TITAN HUNG YEN PHASE 1 - YM1A
LEED CORE & SHELL

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

ARDOR GROUP (WWW.ARDORARCH.COM)
Vietnam Green Building Council Board Member
EDGE Green Design Certification Advisory Board
HCMC Green Architecture Club Vice President
© All Rights Reserved By Ardor Green @ 09/2023


Agenda / Nội dung Trình bày

LEED CORE & SHELL, DETAIL ASSESSMENT
1. LEED Schedule
Tiến Độ LEED
2. LEED Assessment For Titan Hung Yen - Phase 1
Đánh Giá LEED Cho Dự Án Titan Hung Yen - Phase 1

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023


LEED Certification Process / Quy trình LEED

Basic Design

Design
Development

Technical Specification &


Construction Drawings

Tendering

❖ Integrative process

❖ LEED Detail Assessment

❖ LEED Preliminary

❖ Detailed Building Energy Simulation

Guidance for

❖ Daylighting Simulation

Tender

Assessment
❖ LEED Registration

❖ Water Uses Assessment

❖ LEED

Construction Stage

❖ LEED Guidance for Sustainable

Construction

❖ LEED Testing & Commissioning
❖ LEED Final Submission

❖ LEED Design Submission

GBCI Registration Fee

GBCI Design Review Fee

LEED Design Review

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

GBCI Final Review Fee

LEED Final Review


Agenda / Nội dung Trình bày

LEED CORE & SHELL, PRELIMINARY ASSESSMENT
1. LEED Schedule
Tiến Độ LEED
2. LEED Assessment For Titan Hung Yen - Phase 1
Đánh Giá LEED Cho Dự Án Titan Hưng Yên - Phase 1

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023


9 LEED Categories / 9 Hạng mục LEED


Integrative Process / Quy trình tích hợp

Energy and Atmosphere / Năng lượng và Khí quyển

Promote reaching across disciplines to incorporate diverse team

Promote better building energy performance through innovative

members during the pre-design period.

strategies.

Khuyến khích tương tác giữa các bộ môn để có một nhóm dự án tích

Nâng cao hiệu quả năng lượng công trình cao hơn thông qua các

hợp và đa dạng trong giai đoạn tiền thiết kế.

chiến lược sáng tạo.

Materials and Resources / Vật liệu và Tài nguyên
Location and Transportation / Địa điểm và Vận chuyển
Projects within relatively dense areas, near diverse uses, with access to
a variety of transportation options.
Các dự án trong khu vực mật độ lớn, gần các tiện ích đa dạng, tiếp cận

Encourage using sustainable building materials and reducing waste.
Khuyến khích việc sử dụng các vật liệu công trình bền vững và giảm
rác thải.


Indoor Environmental Quality / Chất lượng Môi trường

đến các hệ thống giao thông công cộng.
Promote better indoor air quality and access to daylight and views.
Nâng cao chất lượng không khí trong nhà tốt hơn và cải thiện chiếu sáng

Sustainable Sites / Khu đất Bền vững

tự nhiên và tầm nhìn chất lượng

Encourage strategies that minimize the impact on ecosystems and

Innovation / Sáng tạo

water resources.

Khuyến khích các chiến lược giảm tác động lên hệ sinh thái và nguồn
nước.

Address sustainable building expertise as well as design measures not
covered in LEED.

Các biện pháp thiết kế bền vững chưa được đề cập trong LEED hoặc
các giải pháp vượt trội

Water Efficiency / Hiệu quả Nước

Regional Priority / Ưu tiên Địa phương


Promote smarter use of water, inside and out, to reduce potable water

Address regional environmental priorities for buildings in different

consumption.

geographic regions.

Đề cao sử dụng nguồn nước thông minh hơn, bên trong và bên ngoài,

Đề cập đến các ưu tiên địa phương cho các công trình tại các vùng địa

để giảm lượng nước thủy cục của khu vực

lý khác nhau.

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023


LEED Scorecard – Titan Hung Yen Phase 1
Y
1

?

