TOP-DOWN CONSTRUCTION METHOD
TOP-DOWN CONSTRUCTION METHOD
Use of diaphragm wall as the side support
Use of diaphragm wall as the side support
for the earth
for the earth
Construction progress upwards and
Construction progress upwards and
downwards at the same time
downwards at the same time
Savings in construction time
Savings in construction time
Schematics and pictures give ideas on
Schematics and pictures give ideas on
ongoing activities during construction
ongoing activities during construction
Diaphragm Wall Installation
Diaphragm Wall Installation
Conventional Open-cut
Conventional Open-cut
& Bottom-up
& Bottom-up
Construction Method
Construction Method
(For comparison with
(For comparison with
Top-Down Method)
Top-Down Method)
Conventional Open-cut & Bottom-up
Conventional Open-cut & Bottom-up
Construction Method (For
Construction Method (For
comparison with Top-Down Method)
comparison with Top-Down Method)
Top-Down
Top-Down
Construction
Construction
Method
Method
Top-Down Construction Method
Top-Down Construction Method
Main Advantage of Top-Down Construction
Main Advantage of Top-Down Construction
Details of Top-Down
Details of Top-Down
Construction Method
Construction Method
Excavation to Level -1
Excavation to Level -1
Excavate to Level -2
Excavate to Level -2
Compaction and leveling of
Compaction and leveling of
basement slab for reinforcement
basement slab for reinforcement
and concrete works
and concrete works
Circular ramp beam and wall
Circular ramp beam and wall
supported on bored column
supported on bored column
Excavation work of Level -3 in progress, use of clamp-shell for exc.
Excavation work of Level -3 in progress, use of clamp-shell for exc.
Excavation of Ramp Level -3 to - 4 in progress
Excavation of Ramp Level -3 to - 4 in progress
More excavation work in progress
More excavation work in progress
More excavation work of lower levels inprogress
More excavation work of lower levels inprogress
Above ground, structure works in progress
Above ground, structure works in progress
Typical basement reinforcement slab ready for concreting
Typical basement reinforcement slab ready for concreting
Concreting of
Concreting of
basement slab
basement slab
for top-down
for top-down
construction
construction
method
method
Top-down construction work in progress
Top-down construction work in progress
Complete construction of project
Complete construction of project
Another example of top-down construction
Another example of top-down construction
Another example of top-down construction
Another example of top-down construction
Conclusion
Conclusion
Need careful consideration for use in HCMC
Need careful consideration for use in HCMC
since method is new here
since method is new here
Ideal for 5 basements or more
Ideal for 5 basements or more
May need some soil improvement
May need some soil improvement
techniques and good dewatering system
techniques and good dewatering system
Equipment for these works may not be
Equipment for these works may not be
readily available in HCMC
readily available in HCMC
Handling of excavated soil material require
Handling of excavated soil material require
planning, keeping in mind marine clay at
planning, keeping in mind marine clay at
upper level and silty sand at lower level
upper level and silty sand at lower level