ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN BORED PILE STAGE - OPTION3
TO BEN LUC

TO LONG THANH

21@2m=42

19@2m=38

4%

7

7

4%

Ramp way

Barge 600Tons

Barge 600Tons

40

23.4

9.5

10.8



Crawler crane
50Tons

Drilling System
Barge 1000tons

35.4

m
R20 ons
T
0
0
.
5

Crawler crane
50Tons

9
wharf 2a

25.1

Super structure line

Jetty 1a

P42


26.1

P39

P43

17.7

14
Rebar work
Barge

P40
K

15.6

9.5

10

16

12

Jetty 2a

10.8


wharf 1

38
Material Barge

15.5

22.8

Ramp way

R2 0
5.0t m
ons

Material Barge

0L
+00
m26

K

P41

Rebar work
Barge

0L
+10

m26

12

00L
6+3
K m2

00L
6+4
K m2

Drilling System
Barge 1000tons
Bentonite System
Barge 600tons

Bentonite System
Barge 600tons

K m2

00R
6+1

31@2m=62

15@2m=30

CONSORTIUM OF


TITLE

NAME

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2


Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

00R
6+3

K m2

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

K m2


00R
6+4

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

PLAN OF WHARF AND JETTY BORED PILE STAGE-OPTION3
SCALE:


ATTACHMENT NO.1

PLAN OF WHARF AND JETTY IN SPSP CONSTRUCTION STAGE - OPTION 3
TO BEN LUC

TO LONG THANH

21@2m=42

19@2m=38

4%

7

7


4%

Ramp way

Barge 600Tons

Barge 600Tons

40

wharf 1

38
Material Barge

Jetty 2a
23.4

220KVA

14

K

0L
+10
m26

9.5


10.8

P43

17.7

12

P41
00L
6+3
K m2

Crane 120T

00L
6+4
K m2

Barge 1000tons
Barge 600tons
Crane 80T

Barge 600tons
R
4.1 32
To m
ns

K


P42

R20m
s
19.5 Ton

P40
0L
+00
m26

wharf 2a

26.1

Jetty 1a

P39

9

25.1

Super structure line

Crawler crane
50Tons

220KVA


35.4

0m s
R2 Ton
.5
19

16

m
R20 ons
T
0
0
.
5

9.5

10.8

Barge 1000tons

12

15.6

10


Crawler crane
50Tons

15.5

22.8

Ramp way

R2 0
5.0t m
ons

Material Barge

00R
6+1

31@2m=62

15@2m=30

TITLE

NAME

K m2

SIGNATURE


DATE

TITLE
PREPARED BY

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

CHECKED BY

00R
6+3

K m2

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER


THE EMPLOYER
CONSORTIUM OF

m
R32 ns
o
4.1 T

K m2

NAME
NGUYEN SY BAO

SIGNATURE

DATE

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-


Designed date

00R
6+4

PLAN OF WHARF AND JETTY IN SPSP CONSTRUCTION STAGE
OPTION 3
SCALE:


ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE - OPTION 3
TO BEN LUC

TO LONG THANH

27@2m=54m

35@2m=70m

4%

7

Material Barge

7

4%


Ramp way

Barge 600Tons

Barge 600Tons

40

35.4
Material Barge

K

K

K m2

00R
6+1

0L
+10
m26

TITLE

NAME

25.1


26.1

K m2

DATE

17.7

12

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date


Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

00L
6+4
K m2

00R
6+3

K m2

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR


SIGNATURE

Stationary Pump

00L
6+3
K m2

21@2m=42m

THE ENGINEER
CONSORTIUM OF

Jetty 2b

P43

P41

31@2m=62

THE EMPLOYER

27
P42

R40
4.2 T m
ons


P40
0L
+00
m26

Concrete truck wharf 2a

15

14

9

Jetty 2c

15

12

Super structure line

R2
5.0 0m
t on
s

16.6

Concrete truck

P39

Crawler crane
50Tons

4.8

16

m
R20 ons
T
0
0
.
5

R40m
4.2 T
ons

9.5

10.8

Stationary Pump

15.6

9.5


10

23.4

10.8

22.8

wharf 1

Jetty 2a

Crawler crane
50Tons

Jetty 1a

15.5

38
Ramp way

00R
6+4

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-


PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
STAGE - OPTION 3
SCALE:


ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE AT PIER 40 - OPTION 3
TO BEN LUC

