HANOI PILOT LIGHT METRO LINE 03
CP03-WORKS PROGRAMME UPDATED Cut-off Date: 15/03/19
Activity ID (1)
Activity Name (2)
Design Unit
Q'ty (4) (3)
Workdone
Q'ty (5)
Workdone
%
(6)=(5)/(4)
Plan Q'ty
(7)
Plan %
(8)=(7)/(4)
Plan start
(9)
Plan finish
(10)
Plan duration
(11)
Actual Start
(12)
Actual Finish
(13)
Actual duration
(14)=(13)-(12)
Soon /late
(15)=(13)-(10)
Remaining
Duration
2019
Q4
Q1
Q2
2020
Q3
Q4
Q1
Q2
114.00
60.00
54.00
0%
29/11/18
31/05/19
133
16/12/18 A
31/05/19
121
0
57
31/05/19, Construction Plan for 2019 Updated
114.00
Contract Package HPLML/CP-03 Tunnel and Underground Stations
60.00
54.00
0%
29/11/18
31/05/19
133
16/12/18 A
31/05/19
121
0
57
31/05/19, Contract Package HPLML/CP-03 Tunnel and Underground Stations
39.00
26.00
0.00
0%
29/11/18
31/05/19
133
16/12/18 A
31/05/19
121
0
57
0.00
0.00
0.00
0%
06/02/19
25/02/19
14
27/02/19 A
25/03/19
20
-21
8
0.00
0.00
0.00
0%
06/02/19
25/02/19
20
27/02/19 A
18/03/19
20
-21
4
18/03/19, Temporary Bridge material
100%
06/02/19
25/02/19
20
27/02/19 A
18/03/19
20
-21
4
Review and approval by PIC
0.00
0.00
0
13/03/19 A
25/03/19
10
8
25/03/19, Waterproofing
0.00
0.00
0.00
0.00
Construction Plan for 2019 Updated
Ramp
2.Material
Temporary Bridge material
A10210
Review and approval by PIC
100%
Waterproofing
A10131
Submission (Rev. 3A)
0%
3. Method statement
Method statement for U-Frame
A10270
PIC review
D/wall & Structure work
D/Wall work
Phase 2(39 panels at Zone E)(Utility Diversion)
Station 9
1. Design
4) Internal Structure
A10750
A10630
A10970
A11000
A11160
Construction
A11730
A11360
0%
21/02/19
13/03/19
21
21/02/19 A
21/03/19
29
-8
7
21/03/19, Method statement for U-Frame
100%
21/02/19
13/03/19
21
21/02/19 A
21/03/19
29
-8
7
PIC review
78
31/05/19, 4.Construction
39.00
26.00
0.00
0%
29/11/18
31/05/19
184
16/12/18 A
31/05/19
167
0
78
31/05/19, D/wall & Structure work
39.00
26.00
0.00
0%
29/11/18
31/05/19
184
16/12/18 A
31/05/19
167
0
78
31/05/19, D/Wall work
39.00 EA
26.00
57.61%
29/11/18
31/05/19
184
16/12/18 A
31/05/19*
167
0
78
63.00
28.00
42.00
0%
22/12/18
01/05/19
94
23/12/18 A
01/05/19
94
0
35
01/05/19, Station 9
0.00
0.00
0.00
0%
17/01/19
01/05/19
76
21/02/19 A
01/05/19
51
0
35
01/05/19, 1. Design
0.00
0.00
0.00
0%
01/05/19
01/05/19
1
01/05/19 A
01/05/19
1
0
1
01/05/19, 4) Internal Structure
0%
01/05/19
01/05/19
1
01/05/19 A
01/05/19
1
0
1
0.00
0.00
0%
17/01/19
23/01/19
7
21/02/19 A
18/03/19
26
-54
4
18/03/19, 1) Top Slab
100%
17/01/19
23/01/19
7
21/02/19 A
18/03/19
26
-54
4
Submission(Rev.4A)
0.00
0.00
0.00
0%
12/02/19
21/02/19
10
12/03/19 A
25/03/19
14
-32
11
25/03/19, 2. Material
0.00
0.00
0.00
0%
12/02/19
21/02/19
10
12/03/19 A
25/03/19
14
-32
11
25/03/19, 2) Waterproofing(Same with S10)
100%
12/02/19
21/02/19
10
12/03/19 A
25/03/19
14
-32
11
Submission(Rev.3A)
66.67%
0.00
Phase 2(39 panels at Zone E)(Utility Diversion)
Submission(Rev.1A)
