4
Process Analysis
PowerPoint Slides
by Jeff Heyl
For Operations Management, 9e by
Krajewski/Ritzman/Malhotra
© 2010 Pearson Education
4–1
Process Analysis
Processes may be the least understood
and managed aspect of a business
A firm can not gain a competitive
advantage with faulty processes
Processes can be analyzed and improved
using certain tools and techniques
Process analysis can be accomplished
using a six-step blueprint
4–2
A Systematic Approach
Define
scope
2
Identify
opportunity
1
Document
process
3
Implement
changes
6
Evaluate
performance
4
Redesign
process
5
Figure 4.1 – Blueprint for Process Analysis
4–3
Documenting The Process
Three effective techniques for
documenting and evaluating processes are
1)
Flowcharts
2)
Service blueprints
3)
Process charts
They help you see how a process operates
and how well it is performing
Can help find performance gaps
4–4
Flowcharts
Marketing
lead
Sales: Initial
conversation
with client
Sales and/or
consulting
drafts proposal
Sales
lead
Follow-up
conversation
between client
and sales
No
Consulting:
Initial
conversation
with client
Consulting
lead
Consulting
drafts
proposal
Follow-up
conversation
between client
and consulting
Line of visibility
Follow-up by
accounting,
sales, or
consulting
Client billed by
accounting,
sales, or
consulting
Yes
Approval
by
consulting?
Is
proposal
complete?
Yes
Nested Process
Client agreement
and service
delivery
Final invoice
created by
accounting, sales,
or consulting
No
No
Payment
received?
Yes
Finish
Figure 4.2 – Flowchart of the Sales Process
for a Consulting Company
4–5
Flowcharts
Is
proposal
complete?
Final invoice
created by
accounting, sales,
or consulting
Verbal OK
from client
Form
completed by
sales or
consulting
Project
manager
assigned
Delivery of
service by
consulting
50% invoiced
by accounting,
sales, or
consulting
Letter of
agreement
signed
Figure 4.3 – Flowchart of the Nested Subprocess of
Client Agreement and Service Delivery
4–6
CUSTOMER
Order
completed
and submitted
100%
of credit
checked within
24 hours
Two
scheduling
errors per
quarter
Payment
sent
FINANCE
Yes
New
customer?
Credit
check
OK?
Yes
Production
scheduled
Order
Items
manufactured
`
Packages
assembled and
inventoried
Invoice
sent
Order
stopped
Order
picked
Product packages
Inventory
adjusted
Invoice
prepared
Payment
received
Notice of shipment
Production Control
and Manufacturing
Order
entered
No
Order cancellation
Order
Order
received
No
Assembly and
Shipping
Payment
Order
cancelled
Credit and
invoicing
PRODUCTION
Product
and invoice
received
Order
Order
generated
SALES
Flowcharts
Order
shipped
Figure 4.4 – Flowchart of the Order-Filling Process Showing Handoffs
Between Departments
4–7
Process Charts
An organized way to document all the
activities performed by a person or group
Activities are typically organized into five
categories
Operation,
Transportation,
Inspection,
Delay,
Storage,
4–8
Process Charts
Step
No.
Time
(min)
Distance
(ft)
1
0.50
15.0
2
10.00
3
0.75
4
3.00
5
0.75
6
1.00
7
1.00
8
4.00
9
5.00
10
2.00
11
3.00
12
2.00
13
3.00
14
2.00
15
1.00
16
4.00
17
2.00
18
4.00
Sit down and fill out patient history
X
Nurse escorts patient to ER triage room
X
Nurse inspects injury
X
40.0
Return to waiting room
X
X
60.0
X
Nurse takes patient to radiology
X
Technician x-rays patient
X
Return to bed in ER
X
X
X
X
X
Return to emergency entrance area
Check out
X
180.0
Wait for doctor to return
Doctor provides diagnosis and advice
X
60.0
Wait for doctor
Doctor inspects injury and questions patient
X
200.0
Wait for available bed
Go to ER bed
X
200.0
Step Description
Enter emergency room, approach patient window
X
40.0
Walk to pharmacy
Pick up prescription
Leave the building
20.0 for Emergency
Figure
Process Chart
19 4.5 –1.00
X Room Admission
4–9
Process Charts
Step
No.