TO LONG THANH

Barge 600Tons

40

7

4%

Ramp way
22.8

Crawler crane
50Tons
Jetty 1a

wharf 1

10


35.4
Material Barge

9.5

10.8

Stationary Pump

16

R2
5.0 0m
Ton
s

17.2

16.6

Concrete truck

26.1

P39

14

15


12

R 40
4.2 T m
ons

P40

00L
6+1
Km2

00L
6+0
Km2

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER


THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date


CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
AT PIER 40 STAGE - OPTION 3
SCALE:


ATTACHMENT NO.1
PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION STAGE AT PIER 41 - OPTION 3
TO BEN LUC

TO LONG THANH

Barge 600Tons


4%

7

Material Barge

15.5

38

Jetty 2a
15.6

9.5

10.8

23.4

Crawler crane
50Tons

0m
R2 ons
T
5.0

R40m
4.2 T
ons


9
wharf 2a
Concrete truck

25.1

Super structure line

27
P42

Jetty 2c
4.8

Jetty 2b
17.7

15

Stationary Pump

12

P41

00L
6+3
Km2


Concrete truck

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY


NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2

SMC4 JO-

PLAN OF WHARF AND JETTY IN CANTILEVER CONSTRUCTION
AT PIER 41 STAGE - OPTION 3
SCALE:


RAMP WAY AT PIER 40 - OPTION 3

TO BEN LUC

20000

35000

5000

2920

9610
Barge 600 tons

B

A
Htb = +1.16

Hmax = +1.68

4%

Hmin = -1.28
1:2

Gabions
1mx1mx2m

B

A
Existing ground

Designing elevation
+2.00
Elevation of Existing ground +0.60
Distance

+2.00
+0.66
10.00

+2.00
+0.82

+1.60
+0.83

10.00

+1.20
+0.83


10.00

10.00

+0.80
+0.24

+0.40
-0.38

10.00

10.00

-1.84
-1.00

-2.00
-2.00

6.90

6.70

-3.00
-3.00
6.00

-4.00

-4.00
5.00

-5.00
-5.00

-6.00
-6.00

6.80

12.80

PLAN OF TEMPORARY SLOPE AT PIER 40
40000

Barge 600 tons

30000

00
200

10000

6300

12001200

3000


5000
00
R25
0

SECTION A - A
6 H200x200
1000

SECTION B - B

6 H200x200
7000

1500

1000

7000

1500

Gabion
1mx1mx2m

2000

2000


60cm Stone 4x6cm
Geotextile fabric
Black sand K95
Geotextile fabric

300

1
1

1
1

60cm Stone 4x6cm
Geotextile fabric
Black sand K95
Geotextile fabric

Gabion
1mx1mx2m

NOTES:
All dimensions are m, levels are m
Dimensions in typical section are mmm

CONSORTIUM OF

TITLE

NAME


NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY


NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

RAMP WAY AT PIER 40
SCALE:


structures of temporary JETTY 1A - option 3

C

D32, L=10.5m
10000
Larsen IV, L=20m

5000

35400
5000

5000

5000

5000
Detail ''G''

4000

400

2000 1000

3000 250

5000

3000
9500


27@400=10800

A
250 3000

2[-200x75x5.2x9, L=10m

1000

1000 2000

A

2000

10000

2000

H350x350x12x19, L=12m

B

D32@3m, L=1.57m

, L=11.74m

2[-200x75x5.2x9
L=24.2m


2[-200x75x5.2x9
L=11.54m

5@1600=8000

Deck plate
3000x1000x200

H800x300x14x26
L=25.4m

[-200x75x5.2x9
L=24.6m

B

35@1000=35000

16000
Detail ''D''

200

C
a-a section

13000

35400

2000

Geotextile Fabric

5000

5000

5000

5000

5000

5000

4000

400

Black sand
K95

Hmax = +1.68
1420

2300

850


1

600

1:

500

+1.00

+2.20

200

+2.20

-0.30

-1.00

Detail ''B''

H400x400x13x21
L=9.5m
H800x300x14x26
L=25.4m

Detail ''E''

-1.630


Htb = +1.16

Hmin = -1.28

PC bar D32

2[-200x75x5.2x9, L=9.0m

-5.04

2[-200x75x5.2x9
L=11.54m

-13.50

L100x100x10,
L=3.8m
Crossbeam,
2[-300x90x9x13, L=9.5m

Existing ground

H350x350x12x19, L=12m

DETAIL ''A''

1000

Detail ''A''


Detail ''C''

Steel sheet pile, Larsen IV, L=20m

20cm Sub base
Steel plate
12000x1000x25

Steel pile, L=48m
H400x400

Concrete C20
t=350mm

50

Deck plate
3000x1000x20

-17.85

350 200

-47.22

[200x76

DETAIL ''B''