30/03/19, 3. Method Statement
0.00
0.00
0.00
0%
02/03/19
22/03/19
21
02/03/19 A
30/03/19
29
-8
16
0.00
0.00
0.00
0%
07/03/19
16/03/19
10
07/03/19 A
23/03/19
17
-7
9
23/03/19, 2) Top Slab(Earth, Structure Work)
80%
07/03/19
16/03/19
10
07/03/19 A
23/03/19
17
-7
9
Submission(Rev.2A)
0.00
0.00
0%
02/03/19
22/03/19
21
02/03/19 A
30/03/19
29
-8
16
30/03/19, 3) Waterproofing
61.9%
02/03/19
22/03/19
21
02/03/19 A
30/03/19
29
-8
16
PIC review
63.00
28.00
42.00
0%
22/12/18
10/04/19
110
23/12/18 A
19/04/19
118
-9
36
19/04/19, 4. Construction
63.00
28.00
42.00
0%
22/12/18
10/04/19
110
23/12/18 A
19/04/19
118
-9
36
19/04/19, 1) Diaphragm Wall Main box
63.00 EA
28.00
42.00
75.45%
22/12/18
10/04/19
110
23/12/18 A
19/04/19
118
-9
36
D-Wall (Tet Holiday)
0.00
0%
15/01/19
17/04/19
93
15/01/19 A
17/04/19
93
0
34
17/04/19, Shaft
0.00
0.00
0.00
0.00
0.00
44%
0.00
0%
Construction Design(Retaining Wall)
21/03/19, 3. Method statement
0
Utilities Diversion(By MRB)
Design
7
167
0%
D-Wall (Tet Holiday)
8
31/05/19
PIC review
Shaft
-8
16/12/18 A
0%
1) Diaphragm Wall Main box
29
184
Submission(Rev.2A)
4. Construction
21/03/19
31/05/19
100%
3) Waterproofing
21/02/19 A
29/11/18
Submission(Rev.3A)
2) Top Slab(Earth, Structure Work)
10
21
0%
100%
3. Method Statement
25/03/19
13/03/19
0.00
Submission(Rev.4A)
2) Waterproofing(Same with S10)
13/03/19 A
21/02/19
26.00
0%
2. Material
A10890
0.00
Submission (Rev. 3A)
0
0%
39.00
Submission(Rev.1A)
1) Top Slab
0%
0%
0.00
0%
4.Construction
A10450
0.00
31/05/19, Ramp
25/03/19, 2.Material
0%
15/01/19
15/03/19
60
15/01/19 A
23/03/19
68
-8
9
23/03/19, Construction
98.33%
15/01/19
15/03/19
60
15/01/19 A
23/03/19
68
-8
9
Utilities Diversion(By MRB)
0.00
0.00
0.00
0%
12/03/19
17/04/19
37
12/03/19 A
17/04/19
37
0
34
17/04/19, Design
0.00
0.00
0.00
0%
11/04/19
17/04/19
7
11/04/19 A
17/04/19
7
0
7
17/04/19, Construction Design(Retaining Wall)
0%
11/04/19
17/04/19
7
11/04/19 A
17/04/19
7
0
7
0%
12/03/19
18/03/19
7
12/03/19 A
20/03/19
9
-2
6
20/03/19, Building Risk Assessment(BRA)
BRA(Rev.2)
PIC review
100%
0.00
42.86%
12/03/19
18/03/19
7
12/03/19 A
20/03/19
9
-2
6
0.00
0.00
0.00
0%
01/03/19
21/03/19
21
01/03/19 A
29/03/19
29
-8
15
29/03/19, Subcontract
0.00
0.00
0.00
0%
01/03/19
21/03/19
21
01/03/19 A
29/03/19
29
-8
15
29/03/19, D-Wall(S11, S12)
66.67%
01/03/19
21/03/19
21
01/03/19 A
29/03/19
29
-8
15
PIC review
Station 10
2.00
0.00
2.00
0%
25/01/19
06/03/19
41
25/01/19 A
03/04/19
69
-28
20
1. Design
0.00
0.00
0.00
0%
14/02/19
06/03/19
21
13/03/19 A
21/03/19
9
-15
7
21/03/19, 1. Design
0.00
0.00
A11400
BRA(Rev.2)
0%
Subcontract
D-Wall(S11, S12)
A11680
PIC review
0%
2) Road Reinstatement
A11890
PIC review
3) Waterproofing
Equipment inspection & Mobilization on Site
0%
14/02/19
06/03/19
21
13/03/19 A
21/03/19
9
-15
7
21/03/19, 2) Road Reinstatement
100%
14/02/19
06/03/19
21
13/03/19 A
