FOR COMMENT
A
Rev
Owner
16-Jan-13
Date
S.J Cho
Prepared
C.K Kim
Checked
Y.M Cho
Approved
For Comment
Details of Revision
AES-VCM MONG DUONG
POWER COMPANY LIMITED
Consultant
POWER ENGINEERING CONSULTING
JOINT STOCK COMPANY 2
Contractor
Doosan Heavy Industries & Construction Co., Ltd
PC
Project :
T10206
MONG DUONG II 2 x 560MW(NET)
THERMAL POWER PLANT
UAS
DN02
UNIT
P0
KKS
Title
COMMISSIONING PROCEDURE
FOR
PROTECTION RELAY PANEL OF SITE TEST
(GEN, GSUT, UAT, SAT, TARIFF METER)
Document No.
BYC
Reg. No.
840001
Rev.
A
Pages –No.
T10206-DN02-P0BYC-840001
1 of 13
Rev. A
Table of Contents
1.0
GENERAL PURPOSE...........................................................................................3
1.1
Introduction and commissioning boundary........................................................................3
1.2
Scope of commissioning package.....................................................................................3
1.3
The safety knowledge in operation....................................................................................4
2.0
GENERAL SPECIFICATION.............................................................................. 5
2.1
Specification.......................................................................................................................5
2.2
Protection Relay & Tariff Meter..........................................................................................6
2.3
Setting................................................................................................................................6
2.4
Testing Equipment Required..............................................................................................6
3.0
TEST PROCEDURE.......................................................................................... 7
3.1
Panels Inspection...............................................................................................................7
3.2
Test for each equipment (de-energized)............................................................................9
3.3
Test for each equipment (energized).................................................................................9
3.4
Settings check..................................................................................................................10
3.5
On-load check..................................................................................................................10
3.6
Final checks.....................................................................................................................11
4.0
RESULT OF CHECK SHEETS......................................................................... 12
5.0
ATTACHMENTS..................................................................................................13
Attachment 5.1 GSUT #1,2 Primary Protection Relay Panel
Attachment 5.2 GSUT #1,2 Backup Protection Relay Panel
Attachment 5.3 UAT #1,2 Primary Protection Relay Panel
Attachment 5.4 UAT #1,2 Backup Protection Relay Panel
Attachment 5.5 GEN Primary Protection Relay Panel
Attachment 5.6 GEN Backup Protection Relay Panel
Attachment 5.7 SAT Primary & Backup Protection Relay Panel
Attachment 5.8 GSUT #1,2 , SAT Main Tariff Meter & Check Tariff Meter
Attachment 5.9 UAT #1,2 , Gen #1, 2 Main Tariff Meter & Check Tariff Meter
Page 2 of 13
Rev. A
1.0
GENERAL PURPOSE
1.1
Introduction and commissioning boundary
This
procedure
covers
the
activities
required
for
testing
and
commissioning of the following Protection Relay Panel for Gen, GSUT,
SAT, UAT, Tariff Meter consist of the below table
KKS Number
1.2
Description
P1BAY01
GSUT #1,2 PRIMARY PROTECTION RELAY PANEL
P1BAY02
GSUT #1,2 BACKUP PROTECTION RELAY PANEL
P1BYB01
UAT #1,2 PRIMARY PROTECTION RELAY PANEL
P1BYB02
UAT #1,2 BACKUP PROTECTION RELAY PANEL
P1BYA01
GEN #1,2 PRIMARY PROTECTION RELAY PANEL
P1BYA02
GEN #1,2 BACKUP PROTECTION RELAY PANEL
P1BYC01
SAT PRIMARY PROTECTION RELAY PANEL
P1BYC02
SAT BACKUP PROTECTION RELAY PANEL
P1ASQ01
GSUT #1,2 SAT MAIN TARIFF METER
P1ASQ01
GSUT #1,2 SAT CHECK TARIFF METER
P1ASQ02
UAT #1,2 MAIN TARIFF METER
P1ASQ02
GEN #1,2 TARIFF METER
Scope of commissioning package
The commissioning package for Protection Relay Panel for Tariff Meter consist of the following
packages :
KKS Number
Description
P1BAY01
GSUT #1,2 PRIMARY PROTECTION RELAY PANEL
P1BAY02
GSUT #1,2 BACKUP PROTECTION RELAY PANEL
P1BYB01
UAT #1,2 PRIMARY PROTECTION RELAY PANEL
P1BYB02
UAT #1,2 BACKUP PROTECTION RELAY PANEL
P1BYA01
GEN #1,2 PRIMARY PROTECTION RELAY PANEL
P1BYA02
GEN #1,2 BACKUP PROTECTION RELAY PANEL
P1BYC01
SAT PRIMARY PROTECTION RELAY PANEL
P1BYC02
SAT BACKUP PROTECTION RELAY PANEL
P1ASQ01
GSUT #1,2 SAT MAIN TARIFF METER
P1ASQ01
GSUT #1,2 SAT CHECK TARIFF METER
P1ASQ02
UAT #1,2 MAIN TARIFF METER
P1ASQ02
GEN #1,2 TARIFF METER
Page 3 of 13
Rev. A
1.3
1.3.1
The safety knowledge in operation
Before the start of any testing it should be confirmed that all power supplies to the system have
been isolated or that they are in a known condition. The Commissioning engineer is
responsible for the safety of those personnel working of the system Check for the presence of
harmful electrical or mechanical potential energy before starting work.
