ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN BORED PILE STAGE - OPTION1
TO BEN LUC
TO LONG THANH
21@2m=42
19@2m=38
4%
7
7
4%
Ramp way
Barge 600Tons
Barge 600Tons
40
Jetty 2a
23.4
10.8
9.5
9.5
10.8
Crawler crane
50Tons
Drilling System
Barge 1000tons
35.4
m
R20 ons
T
0
0
.
5
Crawler crane
50Tons
9
wharf 2a
Super structure line
25.1
16
Jetty 1a
P42
26.1
P39
P43
17.7
14
Rebar work
Barge
P40
K
15.6
10
wharf 1
12
38
Material Barge
15.5
22.8
Ramp way
R2 0
5.0t m
ons
Material Barge
0L
+00
m26
K
P41
Rebar work
Barge
0L
+10
m26
12
00L
6+3
K m2
00L
6+4
K m2
Drilling System
Barge 1000tons
Bentonite System
Barge 600tons
Bentonite System
Barge 600tons
K m2
00R
6+1
31@2m=62
15@2m=30
CONSORTIUM OF
TITLE
NAME
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
00R
6+3
K m2
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
K m2
00R
6+4
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
PLAN OF WHARF AND JETTY BORED PILE STAGE-OPTION1
SCALE:
ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN SPSP CONSTRUCTION STAGE - OPTION 1
TO BEN LUC
TO LONG THANH
21@2m=42
19@2m=38
4%
7
7
4%
Ramp way
Barge 600Tons
Barge 600Tons
40
38
Material Barge
Jetty 2a
23.4
Super structure line
220KVA
14
K
10.8
9.5
wharf 2a
P42
0L
+10
m26
P43
17.7
R20m
s
19.5 Ton
P40
12
P41
00L
6+3
K m2
Crane 120T
00L
6+4
K m2
Barge 1000tons
Barge 600tons
Crane 80T
Barge 600tons
R
4.1 32
To m
ns
K
9
26.1
Jetty 1a
P39
Crawler crane
50Tons
25.1
35.4
0m s
R2 Ton
.5
19
16
m
R20 ons
T
0
0
.
5
220KVA
Crawler crane
50Tons
9.5
10.8
Barge 1000tons
0L
+00
m26
15.6
10
wharf 1
12
15.5
22.8
Ramp way
R2 0
5.0t m
ons
Material Barge
00R
6+1
31@2m=62
15@2m=30
TITLE
NAME
K m2
SIGNATURE
DATE
TITLE
PREPARED BY
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
00R
6+3
K m2
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
CONSORTIUM OF
m
R32 ns
o
4.1 T
K m2
NAME
NGUYEN SY BAO
SIGNATURE
DATE
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
00R
6+4
PLAN OF WHARF AND JETTY IN SPSP CONSTRUCTION STAGE
OPTION 1
SCALE:
ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE - OPTION 1
TO BEN LUC
TO LONG THANH
21@2m=42
19@2m=38
4%
7
7
4%
Ramp way
Barge 600Tons
Barge 600Tons
40
Material Barge
35.4
Material Barge
7.5
K
0L
+10
m26
25.1
P43
17.7
P40
P41
Jetty 2b
00L
6+3
K m2
6
crawler crane
80Tons
12
00L
6+4
K m2
Stationary pump
7.9
0L
+00
m26
6m
R2 ons
T
4
.
5
P42
8.5
K
14
wharf 2a
R20m
5.0tons
12
9
26.1
17.2
P39
Crawler crane
50Tons
Super structure line
10.2
16
Concrete truck
m
R20 ons
T
0
0
.
5
9.5
10.8
Stationary pump
15.6
9.5
10
23.4
10.8
22.8
wharf 1
Jetty 2a
Crawler crane
50Tons
Jetty 1a
15.5
38
Ramp way
14
8.7
Concrete truck
wharf 2b
6m
R2 ons
t
5.4
K m2
00R
6+1
31@2m=62
15@2m=30
CONSORTIUM OF
TITLE
NAME
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
00R
6+3
K m2
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
K m2
00R
6+4
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
STAGE - OPTION 1
SCALE:
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE AT PIER 40 - OPTION 1
Barge 600Tons
40
7
4%
Ramp way
22.8
Crawler crane
50Tons
Jetty 1a
wharf 1
10
35.4
Material Barge
9.5
10.8
Stationary pump
16
R20m
5.0tons
7.5
26.1
concrete supply pile
D=135mm, t=5mm
17.2
Super structure line
10.2
Concrete truck
6m
R2 ons
T
4
5.
K m2
P40
00L
6+ 1
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
STAGE AT PIER 40 - OPTION 1
SCALE:
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE AT PIER 41 - OPTION 1
7
4%
Material Barge
15.5
38
Jetty 2a
15.6
9.5
10.8
23.4
m
R20 ons
T
0
0
.
