General comments:
(1) Project specifications and code/
standard applied for earth works indicated
to be listed. Noted that code/standard for

APPROVED

underground works, filled & bedding

Approved

AP
AC

APPROVED WITH COMMENT

materials and so on.

Contractor to revise the correction and resubmit

(2) Over-excavation for rock or soil ground
to be more specific requirement and

NA

NOT APPROVED

For Approval

Revise the correction and resubmit before proceeding


RE

REVIEWED

acceptance.

Information acknowledged with no comment

(3) For deep hole, pit, foundation, please

RC

REVIEWED WITH COMMENT

consider the access to go up and down for

Information acknowledged with comments

safety issue.

Note: Approval or comment does not relieve the Contractor of
all obligations covered under contract

(4) Protection slope during construction to

Discipline: Civil and Structural
08 Jan 2020
Date:

be considered particularly in rain season.


A

19-Dec-2019

For Approval

JH Choi

KS Kim

ET Kim

REV

DATE

DESCRIPTION

Approved

Checked

Prepared

OWNER

VAN PHONG POWER COMPANY LIMITED
PROJECT


Van Phong 1 BOT Thermal Power Plant Project
Status
□Approved
□Approved with Comment
□Not Approved
□Reviewed

OWNER’S ENGINEER

Pöyry Switzerland Ltd.
EPC CONTRACTORS

IHI–TESSC–CTCI–DHI CONSORTIUM

PROJECT DOCUMENT No
VP1-0-L4-C-GEN-10008

REV
A

DOCUMENT TITLE

METHOD STATEMENT FOR EXCAVATION AND BACKFILLING WORKS
EPC

EPC DOCUMENT No.

REV

VP1-0-L4-C-GEN-10008


Doosan Heavy Industries and Construction

A


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

CONTENTS

1. PREFACE ................................................................................................................................. 2
2. MACHINERY & EQUIPMENT ............................................................................................ 2
3. RESPONSIBILITIES .............................................................................................................. 3
4. PROCEDURE AND SEQUENCE .......................................................................................... 3
5. QUALITY CONTROL ............................................................................................................ 9
6. ENVIRONMENT, HEALTH AND SAFETY (EHS) ............................................................ 9

1 of 14


- Definite what the 'General excavation and
backfilling' is
VAN PHONG 1 BOT THERMAL POWER PLANT - Applicable case of this MS. (For example:
PROJECT
onshore open excavation and max 3 meter
depth or ect.)
- Format in one font

1.0 PREFACE

The purpose of this Method Statement is to describe the methodology involved in general excavation and backfilling
works and to details out the steps to be taken in meeting the technical standards and EHS requirements


Plant Project:

VP1 BOT Thermal Power Plant



Company/Owner:

Van Phong Power company limited(VPCL)



Contractor:

DHI

2.0 MACHINERY & EQUIPMENT
No.

Description

1

Excavator

2


Loader

3

Dump Trucks

4

Roller or small vibrating roller

5

Water Tanker

6

Total Station

7

Automatic Level with Tripod and Staff Rod

8

Hand Tools

9

Barriers


10

Submersible Pumps

11

Generator

12

Rammer

3.0 RESPONSIBILITIES

Q’ty

Who is DMPP and what
attachment?

• It is overall responsibility of Project Manager to organize resources prior to perform construction activities as per
project specification in compliance with the quality, schedule & safety requirements.
• EHS Manager will ensure in coordination with Site Engineer that all measure/construction taken shall be
maintained till completion of job.
• It is the responsibility of Construction Manager/Site Engineer that construction activities are executed according
to the relevant project specification in compliance with the quality, schedule & safety requirements.
• DMPP will ensure that all works are performed safely according to the attachment.
• The relevant DMPP Supervisor will ensure that the work is carried out in accordance with this method statement
and project specification.
• The QC Inspector will ensure that the work is executed according to the requirements of quality dossier are

fulfilled
2 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

4.0 PROCEDURE AND SEQUENCE

Describe clearly basic requirement of site
clearance before each excavation,
backfilling