DETAIL ''C''

Geotextile fabric
150 400

Sub-base t=20cm

2 [200x76
200

200

2[-200x76x5.2x9
D32
20

500

PC bar D32
L=1.57m

NOTEs:

Plate 200x200
t=20mm

Geotextile fabric

Plate washer
165x165x20

Steel sheet pile,
Larsen IV

Larsen IV

CONSORTIUM OF

TITLE

NAME

H350x350x12x19

SIGNATURE

DATE

TITLE
PREPARED BY

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1


Approved Date 1 APPROVED BY

CHECKED BY

- The material may be changed depend on actual condition.

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

- All the dimension are mm, levels are m.

NAME
NGUYEN SY BAO

SIGNATURE

DATE

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

Designed date

NGUYEN SONG TOAN


Checked Date

Approved 2

Approved Date

REV.

STRUCTURE OF TEMPORARY JETTY 1A - OPTION 3
SCALE:


ATTACHMENT NO.3

TYPICAL SECTION of temporary JETTY 1A - OPTION 3

b-b section

C-C section

Deck plate
3000x1000x200 9500
3000

3000

250

Detail ''F''


+2.20

+2.20

Hmax = +1.68
3200

H800x300x14x26, L=23.2m
H400x400x13x21
L=9.5m

2700

3000

PC bar D32
-1.00

500

2000

[-300x90x9x13
L=2.9m
-1.23

250
20 400800 200


Htb = +1.16

1420

[-200x75x5.2x9

Sub-base t=200mm
10800

L100x100x10, L=3.8m
Hmin = -1.28

Black sand
K95

Crossbeam, L=9.4m
2[-300x90x9x13

Steel sheet pile, Larsen IV, L=20m

Steel pile, L=48m
H400x400

-17.85

-47.22

DETAIL ''F''
DETAIL ''E''


DETAIL ''D''

L50x50

[-300x90x9x13

Deck plate
3000x1000x20

L100x100x10@2m

2[-200x76x5.2x9

600

H800x300x14x26
H800

300

Steel pile
H400x400

[-200x76x5.2x9
1500

Bolt M22

Larsen IV


H800x300

D25 rebar

Deck plate
3000x1000x20

PC bar D32@2m

H400x400

900

DETAIL ''G''

Stiffener t=14mm
S­êng t¨ng c­êng

[-300x90x9x13
[-200x76x5.2x9

300
Plate 500x500x20

400

Stiffener plate, t=20mm

350


H400x400x13x21

Plate 500x500x20

H400x400x13x21
H400x400x13x21

L100x100x10

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

L100x100x10
Bracing

SIGNATURE

DATE


TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1


APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

TYPICAL SECTION OF TEMPORARY JETTY 1A - OPTION 3
SCALE:


structures of temporary JETTY 2A -OPTION 3
DETAIL ''A''
B

C

D32@3m, L=1.57m

D32, L=10.5m

2[-200x75x5.2x9
L=24.2m
15600
Larsen IV, L=20m


23400
5500
Detail ''G''

5500

5500

1000

Deck plate
3000x1000x20

2000

A

Concrete C20
t=350mm

10800

[200x76

Geotexti
150 400

2 [200x76


200

2000

2000
2000
9000

7@1200=8400

3000

27@400=10800

2[-200x75x5.2x9, L=9.0m

250 3000

9500

A
H400x400
L=9.5m

20cm Sub base
Steel plate
12000x1000x25

350 200


5500

3000 250

400

50

[-200x75x5.2x9
L=9.0m

D32, L=11.74m

PC bar D32
L=1.57m

20

[-200x75x5.2x9
L=23.2m

B

Deck plate
3000x1000x200
23400

H800x300x14x26
L=23.2m


2[-200x75x5.2x9
L=11.54m

Plate 200x200
t=20mm

9000

Geotextile fabric

H350x350x12x19, L=12m

Larsen IV

C

a-a section
15600
200 2000

H800x300x14x26
L=23.2m
L100x100x10, L=3.8m

-1.00

PC bar D32

Black sand
K95


Plate washer
165x165x20
Steel sheet pile,
Larsen IV

2[-200x75x5.2x9, L=9.0m

-13.50

Steel sheet pile,
Larsen IV, L=20m

Steel pile, L=48m
H400x400

D32

+0.86

H350x350x12x19
L=12m

2[-200x75x5.2x9
L=11.54m
-6.58

2[-200x76x5.2x9
+2.20


500

850
-0.30

-1.65

Crossbeam,
2[-300x90x9x13, L=9.5m

Detail ''C''

1

H400x400x13x21
L=9.5m

600

Detail ''E''

Geotextile Fabric
200

+2.20

1:

Detail ''A''


2300

Hmin = -1.28

23400
23@1000=23000

200

20 400 800 200

Htb = +1.16

1420

Hmax = +1.68

DETAIL ''B''

DETAIL ''C''
Sub-base t=20cm

200

-17.85

500

-47.22


H350x350x12x19

NOTEs:
- All the dimension are mm, levels are m.

