Tải bản đầy đủ (.pptx) (10 trang)

Accounting information system an overview 9e bodnar and hopwood 2015 chapter 22

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (171.21 KB, 10 trang )

Systems Design, Implementation, and Operation
Chapter 22

Copyright © 2015 Pearson Education, Inc.

22-1


Learning Objectives



Discuss the conceptual systems design process and the activities in this phase.



Discuss the physical systems design process and the activities in this phase.



Discuss the systems implementation and conversion process and the activities in
this phase.



Discuss the systems operation and maintenance process and the activities in this
phase.

Copyright © 2015 Pearson Education, Inc.

22-2




Phase 2: Conceptual Systems Design

Copyright © 2015 Pearson Education, Inc.

22-3


Phase 3: Physical Systems Design








Output design (e.g., reports)
File and database design
Input design (e.g., forms, computer screen input)
Program design
Procedures design
Control design

Copyright © 2015 Pearson Education, Inc.

22-4



Program Design










Determine user needs
Create and document development plan
Write the computer code
Test the program
Document the program
Train users
Install the system (including components and hardware)
Use and modify the system

Copyright © 2015 Pearson Education, Inc.

22-5


Phase 4: Systems Implementation






Implementation plan
Select and train personnel
Complete documentation








Development documentation
Operations documentation
User documentation

Testing the system
Conversion

Copyright © 2015 Pearson Education, Inc.

22-6


Testing the System



Walk-throughs






Processing test data





Step by step review

Test all valid transactions and error conditions

Acceptance tests



Use copies of real data

Copyright © 2015 Pearson Education, Inc.

22-7


Conversion Approaches



Direct conversion




Parallel conversion



Phase-in conversion



Pilot conversion



Terminates the old and begins with the new system



Operate old and new systems for a period of time



Gradual replacement of old elements with new system elements



Implement a system in a part of an organization (e.g., a branch)

Copyright © 2015 Pearson Education, Inc.


22-8


Phase 5: Operations and Maintenance



Conduct post-implementation review

Copyright © 2015 Pearson Education, Inc.

22-9


Key Terms











Conceptual design specifications
Conceptual systems design report
Scheduled report

Special-purpose analysis report
Triggered exception report
Demand report
Structured programming
Debugging
Program maintenance
Physical systems design report

Copyright © 2015 Pearson Education, Inc.














Systems implementation
Implementation plan
Walk-through
Processing test data
Acceptance test
Conversion
Direct conversion

Parallel conversion
Phase-in conversion
Pilot conversion
Post-implementation review
Post-implementation review report

22-10



×