4.1. Site Clearance
• It has been done before the commencement of any excavation or placing of fill material.
4.2. Mobilization
• Prior to entering the working area, all equipment and machinery will be inspected by safety personnel. Safety
personnel shall be responsible for preparing and providing relevant documents.
• All machineries, equipment and material shall be entering using the designated entrance gate.
4.3 Equipment Setting-up
• All material, machineries and equipment shall be located at designated area.
• Setting-up of equipment will be done by Supervisor by adhering to all safety measurement and requirement
outline.
• Upon completion of set-up, joint inspection will be carried out to satisfy all parties and ensure all relevant
equipment/machineries shall be complied with safety rules and regulation.
4.4 Survey
• Prior to the work commencement, construction drawing will be reviewed to check of its latest issuance for
construction and all essential details are given. It will be checked that the intermediate dimension agreed with the
overall dimension.
• The setting-out will be made at the beginning stage of the work by referring to the construction drawing and all

reference points will be made necessary for the entire work. This will be acquired and develop method of
checking and cross-checking on all setting-out operations. When principal lines and levels haste be set-out, it
would be advised to be the relevant persons.
4.5 Layout and Marking
• Layout and marking will be marked using surveying equipment having a valid calibration certificate and will be
Excavation should be divided by depth so that in
each case, can design:
4.6 Excavation
1. Necessary space for manpower working or not
2. Kind of slope and slope protection or shoring
4.6.1 Excavation by Mechanical Means
system
3. Kindof
of existing
barricade,
distance
to edge line
• If required trial holes will be dug with hand tools to confirm the locations
services
before
4. Loading distance to edge line
carrying out excavation using the excavators to widths, lengths and5.
depths
in theequipment
Type as
of given
excavation
6. De-watering system
specification/drawings.
ect..


verified by QC.



For foundation excavation, leave the bottom layer of minimum 50mm undisturbed while mechanical
excavation and subsequently remove this layer manually when the blinding concrete is about to be placed.
This prevents softening or deterioration of the excavated surface. If hard strata appear then jack hammer and
breaker can be used.

4.6.3 Excavation Concrete foundations, Manholes and Miscellaneous Structures


Excavation for concrete foundation, concrete valve boxes, manholes and appurtenant structures shall include
the work of removing all earth, sand, gravel, quicksand, stone, loose rock, solid rock, clay, shale, cement,

3 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

hardpan, boulders and all other materials necessary to be moved in excavating the trench for the pipe and
other structures; maintaining the excavation by shoring, bracing and sheeting or well pointing to prevent the
sides of the trench from caving in whilst in progress and removing sheeting from the trench after pipe has
been laid.


Trench support system shall be suitable for the soil structure, depth of cut, water content of soil, weather
conditions, superimposed loads, vibration. The method shall be ensuring safety of workers on the trench.




Sloping sides of trench to the angle of repose at which the soil will remain safely at rest.



Shoring trench sides by placing sheeting, timber shores, trench jacks, bracing, piles, or other materials to
resist pressures surrounding the excavation.



Trenches shall be of the necessary width for proper laying of pipe. Care shall be taken not to over-excavate.
The bottom of the trenches shall be accurately graded to provide uniform bearing and support for each
section of the pipe along the entire length of the barrel of the pipe.



Grading of trenches shall be performed to avoid interference of water and sewer lines with other
underground utilities and structures.



Excavation for manholes, concrete foundations, and similar structures shall be sufficient to leave at least
400mm in the clear between the outer surfaces and the embankment or timber that may be used to hold and
protect the banks.



Excess materials shall be hauled away from the construction site or otherwise disposed of on designated

disposal area.


TYPICAL FOUNDATION

Rock excavation shall
be included in this
MS or separated submission of MS for
rock excavation.

- showing barricades
- drainage trench if any
EXCAVATION PLAN

DUMP TRUCK

EXCAVATOR

SECTION A-A

4 of 14


Excavation should be divided by depth so that in
each case, can design:
1. Necessary space for manpower working or not
VAN PHONG 1 BOT THERMAL POWER PLANT 2. Kind of slope and slope protection or shoring
PROJECT
system
3. Kind of barricade, distance to edge line

4. Loading distance to edge line
5. Type of excavation equipment
6. De-watering system
ect..

4.6.4 Excavation on Underground Service Pipeline


If required trial holes will be dug with hand tools to confirm the locations of existing services before
carrying out excavation using the excavators to widths, lengths and depths as given in the
specification/drawings.



Pipe trenches shall not be opened too far in advance of pipe laying.