4

2

14


2

LTc1 LEED for Neighborhood Development Location
LTc2 Sensitive Land Protection
1 LTc3 High Priority Site

20
20
2
3

7
Y
Y
3

6 LTc4 Surrounding Density and Diverse Uses

6

1

1 MRc2

6 LTc5 Access to Quality Transit

6

1


1 MRc3

1 LTc6 Bicycle Facilities
LTc7 Reduced Parking Footprint
LTc8 Green Vehicles

1
1
1

2

2 MRc4
MRc5

IPc1

2

1
1
6
Y
1
1

N

0


1

Location and Transportation

Sustainable Sites

5
SSp1
SSc1
1 SSc2
1 SSc3
3 SSc4
SSc5

1

Integrative Process

Construction Activity Pollution Prevention
Site Assessment
Site Development - Protect or Restore Habitat
Open Space
Rainwater Management
Heat Island Reduction

11
Required
1
2

1
3
2

1

SSc6 Light Pollution Reduction

1

1

SSc7 Tenant Design and Construction Guidelines

1

8
Y
Y
Y
1
6

0

1
13 0
Y
Y
Y

Y

3
WEp1
WEp2
WEp3
1 WEc1
WEc2
2 WEc3
WEc4
20

Water Efficiency
Outdoor Water Use Reduction
Indoor Water Use Reduction
Building-Level Water Metering
Outdoor Water Use Reduction
Indoor Water Use Reduction
Cooling Tower Water Use
Water Metering

Energy and Atmosphere

EAp1 Fundamental Commissioning and Verification
EAp2 Minimum Energy Performance
EAp3 Building-Level Energy Metering
EAp4 Fundamental Refrigerant Management
6 EAc1 Enhanced Commissioning
11
7 EAc2 Optimize Energy Performance

1
EAc3 Advanced Energy Metering
2 EAc4 Demand Response
3 EAc5 Renewable Energy Production
1
EAc6 Enhanced Refrigerant Management
ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023
2 EAc7 Green Power and Carbon Offsets

11
Required
Required
Required
2
6
2
1
33
Required
Required
Required
Required
6
18
1
2
3
1
2


0

Materials and Resources

7
MRp1
MRp2
3 MRc1

7
Y
Y
2
3
1
1

1

5

0

1

1
1
1
1


Indoor Environmental Quality

2
EQp1
EQp2
EQc1
EQc2
EQc3
EQc7
1 EQc8

4
1
1
1
1

0

55

3

Minimum Indoor Air Quality Performance
Environmental Tobacco Smoke Control
Enhanced Indoor Air Quality Strategies
Low-Emitting Materials
Construction Indoor Air Quality Management Plan
Daylight
Quality Views


Innovation

1
LTc7
MRc5
INc1
INc2
1 Credit
Credit

1

Storage and Collection of Recyclables
Construction and Demolition Waste Management Planning
Building Life-Cycle Impact Reduction
Building Product Disclosure and Optimization
Environmental Product Declarations
Building Product Disclosure and Optimization
Sourcing of Raw Materials
Building Product Disclosure and Optimization - Material Ingredients
Construction and Demolition Waste Management

Regional Priority
EAc2
SSc2
WEc2
WEc1

52


Optimize Energy Performance
Site Development - Protect or Restore Habitat
Indoor Water Use Reduction
Outdoor Water Use Reduction

TOTALS

58

2
2
2
2
10
Required
Required
2
3
1
3
1

6

Reduced Parking Footprint
Construction and Demolition Waste Management
Green Awareness
Daylight for Toilet
Innovation

LEED Accredited Professional

0

14
Required
Required
6

Possible Points:

1
1
1
1
1
1
4
1
1
1
1
110


LEED Prerequisite - YM1A / LEED Tiêu chí Bắt ḅc

SSp1

EAp3


EAp4

YP2C
Design Pending

WEp2

WEp1

MRp1

EAp1

EAp2 - EQp1

MRp2

YEN MY
No

Design Pending

No

PREREQUISITE

REQUIREMENTS / TASKS

Construction Activity Pollution Prevention


Sustainable construction methods

ARDOR's FEEDBACKS (27/09/2023)

X

X

SSp1

X

X

WEp1 Outdoor Water Use Reduction

Native/Adaptive Plants - Drip or Sprinkler Irrigation

Compliant (YM1A-MEP-MP-PL-205)

X

X

WEp2 Indoor Water Use Reduction

Water fixtures meet the requirements of flowrate

Compliant (YM1A Sanitary Catalogue)


X

X

WEp3 Building-Level Water Metering

Water meter for whole project water uses

Compliant (YM1A-MEP-MP-LSCH-101)