5
Crawler crane
50Tons
9
wharf 2a
25.1
Super structure line
P42
17.7
P41
12
Jetty 2b
00L
6+ 3
Stationary pump
7.9
K m2
concrete supply pile
D=135mm, t=5mm
8.5
6
crawler crane
80Tons
8.7
14
Concrete truck
wharf 2b
6m
R2 tons
5.4
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
STAGE AT PIER 41 - OPTION 1
SCALE:
CHECKING CONDITION CRAWLER CRANE 80 TONS IN CANTILEVER CONSTRUCTION AT PIER 40 - OPTION 1
Working Radius R=26m
Rate Load = 5.4 tons
om
Bo
gth
Len
m
5.5
=4
Max working Load
5 Tons
Traveller
8
38
+15.545
21400
57°
Crawler crane
80 Tons
Jetty
B=6.0m
Main beam: H 800x300 +2.20
Hmax = +1.68
Htb = +1.16
1785
Pier Column
Jetty
B=9.0m
+2.220
Hmin = -1.28
Hmax = +1.68
Htb = +1.16
Hmin = -1.28
1587
6060
2553
Existing bottom river
-4.590
-5.660
H 400x400
L=48m
-9.160
8000
4500
4500
1050
3000
3000
Note :
3000
All dimensions are in mm, levels are in m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
PREPARED BY
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
NAME
NGUYEN SY BAO
SIGNATURE
DATE
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
REV.
CHECKING CONDITION CRAWLER CRANE 80 TONS
IN CANTILEVER CONSTRUCTION AT PIER 40-OPTION 1
SCALE:
1 : 250
GENERAL VIEW CASTING CONCRETE PROCESS AT PIER 40 SIDE
Traveller
+15.545
21400
Concrete supply pile
D=135mm , t=5mm
H300x300
Jetty 1a
B=9.0m
Jetty 1b
B=1.5m
SPSPCofferdam system
D=0.7m, L=35m
6500
4500
4500
1000400
9090
+2.20
+2.20
Hmax = +1.68
Htb = +1.16
Htb = +1.16
H400x400x21x13
L=8m
C 220x80x12x8.7
L=16.5m
PIER 40
Hmin = -1.28
H800x300x26x14
L=10.4m
Hmin = -1.28
Existing bottom river
-4.59
-4.59
H 400x400
L=48m
7650
4500
4500
1400
3000
3000
3000
Note :
All dimensions are in mm, levels are in m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
PREPARED BY
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
NAME
NGUYEN SY BAO
SIGNATURE
DATE
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
REV.
GENERAL VIEW CASTING CONCRETE PROCESS
AT PIER 40 SIDE
SCALE:
CHECKING CONDITION CRAWLER CRANE 80 TONS IN CANTILEVER CONSTRUCTION AT PIER 41 - OPTION 1
Working radius = 26m
Rate Load = 5.4 tons
Bo
om
Le
ngt
h=
5m
45.
Max working Load
5 Tons
Traveller
388
+15.545
21400
57°
Crawler crane
80 Tons
250
Hmax = +1.68
2035
Hmin = -1.28
+2.20
4030
2035
Htb = +1.16
1950
+2.45
Htb = +1.16
1785
Pier Column
Hmin = -1.28
Sub-base t=20cm
PC Bar D32
Black sand
K95
-3.590
Existing bottom river
-5.660
7892
8500
-9.160
Steel sheet pile
Larsen IV, L=20m
Note :
All dimensions are in mm, levels are in m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
PREPARED BY
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
NAME
NGUYEN SY BAO
SIGNATURE
DATE
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
REV.
CHECKING CONDITION CRAWLER CRANE 80 TONS
IN CANTILEVER CONSTRUCTION AT PIER 41 - OPTION 1
SCALE:
1 : 250
GENERAL VIEW CASTING CONCRETE PROCESS AT PIER 41 SIDE
Traveller
+15.545
21400
Concrete supply pile
D=135mm , t=5mm
H300x300
Whaft 2b
Jetty 2b
SPSPCofferdam system
D=0.7m, L=35m
+2.20
Hmax = +1.68
Htb = +1.16
1700
Htb = +1.16
PIER 41
Hmin = -1.28
Hmin = -1.28
Sub-base t=20cm
PC Bar D32
Black sand
K95
Existing bottom river
-3.590
-5.660
7892
8500
Steel sheet pile
Larsen IV, L=20m
Note :
All dimensions are in mm, levels are in m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
PREPARED BY
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
NAME
NGUYEN SY BAO
SIGNATURE
DATE
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
REV.