Width of the trench shall be minimum of 1M (excavator bucket width) but in any case shall not be less than
the outer diameter of the pipe plus 300 mm on either side to allow proper compaction of the side fill
material.



Bottom of the trench shall be trimmed to form the pipe bed as per the pipe gradient. Where solid rock is
encountered at invert level, it shall be removed by breaking with jack hammer.
Please input slope
protection ratio & angle?

1:n


Pipe

300

- showing barricades
- drainage trench if any
Is there enough for
- if deep foundation,
people
walking & working
access path for inspector
space?
is required

300
Min. 1,000

4.6.5 Maintenance of Excavated Area


Continuously monitor the dimension/level of excavation to avoid over cutting. If any accidental over cutting
takes place, fill and compact with suitable material to the desired level.



Remove any undesirable material (vegetation, organic soils, etc.) encountered during the excavation. Take
necessary measures to keep the excavation free from water by dewatering wherever required.




Arrange shoring so that it does not interfere with the progress of work. As work proceeds, remove the
shoring carefully without causing any damage to the excavation.



What is meaning of properly slope,
please describe ratio & angle of slope

If any accidental slips or settlement occurs in the excavated area, properly filled by selected materials.

4.6.6 Cutting and Sloping the Sides of Excavation


Whenever there are chances of sliding, properly slope side of excavation. Trim the slopes by hand or be

It is a very common
mechanical means to uniform batters. Trim any rock or boulders appearing in the face of the slope and
description, do not know what
deep what slope, space for remove it altogether if it seems unstable.
working, drainage..



If any rock is removed, fill the resulting void with compacted material.



Any overhanging, loosed or unstable material shall be removed.




In cutting where the strata consist of earth overlaying rock which is required to be cut to a slope of 1:2, the
face of the rock shall be given its appropriate slope up to the junction of the rock and earth and the latter
shall be stripped to form a bench and sloped to the gradient as specified.
5 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT



In all cuttings, whether in earth or rock, undulations in the general plane of the slope will not be permitted.



The excavation shall be so arranged that the working areas are adequately drained throughout the period of
construction.

4.6.7 Removal of Rocks

Supplement compaction •
requirement on the
surface of excavation pit •

Should rock be met in the course of excavation, it shall be removed by approved means.
The written consent of the OWNER shall be obtained on occasion DHI wishes to use a method.
The OWNER shall be fully informed by DHI as to the steps and precautionary measures taken to safeguard
the surroundings. It shall be determined the danger zone likely to be created and ensure that no damage is

caused to persons or property on site.

4.7 Backfilling
4.7.1 Placing of Fill Material


Filling material shall
comply with Code/
Standard. Please make it
clear

Where the concrete protective coating is applicable the area shall be cleaned thoroughly and protective
coating shall be applied in accordance with the approved coating specification before backfilling work.



Approved suitable excavated material from the site can be used for backfilling/general filling. If the
excavated material is of a poor quality, obtain fill material from approved borrow pits or any other source



This is backfill work after completion
of permanence structure, 500mm
Filling area surface shall be kept free from water, such as materials and debris. layer thickness is not accepted



Fill materials shall be placed and spread in uniform horizontal layers across the full area of the foundation

able to provide material as per specifications.


without segregation.

The thickness of each layer after compaction shall not exceed 300 mm from third

layer, first and second layer shall not exceed 500mm.


Fill in areas not intended to receive concrete foundations shall be placed and spread in uniform layers not
exceeding 300 mm after compaction from third layer, first and second layer shall not exceed 500mm.



Filling operations shall be programmed so as to ensure that the specified compaction is attained throughout.



Fill materials shall be laid, spread and leveled using manpower and compacted by using roller compactor to
the required levels.



No person shall be permitted to position or operate machinery in a manner likely to endanger that person or
others in vicinity of the excavation area.



Filling?

Field density test (FDT) shall be carried out randomly on agreed area before proceed to the next excavation

site or layer.



Setting out the level again for rechecking the excavation level as stated in the drawings.



Each lift shall be evenly spread and moistened or dried by other means so that the required density will be
produced.