1.3.2
Project Lockout / Tag out (LOTO) procedures must be adhere to all test area.
1.3.3
Fire is strictly prohibited on site, no smoking there must be a warning mark in hazardous area.
1.3.4
Strictly comply with the safety and environmental protection regulations of local government.
1.3.5
In order to ensure the reliable operation of every part of the system, strictly obey the
corresponding procedures.
1.3.6
1.3.7
Have a regular maintenance for the long-time standby equipment
Obey the relevant safety regulations of the power plant during commissioning all along. Ensure
the successful commissioning work.
1.3.8
All personnel directly involved with the commissioning that will attend a kickoff safety meeting to
review for the dangers. Ensure that all personnel understand the process and the operation.
Any personnel involved in the commissioning have the authority to terminate the operation at
any time, if a serious problem or safety issue develops.
Page 4 of 13
Rev. A
2.0
GENERAL SPECIFICATION
2.1
Specification
The following test and inspection will be performed as follows;
-
Visual check and measurement of dimension
-
Measurements of insulation resistance
-
Material type test report check
-
Operation test
ⅰ) Protection : Over-current, Differential, Under/over voltage, DC auxiliary
ⅱ) TR Protection :
ⅲ) Metering : Measuring of A, V, F, PF, KW, KVAR, KVA, KWH, KVARH, KVAH
ⅳ) Synchro.-check : Synchro. check
ⅴ) FMS : Function check, Data recording check, Communication check, Setting &
configuration check, Diagnostic check
-
Wiring test
-
Insulation test
-
High voltage test
-
Hardware functionality test
-
System alarm test
-
Accuracy test
The results of the tests will be prepared and submitted.
The procedure will be tested in accordance with the requirements of the current
issues of the IEC standard.
…
Page 5 of 13
Rev. A
2.2
Protection Relay & Tariff Meter
Protection relay and tariff meter are fully numerical in their design, implementing all protection
and non-protection functions in software. The equipment employ a high degree of selfchecking and, in the unlikely event of a failure, will give an alarm. To commission equipment,
it is only necessary to verify that the hardware is functioning correctly and the applicationspecific software setting have been applied to the equipment. It is considered unnecessary to
test every function of the equipment if the settings have been verified by one of following
methods;
2.3
-
Extracting the settings applied to the relay using appropriate setting software
-
Via the operator interface
Setting
The equipment will be tested in accordance with the application-specific settings furnished by
the contractor, after which, tests should be made to determine if the actual operating
characteristics check with the adjustments made.
2.4
Testing Equipment Required
-
OMICRON CMC256+ test sets (Secondary Injection Tester).
-
An insulation tester and multi-meter
-
A laptop PC with setup software,
-
Multi-finger test Plug
Page 6 of 13
Rev. A
3.0
TEST PROCEDURE
The test is performed by the procedure as below; The result of the test will be checked and
recorded to the attached check sheets. The recorded check sheets will be submitted to
purchaser.