GENERAL VIEW CASTING CONCRETE PROCESS
AT PIER 41 SIDE
SCALE:
RAMP WAY AT PIER 40 - OPTION 1
TO BEN LUC
20000
35000
5000
2920
9610
Barge 600 tons
B
A
Htb = +1.16
Hmax = +1.68
4%
Hmin = -1.28
1:2
Gabions
1mx1mx2m
B
A
Existing ground
Designing elevation
+2.00
Elevation of Existing ground +0.60
Distance
+2.00
+0.66
10.00
+2.00
+0.82
+1.60
+0.83
10.00
+1.20
+0.83
10.00
10.00
+0.80
+0.24
+0.40
-0.38
10.00
10.00
-1.84
-1.00
-2.00
-2.00
6.90
6.70
-3.00
-3.00
6.00
-4.00
-4.00
5.00
-5.00
-5.00
-6.00
-6.00
6.80
12.80
PLAN OF TEMPORARY SLOPE AT PIER 40
40000
Barge 600 tons
30000
00
200
10000
6300
12001200
3000
5000
00
R25
0
SECTION A - A
6 H200x200
1000
SECTION B - B
6 H200x200
7000
1500
1000
7000
1500
Gabion
1mx1mx2m
2000
2000
60cm Stone 4x6cm
Geotextile fabric
Black sand K95
Geotextile fabric
300
1
1
1
1
60cm Stone 4x6cm
Geotextile fabric
Black sand K95
Geotextile fabric
Gabion
1mx1mx2m
NOTES:
All dimensions are m, levels are m
Dimensions in typical section are mmm
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
RAMP WAY AT PIER 40
SCALE:
structures of temporary JETTY 1A - option 1
C
D32, L=10.5m
10000
Larsen IV, L=20m
5000
35400
5000
5000
5000
5000
Detail ''G''
4000
400
2000 1000
3000 250
5000
3000
9500
27@400=10800
A
250 3000
2[-200x75x5.2x9, L=10m
1000
1000 2000
A
2000
10000
2000
H350x350x12x19, L=12m
B
D32@3m, L=1.57m
, L=11.74m
2[-200x75x5.2x9
L=24.2m
2[-200x75x5.2x9
L=11.54m
5@1600=8000
Deck plate
3000x1000x200
H800x300x14x26
L=25.4m
[-200x75x5.2x9
L=24.6m
B
35@1000=35000
16000
Detail ''D''
200
C
a-a section
13000
35400
2000
Geotextile Fabric
5000
5000
5000
5000
5000
5000
4000
400
Black sand
K95
Hmax = +1.68
1420
2300
850
1
600
1:
500
+1.00
+2.20
200
+2.20
-0.30
-1.00
Detail ''B''
H400x400x13x21
L=9.5m
H800x300x14x26
L=25.4m
Detail ''E''
-1.630
Htb = +1.16
Hmin = -1.28
PC bar D32
2[-200x75x5.2x9, L=9.0m
-5.04
2[-200x75x5.2x9
L=11.54m
-13.50
L100x100x10,
L=3.8m
Crossbeam,
2[-300x90x9x13, L=9.5m
Existing ground
H350x350x12x19, L=12m
DETAIL ''A''
1000
Detail ''A''
Detail ''C''
Steel sheet pile, Larsen IV, L=20m
20cm Sub base
Steel plate
12000x1000x25
Steel pile, L=48m
H400x400
Concrete C20
t=350mm
50
Deck plate
3000x1000x20
-17.85
350 200
-47.22
[200x76
DETAIL ''B''
DETAIL ''C''
Geotextile fabric
150 400
Sub-base t=20cm
2 [200x76
200
200
2[-200x76x5.2x9
D32
20
500
PC bar D32
L=1.57m
NOTEs:
Plate 200x200
t=20mm
Geotextile fabric
Plate washer
165x165x20
Steel sheet pile,
Larsen IV
Larsen IV
CONSORTIUM OF
TITLE
NAME
H350x350x12x19
SIGNATURE
DATE
TITLE
PREPARED BY
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
- The material may be changed depend on actual condition.
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
- All the dimension are mm, levels are m.
NAME
NGUYEN SY BAO
SIGNATURE
DATE
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
REV.
STRUCTURE OF TEMPORARY JETTY 1A - OPTION 1
SCALE:
ATTACHMENT NO.3
TYPICAL SECTION of temporary JETTY 1A - OPTION 1
b-b section
C-C section
Deck plate
3000x1000x200 9500
3000
3000
250
Detail ''F''
+2.20
+2.20
Hmax = +1.68
3200
H800x300x14x26, L=23.2m
H400x400x13x21
L=9.5m
2700
3000
PC bar D32
-1.00
500
2000
[-300x90x9x13
L=2.9m
-1.23
250
20 400800 200
Htb = +1.16
1420
[-200x75x5.2x9
Sub-base t=200mm
10800
L100x100x10, L=3.8m
Hmin = -1.28
Black sand
K95
Crossbeam, L=9.4m
2[-300x90x9x13
Steel sheet pile, Larsen IV, L=20m
Steel pile, L=48m
H400x400
-17.85
-47.22
DETAIL ''F''
DETAIL ''E''
DETAIL ''D''
L50x50
[-300x90x9x13
Deck plate
3000x1000x20
L100x100x10@2m
2[-200x76x5.2x9
600
H800x300x14x26
H800
300
Steel pile
H400x400
[-200x76x5.2x9
1500
Bolt M22
Larsen IV
H800x300
D25 rebar
Deck plate
3000x1000x20
PC bar D32@2m
H400x400
900
DETAIL ''G''
Stiffener t=14mm
Sêng t¨ng cêng
[-300x90x9x13
[-200x76x5.2x9
300
Plate 500x500x20
400
Stiffener plate, t=20mm
350
H400x400x13x21
Plate 500x500x20
H400x400x13x21
H400x400x13x21
L100x100x10
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
L100x100x10
Bracing
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
TYPICAL SECTION OF TEMPORARY JETTY 1A - OPTION 1
SCALE:
structures of temporary JETTY 2A -OPTION 1
DETAIL ''A''
B
C
D32@3m, L=1.57m
D32, L=10.5m
2[-200x75x5.2x9
L=24.2m
