About T.P.M.
After World War ll. Japanese industries determined that to complete successfully in the world market
they had to improve the quality of their products. to do so, they imported management and manufacturing
techniques from United States and adapted them to their circumstances. Subsequently, their products became
known throughout the world for their superior quality, focusing world attention on Japanese- style
management techniques.
TPM DEVELOPMENT PROGRAM
Implementing Total Productive Maintenance
Seiichi Nakajima.
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
2
Courtesy, in part, of Motorola SPS.
Thank You!
WHAT IS T.P.M. ??
Definition of T.P.M :
T.P.M. IS: A PRODUCTIVE MANUFACTURING SYSTEM with the TOTAL
Participation of: Managers, Supervisors, Engineers,
Technicians and Operators.
T.P.M. Includes the Following Benefits:
• Maximize Overall Equipment Effectiveness
• Establishment a Complete System of Maintenance for the Machine Entire
Life
• Create a Better Work Environment, Promoting the Participation for All
Employees
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
3
Courtesy, in part, of Motorola SPS.
Thank You!
T.P.M. = Medical Science of Equipment
PRODUCTION
Foton
AUTOMATION
B-820
VIDEO-AUTO DIE-BONDER MODEL 8030A
POWER
HEATER
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
4
Courtesy, in part, of Motorola SPS.
Thank You!
The Main objective of TPM is :
Zero Interruptions
Zero Defects
Zero Accidents
Throughout total employees participation from Top Management to Operators,
based in the following activities:
Autonomous Maintenance
• Planned Maintenance
• Individual Improvement
• Quality Maintenance
• Early Equipment Management
• Education/Training (People Development)
• Safety
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
5
Courtesy, in part, of Motorola SPS.
Thank You!
PILLARS OF TPM
A
U
T
O
N
O
M
O
U
S
M
A
I
N
T
E
N
A
N
C
E
Q
U
A
L
I
T
Y
M
A
I
N
T
E
N
A
N
C
E
P
L
A
N
N
E
D
M
A
I
N
T
E
N
A
N
C
E
I
N
D
I
V
I
D
U
A
L
I
M
P
R
O
V
E
M
E
N
T
T
R
A
I
N
I
N
G
P
E
O
P
L
E
D
E
V
E
L
O
P
S
A
F
E
T
Y
E
H
S
E
A
R
L
Y
E
Q
U
I
P
M
A
N
A
G
E
M
E
N
T
5S´s
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
6
Courtesy, in part, of Motorola SPS.
Thank You!
T.P.M.
Total Productive Manufacturing
People , Equipment and Product
Improvement by Working Together.
EXCELLENCE
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
7
Courtesy, in part, of Motorola SPS.
Thank You!
PLANT
OVERVIEW
PLANT
OVERVIEW
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
8
Courtesy, in part, of Motorola SPS.
Thank You!
TPM
Self Assessment
PLANT
OVERVIEW
TPM
Self Assessment
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
9
Courtesy, in part, of Motorola SPS.
Thank You!
TPM Self Assessment
Background:
∆1991 First attempt to implement TPM.
∆ TPM consultant provides training to selected Managers,
Supervisors and Engineers.
∆ One coordinator with experience in Process and Maintenance
is assigned to lead TPM.
∆ Literature and materials, prepared and distributed.
Lack of support and involvement results on failing the
implementation.
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
10
Courtesy, in part, of Motorola SPS.
Thank You!
TPM Self Assessment
1996
∆ One Staff Mgr. is assigned to lead the TPM Implementation
∆
∆
∆
∆
∆
plant wide.
A core team is formed on 2Q/96 with key people from different
departments to coordinate the implementation.
Model equipment is selected based on bottle neck operation.
Equipment conditions analysis performed.
Most of the teams cover the initial cleaning.
Activities are focused on six big losses detected and 5 S´s
implementation.
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
11
Courtesy, in part, of Motorola SPS.
Thank You!
Asia
Benchmarking
PLANT
OVERVIEW
TPM
Self Assessment
Asia
Benchmarking
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
12
Courtesy, in part, of Motorola SPS.
Thank You!
TPM Benchmarking
Asia Facilities
Facility 1
Facility 2
Facility 3
Committee:
Objective:
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
1996
April
May
June
4 Chosen Folks
Learn from Asia success experiences in TPM
implementation and come up with directions for
Plant implementation.
TPM Awareness Information
13
Courtesy, in part, of Motorola SPS.
Thank You!
Benchmarking Conclusions
Total management involvement.
T.P.M. Manager (dedicated).
A well defined implementation process.
Provide people with time to work on it. ( 4- 6 Hr./wk ).
Each staff has their own T.P.M. Promoter full time.
Focused in Consultant X model.
Focused in just one product line per area.
Budget assigned for consulting and external training.
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
14
Courtesy, in part, of Motorola SPS.
Thank You!
PLANT
OVERVIEW
TPM
Implementation
TPM
Self Assessment
Asia
Benchmarking
TPM
Implementation
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
15
Courtesy, in part, of Motorola SPS.
Thank You!
IMPLEMENTATION/CONSULTANT
* Q3 1996, Consultant X is selected to be Consultant.
* Training of Managers, Team leaders and Team members
* Master Plan Defined
* TPM. implementation initiated according to Consultant X recommendations
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
16
Courtesy, in part, of Motorola SPS.
Thank You!
T.P.M. POLICY
# ESTABLISH AN INTEGRATED STRUCTURE TO PROMOTE T.P.M.
AS A COMPANY CULTURE.