X

X

EAp1

Fundamental Commissioning and Verification

3rd-party Fundamental Commissioning

X

X

EAp2

Minimum Energy Performance

X


X

EAp3

Building-Level Energy Metering

Compliant
ASHRAE 90.1-2010, Mandatory Provision for Envelop, HVAC, Lighting, Plumbing,
ARCH:
etc.
01-YM1A-MA-List-V1.3(ARC)
MEP: 05-YM1A-MEP-TECHNICAL SHEET
Energy meter/monitor for whole building energy uses
Compliant (YM1A-MEP-MP-EE-101,102&103)

X

X

EAp4

Fundamental Refrigerant Management

No CFC-based refrigerant

X

X


MRp1 Storage and Collection of Recyclables

X

X

MRp2 Construction and Demolition Waste Management Planning Sustainable construction methods

X

X

EQp1

Minimum Indoor Air Quality Performance

ASHRAE 62.1 - 2010, Ventilation system
- Outdoor air intake monitoring
- CO2 monitoring

Compliant
(01. YM1A_MEP-ACMV-CAL-001-V1.0)
(YM1A-MEP-NX1,NX7,NX8-ACMV-101)

X

X

EQp2


Environmental Tobacco Smoke Control

Outdoor smoking area

Compliant (YM1A-ARC-UL-PL-01)

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

Collection areas for recyclable materials

Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET
Compliant (YM1A-ARC-UL-PL-01)

EQp2


LEED Integrative Process - YM1A / LEED Quy trình Tích hợp

1. IP - INTEGRATIVE PROCESS



To support high performance, cost effective project
outcomes through an early analysis of the
interrelationships among systems



Perform a preliminary simple box energy modeling

analysis (site consitions, building envelope, lighting
levels,…)



Perform a preliminary water budget analysis (indoor,

outdoor water demand, process water demand, supply
sources)


Document how the above analysis in the owner’s
project requirements and basic of design.

YP2C

1
1

0

YEN MY

0

1
1

0


0
IPc1

INTEGRATIVE PROCESS

REQUIREMENTS / TASKS

ARDOR's FEEDBACKS (27/09/2023)

Integrative Process

ARD to do the documents

Compliant

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023


LEED Location and Transportation - YM1A / LEED Địa điểm và Vận chuyển

2. LT - LOCATION AND TRANSPORTATION
LTc2: Project location in areas of no sensitive land - không phải đất nông nghiệp (2
points)
LTc3: Project location in high priority site (2 points): landmine removal report
+ Vùng kinh tế kém phát triển, tỷ lệ hộ nghèo cao: không đáp ứng yêu cầu, sẽ trình
nộp báo cáo rà phá bom mìn
LTc4: Additional public services (1 point): Not compliant, need to have 4 public
services
+ Mật độ xây dựng xung quanh thấp (<0.5): không đáp ứng yêu cầu, phải có 4 tiện ích


YP2C

6

2

YEN MY

12

2

2

14

2
2

2

4

LOCATION AND TRANSPORTATION

REQUIREMENTS / TASKS

ARDOR's FEEDBACKS (11/12/2023)

LTc1 LEED for Neighborhood Developm ent Location


Locate the project on LEED neighborhood area

Not compliant

PARTY

LTc2 Sensitive Land Protection

No sensitive land (farmland, floodplain, habitat, w etland)

Compliant

FPV

1

LTc3 High Priority Site

Locate the project on an infill location in a historic district

ARDOR w ill submit for GBCI construction review

FPV

4

6

LTc4 Surrounding Density and Diverse Uses


Site survey for surrounding density

Site Visit after construction finish

6

6

LTc5 Access to Quality Transit

Not compliant

1

1

LTc6 Bicycle Facilities

Within a 400-meter w alking distance of existing or planned bus
Bicycle spaces for 5% of project occupancy and 2.5% of peak
visitors
1 show er facility for the first 100 project occupants and additional
show er facility for every 150 occupants thereafter

1

2

1


1

LTc7 Reduced Parking Footprint

60% reduction of base ratio

1

1

LTc8 Green Vehicles

5% of total car parking spaces for electrical cars, 2% for chargers

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

ARD, FPV, Design
Consultant

FPV

Not compliant. No bicycle netw ork

4 car-parking spaces. Compliant
(YM1A-ARC-MP-01)
Compliant (YM1A-ARC-MP-01)