3.1
3.1.1
Panels Inspection
Visual Inspection
3.1.2
Signed
Check
Yes
No
Signed
Any damaged parts
Any missing components
Rating information in conformity with installation
Earth terminals on case connected
Correct Name plates
Painting color: RAL7032
Degree of protection : IP41
Dimension Inspection
3.1.3
Check
Yes
No
Dimension within an acceptable error
Thickness of painting : More than 60㎛
Wiring Check
Check
Yes
No
Signed
Wiring checked against diagram
Page 7 of 13
Rev. A
Terminal lug type (Ring type)
Cable type (Flame-retardant)
Cable color & size
- VT secondary circuit : Blue (1.5 mm2)
- CT secondary circuit : Black (2.5 mm2)
- AC control circuit : Gray (1.5 mm2
- DC control circuit : Gray (1.5 mm2)
- Ground circuit : Yellow/Green (2.5 mm2)
3.1.4
Insulation Test
■
3.1.5
Insulation test for wiring
Yes
No
Signed
Sequence Test
Check
Yes
3.1.6
3.2
3.2.1
AC sequence test
DC sequence test
DI, DO Module test
Trip & Alarm sequence test
No
Signed
Auxiliary supply measured : V DC
Test for each equipment (de-energized)
Visual Inspection
Check
Signed
Page 8 of 13
Rev. A
Yes
Any damaged parts
Rating information in conformity with installation
Earth terminals on case connected
When the relay is withdrawn from its case, check if
No
the current short- circuits are closed
3.2.2
Watchdog Check(if provided)
■
3.2.3
Wiring checked against diagram
Watchdog contacts (auxiliary supply connected)
3.3.2
Date and time
■
3.4.1
Signed
Clock set for local time?
Yes
No
Signed
Operation of the LEDs OK?
Yes
No
Signed
Operation of opto-isolated inputs OK?
Yes
No
Signed
Operation of outputs OK?
Yes
No
Signed
Rear Communication check
■
3.4
No
Output relays
■
3.3.6
Yes
Opto-isolated inputs
■
3.3.5
Signed
Indicator LEDs
■
3.3.4
No
Test for each equipment (energized)
3.3.1
3.3.3
Yes
Wiring Check
■
3.3
Watchdog contacts (auxiliary supply disconnected)
RS485/Ethernet/IEC61850 communication OK?
Yes
No
Signed
Settings check
Setting
Check
Signed
Page 9 of 13
Rev. A
Yes
Application-specific function settings applied
Application-specific programmable schematic logic
No
settings applied
3.4.2
Setting Check
Check
Yes
Application-specific function settings verified
Application-specific programmable schematic logic
No
Signed
tested
3.4.3
Function Time Test
Check
Yes
3.5
Protection function timing tested
Expected operating time
Measured operating time
No
On-load check
Check
Yes
3.5.1
Signed
Test wiring removed
Disturbed customer wiring re-checked
On-load test performed
No
Signed
PT check
Check
Yes
No
Signed
PT wiring checked
Page 10 of 13
Rev. A
3.5.2
Phase rotation correct
Display voltage
CT check
Check
Yes
3.6
CT wiring checked
CT polarities correct
Display current
No
Signed
Final checks
Check
Yes
Test wiring removed
Disturbed customer wiring re-checked
Test mode disabled
Current count reset
Menu language set to customer preference
Event record reset
Fault record reset
Disturbance record reset
Alarm reset
LEDs reset
No
Signed
Page 11 of 13
Rev. A
4.0
RESULT OF CHECK SHEETS
4.1
Calibration &Test Report for SAT Protection Relay
4.2
Calibration &Test Report for GEN Protection Relay
4.3
Calibration & Test Report for GSUT Protection Relay
4.4
Calibration & Test Report for UAT Protection Relay
4.5
Calibration & Test Report for Tariff Meter (GEN, UAT, GSUT, SAT)
Page 12 of 13
Rev. A
5.0
ATTACHMENTS
Attachment 5.1 GSUT #1,2 Primary Protection Relay Panel
Attachment 5.2 GSUT #1,2 Backup Protection Relay Panel
Attachment 5.3 UAT #1,2 Primary Protection Relay Panel
Attachment 5.4 UAT #1,2 Backup Protection Relay Panel
Attachment 5.5 GEN Primary Protection Relay Panel
Attachment 5.6 GEN Backup Protection Relay Panel
Attachment 5.7 SAT Primary & Backup Protection Relay Panel
Attachment 5.8 GSUT #1,2 , SAT Main Tariff Meter & Check Tariff Meter
Attachment 5.9 UAT #1,2 , Gen #1, 2 Main Tariff Meter & Check Tariff Meter
Page 13 of 13