Time
(min)
Distance
(ft)
1
0.50
15.0
2
10.00
3
0.75
4
3.00
5
0.75
6
1.00
7
1.00
8
4.00
9
5.00
10
2.00
11
3.00
12
2.00
13
3.00
14
2.00
15
1.00
16
4.00
17
2.00
18
4.00
Activity
X
Operation
X
X
40.0
Transport
X
Inspect
X
60.0
X
Delay
X
X
200.0
Store
X
5 to ER triage
23.00room
Nurse escorts patient
Nurse inspects injury
9
Return to waiting room
Wait for available2bed
Go to ER bed
Wait for doctor
3
11.00
815
8.00
8.00
Doctor inspects injury
patient
― and questions
―
Wait for doctor to return
Doctor provides diagnosis and advice
X
X
Return to emergency entrance area
Check out
X
X
X
(ft)
Return to bed in ER
X
180.0
(min)
Technician x-rays patient
X
60.0
of Steps
Nurse takes patient to radiology
X
200.0
Number
TimepatientDistance
Enter emergency
room, approach
window
Sit down and fill out patient history
X
40.0
Summary
Step Description
Walk to pharmacy
Pick up prescription
Leave the building
20.0 for Emergency
Figure
Process Chart
19 4.5 –1.00
X Room Admission
4 – 10
Process Charts
The annual cost of an entire process can
be estimated
It is the product of
1)
Time in hours to perform the process each
time
2)
Variable costs per hour
3)
Number of times the process is performed
each year
Annual
labor cost
=
Time to perform
the process in hours
Variable costs
per hour
Number of times process
performed each year
4 – 11
Process Charts
If the average time to serve a customer is
4 hours
The variable cost is $25 per hour
And 40 customers are served per year
The total labor cost is
4 hrs/customer $25/hr 40 customers/yr = $4,000
4 – 12
Work Measurement Techniques
Used to estimate the average time each
step in a process would take
1)
Time study method
2)
Elemental standard data approach
3)
Predetermined data approach
4)
Work sampling method
Learning curve analysis is appropriate for
new products or processes
4 – 13
Time Study of Revised Process
EXAMPLE 4.1
A process at a watch assembly plant has been changed. The
process is divided into three work elements. A time study has
been performed with the following results. The time standard
for process previously was 14.5 minutes. Based on the new
time study, should the time standard be revised?
SOLUTION
The new time study had an initial sample of four observations,
with the results shown in the following table. The performance
rating factor (RF) is shown for each element, and the allowance
for the whole process is 18 percent of the total normal time.