ARD
Design Consultant



LEED Location and Transportation - YM1A / LEED Địa điểm và Vận chuyển

2. LT - LOCATION AND TRANSPORTATION

Project location in areas of no sensitive land (2 points - no incremental cost)
Project location in high priority site (2 points - no incremental cost)
Additional public services (1 point)
LTc7: Reduced carparking (1 point)
4 chỗ đậu xe hơi: compliant
Car parking: 60% reduction from the
base ratios:
1.99 spaces/100sqmGFA - Institute of
Transportation Engineers’ Transportation
Planning Handbook, 3rd edition

Green vehicles
- Electrical parking: 5% of all car parking
spaces
- EV charger: 2% of all car parking spaces

LTc8: EV chargers for Electric cars (1 point)
1 chỗ cho xe điện và trụ sạc điện
YP2C

6

2


YEN MY

12

2

2

14

2
2

2

4

LOCATION AND TRANSPORTATION

REQUIREMENTS / TASKS

ARDOR's FEEDBACKS (11/12/2023)

LTc1 LEED for Neighborhood Developm ent Location

Locate the project on LEED neighborhood area

Not compliant

PARTY


LTc2 Sensitive Land Protection

No sensitive land (farmland, floodplain, habitat, w etland)

Compliant

FPV

1

LTc3 High Priority Site

Locate the project on an infill location in a historic district

ARDOR w ill submit for GBCI construction review

FPV

4

6

LTc4 Surrounding Density and Diverse Uses

Site survey for surrounding density

Site Visit after construction finish

6


6

LTc5 Access to Quality Transit

Not compliant

1

1

LTc6 Bicycle Facilities

Within a 400-meter w alking distance of existing or planned bus
Bicycle spaces for 5% of project occupancy and 2.5% of peak
visitors
1 show er facility for the first 100 project occupants and additional
show er facility for every 150 occupants thereafter

1

2

1

1

LTc7 Reduced Parking Footprint

60% reduction of base ratio


1

1

LTc8 Green Vehicles

5% of total car parking spaces for electrical cars, 2% for chargers

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

ARD, FPV, Design
Consultant

FPV

Not compliant. No bicycle netw ork

4 car-parking spaces. Compliant
(YM1A-ARC-MP-01)
Compliant (YM1A-ARC-MP-01)

ARD
Design Consultant


LEED Sustainable Sites - YM1A / LEED Khu đất Bền vững

3. SS - SUSTAINABLE SITES
SSc1: Site assessment - Environmental Impact Assessment is required (1

point)
Phê duyệt Đánh giá tác động Môi trường đã được cung cấp
Restore 15% of site area by native/adaptive plants (1 point)
Heat island reduction by Reflective material for Roof
and pavement (2 points)
External lighting fixtures meet the requirements of BUG rating (1 point)
Tenant Design and Construction Guideline published (1 point)

YP2C

6

0

YEN MY

5

1
1

6

0

SUSTAINABLE SITES

REQUIREMENTS / TASKS

SSc1


Site Assessment

To do the site asessment following to LEED forms

1

SSc2

Site Development - Protect or Restore Habitat

1

SSc3

Open Space

5

1
1

1

1

3

3


Restore 15% of site area by native/adaptive plants (Green Area) - 1 point
Restore 25% for 2 points
30% of site area is open spaces

SSc4

Rainwater Management

Rainwater tank or bioretention to capture total runoff volume of percentile
raDesign Consultantall event:
- 80th: 1 point;
- 85th: 2 points;
- 90th: 3 points.

ARDOR's FEEDBACKS (27/09/2023)
Compliant (YM1A-ARC-MP-01)

Compliant
ARCH: 01-YM1A-MA-List-V1.3(ARC)

2

2

SSc5

Heat Island Reduction

Reflective material for Roof (SRI > 82) and pavement (SRI > 33)
Light color concrete asphalt for internal roads.


1

1

SSc6

Light Pollution Reduction

External lighting fixtures meet the requirements of BUG rating

Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

1

1

SSc7

Tenant Design and Construction Guidelines

Publish for tenants an illustrated document, to educate tenants in
implementing sustainable design and construction features in their tenant
improvement buildouts.

