Tải bản đầy đủ (.doc) (13 trang)

T10206 DN02 P0BYC 840001 protection relay panel

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (202.48 KB, 13 trang )

FOR COMMENT

A
Rev
Owner

16-Jan-13
Date

S.J Cho
Prepared

C.K Kim
Checked

Y.M Cho
Approved

For Comment
Details of Revision

AES-VCM MONG DUONG
POWER COMPANY LIMITED
Consultant

POWER ENGINEERING CONSULTING
JOINT STOCK COMPANY 2
Contractor

Doosan Heavy Industries & Construction Co., Ltd
PC



Project :

T10206

MONG DUONG II 2 x 560MW(NET)
THERMAL POWER PLANT

UAS
DN02
UNIT
P0
KKS

Title

COMMISSIONING PROCEDURE
FOR
PROTECTION RELAY PANEL OF SITE TEST
(GEN, GSUT, UAT, SAT, TARIFF METER)
Document No.

BYC
Reg. No.
840001
Rev.
A

Pages –No.


T10206-DN02-P0BYC-840001

1 of 13


Rev. A

Table of Contents

1.0

GENERAL PURPOSE...........................................................................................3

1.1

Introduction and commissioning boundary........................................................................3

1.2

Scope of commissioning package.....................................................................................3

1.3

The safety knowledge in operation....................................................................................4

2.0

GENERAL SPECIFICATION.............................................................................. 5

2.1


Specification.......................................................................................................................5

2.2

Protection Relay & Tariff Meter..........................................................................................6

2.3

Setting................................................................................................................................6

2.4

Testing Equipment Required..............................................................................................6

3.0

TEST PROCEDURE.......................................................................................... 7

3.1

Panels Inspection...............................................................................................................7

3.2

Test for each equipment (de-energized)............................................................................9

3.3

Test for each equipment (energized).................................................................................9


3.4

Settings check..................................................................................................................10

3.5

On-load check..................................................................................................................10

3.6

Final checks.....................................................................................................................11

4.0

RESULT OF CHECK SHEETS......................................................................... 12

5.0

ATTACHMENTS..................................................................................................13
Attachment 5.1 GSUT #1,2 Primary Protection Relay Panel
Attachment 5.2 GSUT #1,2 Backup Protection Relay Panel
Attachment 5.3 UAT #1,2 Primary Protection Relay Panel
Attachment 5.4 UAT #1,2 Backup Protection Relay Panel
Attachment 5.5 GEN Primary Protection Relay Panel
Attachment 5.6 GEN Backup Protection Relay Panel
Attachment 5.7 SAT Primary & Backup Protection Relay Panel
Attachment 5.8 GSUT #1,2 , SAT Main Tariff Meter & Check Tariff Meter
Attachment 5.9 UAT #1,2 , Gen #1, 2 Main Tariff Meter & Check Tariff Meter


Page 2 of 13


Rev. A

1.0

GENERAL PURPOSE

1.1

Introduction and commissioning boundary

This

procedure

covers

the

activities

required

for

testing

and


commissioning of the following Protection Relay Panel for Gen, GSUT,
SAT, UAT, Tariff Meter consist of the below table
KKS Number

1.2

Description

P1BAY01

GSUT #1,2 PRIMARY PROTECTION RELAY PANEL

P1BAY02

GSUT #1,2 BACKUP PROTECTION RELAY PANEL

P1BYB01

UAT #1,2 PRIMARY PROTECTION RELAY PANEL

P1BYB02

UAT #1,2 BACKUP PROTECTION RELAY PANEL

P1BYA01

GEN #1,2 PRIMARY PROTECTION RELAY PANEL

P1BYA02


GEN #1,2 BACKUP PROTECTION RELAY PANEL

P1BYC01

SAT PRIMARY PROTECTION RELAY PANEL

P1BYC02

SAT BACKUP PROTECTION RELAY PANEL

P1ASQ01

GSUT #1,2 SAT MAIN TARIFF METER

P1ASQ01

GSUT #1,2 SAT CHECK TARIFF METER

P1ASQ02

UAT #1,2 MAIN TARIFF METER

P1ASQ02

GEN #1,2 TARIFF METER

Scope of commissioning package
The commissioning package for Protection Relay Panel for Tariff Meter consist of the following
packages :