15600
Larsen IV, L=20m
23400
5500
Detail ''G''
5500
5500
1000
Deck plate
3000x1000x20
2000
A
Concrete C20
t=350mm
10800
[200x76
Geotexti
150 400
2 [200x76
200
2000
2000
2000
9000
7@1200=8400
3000
27@400=10800
2[-200x75x5.2x9, L=9.0m
250 3000
9500
A
H400x400
L=9.5m
20cm Sub base
Steel plate
12000x1000x25
350 200
5500
3000 250
400
50
[-200x75x5.2x9
L=9.0m
D32, L=11.74m
PC bar D32
L=1.57m
20
[-200x75x5.2x9
L=23.2m
B
Deck plate
3000x1000x200
23400
H800x300x14x26
L=23.2m
2[-200x75x5.2x9
L=11.54m
Plate 200x200
t=20mm
9000
Geotextile fabric
H350x350x12x19, L=12m
Larsen IV
C
a-a section
15600
200 2000
H800x300x14x26
L=23.2m
L100x100x10, L=3.8m
-1.00
PC bar D32
Black sand
K95
Plate washer
165x165x20
Steel sheet pile,
Larsen IV
2[-200x75x5.2x9, L=9.0m
-13.50
Steel sheet pile,
Larsen IV, L=20m
Steel pile, L=48m
H400x400
D32
+0.86
H350x350x12x19
L=12m
2[-200x75x5.2x9
L=11.54m
-6.58
2[-200x76x5.2x9
+2.20
500
850
-0.30
-1.65
Crossbeam,
2[-300x90x9x13, L=9.5m
Detail ''C''
1
H400x400x13x21
L=9.5m
600
Detail ''E''
Geotextile Fabric
200
+2.20
1:
Detail ''A''
2300
Hmin = -1.28
23400
23@1000=23000
200
20 400 800 200
Htb = +1.16
1420
Hmax = +1.68
DETAIL ''B''
DETAIL ''C''
Sub-base t=20cm
200
-17.85
500
-47.22
H350x350x12x19
NOTEs:
- All the dimension are mm, levels are m.
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
PREPARED BY
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
NAME
NGUYEN SY BAO
SIGNATURE
DATE
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
REV.
STRUCTURE OF TEMPORARY JETTY 2A - OPTION 1
SCALE:
TYPICAL SECTION of temporary JETTY 2A - OPTION 1
b-b section
C-C section
Deck plate
3000x1000x200 9500
2000
3000
3000
250
Detail ''F''
+2.20
+2.20
H400x400x13x21
L=9.5m
L100x100x10, L=3.8m
2700
Hmax = +1.68
H800x300x14x26, L=23.2m
3200
[-300x90x9x13
L=2.9m
-1.23
3000
20 400800 200
1420
Htb = +1.16
250
Sub-base t=200mm
10800
PC bar D32
-1.00
500
[-200x75x5.2x9
Hmin = -1.28
Black sand
K95
Crossbeam, L=9.4m
2[-300x90x9x13
Steel sheet pile, Larsen IV, L=20m
Steel pile, L=48m
H400x400
-17.85
-47.22
DETAIL ''G''
DETAIL ''F''
DETAIL ''E''
DETAIL ''D''
[-300x90x9x13
Deck plate
3000x1000x20
L50x50
L100x100x10@2m
PC bar D32@2m
900
H800x300x14x26
300
Steel pile
H400x400
[-200x76x5.2x9
1500
2[-200x76x5.2x9
D25 rebar
Deck plate
3000x1000x20
Bolt M22
Larsen IV
H800x300
Stiffener t=14mm
Sêng t¨ng cêng
600
H400x400
H800
[-300x90x9x13
Plate 500x500x20
400
[-200x76x5.2x9
300
Stiffener plate, t=20mm
H400x400x13x21
350
H400x400x13x21
L100x100x10
Plate 500x500x20
H400x400x13x21
L100x100x10
Bracing
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
TYPICAL SECTION OF TEMPORARY JETTY 2A - OPTION 1
SCALE:
structures of temporary JETTY 1b - option 1
c
B
H800x300x26x14
L=10.4m
200
10@1000=10000
DETAIL ''A''
( 1: 50)
200
Steel plate 6000x1500x20
1000
4500
4500
400
C 220x80x12x8.7
L=16.5m
Jetty 1A
Deck Plate
3000x1000x200
626
1500
324
550
+2.20
C 300x100x15x10
L=1.8m
C 220x80x12x8.7
L=16.5m
H 800x300
L= 10.4m
1400
B
Jetty 1A
c
10400
9500
150
16500
Detail "A"
9500
Jetty 1A
Hmax = +1.68
Htb = +1.16
DETAIL ''B''
(1:50)
A - A SECTION
( 1:150 )
150
16900
1000
+2.20
4500
4500
+2.20
6500
210
H400x400x21x13
L=8m
H800x300x26x14
L=10.4m
L100x100x10
L=3.8m
Hmin = -1.28
C 220x80x12x8.7
L=16.5m
C 220x80x12x8.7
L=16.5m
Cross beam
2C 300x90x13x9 , L=6.4m
46
SPSP
Detail "B"
C 300x90x13x9
L=1.8m
14
A
6100
Stiffener plate
t=14mm
H 300x300
-4.59
Steel pile
H400x400 , L=48m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
PREPARED BY
NAME
NGUYEN SY BAO
SIGNATURE
DATE
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
Designed date
STRUCTURE OF TEMPORARY JETTY 1B - OPTION1
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
SCALE:
TYPICAL SECTION OF JETTY 1B - OPTION 1
B - B SECTION
(1:75)
150
1500
150
3000
3000
250
+2.20
400 474 300225
+2.20
C - C SECTION
(1:20)
V 100x100x10
L=1.3m
1420
Hmax = +1.68
H 800x300x26x14
L=10.4m
Htb = +1.16
Grille XG21 t=5mm
H 400x400
L=8.0m
C 300x100x15x10
1500
L 100x100x10
L=3.8m
650
650
100 50
2000
50 100
Detail "C"
Hmin = -1.28
C 160x65x10x7.2
L=0.28m
Cross beam
2C 300x90x13x9 , L=6.4m
C 220x80x12x8.7
DETAIL C
(1:30)
-4.59
1750
3000
3000
Grille XG21
t=5mm
L 100x100x10