Compliant

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023



LEED Sustainable Sites - YM1A / LEED Khu đất Bền vững

3. SS - SUSTAINABLE SITES
Site assessment - Environmental Impact Assessment is required (1 point)
SSc2: Restore 15% of site area by native/adaptive plants (1 point)
Mật độ cây xanh 21%
Heat island reduction by Reflective material for Roof
and pavement (2 points)
External lighting fixtures meet the requirements of BUG rating (1 point)
Tenant Design and Construction Guideline published (1 point)

YP2C

6

0

YEN MY

5

1
1

6

0

SUSTAINABLE SITES


REQUIREMENTS / TASKS

SSc1

Site Assessment

To do the site asessment following to LEED forms

1

SSc2

Site Development - Protect or Restore Habitat

1

SSc3

Open Space

5

1
1

1

1


3

3

Restore 15% of site area by native/adaptive plants (Green Area) - 1 point
Restore 25% for 2 points
30% of site area is open spaces

SSc4

Rainwater Management

Rainwater tank or bioretention to capture total runoff volume of percentile
raDesign Consultantall event:
- 80th: 1 point;
- 85th: 2 points;
- 90th: 3 points.

ARDOR's FEEDBACKS (27/09/2023)
Compliant (YM1A-ARC-MP-01)

Compliant
ARCH: 01-YM1A-MA-List-V1.3(ARC)

2

2

SSc5


Heat Island Reduction

Reflective material for Roof (SRI > 82) and pavement (SRI > 33)
Light color concrete asphalt for internal roads.

1

1

SSc6

Light Pollution Reduction

External lighting fixtures meet the requirements of BUG rating

Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

1

1

SSc7

Tenant Design and Construction Guidelines

Publish for tenants an illustrated document, to educate tenants in
implementing sustainable design and construction features in their tenant
improvement buildouts.


Compliant

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023


LEED Sustainable Sites - YM1A / LEED Khu đất Bền vững

3. SS - SUSTAINABLE SITES
Site assessment - Environmental Impact Assessment is required (1 point)
Restore 15% of site area by native/adaptive plants (1 point)
SSc5: Heat island reduction by Reflective material for Roof
and pavement (2 points)
Mái có hệ số SRI > 82 (Đông Á, Bluescope,…)
External lighting fixtures meet the requirements of BUG rating (1 point - no
incremental cost)

High reflective roof: SRI > 82

Tenant Design and Construction Guideline published (1 point)

YP2C

6

0

YEN MY

5


1
1

6

0

SUSTAINABLE SITES

REQUIREMENTS / TASKS

SSc1

Site Assessment

To do the site asessment following to LEED forms

1

SSc2

Site Development - Protect or Restore Habitat

1

SSc3

Open Space

5


1
1

1

1

3

3

Restore 15% of site area by native/adaptive plants (Green Area) - 1 point
Restore 25% for 2 points
30% of site area is open spaces

SSc4

Rainwater Management

Rainwater tank or bioretention to capture total runoff volume of percentile
raDesign Consultantall event:
- 80th: 1 point;
- 85th: 2 points;
- 90th: 3 points.

ARDOR's FEEDBACKS (27/09/2023)
Compliant (YM1A-ARC-MP-01)

Compliant

ARCH: 01-YM1A-MA-List-V1.3(ARC)

2

2

SSc5

Heat Island Reduction

Reflective material for Roof (SRI > 82) and pavement (SRI > 33)
Light color concrete asphalt for internal roads.

1

1

SSc6

Light Pollution Reduction

External lighting fixtures meet the requirements of BUG rating

Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

1

1


SSc7

Tenant Design and Construction Guidelines

Publish for tenants an illustrated document, to educate tenants in
implementing sustainable design and construction features in their tenant
improvement buildouts.

Compliant

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023


LEED Sustainable Sites - YM1A / LEED Khu đất Bền vững

3. SS - SUSTAINABLE SITES
Site assessment - Environmental Impact Assessment is required (1 point)
Restore 15% of site area by native/adaptive plants (1 point)
Heat island reduction by Reflective material for Roof
and pavement (2 points - no incremental cost)

SSc6: External lighting fixtures meet the requirements of BUG rating (1
point)
Spec đèn đường đáp ứng yêu cầu thang đo B (backlight), U (uplight)
và G (Glare)
SSc7: Tenant Design and Construction Guideline published (1 point)
Tài liệu hướng dẫn cho thuê có thể hiện các đặc điểm bền vững

YP2C


6

0

YEN MY

5

1
1

6

0

SUSTAINABLE SITES

REQUIREMENTS / TASKS

SSc1

Site Assessment

To do the site asessment following to LEED forms

1

SSc2

Site Development - Protect or Restore Habitat


1

SSc3

Open Space

5

1
1

1

1

3

3

Restore 15% of site area by native/adaptive plants (Green Area) - 1 point
Restore 25% for 2 points
30% of site area is open spaces

SSc4

Rainwater Management

Rainwater tank or bioretention to capture total runoff volume of percentile
raDesign Consultantall event:

- 80th: 1 point;
- 85th: 2 points;
- 90th: 3 points.

