Tải bản đầy đủ (.pdf) (384 trang)

Construction scheduling principles and practices

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (14.53 MB, 384 trang )


S E C O N D

E D I T I O N

CONSTRUCTION SCHEDULING
PRINCIPLES AND PRACTICES


This page intentionally left blank


S E C O N D

E D I T I O N

Construction Scheduling
Principles and Practices
Jay S. Newitt
Brigham Young University

Prentice Hall
Upper Saddle River, New Jersey 07458
Columbus, Ohio


Library of Congress Cataloging-in-Publication Data
Newitt, Jay S.
Construction scheduling: principles and practices/ Jay S. Newitt.—2nd ed.
p. cm.
Includes indexes.


ISBN-13: 978-0-13-513782-6 (alk. paper)
ISBN-10: 0-13-513782-9 (alk. paper)
1. Building industry—Management. 2. Building—Superintendence.
3. Production scheduling. I. Title.
TH438.4.N48 2009
690.068'5—dc22
2008024948
Vice President and Executive Publisher: Vernon R.
Anthony
Acquisitions Editor: Eric Krassow
Editorial Assistant: Sonya Kottcamp
Production Manager: Wanda Rockwell
Creative Director: Jayne Conte

Cover Designer: Karen Salzbach
Cover Image: Geoffry Wright
Director of Marketing: David Gesell
Marketing Manager: Derrill Trakalo
Marketing Coordinator: Alicia
Dysert

This book was set in Palatino by Integra Software Services Pvt. Ltd. It was printed and bound by Hamilton. The
cover was printed by Phoenix Color Corp.
Primavera Project Planner® and SureTrak® are registered trademarks of Primavera Systems, Inc.
P6™ is a trademark of Primavera Systems, Inc.
Microsoft Project® is a registered trademark of Microsoft Corporation in the United States and/or other
countries.
Copyright © 2009, 2005 by Pearson Education, Inc., Upper Saddle River, New Jersey 07458.
Pearson Prentice Hall. All rights reserved. Printed in the United States of America. This publication is
protected by Copyright and permission should be obtained from the publisher prior to any prohibited

reproduction, storage in a retrieval system, or transmission in any form or by any means, electronic,
mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to: Rights
and Permissions Department.
Pearson Prentice Hall™ is a trademark of Pearson Education, Inc.
Pearson® is a registered trademark of Pearson plc
Prentice Hall® is a registered trademark of Pearson Education, Inc.
Pearson Education Ltd., London
Pearson Education Singapore, Pte. Ltd.
Pearson Education Canada, Inc.
Pearson Education–Japan
Pearson Education Australia PTY, Limited

Pearson Education North Asia, Ltd., Hong Kong
Pearson Educación de Mexico, S.A. de C.V.
Pearson Education Malaysia, Pte. Ltd.
Pearson Education Upper Saddle River,
New Jersey

10 9 8 7 6 5 4 3 2 1
ISBN-13: 978-0-13-513782-6
ISBN-10:

0-13-513782-9


PREFACE
Anyone involved in the management of projects will find this text useful; however, it is
written specifically for managers in the construction industry and for students preparing
for management positions. Therefore, the examples are construction related. However,
this text would be extremely helpful to anyone in a project management position in

manufacturing, engineering, computer and software design, technology, military, or
business management.
This is a comprehensive textbook that can be the sole reference for learning the basics
of project management scheduling. This is due to the fact that it contains not only the
necessary information to learn scheduling and project management principles but also
information to help learn the project management software that has become the standard
in the industry: Microsoft Project, Primavera Project Planner (P3), SureTrak, and P6 Project

×