KKS Number

Description

P1BAY01

GSUT #1,2 PRIMARY PROTECTION RELAY PANEL

P1BAY02

GSUT #1,2 BACKUP PROTECTION RELAY PANEL

P1BYB01

UAT #1,2 PRIMARY PROTECTION RELAY PANEL

P1BYB02

UAT #1,2 BACKUP PROTECTION RELAY PANEL

P1BYA01

GEN #1,2 PRIMARY PROTECTION RELAY PANEL

P1BYA02

GEN #1,2 BACKUP PROTECTION RELAY PANEL

P1BYC01


SAT PRIMARY PROTECTION RELAY PANEL

P1BYC02

SAT BACKUP PROTECTION RELAY PANEL

P1ASQ01

GSUT #1,2 SAT MAIN TARIFF METER

P1ASQ01

GSUT #1,2 SAT CHECK TARIFF METER

P1ASQ02

UAT #1,2 MAIN TARIFF METER

P1ASQ02

GEN #1,2 TARIFF METER

Page 3 of 13


Rev. A

1.3
1.3.1


The safety knowledge in operation
Before the start of any testing it should be confirmed that all power supplies to the system have
been isolated or that they are in a known condition. The Commissioning engineer is
responsible for the safety of those personnel working of the system Check for the presence of
harmful electrical or mechanical potential energy before starting work.

1.3.2

Project Lockout / Tag out (LOTO) procedures must be adhere to all test area.

1.3.3

Fire is strictly prohibited on site, no smoking there must be a warning mark in hazardous area.

1.3.4

Strictly comply with the safety and environmental protection regulations of local government.

1.3.5

In order to ensure the reliable operation of every part of the system, strictly obey the
corresponding procedures.

1.3.6
1.3.7

Have a regular maintenance for the long-time standby equipment
Obey the relevant safety regulations of the power plant during commissioning all along. Ensure
the successful commissioning work.


1.3.8

All personnel directly involved with the commissioning that will attend a kickoff safety meeting to
review for the dangers. Ensure that all personnel understand the process and the operation.
Any personnel involved in the commissioning have the authority to terminate the operation at
any time, if a serious problem or safety issue develops.

Page 4 of 13


Rev. A

2.0

GENERAL SPECIFICATION

2.1

Specification
The following test and inspection will be performed as follows;
-

Visual check and measurement of dimension

-

Measurements of insulation resistance

-


Material type test report check

-

Operation test
ⅰ) Protection : Over-current, Differential, Under/over voltage, DC auxiliary
ⅱ) TR Protection :
ⅲ) Metering : Measuring of A, V, F, PF, KW, KVAR, KVA, KWH, KVARH, KVAH
ⅳ) Synchro.-check : Synchro. check
ⅴ) FMS : Function check, Data recording check, Communication check, Setting &
configuration check, Diagnostic check

-

Wiring test

-

Insulation test

-

High voltage test

-

Hardware functionality test

-


System alarm test

-

Accuracy test

The results of the tests will be prepared and submitted.
The procedure will be tested in accordance with the requirements of the current
issues of the IEC standard.



Page 5 of 13


Rev. A
2.2

Protection Relay & Tariff Meter
Protection relay and tariff meter are fully numerical in their design, implementing all protection
and non-protection functions in software. The equipment employ a high degree of selfchecking and, in the unlikely event of a failure, will give an alarm. To commission equipment,
it is only necessary to verify that the hardware is functioning correctly and the applicationspecific software setting have been applied to the equipment. It is considered unnecessary to
test every function of the equipment if the settings have been verified by one of following
methods;

2.3

-

Extracting the settings applied to the relay using appropriate setting software


-

Via the operator interface

Setting
The equipment will be tested in accordance with the application-specific settings furnished by
the contractor, after which, tests should be made to determine if the actual operating
characteristics check with the adjustments made.

2.4

Testing Equipment Required
-

OMICRON CMC256+ test sets (Secondary Injection Tester).

-

An insulation tester and multi-meter

-

A laptop PC with setup software,

-

Multi-finger test Plug

Page 6 of 13



Rev. A

3.0

TEST PROCEDURE
The test is performed by the procedure as below; The result of the test will be checked and
recorded to the attached check sheets. The recorded check sheets will be submitted to
purchaser.