Rocks or stones larger than 100 mm, shall not be used for fill
Place compacted fill in successive horizontal layers of loose material not more than 300 mm
thicktowhen
compaction
by rollers
or vibrators,uniformly
and 150 mm
is
Backfilling adjacent
structures
shallisbemade
placed
and compacted
inwhen
such mechanical
manner astamping
to prevent

required
eccentric loading Field
upondensity
or adjacent
to the
structures.
Slopes
bounding
within areas
backfilled
test shall
be carried
out once
for each
layer ofor
compaction
areato
or be
once
for each shall
layer of 400 sq.m.

be stepped or serrated to prevent sliding of the fill.
4.8 Compaction and Leveling the Fill


During compaction, maintain the moisture content of fill material usually +/- percent of overall moisture

6 of 14



VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

content. If required, add clean water to the fill material in order to maintain the necessary moisture content.


Around new (or existing remaining) concrete foundations or other sub structures, do not compact by rolling
instead, use mechanical rammers or plate compactors to compact the space in vicinity of concrete structure.



After compaction, level the surface free from undulations using suitable equipment.



Mechanical compaction shall be accomplished by the use of foot rollers, pneumatic tire rollers, vibrating
rollers or other mechanical tampers of a size and type necessary to achieve the required degree of
compaction.



The type, size and efficiency of compaction equipment shall be subject to the OWNER approval and shall
be capable of achieving the specified degree of compaction. Minimum fill compaction will be as follows:



The mechanical rammers or plate compactors shall be used to compact the confined space in vicinity of
Not accepted


concrete structure instead of rollers.


After compaction, the surface shall be leveled using suitable equipment.



By using adequate capacity of vibrio-max roller about 6 to 8 passes are ensured to achieve minimum
required compaction on 300mm thick layer from third layer, first and second layer shall not exceed 500mm.

4.9 Dewatering


The DHI shall do all pumping, shall build all drains and do all the work necessary to keep the trench and
pipes free from water during the progress of the work.

7 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

What is meaning
of DP?



What is process of disposal?
Please describe detail how to control water
before discharge?


It shall be on proper steps to ensure that all water disposal is done in line with good engineering practices
and is compliance with national & local laws, rules and codes.



DP will take the proper steps to ensure that the backfilling works are kept free from water until completion
of works. This can be achieved by continually dewatering water from the area to the designated drainage
system.



Excavation and removal of the mud will be done by backhoe and dump trucked working simultaneously.

Please describe how far
• The submerged pumps will be arranged sufficiently so that the excavation and removal of the mud can be
barricade will be installed
from the edge of excavation preceded with no obstruction

4.10 Protection


Provide barricades or warning tape with post and restrict access as appropriate to prevent damage to work in
place.



DHI shall be responsible for protection of work in place against displacement, damage, or loss until
OWNER’s acceptance. Any work and subsequently damaged, lost or displaced shall be repaired and
replaced to the OWNER’s satisfaction.


4.11 Cleaning


Thoroughly clean, rake, wash, flush or sweep as required to clean adjacent improvements of materials
covered as part of this work to submitting for OWNER’s acceptance.



Contractor shall provide all labor, equipment, materials and other items as required to perform clean up as
required by the OWNER.



Finish grading of areas affected by this work shall be required as part of clean up.



The roadway including shoulders, slopes, ditches, and borrow pits shall be smoothly
trimmed,
and
shaped
- Code and
standard
should
be stated at
the beginning of the document.
- Frequency of testing should be stated in
structure
ITP

so maintained until accepted. Any surplus material not suitable for spreadingeach
along
the road
to (5000m3
widen theapplied for
site leveling only)
existing shoulder or raise the grade shall be disposed of as specified above. - State the requirement of field density of
both excavation and backfill

by machinery or other satisfactory methods to the lines, grades and cross-sections as established and shall be

4.12 Testing:


Tests for un-compacted materials shall be in accordance with ASTM/TCVN or equivalent method and tests
for compacted materials shall be in accordance with ASTM D/TCVN or equivalent method. Each test shall
be executed every 5,000 m3 according to the instruction of the OWNER.

4

QUALITY Control

Code and standard should be stated at
the beginning of the document.

4.6 The Site Inspection and Test Plan (ITP) for this work summarize various characteristics to be checked. The
concerned Site Engineer/Foreman will be responsible to ensure stage wise compliance for this operation and the
Site QA/QC Engineer/Inspector will carry-out quality control checks and report the inspection results.
4.7 Codes and Standards
All excavation and fill works shall be in accordance with the Contract Part III-2 Exhibit B1 Tech Spec Section 8.