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE
PREPARED BY

CHECKED BY

Checked 1


Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

CHECKED BY

NAME
NGUYEN SY BAO

SIGNATURE

DATE

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

Designed date

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date


REV.

STRUCTURE OF TEMPORARY JETTY 2A - OPTION 3
SCALE:


TYPICAL SECTION of temporary JETTY 2A - OPTION 3

b-b section

C-C section

Deck plate
3000x1000x200 9500

2000

3000

3000

250

Detail ''F''

+2.20

+2.20
H400x400x13x21

L=9.5m
L100x100x10, L=3.8m

2700

Hmax = +1.68

H800x300x14x26, L=23.2m

3200

[-300x90x9x13
L=2.9m
-1.23

3000

20 400800 200

1420

Htb = +1.16

250

Sub-base t=200mm
10800

PC bar D32
-1.00


500

[-200x75x5.2x9

Hmin = -1.28

Black sand
K95

Crossbeam, L=9.4m
2[-300x90x9x13

Steel sheet pile, Larsen IV, L=20m
Steel pile, L=48m
H400x400

-17.85

-47.22

DETAIL ''G''

DETAIL ''F''

DETAIL ''E''

DETAIL ''D''

[-300x90x9x13


Deck plate
3000x1000x20

L50x50
L100x100x10@2m

PC bar D32@2m
900

H800x300x14x26

300

Steel pile
H400x400

[-200x76x5.2x9
1500

2[-200x76x5.2x9

D25 rebar

Deck plate
3000x1000x20

Bolt M22

Larsen IV


H800x300

Stiffener t=14mm
S­êng t¨ng c­êng

600

H400x400

H800
[-300x90x9x13

Plate 500x500x20

400

[-200x76x5.2x9

300

Stiffener plate, t=20mm
H400x400x13x21

350

H400x400x13x21

L100x100x10


Plate 500x500x20
H400x400x13x21
L100x100x10
Bracing

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE


DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY


REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

TYPICAL SECTION OF TEMPORARY JETTY 2A - OPTION 3
SCALE:


GENERAL PLAN OF TOWER CRANE AT PIER 40 - OPTION 3
9500

Crawler crane 55Tons
Super Structure line

Material Truck
Tower crane
168Tons.m

Jetty 1a
Bring frame
4000

4750

4000

35400

Foundation of tower crane

4mx4mx1.5m

2900

Jetty 1b
B=1.5m

1500

16640
Pier 40

A

A

Concrete supply pipe
D135mm, t=5mm

NOTE :
- Dimensions are mm, Levels are m

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)


THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date


Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

GENERAL PLAN OF TOWER CRANE AT PIER 40 - OPTION3
SCALE:


STRUCTURE OF JETTY 1b
1000

Hmax=+1.68


C 100x50x5.9x8
L=2.660m

6500

6500

Hmin=-1.28

Hmin=-1.28

C 200x75x8.2x11.5
L=1.5m

2380

3878

1260

Hmax=+1.68
Htb=+1.16

V 100x100x8
L=2.5m

C 200x75x8.2x11.5
L=1.5m


Hmin=-1.28

+2.20

100

H 200x200x8x12
L=1.6m

Htb=+1.16

2500

Htb=+1.16

H 200x200x8x12
L=1.6m

H 200x200x8x12
L=16.64m

100

4005

+2.20

1500
1300


12

16640

12400

290

Detail "A"

A

2500

MAIN VIEW OF JETTY 1b
(1:75)

A-A SECTION
(1:75)

1300
-4.59

H 200x200x8x12
L=30m

H 200x200x8x12
L=30m

A


H 200x200x8x12
L=1.6m

PLAN OF JETTY 1b
(1:75)

H 200x200x8x12
L=16.64m

22@750=16500

70

DETAIL "A"
(1:20)

70

Expanded metal
XG21, t=5mm

V 100x100x10
L=1.2m

1500

+2.20
C 150x75x10x6.5
L=1.29m

50

C 150x75x6.5x10
L=1.292m

1260

6500

6500

290

H 200x200x8x12
L=1.6m

H 200x200x8x12
L=16.64m

2380

16640

C 150x75x10x6.5
L=0.3m

Plate 250x250x12

H 200x200x8x12
L=30m

NOTE :
- Dimensions are mm, Levels are m

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE


PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.


PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

STRUCTURE OF JETTY 1b
SCALE:


GENERAL VIEW OF TOWER CRANE AT PIER 40 - OPTION 3

12000

40000

Tower crane
168Tons.m

Radius=20.6m
Rate load = 6.88Tons

A-A SECTION
(1:250)
Max moving Load
6Tons

16863

1600

30000


Traveller

Bring frame
+15.545

13138

H300x300

Jetty 1a
9000
Hmax=+1.68

290

SPSP Cofferdam
D=0.7m , L=35m

16640

+2.20

+2.20
Pier 40

1500

Htb=+1.16

Concrete supply pipe

D=135mm, t=5mm

Jetty 1b

Htb=+1.16

4000

Hmin=-1.28

5290

Hmin=-1.28

Hmax=+1.68

-4.59

-4.59

H200x200
L=30m

NOTE :
- Dimensions are mm, Levels are m

SPSP D=0.7m
L=35m

CONSORTIUM OF


TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO


Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

GENERAL VIEW OF TOWER CRANE AT PIER 40 - OPTION3

SCALE:


GENERAL PLAN OF TOWER CRANE AT PIER 41 - OPTION 3
Super Structures Line

8250

8250

6750

D
Foundation of tower crane
4mx4mx1.5m

1500

4000

4000

C

C

Tower crane
168Tons.m

4800

Jetty 2c
L=4.8m

Riverside

27000

Jetty 2b
L=27m

NOTE :

1000

- Dimensions are mm, Levels are m

750 1500 750
Gabions

3000

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)


THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date


Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

GENERAL PLAN OF TOWER CRANE AT PIER 41 - OPTION 3
SCALE:


GENERAL VIEW OF TOWER CRANE AT PIER 41 - OPTION 3

40000

12000


Tower crane
168Tons.m

Radius=20.6m
Rate load = 6.88Tons

1600
21862

C-C SECTION
(1:250)

Max moving Load
6Tons

30000

Traveller

Bring frame
+15.545

Concrete supply pipe
D=135mm, t=5mm

SPSP Cofferdam
D=0.7m , L=35m

Foundation

4mx4mx1.5m

Jetty 2c
+2.20

Hmax=+1.68

Pier 41

1500

Htb=+1.16

13138

H300x300

Htb=+1.16

4000

Hmin=-1.28
4290

Hmin=-1.28

-3.59

-3.59


SPSP D=0.7m
L=35m

NOTE :
- Dimensions are mm, Levels are m

15000

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME


SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1


Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

GENERAL VIEW OF TOWER CRANE AT PIER 41 - OPTION 3
SCALE:


STRUCTURE OF JETTY 2c
B-B SECTION
(1:25)

Column of tower crane

V 70x70x6

B
Foundation
4mx4mx1.5m

Jetty 2c, B=1.5m
700

3646

400


V 100x100x10
L=1.2m

+2.20

Expanded metal
XG21 ,t=5mm
C 150x75x10x6.5
L=1.29m
1500

Hmax=+1.68
1500

455

B

150

C 150x75x10x6.5
L=0.3m

50

195

Htb=+1.16


150

1200

54

Rebar D19
550

4800

150 100

4000

1300

100 150

1800
Detail "B"

H 200x200x8x12
L=4.8m

Hmin=-1.28

DETAIL "B"
(1:15)


SPSP D=0.7m
L=35m
Cofferdam system at P41

PLAN OF JETTY 2c
(1:50)

4000

Grille XG21
t=5mm
Foundation
4mx4mx1.5m

V 100x100x10
L=1.2m

+2.40
20

13

Cofferdam system at P41

4

C 150x75x10x6.5
L=1.29m

C 150x75x10x6.5

L=0.3m
13

38

C 150x75x6.5x10
L=1.292m
4800

146

100 54
300

1500

4000

H 200x200x8x12
L=4.8m

6@750=4500

150

150

NOTE :
- Dimensions are mm, Levels are m


H200x200x8x12
L=4.8m

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE


PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.


PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

STRUCTURE OF JETTY 2c
SCALE:


STRUCTURE OF JETTY 2b
A-A SECTION
(1:75)

Column of tower
Jetty 2b
L=12m

Detail "A"

A
Black sand
K95

Hmax=+1.68
1500

Htb=+1.16

+0.92
Foundation of tower crane
4mx4mx1.5m


4000

H200x200x8x12
L=1.6m

Hmax=+1.68
Htb=+1.16

V 100x100x8
L=2.3m

1000

-1.69

H200x200x8x12
L=30m

-4.50

+2.40

100

H 200x200x8x12
L=1.6m

H200x200x8x12
L=27m
Gabions 1mx1mx2m


A

Hmin=-2.72

-0.48

1500
1300

12

+2.20

100

2000

9000

-1.69

1478

9000

4005

9000


1000

27000

C 200x75x8.2x11.5
L=1.5m

Hmin=-1.28

SPSP D=0.7m
l=35m

PLAN OF JETTY 2b
(1:150)

Riverside
1300

27000
400

25600

1000

C 150x75x6.5x10
L=1.292m

750


1500

4000

750

Foundation
4mx4mx1.5m

H200x200x8x12
L=27m

650

34@750=25500

H 200x200x8x12
L=30m

650

4000

DETAIL "A"
(1:40)

150

Rebar D19
V 100x100x10

L=1.2m
1200

Expanded metal
XG21 ,t=5mm
C 150x75x10x6.5
L=1.29m
1500

150
C 150x75x10x6.5
L=0.3m

195

455

550

V 70x70x6

H 200x200x8x12
L=1.6m

H 200x200x8x12
L=27m
V 100x100x10
L=2.3m

H 200x200x8x12

L=30m

NOTE :
- Dimensions are mm, Levels are m

1300

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME


SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1


Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

STRUCTURE OF JETTY 2b
SCALE:


CONSTRUCTION METHOD OF TEMPORARY RAMP WAY
STEEP 2 : EXCAVATION OF FOUNDANTION GABIONS

STEEP 1 : EXCAVATION SOIL

Moving Direction

- Excavator Soil by crawler Excavator in barge 500tons.
- Moving barge to dig inner.

Moving Direction

- To dig soil foundation of gabion to designing level .

Crawler Excavator

Crawler Excavator
Excavation part


Hmax = +1.68
Htb=+1.16

Barge 500 tons

Hmax = +1.68

Barge 500 tons

Htb=+1.16

Hmin = -1.28

Hmin = -1.28

Excavation part
Existing ground

Existing ground

STEEP 3 : INSTALLING GABIONS

STEEP 4 : SPREAD STONE IN GABIONS SCOPE

- Transpost gabions by other 500tons barge.
- Use crawler excavator to installing gabions.

- Transpost stone 4x6cm in truck by other 500tons barge.
- Use crawler excavator to spread in gabions scope.


Moving Direction

Moving Direction
Crawler Excavator
Crawler Excavator
Excavation part

Barge 500 tons

Gabions

Stone truck

Gabions
1x1x2m

Barge 500 tons

Excavation part

Hmax = +1.68
Htb=+1.16

Barge 500 tons

Barge 500 tons

Stone
4cmx6cm


Hmax = +1.68
Htb=+1.16

Hmin = -1.28

Hmin = -1.28
Gabions

Existing ground

Existing ground

STEEP 5 : EXCAVATION NEXT SEGMENT

STEEP 6 : SPREAD STONE NEXT SEGMENT

- Moving crawler excavation to gabions scope.
- Soil Excavator inner scope.

- Moving stone truck to next scope .
- Use crawler excavator to spread stone next scope.
Moving Direction

Moving Direction
Crawler Excavator

Crawler Excavator

Stone truck


Stone truck

Excavation part

Barge 500 tons

Stone
4cmx6cm

Barge 500 tons

Stone
4cmx6cm

Hmax = +1.68
Htb=+1.16

Hmax = +1.68
Htb=+1.16

Hmin = -1.28

Hmin = -1.28
Gabions

Gabions
Existing ground

Existing ground


STEEP 7 : PUMP BLACK SAND
- Spread geotextile fabric
- Transport black sand by truck in 500tons barge
- Use pump to pump black sand designing scope.

Sand pump

Pump pipe

- Spread stone 4x6cm .
- Completing of temporary ramp way.

