ALCATEL BSS
A9120 BSC With Multipair Cables
Extension Manual
3BK 17186 0002 RJZZA Ed.05
BLANK PAGE BREAK
Status
RELEASED
Short title
INS
All rights reserved. Passing on and copying of this document, use
and communication of its contents not permitted without written
authorization from Alcatel/Evolium.
2 / 52
3BK 17186 0002 RJZZA Ed.05
Contents
Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1
5
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1
Hardware Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.1
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.2
Racks Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3
Weight and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2
Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3
Prerequisite . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.4
Initial State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.5
Final State . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.6
Operating Principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.7
Time Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.8
Information Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preliminary Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1
Before Leaving for the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2
Before Starting (on Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Racks Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1
Rack Delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2
Mechanical Assembling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.1
Preparing the Rack Already in Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.2
Racks Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.3
Racks Assembling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.4
Top Structures Fitting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.5
Right Side Panel Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2.6
Horizontal Cable Way Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inter-Rack Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7
8
8
9
10
10
10
10
10
11
12
12
13
14
14
15
16
18
18
20
21
22
22
23
25
PCM Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.1
Cable Installation in the Cable Way . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2
Cable Routing at Back of Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.3
Connecting to the Extension Racks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.4
PCM Cable Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6
Power Cables Connecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.1
Option: Case of 2-Wire Power System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.2
Case of 3-Wire Power System Connection (Standard Installation) . . . . . . . . . . . . . . . . . . . . . .
6.3
Test the Power Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7
Finishing Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.1
Mechanical Assembly Finishing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.2
Finishing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Appendix A : Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
29
30
30
31
34
35
36
39
41
43
44
46
47
2
3
4
5
Appendix B : List of Items Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
3BK 17186 0002 RJZZA Ed.05
3 / 52
Contents
4 / 52
3BK 17186 0002 RJZZA Ed.05
Preface
Preface
Purpose
Audience
This document describes how to extend on site a A9120 BSC with mutipair
cables of ALCATEL BSS (one or two racks)
This document is intended for:
Installers
Site administrators
Supervisors
Project managers
Field service technicians
Occasional users
Assumed Knowledge
You must have a basic understanding of the following:
Basic knowledge of Alcatel BSS equipment
Experience of electrical mounting and cabling
3BK 17186 0002 RJZZA Ed.05
5 / 52
Preface
6 / 52
3BK 17186 0002 RJZZA Ed.05
1 General Information
1 General Information
This chapter provides general information about the operating principle and
requirements of the procedure
Hardware Description
Restrictions
Prerequisite
Initial State
Final State
Time Schedule
Information Required
3BK 17186 0002 RJZZA Ed.05
7 / 52
1 General Information
1.1 Hardware Description
1.1.1 General Information
Rack A Rack B Rack C Rack D
Power
supply
Figure 1: Examples of Site Installation
8 / 52
3BK 17186 0002 RJZZA Ed.05
1 General Information
1.1.2 Racks Configuration
0 1 0 3 0 5 0 7 09 1 1 1 3 1 5 1 7 1 9 21 23 25 2 7 2 9 3 1 33 35 3 7 3 9 41 4 3 45 47 49 5 1 53 55 5 7 5 9 6 1 6 3
SAU
01
TR U
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
S S S
W D C W W W
C D C C C C
H
H H H
GS 2 G S 2 GS2 GS2 GS2 GS2 GS 2 GS2
1 /0 1 /1 1 /2 1 /3 1 /4 1 / 5 1 /6 1 /7
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
S S S
W D C W W W
C D C C C C
H
H H H
G S 2 G S 2 G S 2 G S2 G S 2 G S2 G S2 G S 2
2 /0 2/ 1 2 /2 2/ 3 2 /4 2 /5 2/6 2 /7
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
W D C
C D C
H
SAU