4 – 14
Time Study of Revised Process
Obs 1
Obs 2
Obs 3
Obs 4
Average
(min)
RF
Normal
Time
Element 1
2.60
2.34
3.12
2.86
2.730
1.0
2.730
Element 2
4.94
4.78
5.10
4.68
4.875
1.1
5.363
Element 3
2.18
1.98
2.13
2.25
2.135
0.9
1.922
Total Normal Time = 10.014
The normal time for an element in the table is its average time,
multiplied by the RF. The total normal time for the whole
process is the sum of the normal times for the three elements,
or 10.01 minutes. To get the standard time (ST) for the process,
just add in the allowance, or
ST = 10.014(1 + 0.18) = 11.82 minutes/watch
4 – 15
Work Sampling
Figure 4.6 – Work Sampling Study of Admission Clerk at Health
Clinic Using OM Explorer
4 – 16
Learning Curves
140,000
Labor Hours per Unit
120,000 –
100,000 –
80,000 –
60,000 –
40,000 –
20,000 –
0
|
|
|
|
|
|
|
0
20
40
60
80
100
120
Cumulative Units Produced
Figure 4.7 – Learning Curve with 80% Learning Rate Using OM Explorer
4 – 17
Evaluating Performance
Chapter 5, Quality and Performance
Customer satisfaction measures
Error rate
Rework or scrap rate
Internal failure costs
Chapter 6, Capacity Planning; Supplement C, Waiting Lines; Supplement H,
Measuring Output Rates; Supplement I, Learning Curve Analysis
Processing time
Total time from start to finish (throughput time)
Setup time
Operating expenses
Capacity utilization
Average waiting time
Average number of customers or jobs waiting in line
Figure 4.8 – Metrics for Flowcharts, Process Charts, and Accompanying Tables
4 – 18
Evaluating Performance
Chapter 7, Constraint Management
Cycle time
Idle time
Chapter 8, Lean Systems
Setup time
Average waiting time
Total time from start to finish (throughput time)
Waste
Figure 4.8 – Metrics for Flowcharts, Process Charts, and Accompanying Tables
4 – 19
Data Analysis Tools
Help identify causes of problems
1)
Checklists
2)
Histograms and bar charts
3)
Pareto charts
4)
Scatter diagrams
5)
Cause-and-effect diagrams
6)
Graphs
4 – 20
Pareto Chart for a Restaurant
EXAMPLE 4.2
The manager of a neighborhood restaurant is concerned about
the smaller numbers of customers patronizing his eatery.
Complaints have been rising, and he would like to find out what
issues to address and present the findings in a way his
employees can understand.
SOLUTION
The manager surveyed his customers over several weeks and
collected the following data:
Complaint
Frequency
Discourteous server
12
Slow service
42
Cold dinner
5
Cramped table
20
Atmosphere
10
4 – 21
Pareto Chart for a Restaurant
Failures
Figure 4.9 is a bar chart and Figure 4.10 is a Pareto chart, both
created with OM Explorer’s Bar, Pareto, and Line Charts solver.
They present the data in a way that shows which complaints are
more prevalent (the vital few).
50 –
45 –
40 –
35 –
30 –
25 –
20 –
10 –
5–
0–
Discourteous
server
Slow
service
Cold
dinner
Cramped
tables
Atmosphere
Failure Name
Figure 4.9 – Bar Chart
4 – 22
Pareto Chart for a Restaurant
(42 + 20)
100% = 69.7%
89
45 –
– 100.0%
40 –
Failures
30 –
– 60.0%
25 –
– 40.0%
20 –
– 20.0%
10 –
Percent of Total
– 80.0%
35 –
– 0.0%
5–
0–
Slow
service
Cramped
tables
Discourteous
server
Atmosphere
Cold
dinner
Failure Name
Figure 4.10 – Pareto Chart
4 – 23
Analysis of Flight Departure Delays
EXAMPLE 4.3
The operations manager for Checker Board Airlines at Port
Columbus International Airport noticed an increase in the
number of delayed flight departures.
SOLUTION
To analyze all the possible causes of that problem, the
manager constructed a cause-and-effect diagram, shown in
Figure 4.11. The main problem, delayed flight departures, is the
“head” of the diagram. He brainstormed all possible causes
with his staff, and together they identified several major
categories: equipment, personnel, materials, procedures, and
“other factors” that are beyond managerial control. Several
suspected causes were identified for each major category.
4 – 24
Analysis of Flight Departure Delays
Equipment
Personnel
Aircraft late to gate
Other
Passenger processing at gate
Mechanical failures
Late cabin cleaners
Weather
Unavailable cockpit crew
Air traffic delays
Late cabin crew
Late baggage to aircraft
Late fuel
Late food service
Contractor not provided
with updated schedule
Materials
Poor announcement of departures
Delayed
flight
departures
Weight/balance sheet late
Delayed check-in procedure
Waiting for late passengers
Procedures
Figure 4.11 – Cause-and-Effect Diagram for Flight Departure Delays
4 – 25