2 BOT Thermal Power Plant
1. Inspection and Test Plans for earthing system
ID No.
NGHI SON 2 THERMAL POWER PLANT PROJECT
TITLE:
No.
NS2-DH01-P0ZEN-141001
Rev
0
Date
24-01-2019
INSPECTION AND TEST PLAN FOR EARTHING SYSTEM
Description of Inspection/ Test
Process
Applicable Code &
Standard Documentation
Reporting
format
1
Verify material type, size, quantity
and physical damage
Drawing/Method
Statement
NS2-DD09-P0ZEN140001
2
Earthing Installation
Drawing/Method
Statement
NS2-DD09-P0ZEN140001
Inspection & Test Activities
Sub
Contractor
Doosan
Owner/Owner
Engineer
H
W
R
2.1
Installation of the earthing rode (if
required)
Drawing/Method Statement
NS2-DD09-P0ZEN140001
H
2.2
Laying the earthing cable
Drawing/Method Statement
NS2-DD09-P0ZEN140001
H
W
W
Drawing/Method Statement
NS2-DD09-P0ZEN140001
H
W
S
Drawing/Method
Statement
NS2-DD09-P0ZEN140001
H
W
W
2.3
3
Bonding & connection
Earth Resistance Measurement
Abbreviation :
S: Surveillance
Rev. 0
R: Report Review
W: Witness Inspection
W
H: Hold Inspection
S
Remarks
NS2PC
DVN
Nghi Son 2 BOT Thermal Power Plant
2. Inspection and Test Plans for lightning protection system
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
TITLE:
No.
INSPECTION AND TEST PLAN FOR
Description of Inspection/ Test
Process
ID No.
NS2-DH01-P0ZEN-140001
Rev
0
Date
24-01-2019
LIGHTNING PROTECTION SYSTEM
Applicable Code &
Standard Documentation
Reporting
format
1
Verify material type, size, quantity
and physical damage
Drawing/Method
Statement
NS2-DD09-P0ZEN140001
2
Lightning
Drawing/Method
Statement
NS2-DD09-P0ZEN140001
Installation
Inspection & Test Activities
Sub
Contractor
Main
Contractor
Owner/Owner
Engineer
H
W
R
2.1
Installation of the air termination
conductor (if required)
Drawing/Method Statement
NS2-DD09-P0ZEN140001
H
W
S
2.2
Laying the lightning cable
Drawing/Method Statement
NS2-DD09-P0ZEN140001
H
W
W
2.3
Bonding & connection
Drawing/Method Statement
NS2-DD09-P0ZEN140001
H
W
S
Drawing/Method
Statement
NS2-DD09-P0ZEN140001
H
W
W
3
Earth Resistance Measurement
Abbreviation :
S: Surveillance
Rev. 0
R: Report Review
W: Witness Inspection
H: Hold Inspection
Remarks
NS2PC
DVN
Nghi Son 2 BOT Thermal Power Plant
3. Inspection Report for Earthing System
OWNER
IR No.
INSPECTION REPORT
FOR
EARTHING SYSTEM
CONTRACTOR
DATE
SUBCONTRACTOR
PAGE
Nghi Son 2 BOT Thermal Power Plant Project
PROJECT NAME
of
UNIT NO.
INFORMATION DATA
Const. PKG Name
Construction PKG No.
System/Component
Sys./Component ID
Drawing No./Rev. No.
KKS No.
Related ITP Title
Related ITP Para.
Verification & Approval
CHECK ITEM
No
Yes
1
The type/size of materials as per drawing
2
Verify that the earthing electrodes, support, test link boxes are installed as per drawing?
3
Is the location and elevation of earth cables installed as per drawing?
4
All cad weld/Joints/Connections are correctly performed as per drawing?
5
Excavation and backfilling comply to specification/drawing
6
Is the above-earthing such as earth risers, structure /equipment/test link/Instrument/etc installed properly
7
Measurement of touch voltage, step voltage (if required) , rounding earth resistance
(value to be less than 0.5 Ohm)
No
Remark
N/A
Comments:
No.
Maximum Earth Resistance
Test Instrument
Sub-Contractor
Measurement Value
Tested by
Calibration cert.
Calibration validity
No
Date
Contractor
Full Name
Signature
Date
Rev. 0
Result
Owner/Owner Engineer
NS2PC
DVN
Nghi Son 2 BOT Thermal Power Plant
4. Inspection Report for Lightning Protection System
INSPECTION REPORT
FOR
LIGHTNING SYSTEM
OWNER
CONTRACTOR
SUBCONTRACTOR
PROJECT NAME
IR No.
DATE
PAGE
Nghi Son 2 BOT Thermal Power Plant Project
of
UNIT NO.
INFORMATION DATA
Construction PKG No.
Const. PKG Name
System/Component
Sys./Component ID
Drawing No./Rev. No.
KKS No.
Related ITP Title
Related ITP Para.
INSPECTION DATE & RESULTS
Verification & Approval
CHECK ITEM
No
Yes
1
The type/size of materials as per drawing
2
Verify the location of the air terminal as per drawing
3
The location and elevation of lightning cables as per drawing
4
Is type of Joint and Joint work in accordance with drawing
5
The down-comers shall be implemented by two down-comers strongly interlinked with the main
earthing system
6
Earth test pit, Connection to earth riser, earth electrodes and related support is comply to the drawing
8
Measurement of touch voltage and step voltage(if required), rounding resistance
No
Remark
N/A
Comments:
No.
Maximum Earth Resistance
Test
Measurement Value
Calibration
Instrument
Date
Contractor
Full Name
Signature
Date
Rev. 0
Result
Calibration validity
cert. No
Sub-Contractor
Tested by
Owner/Owner Engineer
NS2PC
DVN
Nghi Son 2 BOT Thermal Power Plant
5. Inspection test report for touch voltage and step voltage
INSPECTION REPORT
FOR
TOUCH VOLTAGE AND STEP
VOLTAGE
OWNER
CONTRACTOR
IR No.
DATE
SUBCONTRACTOR
PAGE
Nghi Son 2 BOT Thermal Power Plant Project
PROJECT NAME
of
UNIT NO.
INFORMATION DATA
Construction PKG No.
Const. PKG Name
System/Component
Sys./Component ID
Drawing No./Rev. No.
Area
Related ITP Title
Related ITP Para.
Test instrument
1.
Touch Voltage Test
No.
2.
Calibration validity
Date
Calibration cert.No
R
I
E
Result
Criteria
1
748.7 V
2
748.7 V
3
748.7 V
Remark
Step Voltage Test
No.
R
I
E
Result
Criteria
1
2515.6 V
2
2515.6 V
3
2515.6 V
Sub-Contractor
Contractor
Full Name
Signature
Date
Rev. 0
Remark
Owner/Owner Engineer