ARDOR's FEEDBACKS (27/09/2023)
Compliant (YM1A-ARC-MP-01)

Compliant
ARCH: 01-YM1A-MA-List-V1.3(ARC)

2

2

SSc5

Heat Island Reduction

Reflective material for Roof (SRI > 82) and pavement (SRI > 33)
Light color concrete asphalt for internal roads.

1

1

SSc6

Light Pollution Reduction

External lighting fixtures meet the requirements of BUG rating


Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

1

1

SSc7

Tenant Design and Construction Guidelines

Publish for tenants an illustrated document, to educate tenants in
implementing sustainable design and construction features in their tenant
improvement buildouts.

Compliant

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023


LEED Sustainable Sites - YM1A / LEED Khu đất Bền vững

3. SS - SUSTAINABLE SITES
Site assessment - Environmental Impact Assessment is required (1 point)
Restore 15% of site area by native/adaptive plants (1 point)
Heat island reduction by Reflective material for Roof
and pavement (2 points - no incremental cost)

SSc6: External lighting fixtures meet the requirements of BUG rating (1

point)
Spec đèn đường đáp ứng yêu cầu thang đo B (backlight), U (uplight)
và G (Glare)
SSc7: Tenant Design and Construction Guideline published (1 point)
Tài liệu hướng dẫn cho thuê có thể hiện các đặc điểm bền vững - Ap dụng
template của Frasers

YP2C

6

0

YEN MY

5

1
1

6

0

SUSTAINABLE SITES

REQUIREMENTS / TASKS

SSc1


Site Assessment

To do the site asessment following to LEED forms

1

SSc2

Site Development - Protect or Restore Habitat

1

SSc3

Open Space

5

1
1

1

1

3

3

Restore 15% of site area by native/adaptive plants (Green Area) - 1 point

Restore 25% for 2 points
30% of site area is open spaces

SSc4

Rainwater Management

Rainwater tank or bioretention to capture total runoff volume of percentile
raDesign Consultantall event:
- 80th: 1 point;
- 85th: 2 points;
- 90th: 3 points.

ARDOR's FEEDBACKS (27/09/2023)
Compliant (YM1A-ARC-MP-01)

Compliant
ARCH: 01-YM1A-MA-List-V1.3(ARC)

2

2

SSc5

Heat Island Reduction

Reflective material for Roof (SRI > 82) and pavement (SRI > 33)
Light color concrete asphalt for internal roads.


1

1

SSc6

Light Pollution Reduction

External lighting fixtures meet the requirements of BUG rating

Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

1

1

SSc7

Tenant Design and Construction Guidelines

Publish for tenants an illustrated document, to educate tenants in
implementing sustainable design and construction features in their tenant
improvement buildouts.

Compliant

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023



LEED Water Efficiency - YM1A / LEED Hiệu quả Nước

4. SS - WATER EFFICIENCY
WEc1: Outdoor water use
Native/Adaptive Plants - Drip / Sprinkler irrigation or Hand watering with flow
control (1 point)
Danh sách cây bản địa/thích nghi
Áp dụng hệ tưới drip hoặc sprinkler hoặc tưới tay có đầu hạn chế lưu lượng
Indoor water use
Low-flow toilets, urinal, faucet and showerheads (6 points)
Water meters for irrigation, indoor fixtures (1 point)

YP2C

8
1

0

YEN MY

3
1

6

8
1

3

1

6

2
1

0

2
1

WATER EFFICIENCY

REQUIREMENTS / TASKS

ARDOR's FEEDBACKS (27/09/2023)

WEc1 Outdoor Water Use Reduction

Native/Adaptive Plants - Drip or Sprinkler irrigation - Turfgrass < 40% (1
point)
Alternative sources (Rainwater, waste water…) tank for Irrigation (1 point)

Compliant (YM1A-MEP-MP-LSCH-101)

WEc2 Indoor Water Use Reduction

Water fixtures meet the requirements of flowrate (6 points);
Rainwater tank for Indoor flushing (1 Innovation point)


Compliant (YM1A Sanitary Catalogue)

WEc3 Cooling Tower Water Use
WEc4 Water Metering

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

Condensate water test for concentration level (1 point)
Chemical treatment for makeup water to increase the cooling tower cycles
(1 point)
Water meters for irrigation, indoor fixtures, cooling tower water, re-used
rainwater