L=1.3m
1500
100
C 160x65
L=0.28m
650
100
C 220x80x12x8.7
L=16.5m
300
Steel pile
H400x400 , L=48m
650
+2.20
400
474
C 300x100x15x10
100
300
1150
H 400x400 , L=8m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
TYPICAL SECTION OF JETTY 1B - SECTION 1
SCALE:
structures of temporary wharf 2b - option 1
B - B SECTION
(1:100)
Subbase , t=200mm
C
2C 200x76x5.2x9
L=22.5m
A
8500
22700
+2.20
A
Hmax = +1.68
1550
2C 200x76x5.2x9
L=9.240m
Htb = +1.16
1500
14000
-0.70
D32 , l=10m
2720
1800
PC bar D32
L=10m
1800
8500
H 350x350x12x19
L=12m
8500
4220
B
Hmin = -1.28
-2.02
1800
2C 200x76x5.2x9
L=7.85m
1550
Black sand
K95
1370
2000
2000
2000
14000
2000
2000
2000
630
Steel sheet pile
Larsen IV , L=20m
2C 200x76x5.2x9
L=13.8m
D32 , l=15m
B
A - A SECTION
(1:150)
200
Detail "A"
22500
+2.20
Hmax = +1.68
+2.20
1330
Htb = +1.16
C
C - C SECTION
(1:100)
+1.44
Subbase , t=200mm
8500
Hmin = -1.28
1602
1500
2C 200x76x5.2x9
L=7.85m
PC Bar D32
L=11.2m
2C 200x76x5.2x9
L=9.240m
+1.14
H 350x350x12x19
L=12m
13500
102
-2.02
+2.20
DETAIL "A"
(1:50)
Steel sheet pile
larsen IV , L=20m
Black sand
K95
Sub base
t=200mm
500
200
+2.20
630
PC Bar D32
L=11.2m
Steel sheet pile
Larsen IV , L=20m
Plate 165x165x20
H 350x350x19x12
L=12m
NOTE :
2C 200x76x5.2x9
L=7.85m
All dimensions are mm , levels are m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
STRUCTURE OF TEMPORARY WHARF 2B - OPTION1
SCALE:
structures of temporary JETTY 2b - option 1
B - B SECTION
(1:25)
V 100x100x10
L=1.3m
Pier 41
A
Grille XG21 t=5mm
100
8100
7900
1500
B
650
650
100
B
Jetty 2b
8700
370
14000
C 160x65x10x7.2
L=0.28m
C 220x80x12x8.7
150 1500 150
8500
DETAIL "A"
(1:50)
Wharf 2b
370
20
50
50
40
C 220x80x12x8.7
L=8.1m
Steel plate
2000x800x40
H 300x300
A
14000
+2.425
A - A SECTION
Hmax = +1.68
Htb = +1.16
+2.20
SPSP
8100
Sub base 20cm
Black sand K95
+2.475
DETAIL "B"
(1:50)
Detail "A"
Detail "B"
Hmin = -1.28
-1.95
Grille XG21 , t=5mm
+2.425
Steel sheet pile
larsen IV , L=20m
C 220x80x12x8.7 L=8.1m
+2.20
8500
7900
20cm Sub base
364
Steel pile
Larsen IV, l=20m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
STRUCTURE OF TEMPORARY JETTY 2B - OPTION1
SCALE:
CONSTRUCTION METHOD OF JETTY OF WHARF
STEEP 1: CONSTRUCTION OF WHARF
STEEP 2: DRIVING STEEL PILE H400x400
- Locating the center of wharf
- Driving steel sheet pile Larsen IV
- Filling and compaction black sand
- Filling sub base to disigning level
- Completing of wharf
STEEP 3: INSTALLING MAIN BEAM AND COVER PLATE
- To moving of crane
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
- Installing beam H400x400
- Installing system connection C300 and V100
- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing guided bar
- Installing corver plate 3000x1000x200
Vibration hammer
Vibration hammer
Level machine
Moving direction
Crawler crane
55 tons
+2.20
+2.20
Crawler crane
55 tons
Crawler crane
55 tons
+2.20
H 400x400
Steel pile
H 400x400
Steel sheet pile
Larsen IV, L=20m
Steel sheet pile
Larsen IV, L=20m
Main beam
H 800x300
Guided bar
H 400x400
Steel sheet pile
Larsen IV, L=20m
Steel pile
H 400x400 , L=48m
Steel pile
H 400x400
STEEP 4: CONSTRUCTION NEXT SEGMENT OF JETTY
STEEP 5: COMPLETING OF JETTY
- To moving of crane
- To moving guided bar
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
- Installing beam H400x400
- Installing system connection C300 and V100
- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing corver plate 3000x1000x200
- Installing railing
- Completing of jetty
Moving direction
+2.20
Cover plate
3000x1000x200
Moving direction
Cover plate
3000x1000x200
Main beam
H 800x300
+2.20
Cover plate
3000x1000x200
+2.20
Main beam
H 800x300
Guided bar
H 400x400
Steel pile
H 400x400
Steel sheet pile
Larsen IV, L=20m
Guided bar
H 400x400
Steel sheet pile
Larsen IV, L=20m
Existing ground
Steel pile
H 400x400 , L=48m
Steel pile
H 400x400 , L=48m
NOTES :
All dimensions are mm , levels are m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
CONSTRUCTION METHOD OF JETTY AND WHARF
SCALE:
CONSTRUCTION METHOD OF TEMPORARY RAMP WAY
STEEP 2 : EXCAVATION OF FOUNDANTION GABIONS
STEEP 1 : EXCAVATION SOIL
Moving Direction
- Excavator Soil by crawler Excavator in barge 500tons.