ASTM D1557 and 4254 shall be applied as an applicable code for the density test.
Relevant TCVN codes shall be applied for material laboratory tests.
ASTM D1194 shall be applied for Plate Load Test.
ASTM D6938 shall be applied in case Nuclear Density Gauge is used for site density test.
AASHTO T27 Standard shall be applied for sieve analysis of material
8 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

5

ENVIRONMENT, HEALTH AND SAFETY (EHS)
6.1 Responsibilities


The Safety Manager is responsible for the overall safety of the construction site. His responsibilities include
site inductions ensuring work permits are valid, accident reports, number of man-hours worked and ensuring
all works are carried out in the safest possible manner consistent with good construction practices. In case of
imminent danger the site supervisor has to stop the work immediately. The Safety officer at site is equally
responsible from stopping the work in the above case.

6.2 Safety


Personal Protective Equipment (PPE) will be issued to all workers such as safety shoes, hard hat, working
gloves, safety goggles, reflective vest and safety harness for workers who will be assigned in elevated places
1.8m and above.




Wearing of the basic PPE will be enforced fully.



All new recruits will undergo proper orientation and safety induction before they could deploy at site for
work.



Place necessary warning signs as required.



Provide flickering lights and reflectors while working in the night time.



Where material must be stacked, make sure that they are staked on a firm and level base and in tidy manner.



No waste, debris, toxic chemical, oil grease and etc. from excavation and backfilling activities shall be
spilled or burned on/in the ground, or discharge into any watercourse. These wastes stored in drums/
containers and taken away and disposed of in the approved manner.



Ensure that proper access is provided before entering excavation area




Always obey speed limits and traffic signs for ingress and egress from the site.



Barricades/Signs will be provided sufficiently and maintained, as precautionary measures during the entire
stage of construction, to protect the work and safety of the workmen.



Prior to using any machines/equipment at site, ensure that they will be inspected and certified by qualified
person.



Operators and drivers are to be equipped with valid driver's/operator's license or permit from concerned
government agency.



Periodic Preventive Maintenance will be made on all equipment and machines.



Lifting equipment as well as its accessories such as sling wire, nylon sling, shackles, chain blocks crane
hook and latch will be inspected prior to using.




Any potentially dusty material being transported from work sites will be securely contained. Transporting
vehicles, etc., will be monitored to prevent overloading and over-filling.



Weight of dump truck containing the excavated material will not be exceeded the limited weight allowed by
the nation, local and traffic law.



Ensure all workers and equipment’s working overtime are properly accounted and obtained permit/ approval
from DHI EHS Manager prior to carry-on works.

9 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT



Periodic refresher trainings, tool box talk and audit shall be conducted.



Excavation and delivery of materials are prohibited during heavy rains.




All personnel should know the locations of fire extinguishers, communications, manual alarms.



All personnel should be aware of assembly points, escape routes, emergency contact numbers.

Please explain, the deep excavation can be
considered confined space entry or not?
What kind of PTW will be applied?

10 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

6.3 Job Safety Analysis
JOB SAFETY ANALYSIS
VP1 BOT Thermal Power Plant Project
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that
control, minimize or eliminating hazards.

List of All Job Steps

List of All Known Hazards

How to Eliminate Hazards

A. Survey Works


A.1 Instrument falling down and
hit a workmen

A.1 Area where the instrument is to be must be well
compacted

A.2 Instrument dropping
ground by accident

A.2 Focus and concentrate all the time during work
execution

B.Working
Operation During
Night Time

to

A.3 Stuck into the muddy area

A.3 Always beware and walk on designated access

A.4 Pegs splatters into the eyes

A.4 Always wear safety PPE

B.1 Working operation of the
equipment may cause injury to
personnel due to poor visibility of
the area


B.1a Must provide sufficient lightings on the entire
working area
B.1b All equipment must be fitted with appropriate
safety device and ensure all lights are operational
not obscured by dirt and mud
B.1c Supervisor and safety personnel shall always
be present for the necessary working.