02
G S 2 G S 2 G S 2 G S 2 G S 2 G S 2 G S 2 G S2
3 /0 3 / 1 3 /2 3 /3 3 /4 3 /5 3 /6 3 /7
D C
D C
SAU
03
SAU
04
SAU
05
AI R B A FF L E
0 1 0 3 0 5 0 7 09 1 1 1 3 1 5 1 7 1 9 21 23 25 2 7 2 9 3 1 33 35 3 7 3 9 4 1 4 3 4 5 47 4 9 5 1 53 55 5 7 5 9 6 1 6 3
D C
D C
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
D D D
T T T
D A
T S
AS
2
AS
6
02 0
02 1
S
W
C
H
S
W
C
H
S
W
C
H
S
W D C
C D C
H
D D D D A
T T T T S
C C C C M C C C C M
C C C C B C C C C B
02 2
0 23
QA
4
D C
D C
02 5
0 26
B
I
U
A
QA
2
G S 1 G S 1 G S 1 G S 1 G S 1 G S 1 G S 1 G S1
0 /0 0 /1 0/2 0 /3 0 /4 0 /5 0 /6 0 /7
T
D C S
D C C
A
0 24
B
I
U
A
T
C
U
C
0 27
QA
5
T
T
D C
D C
T
T
T
T
S
W
C
H
S
W
C
H
D D D D
T T T T
AS
3
AS
7
0 30
T
A
S
C C C C M C C C C M
C C C C B C C C C B
T S
03 1
0 32
0 33
QA
6
034
C
C
C C C C
U U U U
C C C C
C W W D C D
U C C D C D
C H H
01 0
01 3
01 7
T T T T T T
C C C C C C
U U U U U U
C C C C C C
01 2
T
C
U
C
01 6
AS
1
035
03 6
01 5
S
W
C
H
S
S S S
W D C W W W
C D C C C C
H
H H H
SAU
06
QA
7
B
C
L
A
SAU
07
R ACK
M
S
AS
5
01 4
03 7
B
C
L
A
S
C C C
U U U
C C C
01 1
D D D D A
T T T T S
S
W
C
H
S
W
C
H
S
W
C
H
S
W
C
H
S
W D C
C D C
H
SAU
08
G S 2 G S 2 G S 2 G S 2 G S 2 G S 2 G S2 G S 2
0/0 0/ 1 0 /2 0 /3 0/4 0/5 0/6 0 /7
DC converter removed, starting from rack variant 3BK 06796 AAAC
Figure 2: Example of Extension Rack B, C or D (Front View)
3BK 17186 0002 RJZZA Ed.05
9 / 52
1 General Information
1.1.3 Weight and Dimensions
Width
1000 mm
Depth
700 mm
Height (with 50 mm eyebolts for
craning)
2100 mm
Weight
≈ 360 kg (maximum configuration)
1.2 Restrictions
None.
1.3 Prerequisite
The site conforms to the "safety rules" of General Wiring Handbook
The site is ready to receive the racks, according to the SPP 27
1.4 Initial State
Before starting the extension:
The racks and installation kits are packed and delivered on site
Rack A or Rack A+rack B or Rack A+rack B +rack C are already in operation
1.5 Final State
After finishing the extension:
The extension racks are ready for commissioning.
The extension racks are not powered up.
All the PCM cables between rack and site DDF must be installed for each rack.
The internal cables are installed but not connected to operational racks.
10 / 52
3BK 17186 0002 RJZZA Ed.05
1 General Information
1.6 Operating Principle
Preparation before leaving for the site
Delivery
Unpack the equipment
Install the racks on their final locations
Assemble the racks together
Fit the top structure
Fit the top rack horizontal cable tray
Fit the inter−rack cables
Run the PCM cables from the racks to the DDF
Connect the PCM cbles
Connect the power supply
Fit the labels, panels, doors
Finish the installation
3BK 17186 0002 RJZZA Ed.05
11 / 52
1 General Information
1.7 Time Schedule
Basic tasks per rack
duration for 1st
person
duration for 2nd
person
Total for two men
Preliminary checks
60
60
120
Delivery (*1)
60
60
120
Rack installation
75
190
265
Inter-rack cabling
100
0
100
PCM cabling
240
180
420
Finishing installation
15
15
30
Total per rack
550 mn
505 mn
1055 mn
(9.17 hours)
(8.42 hours)
(17.58 hours)
(*1) transportation time to final location depending of the site
1.8 Information Required
Site
Rack precise location
PCM terminal block location.
Rack
2 wires or 3 wire power system.
Kits
PCM cables impedance (120-ohms, 75-ohms).
12 / 52
3BK 17186 0002 RJZZA Ed.05
2 Preliminary Checks
2 Preliminary Checks
This chapter describes preparation for the operation in two steps:
Before leaving for the site
Before starting (On arrival at the site).
3BK 17186 0002 RJZZA Ed.05
13 / 52
2 Preliminary Checks
2.1 Before Leaving for the Site
Check that prerequisites have been
satisfied
See Prerequisite (Section 1.3)
Check availability of all Information
Required
See Information Required (Section 1.8)
Check availability of documentation
See Documents Required (in appendix B); check the
edition and release of the documents.
Check availability of tools
See Tools Required (in appendix B) ; refer to the “Tools
catalogue“ for checking the content
Check calibration label when asked.
Check availability of supplies
See Consumable Supplies (in appendix B).
2.2 Before Starting (on Arrival at the Site)
Check applicable notifications and
operation instructions
Refer to “Applicable notification list” (ITL) to check whether
notifications are to be applied during the operation
Refer to “Applicable operation instruction list” (IO) to check
whether operation instructions are to be applied during the
operation
Check that the safety instructions have
been applied
Refer to “General Wiring Handbook” to check that the
safety precautions have been taken in accordance with
the safety instructions
Read instructions in the event of anomaly
Refer to “General Wiring Handbook” for instructions
Fill in premises inspection form
Refer to “BSS site premises inspection, post handover” and
complete “Premise inspection form” (CEL)
Fill in completion check list
Complete the header field of the “Completion Check List”.