- Moving barge to dig inner.
Moving Direction
- To dig soil foundation of gabion to designing level .
Crawler Excavator
Crawler Excavator
Excavation part
Hmax = +1.68
Htb=+1.16
Barge 500 tons
Hmax = +1.68
Barge 500 tons
Htb=+1.16
Hmin = -1.28
Hmin = -1.28
Excavation part
Existing ground
Existing ground
STEEP 3 : INSTALLING GABIONS
STEEP 4 : SPREAD STONE IN GABIONS SCOPE
- Transpost gabions by other 500tons barge.
- Use crawler excavator to installing gabions.
- Transpost stone 4x6cm in truck by other 500tons barge.
- Use crawler excavator to spread in gabions scope.
Moving Direction
Moving Direction
Crawler Excavator
Crawler Excavator
Excavation part
Barge 500 tons
Gabions
Stone truck
Gabions
1x1x2m
Barge 500 tons
Excavation part
Hmax = +1.68
Htb=+1.16
Barge 500 tons
Barge 500 tons
Stone
4cmx6cm
Hmax = +1.68
Htb=+1.16
Hmin = -1.28
Hmin = -1.28
Gabions
Existing ground
Existing ground
STEEP 5 : EXCAVATION NEXT SEGMENT
STEEP 6 : SPREAD STONE NEXT SEGMENT
- Moving crawler excavation to gabions scope.
- Soil Excavator inner scope.
- Moving stone truck to next scope .
- Use crawler excavator to spread stone next scope.
Moving Direction
Moving Direction
Crawler Excavator
Crawler Excavator
Stone truck
Stone truck
Excavation part
Barge 500 tons
Stone
4cmx6cm
Barge 500 tons
Stone
4cmx6cm
Hmax = +1.68
Htb=+1.16
Hmax = +1.68
Htb=+1.16
Hmin = -1.28
Hmin = -1.28
Gabions
Gabions
Existing ground
Existing ground
STEEP 7 : PUMP BLACK SAND
- Spread geotextile fabric
- Transport black sand by truck in 500tons barge
- Use pump to pump black sand designing scope.
Sand pump
Pump pipe
- Spread stone 4x6cm .
- Completing of temporary ramp way.
Crawler Excavator
Barge 500 tons
Black sand
STEEP 8 : COMPLETING TEMPORARY RAMP WAY
Moving Direction
Black sand
Stone truck
Stone 4x6cm
Black sand
Hmax = +1.68
Barge 500 tons
Hmax = +1.68
Htb=+1.16
Htb=+1.16
Hmin = -1.28
Hmin = -1.28
Gabions
Gabions
Existing ground
Existing ground
NOTE:
- All dimension are mm , Levels are m
CONSORTIUM OF
TITLE
NAME
NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)
THE CONTRACTOR
THE ENGINEER
THE EMPLOYER
SIGNATURE
DATE
TITLE
NAME
SIGNATURE
DATE
PREPARED BY
NGUYEN SY BAO
Designed date
CHECKED BY
NGUYEN SONG TOAN
Checked Date
Approved 2
Approved Date
CHECKED BY
Checked 1
Checked date 1
APPROVED BY
Approved 1
Approved Date 1 APPROVED BY
REV.