B.1d All workers must be wearing visible PPE.
B.2 Generator (Diesel) equipment
oil leakage during operation

B.2a Daily check of the equipment prior to start of
work.
B.2b Regular check &monitoring of the equipment
prior to use
B.2c Provide sundry containment protection under
the equipment to prevent contamination of soil by
oil spillage

B.3 Oil/chemical storage

B.3 Diesel/chemical shall be scored in sundry
containment & MSDS
requirement shall be
communicated with all concerned
B.2b Regular check &monitoring of the equipment
prior to use
B.2c Provide sundry containment protection under

the equipment to prevent contamination of soil by
oil spillage

1. This is not in compliance with Doosan's HSE risk management procedure.
2. Please clarify the risk assessment as job safety analysis, when the both
documents shall be prepared.
3. Please do the intensive study on Doosan's procedure for proper document.
4. It seem that there is no review from Doosan's safety team on this document
11 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

JOB SAFETY ANALYSIS
VP1 BOT Thermal Power Plant Project
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that
control, minimize or eliminating hazards.

List of All Job Steps

List of All Known Hazards

How to Eliminate Hazards

Excavation
of
Soil, Rock and
Trenching


C.1 Slip and trip of workers.

C.1 Secure confirmation by EHS manager
regarding assigned engineers and workers

C.2Fall of workers and equipment

C.2 Excavation plan and excavation work
checklist must be available at the work site

C.3Cave-in of excavation walls

C.3a Assign licensed and experienced operator
C.3b Excavation site must be cordoned with
safety warning tapes and/or hard barricades
painted with red & white whichever is applicable
including provision of sufficient lightings and
blinker lights during nighttime.

C.3c Install adequate safety signs such as
excavation
in-progress,
keep-out
deep
excavation, etc.
C.3e Assign experienced and trained personnel
/workers

C.3f Provide spoil area away at least 2 meters
from the edge of the excavation to avoid cave-in

or collapse in case excavated materials will not
be hauled or disposed at once

C.3g Provide sufficient shoring system, sloping
of ground or other equivalent means such as
sheeting, cross bracings, trench shield or box and
jacks, benching, etc whichever is applicable
C.3h Prohibit movement of vehicles and
equipment near the edge of the excavation that
may result to side wall excavation cave in or
collapse due to severe ground movement

12 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

JOB SAFETY ANALYSIS
VP1 BOT Thermal Power Plant Project
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that
control, minimize or eliminating hazards.

List of All Job Steps

List of All Known Hazards

How to Eliminate Hazards

D.

Backfilling
Works

D.1 Slip and trip of workers

D1. Implement method statement / procedures on
safe backfilling works

D.2 Fall of workers and tools
/equipment

D.2a Strict supervision during backfilling works
D.2b Wearing of the required PPE
D.2c Assign licensed and experienced operator
D.2d Assign experienced and trained personnel
/workers

E. Trenches

E. Falling from height and cavein

E.1 Earth excavated to be stored 2 meters away
from excavation area
E.2 Vehicle to be kept in 2 meters from edge of
excavation
E.3 Experienced and trained workers
E.4 Essential PPE in use

F. Environmental
Conditions

During
Excavation
Works

F.
Extreme
environmental
condition
such
as
high
temperature & humidity and
strong wind

F.1 Implement safety procedures &guidelines on
heat stress

F.2 Inspect excavation and adjacent areas for
possible hazardous atmosphere and any other
condition that may present a hazard
F.3 Suspend / stop all operations during extreme
temperature & humidity and high wind

G. Dewatering

G.1 Pump equipment (Diesel
Engine) oil leakage during
operation

G.1a Daily check of the equipment prior to start of

work

G.1b Regular monitoring of the equipment sin order
to control and prevent oil leakage and other engine
trouble
G.1c Provide sundry containment protection under
the equipment to prevent contamination of soil by
oil spillage

13 of 14


VAN PHONG 1 BOT THERMAL POWER PLANT
PROJECT

JOB SAFETY ANALYSIS
VP1 BOT Thermal Power Plant Project
(Developing a habit of analyzing methods to identify hazards & unsafe practices than developing solutions that
control, minimize or eliminating hazards.

List of All Job
Steps

List of All Known Hazards
G.2 Electric shock due to without
ground external box on pump
station and circuit breakers

How to Eliminate Hazards
G.2a Provide adequate ground and circuit breakers


G.2b Designate electrician/operator for the pump
equipment
H. Disposal of
Excavated/Exces
s Materials

H. Collision between equipment

H.1 Prepare access for the equipment to be provided

I. Dust Control

I.Vehicle/equipment
transporting of excavated soil to
the disposal

I.1 Spraying of water on the road as required to
ensure no dust flying

14 of 14



×