# MAXIMIZE OVERALL EQUIPMENT EFFECTIVENESS
# TOTAL EMPLOYEE INVOLVEMENT.
# CULTIVATE EQUIPMENT & PROCESS RELATED EXPERTISE THROUGHOUT
SHOP FLOOR. ( Autonomous Maintenance, Planned Maintenance etc..)
# ESTABLISH A RELIABILITY AND MAINTAINABILITY SYSTEM TO MAXIMIZE
EQUIPMENT LIFE TIME. (Planned Maintenance Autonomous Maintenance,
Individual Improvement, Early Equipment Management.)
# ALL EMPLOYEES MUST PARTICIPATE IN T.P.M TRAINING PROGRAM.
# ALL AREAS MUST FOLLOW T.P.M. ESTABLISHED GUIDE LINES.
# DEPARTMENT HEAD IS RESPONSIBLE TO ACCOMPLISH AND SUPPORT
T.P.M. GOALS.
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
17
Courtesy, in part, of Motorola SPS.
Thank You!
T.P.M. PLANT WIDE STRUCTURE
TPM
Responsible
Plant Manager
T.P.M. Office
5 ´s
Quality
Maintenance
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
Autonomous
Maintenance
Early
Equipment
Management
Planned
Maintenance
Safety
TPM Awareness Information
Individual
Improvement
Training
People
Development
18
Courtesy, in part, of Motorola SPS.
Thank You!
PROMOTION STRUCTURE
(OVERLAPPING SMALL GROUPS)
PLANT
MANAGER
STAFF MANAGERS
OPERATIONS
TPM PILLARS
& PROMOTION
OFFICE
DEPARTMENT
MANAGERS
DEPARTMENT
SUPERVISORS
TPM
PROMOTERS
TPM TEAM
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
19
Courtesy, in part, of Motorola SPS.
Thank You!
VISION STATEMENT:
TPM
PLANT WIDE
IMPLEMENTATION
Q1 2000
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
20
Courtesy, in part, of Motorola SPS.
Thank You!
T.P.M. IMPLEMENTATION ACTIVITIES
MANAGER TEAMS
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
21
Courtesy, in part, of Motorola SPS.
Thank You!
PREPARATION / PLANNING STAGE
# DEFINE PILOT LINES
# AMOUNT OF MACHINES INCLUDED PER LINE
# DEFINE CORE TEAM MEMBERS OF EACH LINE
# SELECT TEAM MEMBERS PER MACHINE
# START ACTIVITIES IN PILOT MACHINES (bottle neck.)
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
22
Courtesy, in part, of Motorola SPS.
Thank You!
Line and Machine Selection
B-820
B-820
Machine 1
Machine 2
N-661
POWER
HEATER
Machine 3
Machine 4
B-609
B-609
V-701
V-701
Cayman Systems USA 513 777-3394
©1998 Revision A 980810
TPM Awareness Information
23
TPM Implementation Plan
ACTIVITIES
DEFINE STRATEGIES
MASTER PLAN
PREPARATION
ORGANIZATION
STAGE
INTRODUCTION TRAINING
PUBLICITY
I
M
P
L
E
M
E
N
T
A
T
I
O
N
S
T
A
R
T
T
A
R
G
E
T
MODEL MACHINES
Machine 1
Machine 2
Machine 3
Machine 4
EXTEND
IMPLEMENTATION
SIMILAR
PRODUCTION LINES
COMPLETE
IMPLEMENTATION
DEFINED AREAS
1996
1997
1998
1999
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
1
T
P
M
K
I
C
K
O
F
F
2
2000
Q3 Q4 Q1 Q2
3
AUTONOMOUS MAINTENANCE
&
REDUCE 6 BIG LOSSES
EXTEND SIMILAR MACHINES
30%
to
50%
100%
TPM 90 D ays Explosion Plan
O ctober
w w 40
N ovem ber
M achine 1
PILO T TEA M
PILLA RS
Step 3
Planned m aintenance
6 big losses
IndividualIm provem ent
10 Extension team s
step 1-2
19 Extension team s
Start step 1
M achine 2
PILO T TEA M
Step 2-3
Planned m aintenance
6 big losses
IndividualIm provem ent
11 Extension team s
step 1-2
M achine 3
PILO T TEA M
Step 2-3
Planned m aintenance
6 big losses
IndividualIm provem ent
6 Extension team s
step 1-2
2 Extension team s
Start step 1
M achine 4
PILO T TEA M
Step 1-2
Planned m aintenance
6 big losses
IndividualIm provem ent
4 extension team s
Start step 1
IM PLEM EN TA TIO N M O D EL
GA N TT
TPM A ctivity Board Extension Team s
Server
D ata collection
GM A udit
Team presentations
TPM O ffice A udit
Consultant visit
TPM M eeting
LocalBO O T CA M P
TPM M CO E M EETIN G, JA PA N
Pillars m eeting
D ecem ber
w w 41 w w 42 w w 43 w w 44 w w 45 w w 46 w w 47 w w 48 w w 49 w w 50 w w 51
w w 52
Start
Start
Start
Start
4 mc
7 mc
3 mc
6 mc
3 mc
6 mc
Start
Start
Step 1
Step 2
B-613
3 mc
Step 1
2 mc 2 mc
B-601
L-604
Start
Start
Start
Start
2 mc
4 mc
Start
Start
Start
Start
Start
a-820 a-821 J-701 J-601
M1
M2
M3
M4