PACKAGE J2 - GÓI THẦU J2
SMC4 JO-
CONSTRUCTION OF METHOD TEMPORARY RAMP WAY
SCALE:
summary main quantities for temporary jetty at pier p40 - JETTY1a
Particular
Description
H400x400x13x21
H400x400x13x21
H800x300x14x26
H600x200x11x17
C-200x76x5.2x9
C-200x76x5.2x9, L=0.3m
Rebar D25
C - Chanel and L L50x50
shape
L100x100x10, L=1.5m
L100x100x10, L=3.8m
C-300x90x9x13, L=2.9m
C-300x90x9x13, L=9.4m
Steel plate
9x1.0x0.25m
Steel plate
500*500*20mm
Stiffener t=14mm 748*143*14mm
Deck plate
3.0x1.0x0.2m
Concrete C20
9x1.0x0.20m
Bolt M22
H - Beam and
Steel pile
Unit weight
(kg/m)
Unit
Quantity
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Pcs
m3
Set
Total (Tons)
4.00
6.00
4.00
1.00
1.00
22.00
1.00
1.00
22.00
6.00
3.00
12.00
1.00
24.00
44.00
172.00
172.00
210.00
106.00
18.40
18.40
3.85
3.77
14.90
14.90
38.10
38.10
196.25 kg/m2
Length
(m)
Area
(m2)
48.00
9.50
25.40
9.00
86.80
0.30
60.30
60.30
1.50
3.80
2.90
9.40
Weight (Kg)
Number
of sets
33,024.00
9,804.00
21,336.00
954.00
1,597.12
121.44
232.16
227.33
491.70
339.72
331.47
4,297.68
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
11.00
1.00
9.00
Total
Remark
198,144.00
9,804.00
21,336.00
954.00
1,597.12
121.44
232.16
227.33
491.70
2,038.32
3,646.17
4,297.68
1,766.25
942.00
517.24
75.00
1.80
508.00
246,115.40
summary main quantities for wharf at pier p40 - WHARF 1
Particular
H - Beam
C - Chanel
Steel sheet pile
PC bar
Plate washer
Sub-base
Backfill K95
Description
H350x350x12x19
2C-200x76x5.2x9
Type IV
D32, L=14.75
D32, L=11.74
D32, L=1.760
100x100x25mm
t=20cm
Black sand
Unit weight
(kg/m)
137.00
36.80
76.10
6.31
6.31
6.31
Unit
Quantity
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m3
m3
5.00
1.00
125.00
8.00
9.00
4.00
Total
Length
(m)
12.00
68.14
20.00
14.75
11.74
1.76
Area
(m2)
Weight (Kg)
8,220.00
2,507.55
190,250.00
744.58
666.71
44.42
Number
of sets
1.00
1.00
1.00
1.00
1.00
1.00
Total
8,220.00
2,507.55
190,250.00
744.58
666.71
44.42
66.73
47.42
620.03
202,499.99
Remark
summary main quantities for temporary jetty at pier p40 - JETTY1B
Particular
Description
H400x400x13x21
H400x400x13x21
H800x300x14x26
C-200x76x5.2x9
C-200x76x5.2x9, L=0.3m
Rebar D25
L50x50
L100x100x10, L=1.5m
L100x100x10, L=3.8m
C - Chanel and L
C-300x90x9x13, L=2.9m
shape
C-300x90x9x13, L=6.4m
C-300x90x9x13, L=1.8m
C-300x90x9x13, L=1.620m
C-300x90x9x13, L=0.474m
C-220x80x8.7x12, L=16.5m
C-160x65x7.2x10, L=0.28m
Steel plate
6x1.5x0.020m
Steel plate
500*500*20mm
Stiffener t=14mm 748*143*14mm
Stiffener t=14mm 262*158*14mm
Expanded metal
XG21 , t=5mm
Deck plate
3.0x1.0x0.2m
Bolt M22
H - Beam and
Steel pile
Unit weight
(kg/m)
Unit
Quantity
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
15.26 kg/m2
Kg
Pcs
Set
Total (Tons)
3.00
3.00
3.00
1.00
5.00
1.00
1.00
14.00
4.00
2.00
6.00
1.00
3.00
3.00
3.00
7.00
1.00
9.00
15.00
3.00
1.00
172.00
172.00
210.00
18.40
18.40
3.85
3.77
14.90
14.90
38.10
38.10
38.10
38.10
38.10
28.70
18.20
157 kg/m2
Length
(m)
Area
(m2)
48.00
8.00
10.40
44.80
0.30
39.00
39.00
1.50
3.80
2.90
9.40
1.80
1.62
0.47
16.50
0.28
Weight (Kg)
Number
of sets
24,768.00
4,128.00
6,552.00
824.32
27.60
150.15
147.03
312.90
226.48
220.98
2,148.84
68.58
185.17
54.18
1,420.65
35.67
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
377.69
1.00
9.00
24.75
Total
Remark
74,304.00
4,128.00
6,552.00
824.32
27.60
150.15
147.03
312.90
679.44
1,104.90
2,148.84
68.58
185.17
54.18
1,420.65
35.67
1,413.00
353.25
176.33
13.65
377.69
20.00
220.00
94,099.65
summary main quantities for wharf at pier p41 - WHARF 2B
Particular
H - Beam
C - Chanel
Steel sheet pile
PC bar
Plate washer
Sub-base
Backfill K95
Description
H350x350x12x19
2C-200x76x5.2x9