See “Tools catalogue“ and note measurement
The CCL is to be completed as each instruction is carried
out
Check the antistatic wrist strap
Check that the resistance of the antistatic wrist strap is
greater then 1 Mohm and connect it to the rack’s earth
Check availability of Alcatel kits
See Installation Kits (in appendix B)
14 / 52
3BK 17186 0002 RJZZA Ed.05
3 Racks Installation
3 Racks Installation
This chapter describes how to :
Move the racks to their final locations
Unpack the racks
Prepare the racks already in operation
Position the racks
Level the racks
Assemble the racks together
Assemble the horizontal cable way
The extension rack must be assembled with operating racks.
Before making mechanical installation or connection, ensure that the general
safety instructions are applied (see General Wiring Handbook)
3BK 17186 0002 RJZZA Ed.05
15 / 52
3 Racks Installation
3.1 Rack Delivery
Figure 3: Crane Transportation or Pallet Transportation
Procedure
1. Check the number of packages.
2. Report any damages on the carrier’s delivery note.
3. Unpack the equipment.
4. Inspect the racks for cracks, scratches, damages to boards ...
5. Check the serial number
6. Complete the CCL
16 / 52
3BK 17186 0002 RJZZA Ed.05
3 Racks Installation
Figure 4: Unpacking the Rack, then Checking the Serial Number
3BK 17186 0002 RJZZA Ed.05
17 / 52
3 Racks Installation
3.2 Mechanical Assembling
3.2.1 Preparing the Rack Already in Operation
12
12
12
Figure 5: Horizontal Cable Tray (Example on normal floor with site cable tray)
18 / 52
3BK 17186 0002 RJZZA Ed.05
3 Racks Installation
Figure 6: Lateral Panel and Its Supports
Procedure
1. Remove the screws between horizontal cable tray and right support (see
Figure 5).
2. Remove the right side panel (2 in Figure 6).
3. Remove the two rack top earthing brackets (1 in Figure 6).
4. Remove the three lateral panel supports ( Figure 6).
3BK 17186 0002 RJZZA Ed.05
19 / 52
3 Racks Installation
3.2.2 Racks Positioning
Procedure
1. Move the racks to their final location.
Figure 7: Moving the Rack
2. Position the racks in order A, B, C, D.
Rack A
Rack A
Rack C
Rack D
A
B
C
C
Figure 8: Front View Example with 4 Racks
3. Level the RacksUsing the Leveling Feet
20 / 52
3BK 17186 0002 RJZZA Ed.05
3 Racks Installation
Figure 9: Leveling Feet
3.2.3 Racks Assembling
Figure 10: Assembling the Racks
Procedure
1. Assemble the racks together without tightening the screw (1 in Figure10).
2. Insert the spacers (detail) on the screws between the rack (3 in Figure).
3. Insert the bottom contact rails (2 in Figure).
4. Tighten slightly the screws.
5. Fit the bottom contact cover plates (using M6 self theading screws)
3BK 17186 0002 RJZZA Ed.05
21 / 52
3 Racks Installation
3.2.4 Top Structures Fitting
Figure 11: Top Structure
1. Remove the rear cable clamp from top structure
2. Fix the top structure to the rack (4 screws).
3.2.5 Right Side Panel Installation
Procedure
1. Fix the 3 panel supports at right side of the last extension rack.
2. Fix the 2 side panel earthing brackets (1) at top of the last rack.
22 / 52
3BK 17186 0002 RJZZA Ed.05
3 Racks Installation
3. Screw the screws 1AD 00007 0146 to the side panel without tightening them.
4. Position the right side panel (2).
5. Tighten the fastening screws.
3.2.6 Horizontal Cable Way Installation
1
3
12
12
12
2
4
Figure 12: Horizontal Cable Way Mounting
5
6
Figure 13: Fish Plate Mounting
Procedure
1. Lay the mounting on (1) the top of right panel (2). See Figure 12.
2. Fix the pre-cut horizontal cable tray (3) to the mountings.
3. Mount the fish plates (5) and braids between cable trays (6). See Figure 13.
4. Connect earth braid (4 in Figure 12) between structure and horizontal
cable tray.
3BK 17186 0002 RJZZA Ed.05
23 / 52
3 Racks Installation
24 / 52
3BK 17186 0002 RJZZA Ed.05
4 Inter-Rack Cabling
4 Inter-Rack Cabling
This chapter describes the procedure to fit the inter-rack cables between
rack A, B, C and D.
3BK 17186 0002 RJZZA Ed.05
25 / 52