Crawler Excavator
Barge 500 tons

Black sand

STEEP 8 : COMPLETING TEMPORARY RAMP WAY

Moving Direction

Black sand

Stone truck

Stone 4x6cm
Black sand

Hmax = +1.68


Barge 500 tons

Hmax = +1.68
Htb=+1.16

Htb=+1.16

Hmin = -1.28

Hmin = -1.28
Gabions

Gabions
Existing ground

Existing ground
NOTE:

- All dimension are mm , Levels are m

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR


THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2


Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

CONSTRUCTION OF METHOD TEMPORARY RAMP WAY
SCALE:


CONSTRUCTION METHOD OF JETTY OF WHARF
STEEP 1: CONSTRUCTION OF WHARF

STEEP 2: DRIVING STEEL PILE H400x400

- Locating the center of wharf

- Driving steel sheet pile Larsen IV
- Filling and compaction black sand
- Filling sub base to disigning level
- Completing of wharf

STEEP 3: INSTALLING MAIN BEAM AND COVER PLATE

- To moving of crane
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
- Installing beam H400x400
- Installing system connection C300 and V100

- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing guided bar
- Installing corver plate 3000x1000x200

Vibration hammer

Vibration hammer

Level machine

Moving direction
Crawler crane
55 tons

+2.20


Crawler crane
55 tons

Crawler crane
55 tons

+2.20
H(5%)=+1.160

Main beam
H 800x300

+2.20

H 400x400

H(5%)=+1.160
Steel pile
H 400x400

Steel sheet pile
Larsen IV, L=20m

Steel sheet pile
Larsen IV, L=20m

Guided bar
H 400x400

Steel sheet pile

Larsen IV, L=20m

Steel pile
H 400x400 , L=48m

Steel pile
H 400x400

STEEP 4: CONSTRUCTION NEXT SEGMENT OF JETTY

STEEP 5: COMPLETING OF JETTY

- To moving of crane
- To moving guided bar
- Locating the center of steel pile H400x400
- Driving steel pile H400x400
- Installing beam H400x400
- Installing system connection C300 and V100

- Installing main beam H800x300
- Installing system connection whith main beam H800x300
- Installing corver plate 3000x1000x200
- Installing railing
- Completing of jetty

Moving direction
+2.20

H(5%)=+1.160


Moving direction
Cover plate
3000x1000x200

Main beam
H 800x300

Cover plate
3000x1000x200

+2.20
H(5%)=+1.160

Guided bar
H 400x400

Steel pile
H 400x400

Steel sheet pile
Larsen IV, L=20m

Main beam
H 800x300

+2.20

Cover plate
3000x1000x200
H(5%)=+1.160


Guided bar
H 400x400

Steel sheet pile
Larsen IV, L=20m

Existing ground

Steel pile
H 400x400 , L=48m

Steel pile
H 400x400 , L=48m

NOTES :
All dimensions are mm , levels are m

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER


THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date


CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

CONSTRUCTION METHOD OF JETTY AND WHARF
SCALE:


SETTING TOWER CRANE AT PIER P40 - STAGE 1

A - A SECTION
(1 : 300)

PLAN VIEW OF SETTING TOWER CRANE AT PIER 40 - STAGE 1
(1 : 300)


Working radius = 15.8m
Rate load =6.54 tons

15800

15000

0m

9500

Boo

25400

mL

engt

h =4

Jetty 1A

4000

4000

Crawler crane 50t

m=3.55 tons


3000

Segment 3m

A

A

Segment 7.5m
7500

Crawler crane 50t

Htb=+1.16

Hmax=+1.68

Foundation
4x4x1.5m

+2.20

1500

Ra
di
6.5 us =
ton 15.8
s m


Hmin=-1.28

P40

-4.59

Riverside

STAGE1: SETTING BODY OF TOWER CRANE

H 400x400
L=48m

SPSP D=0.7m
L=35m

- Setting a base support
- Setting first segment have length 7.5m
- Setting second segment have length 3m

NOTE :
- Dimensions are mm or m, Levels are m

CONSORTIUM OF

TITLE

NAME


NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN


Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

SETTING TOWER CRANE AT PIER P40 - STAGE 1
SCALE:


SETTING TOWER CRANE AT PIER P40 - STAGE 2


A - A SECTION
(1 : 300)

PLAN VIEW OF SETTING TOWER CRANE AT PIER 40 - STAGE 2
(1 : 300)

Working radius = 15.8m
Rate load =6.54 tons

15800

15000

0m

9500

Boo

25400

mL

engt

h =4

Jetty 1A

4000


4000

Crawler crane 50t

Climbing cage
m=2.66tons

A

A

Crawler crane 50t

Htb=+1.16

Hmax=+1.68

Foundation
4x4x1.5m

+2.20

1500

Ra
di
6.5 us =
ton 15.8
s m


Hmin=-1.28

P40

-4.59

Riverside

H 400x400
L=48m

STAGE 2: SETTING CLIMBING CAGE

SPSP D=0.7m
L=35m

- Setting a climbing cage

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR


THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2


Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

SETTING TOWER CRANE AT PIER P40 - STAGE 2
SCALE:


SETTING TOWER CRANE AT PIER P40 - STAGE 3

A - A SECTION
(1 : 300)

PLAN VIEW OF SETTING TOWER CRANE AT PIER 40 - STAGE 3
(1 : 300)


Working radius = 15.8m
Rate load =6.54 tons

15800

15000

0m

9500

engt

h =4

Jetty 1A

Boo

25400

mL

Turntable cage
6.2 tons

4000

4000


Crawler crane 50t

A

A

Crawler crane 50t

Htb=+1.16

Hmax=+1.68

Foundation
4x4x1.5m

+2.20

1500

Ra
di
6.5 us =
ton 15.8
s m

Hmin=-1.28

P40


-4.59

Riverside

H 400x400
L=48m

STAGE 3: SETTING TURNTABLE CAGE

SPSP D=0.7m
L=35m

- Setting a turtable cage

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE


DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1


Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

SETTING TOWER CRANE AT PIER P40 - STAGE 3
SCALE:


SETTING TOWER CRANE AT PIER P40 - STAGE 4
A - A SECTION
(1 : 300)

PLAN VIEW OF SETTING TOWER CRANE AT PIER 40 - STAGE 4
(1 : 300)

Working radius = 15.8m
Rate load =6.54 tons

15800


15000

9500

h =4
0m

Tower head
1.5 tons

Boo

25400

mL

engt

Jetty 1A

4000

4000

Crawler crane 50t

A

A


Crawler crane 50t

Htb=+1.16

Hmax=+1.68

Foundation
4x4x1.5m

+2.20

1500

Ra
di
6.5 us =
ton 15.8
s m

Hmin=-1.28

P40

-4.59

Riverside

H 400x400
L=48m


STAGE 4: SETTING TOWER HEAD

SPSP D=0.7m
L=35m

- Setting a tower head

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME


SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1


Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

SETTING TOWER CRANE AT PIER P40 - STAGE 4
SCALE:


SETTING TOWER CRANE AT PIER P40 - STAGE 5

PLAN VIEW OF SETTING TOWER CRANE AT PIER 40 - STAGE 5
(1 : 300)

15800

B - B SECTION
(1 : 300)

15000

9500

Tie bars

B
Counter Jib
3.0tons


Counter weight

25400

Jetty 1A

4000

4000

Crawler crane 50t

6790
Jetty 1A
+2.20

A

A

Htb=+1.16

Hmax=+1.68

Hmin=-1.28
Crawler crane 50t

Counter Jib


P40
R=
6.5 15.8
ton m
s

Riverside

STAGE 5: SETTING COUNTER JIB

B

- Setting a counter jib
- Setting counter weight
- Setting tie bars

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)

THE CONTRACTOR

THE ENGINEER

THE EMPLOYER


SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date

Approved 2

Approved Date

CHECKED BY


Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

SETTING TOWER CRANE AT PIER P40 - STAGE 5
SCALE:


SETTING TOWER CRANE AT PIER P40 - STAGE 6
PLAN VIEW OF SETTING TOWER CRANE AT PIER 40 - STAGE 6
(1 : 350)

B - B SECTION
(1 : 350)

15800
9500


B

Tie bars
Counter Jib

R=17m

Crawler crane 50t

5.925tons

25400

Counter weight

Jetty 1A

Jib length
4.520tons

Trolley

4000

4000

Crawler crane 50t

+2.20


A

A

Htb=+1.16

Hmax=+1.68

Hmin=-1.28

Counter Jib

P40

Riverside

B

STAGE 6: SETTING COUNTER JIB
- Setting a jib length
- Setting tie bars

CONSORTIUM OF

TITLE

NAME

NORTH-SOUTH EXPRESSWAY CONSTRUCTION PROJECT
(BEN LUC - LONG THANH SECTION)


THE CONTRACTOR

THE ENGINEER

THE EMPLOYER

SIGNATURE

DATE

TITLE

NAME

SIGNATURE

DATE

PREPARED BY

NGUYEN SY BAO

Designed date

CHECKED BY

NGUYEN SONG TOAN

Checked Date


Approved 2

Approved Date

CHECKED BY

Checked 1

Checked date 1

APPROVED BY

Approved 1

Approved Date 1 APPROVED BY

REV.

PACKAGE J2 - GÓI THẦU J2
SMC4 JO-

SETTING TOWER CRANE AT PIER P40 - STAGE 6
SCALE:


×