3.1
3.1.1

Panels Inspection
Visual Inspection









3.1.2

Signed

Check

Yes
No

Signed

Any damaged parts
Any missing components
Rating information in conformity with installation
Earth terminals on case connected
Correct Name plates
Painting color: RAL7032
Degree of protection : IP41

Dimension Inspection




3.1.3

Check
Yes
No

Dimension within an acceptable error
Thickness of painting : More than 60㎛

Wiring Check
Check
Yes




No

Signed

Wiring checked against diagram

Page 7 of 13


Rev. A



Terminal lug type (Ring type)



Cable type (Flame-retardant)



Cable color & size

- VT secondary circuit : Blue (1.5 mm2)
- CT secondary circuit : Black (2.5 mm2)
- AC control circuit : Gray (1.5 mm2
- DC control circuit : Gray (1.5 mm2)

- Ground circuit : Yellow/Green (2.5 mm2)

3.1.4

Insulation Test


3.1.5

Insulation test for wiring

Yes

No

Signed

Sequence Test
Check
Yes

3.1.6

3.2
3.2.1



AC sequence test




DC sequence test



DI, DO Module test



Trip & Alarm sequence test

No

Signed

Auxiliary supply measured : V DC

Test for each equipment (de-energized)
Visual Inspection
Check

Signed

Page 8 of 13


Rev. A

Yes




Any damaged parts



Rating information in conformity with installation



Earth terminals on case connected



When the relay is withdrawn from its case, check if

No

the current short- circuits are closed

3.2.2

Watchdog Check(if provided)


3.2.3

Wiring checked against diagram


Watchdog contacts (auxiliary supply connected)

3.3.2

Date and time


3.4.1

Signed

Clock set for local time?

Yes

No

Signed

Operation of the LEDs OK?

Yes

No

Signed

Operation of opto-isolated inputs OK?

Yes


No

Signed

Operation of outputs OK?

Yes

No

Signed

Rear Communication check


3.4

No

Output relays


3.3.6

Yes

Opto-isolated inputs



3.3.5

Signed

Indicator LEDs


3.3.4

No

Test for each equipment (energized)

3.3.1

3.3.3

Yes

Wiring Check


3.3

Watchdog contacts (auxiliary supply disconnected)

RS485/Ethernet/IEC61850 communication OK?

Yes


No

Signed

Settings check
Setting
Check

Signed

Page 9 of 13


Rev. A

Yes



Application-specific function settings applied



Application-specific programmable schematic logic

No

settings applied

3.4.2


Setting Check
Check
Yes



Application-specific function settings verified



Application-specific programmable schematic logic

No

Signed

tested

3.4.3

Function Time Test
Check
Yes

3.5



Protection function timing tested




Expected operating time



Measured operating time

No

On-load check
Check
Yes

3.5.1

Signed



Test wiring removed



Disturbed customer wiring re-checked



On-load test performed


No

Signed

PT check
Check
Yes



No

Signed

PT wiring checked

Page 10 of 13


Rev. A

3.5.2



Phase rotation correct




Display voltage

CT check
Check
Yes

3.6



CT wiring checked



CT polarities correct



Display current

No

Signed

Final checks
Check
Yes




Test wiring removed



Disturbed customer wiring re-checked



Test mode disabled



Current count reset



Menu language set to customer preference



Event record reset



Fault record reset



Disturbance record reset




Alarm reset



LEDs reset

No

Signed

Page 11 of 13


Rev. A

4.0

RESULT OF CHECK SHEETS

4.1

Calibration &Test Report for SAT Protection Relay

4.2

Calibration &Test Report for GEN Protection Relay

4.3


Calibration & Test Report for GSUT Protection Relay

4.4

Calibration & Test Report for UAT Protection Relay

4.5

Calibration & Test Report for Tariff Meter (GEN, UAT, GSUT, SAT)

Page 12 of 13


Rev. A

5.0

ATTACHMENTS
Attachment 5.1 GSUT #1,2 Primary Protection Relay Panel
Attachment 5.2 GSUT #1,2 Backup Protection Relay Panel
Attachment 5.3 UAT #1,2 Primary Protection Relay Panel
Attachment 5.4 UAT #1,2 Backup Protection Relay Panel
Attachment 5.5 GEN Primary Protection Relay Panel
Attachment 5.6 GEN Backup Protection Relay Panel
Attachment 5.7 SAT Primary & Backup Protection Relay Panel
Attachment 5.8 GSUT #1,2 , SAT Main Tariff Meter & Check Tariff Meter
Attachment 5.9 UAT #1,2 , Gen #1, 2 Main Tariff Meter & Check Tariff Meter

Page 13 of 13




×