Compliant (YM1A-MEP-MP-LSCH-101)


LEED Water Efficiency - YM1A / LEED Hiệu quả Nước

4. SS - WATER EFFICIENCY
Outdoor water use
Native/Adaptive Plants - Sprinkler irrigation (1 point - costing for sprinkler
system)
WEc2: Indoor water use
Low-flow toilets, urinal, faucet and showerheads (6 points)
Thiết bị vệ sinh đáp ứng yêu cầu về lưu lượng
WEc4: Water meters for irrigation, indoor fixtures (1 point)
Đồng hồ nước cho tưới tiêu và nước dùng cho TBVS

WEc4

YP2C

8
1

0

YEN MY

3
1

6

8
1

0

3
1

6

2
1

WEc2

2

1

WATER EFFICIENCY

REQUIREMENTS / TASKS

ARDOR's FEEDBACKS (27/09/2023)

WEc1 Outdoor Water Use Reduction

Native/Adaptive Plants - Drip or Sprinkler irrigation - Turfgrass < 40% (1
point)
Alternative sources (Rainwater, waste water…) tank for Irrigation (1 point)

Compliant (YM1A-MEP-MP-LSCH-101)

WEc2 Indoor Water Use Reduction

Water fixtures meet the requirements of flowrate (6 points);
Rainwater tank for Indoor flushing (1 Innovation point)

Compliant (YM1A Sanitary Catalogue)

WEc3 Cooling Tower Water Use
WEc4 Water Metering

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

Condensate water test for concentration level (1 point)
Chemical treatment for makeup water to increase the cooling tower cycles

(1 point)
Water meters for irrigation, indoor fixtures, cooling tower water, re-used
rainwater

Compliant (YM1A-MEP-MP-LSCH-101)


LEED Energy and Atmosphere - YM1A / LEED Năng lượng và Khí quyển

5. EA - ENERGY AND ATMOSPHERE
Building Energy Simulation - Meet the requirements of
ASHRAE90.1-2010, AppG for Building Envelop, HVAC,
Lighting, Powers, Process Load, etc
Targeting to achieve 21% energy saving (11 points):
- Laminated LowE glass (U-value 3.6 W/m2K; SHGC 0.4): kính lowE cho văn phòng
- Insulation for roof: Cách nhiệt cho mái
- Energy saving light bulbs (efficacy > 100 lm/W): Đèn tiết kiệm năng lượng
- Lighting control (timers / occupancy sensors): Điều khiển chiếu sáng
Mô phỏng năng lượng công trình đáp ứng yêu cầu tiết kiệm 21% năng lượng tiêu thụ

YP2C

13

0

YEN MY

20


13

0

6

11

0

7

1

11

0

20

ENERGY AND ATMOSPHERE
EAc1 Enhanced Com m issioning

3rd-party Enhanced Commissioning

7

EAc2 Optim ize Energy Perform ance

Meet the requirements of ASHRAE90.1-2010, AppG for Building

Envelop, HVAC, Lighting, Pow ers, Process Load, etc
Building Energy Simulation

1

EAc3 Advanced Energy Metering

2

2

EAc4 Dem and Response

3

3

EAc5 Renew able Energy Production

1

1
2

REQUIREMENTS / TASKS

6

2


+ Base building: Advanced metering for any individual energy end
uses: w ater supply pump, exterior lighting.
+ Tenant spaces: At least 1 meter per space
Participate in an existing demand response (DR) program
135 MWh/year - 840 sqm: 1 point
404 MWh/year - 2521 m2: 2 points + 1 point in EAc2
673 MWh/year - 4201 m2: 3 points + 2 points in EAc2

EAc6 Enhanced Refrigerant Managem ent

Select refrigerants that meet requirements of emission

EAc7 Green Pow er and Carbon Offsets

Engage in a contract for qualified resources of Carbon Offset
program

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

ARDOR's FEEDBACKS (11/12/2023)

PARTY
Design Consultant

21 % energy saving

Compliant (YM1A-MEP-MP-EE-101,102&103)
No need advanced meter for “solar-only”
streetlighting.