Type IV
D32, L=15
D32, L=10
100x100x25mm
t=20cm
Black sand
Unit weight
(kg/m)
137.00
36.80
76.10
6.31
6.31
Unit
Quantity
Kg
Kg
Kg
Kg
Kg
Kg
m3
m3
5.00
1.00
113.00
4.00
7.00
Total
Length
(m)
12.00
45.09
20.00
15.00
10.00
Area
(m2)
Weight (Kg)
8,220.00
1,659.31
171,986.00
378.60
441.70
Number
of sets
1.00
1.00
1.00
1.00
1.00
Total
8,220.00
1,659.31
171,986.00
378.60
441.70
43.18
38.59
332.00
182,728.79
Remark
summary main quantities for temporary jetty at pier p41 - JETTY 2A
Particular
Description
H400x400x13x21
H400x400x13x21
H800x300x14x26
H600x200x11x17
C-200x76x5.2x9
C-200x76x5.2x9, L=0.3m
Rebar D25
C - Chanel and L L50x50
shape
L100x100x10, L=1.5m
L100x100x10, L=3.8m
C-300x90x9x13, L=2.9m
C-300x90x9x13, L=9.4m
Steel plate
9x1.0x0.25m
Steel plate
500*500*20mm
Stiffener t=14mm 748*143*14mm
Deck plate
3.0x1.0x0.2m
Concrete C20
9x1.0x0.20m
Bolt M22
H - Beam and
Steel pile
Particular
H - Beam
C - Chanel
Steel sheet pile
PC bar
Plate washer
Sub-base
Backfill K95
Unit weight
(kg/m)
Unit
Quantity
Length
(m)
Area
(m2)
Weight (Kg)
Kg
4.00
48.00
33,024.00
Kg
5.00
9.50
8,170.00
Kg
4.00
23.40
19,656.00
Kg
1.00
9.00
954.00
Kg
1.00
82.80
1,523.52
Kg
18.00
0.30
99.36
Kg
1.00
56.30
216.76
Kg
1.00
56.30
212.25
Kg
18.00
1.50
402.30
Kg
6.00
3.80
339.72
Kg
3.00
2.90
331.47
Kg
10.00
9.40
3,581.40
Kg
1.00
9.00
Kg
20.00
Kg
36.00
Pcs
m3
Set
Total (Tons)
summary main quantities for wharf at pier p41 - WHARF 2A
Description
H350x350x12x19
2C-200x76x5.2x9
Type IV
D32, L=10.5
D32, L=11.74
D32, L=1.57
100x100x25mm
t=20cm
Black sand
172.00
172.00
210.00
106.00
18.40
18.40
3.85
3.77
14.90
14.90
38.10
38.10
196.25 kg/m2
Unit weight
(kg/m)
Unit
Quantity
Length
(m)
Kg
Kg
Kg
Kg
Kg
Kg
Kg
m3
m3
5.00
1.00
90.00
8.00
5.00
4.00
12.00
54.14
20.00
10.50
11.74
1.57
137.00
36.80
76.10
6.31
6.31
6.31
Total
Area
(m2)
Number
of sets
5.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
9.00
1.00
Weight (Kg)
Number
of sets
8,220.00
1,992.35
136,980.00
530.04
370.40
39.63
1.00
1.00
1.00
1.00
1.00
1.00
Total
Remark
165,120.00
8,170.00
19,656.00
954.00
1,523.52
99.36
216.76
212.25
402.30
1,698.60
2,983.23
3,581.40
1,766.25
785.00
423.19
69.00
1.80
508.00
207,591.86
Total
8,220.00
1,992.35
136,980.00
530.04
370.40
39.63
51.03
33.70
365.99
148,183.44
Remark
summary main quantities for temporary jetty at pier p41 - JETTY2B
Particular
C - Chanel and L
shape
Steel plate
Expanded metal
Description
C-220x80x8.7x12 , L=8.1m
C-160x65x7.2x10, L=0.28m
Rebar D25
L50x50
2x0.8x0.04m
XG21 , t=5mm
Unit weight
Unit
(kg/m)
28.70
Kg
18.20
Kg
3.85
Kg
3.77
Kg
314 kg/m2
Kg
15.26 kg/m2
Kg
Total (Tons)
Quantity
3.00
2.00
1.00
1.00
1.00
1.00
Length
(m)
8.10
0.28
8.10
8.10
Area
(m2)
1.60
12.15
697.41
10.19
31.19
30.54
Number
of sets
1.00
5.00
2.00
2.00
185.41
1.00
Weight (Kg)
Total
697.41
50.96
62.37
61.07
502.40
185.41
1,559.62
Remark
CONTRUCTION VOLUME OF RAM WAY AT PIER 40
No
1
2
3
4
5
6
7
8
ITEMS
Dedge and organic
Filling sand K95
Compensation by sand
Stone 4x6cm
Compensation by stone 4x6cm
Gabion 1mx1mx2m
Steel beam H200x200, L=3m
Geotextile fabric
UNIT
m3
m3
m3
m3
m3
each
kg
m2
VOLUME
1365.12
350.00
105.00
231.00
231.00
17.00
1796.40
784.00
NOTES
Estimated 30% construction volume of sand
Estimated 100% construction volume of stone
CONTRUCTION VOLUME OF RAM WAY AT PIER 41
No
1
2
3
4
5
6
7
8
ITEMS
Dedge and organic
Filling sand K95
Compensation by sand
Stone 4x6cm
Compensation by stone 4x6cm
Gabion 1mx1mx2m
Steel beam H200x200, L=3m
Geotextile fabric
UNIT
m3
m3
m3
m3
m3
each
kg
m2
VOLUME
1010.55
300.00
90.00
201.60
201.60
17.00
1796.40
742.00
NOTES
Estimated 30% construction volume of sand
Estimated 100% construction volume of stone