Design Consultant / ARD

Design Consultant

Design Consultant
Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

Design Consultant


LEED Energy and Atmosphere - YM1A / LEED Năng lượng và Khí quyển

5. EA - ENERGY AND ATMOSPHERE
EAc3: Advanced Energy Metering (1 point)
Metering for:
+ Lesser systems: External lighting and water supply pumps: Advanced
metering (1-hour recording and remotely access): 02 meters
+ Tenant factory/warehouse: 1 meter unit: EVN meters
Đồng hồ điện cho:
+ Hệ thống chủ đầu tư lắp đặt: chiếu sáng bên ngoài / bơm: Đồng hồ nâng
cao (lấy dữ liệu 1 giờ và truy cập dữ liệu từ xa)
+ Khu vực nhà kho/nhà xưởng cho khách thuê: 1 Đồng hồ EVN / unit

YP2C

13

0


0

Advanced Meter: Water pumps

YEN MY

20

13

0

6

11

Advanced Meter: External lighting
No need advanced meter for “solar-only”
streetlighting

7

1

11

0

20


ENERGY AND ATMOSPHERE
EAc1 Enhanced Com m issioning

3rd-party Enhanced Commissioning

7

EAc2 Optim ize Energy Perform ance

Meet the requirements of ASHRAE90.1-2010, AppG for Building
Envelop, HVAC, Lighting, Pow ers, Process Load, etc
Building Energy Simulation

1

EAc3 Advanced Energy Metering

2

2

EAc4 Dem and Response

3

3

EAc5 Renew able Energy Production

1


1
2

REQUIREMENTS / TASKS

6

2

+ Base building: Advanced metering for any individual energy end
uses: w ater supply pump, exterior lighting.
+ Tenant spaces: At least 1 meter per space
Participate in an existing demand response (DR) program
135 MWh/year - 840 sqm: 1 point
404 MWh/year - 2521 m2: 2 points + 1 point in EAc2
673 MWh/year - 4201 m2: 3 points + 2 points in EAc2

EAc6 Enhanced Refrigerant Managem ent

Select refrigerants that meet requirements of emission

EAc7 Green Pow er and Carbon Offsets

Engage in a contract for qualified resources of Carbon Offset
program

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

ARDOR's FEEDBACKS (11/12/2023)


PARTY
Design Consultant

21 % energy saving

Compliant (YM1A-MEP-MP-EE-101,102&103)
No need advanced meter for “solar-only”
streetlighting.

Design Consultant / ARD

Design Consultant

Design Consultant
Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

Design Consultant


LEED Energy and Atmosphere - YM1A / LEED Năng lượng và Khí quyển

5. EA - ENERGY AND ATMOSPHERE
EAc6: Enhanced Refrigerant Management (1 point)
Select refrigerants that meet requirements of emission
(R-410a or R-32 has been used)
Sử dụng môi chất lạnh R-410a hoặc R-32

YP2C


13

0

YEN MY

20

13

0

6

11

0

7

1

11

0

20

ENERGY AND ATMOSPHERE

EAc1 Enhanced Com m issioning

3rd-party Enhanced Commissioning

7

EAc2 Optim ize Energy Perform ance

Meet the requirements of ASHRAE90.1-2010, AppG for Building
Envelop, HVAC, Lighting, Pow ers, Process Load, etc
Building Energy Simulation

1

EAc3 Advanced Energy Metering

2

2

EAc4 Dem and Response

3

3

EAc5 Renew able Energy Production

1


1
2

REQUIREMENTS / TASKS

6

2

+ Base building: Advanced metering for any individual energy end
uses: w ater supply pump, exterior lighting.
+ Tenant spaces: At least 1 meter per space
Participate in an existing demand response (DR) program
135 MWh/year - 840 sqm: 1 point
404 MWh/year - 2521 m2: 2 points + 1 point in EAc2
673 MWh/year - 4201 m2: 3 points + 2 points in EAc2

EAc6 Enhanced Refrigerant Managem ent

Select refrigerants that meet requirements of emission

EAc7 Green Pow er and Carbon Offsets

Engage in a contract for qualified resources of Carbon Offset
program

ARDOR GREEN, LEED CORE & SHELL - TITAN HUNG YEN PHASE 1, 12/2023

ARDOR's FEEDBACKS (11/12/2023)


PARTY
Design Consultant

21 % energy saving

Compliant (YM1A-MEP-MP-EE-101,102&103)
No need advanced meter for “solar-only”
streetlighting.

Design Consultant / ARD

Design Consultant

Design Consultant
Compliant
MEP: 05-YM1A-MEP-TECHNICAL SHEET

Design Consultant