21/03/19
9
-15
7
PIC review
0.00
0.00
0%
12/02/19
21/02/19
10
12/02/19 A
25/03/19
42
-32
11
25/03/19, 2. Material
0.00
0.00
0.00
0%
12/02/19
21/02/19
10
12/02/19 A
25/03/19
42
-32
11
25/03/19, 3) Waterproofing
100%
12/02/19
21/02/19
10
12/02/19 A
25/03/19
42
-32
11
Submission(Rev.3A)
100%
3) Top Slab
03/04/19, Station 10
0.00
Submission(Rev.3A)
4. Construction (phase 1-North)
A12380
0.00
100%
2. Material
A12060
0.00
PIC review
0.00
Building Risk Assessment(BRA)
2.00
0.00
2.00
0%
25/01/19
20/02/19
27
25/01/19 A
03/04/19
69
-42
20
03/04/19, 4. Construction (phase 1-North)
2.00
0.00
2.00
0%
25/01/19
20/02/19
27
25/01/19 A
03/04/19
69
-42
20
03/04/19, 3) Top Slab
1.00
100%
25/01/19
18/02/19
25
25/01/19 A
01/04/19
67
-42
18
Equipment inspection & Mobilization on Site
1.00
LS
0.00
0%
Actual Level of Effort
Remaining Work
Milestone
Project Baseline
Critical Remaining Work
summary
Actual Work
Baseline Milestone
Primary Baseline
Page 1 of 2
Date
22/03/2019
Revision
Checked
Approved
Q3
HANOI PILOT LIGHT METRO LINE 03
CP03-WORKS PROGRAMME UPDATED Cut-off Date: 15/03/19
Activity ID (1)
Activity Name (2)
A12390
Design Unit
Q'ty (4) (3)
Site Preparation
1.00
Station 11
Construction(North)
A12850
Plan Q'ty
(7)
Plan %
(8)=(7)/(4)
Plan start
(9)
Plan finish
(10)
Plan duration
(11)
Actual Start
(12)
Actual Finish
(13)
Actual duration
(14)=(13)-(12)
Soon /late
(15)=(13)-(10)
Remaining
Duration
0.00
0%
1.00
100%
18/02/19
20/02/19
3
19/03/19 A
03/04/19
16
-42
2
Site Preparation
Additional Geotech. Investigation(AGI)
A12970
Additional Geotech. Investigation(AGI)
A12980
Preparation of AGI report
D-Wall(S11, S12)
Q2
2020
Q3
0.00
0.00
0%
15/01/19
15/03/19
60
15/01/19 A
23/03/19
68
-8
9
23/03/19, Station 11
0.00
0.00
0%
15/01/19
15/03/19
60
15/01/19 A
23/03/19
68
-8
9
23/03/19, Construction(North)
98.33%
15/01/19
15/03/19
60
15/01/19 A
23/03/19*
68
-8
9
Utilities Diversion(By MRB)
Q4
10.00
6.00
10.00
0%
12/01/19
21/03/19
69
12/01/19 A
08/04/19
87
-18
25
08/04/19, Station 12
10.00
6.00
10.00
0%
12/01/19
24/02/19
44
12/01/19 A
08/04/19
87
-43
25
08/04/19, Design
10.00
6.00
10.00
0%
12/01/19
24/02/19
44
12/01/19 A
08/04/19
87
-43
25
08/04/19, Additional Geotech. Investigation(AGI)
10.00 EA
6.00
10.00
100%
12/01/19
14/02/19
34
12/01/19 A
08/04/19
87
-53
25
Additional Geotech. Investigation(AGI)
100%
15/02/19
24/02/19
10
12/01/19 A
08/04/19
87
-43
25
0%
01/03/19
21/03/19
21
01/03/19 A
29/03/19
29
-8
15
29/03/19, Subcontract
29/03/19, D-Wall(S11, S12)
0.00
0.00
0.00
0.00
PIC review
60%
0.00
0.00
0%
0.00
Construction(North)
Q1
0.00
0%
Subcontract
2019
Q4
0.00
0%
Design
A13460
Workdone
%
(6)=(5)/(4)
Utilities Diversion(By MRB)
Station 12
A13410
LS
Workdone
Q'ty (5)
Utilities Diversion(By MRB)
0.00
0.00
0%
Actual Level of Effort
Remaining Work
Milestone
Project Baseline
Critical Remaining Work
summary
Actual Work
Baseline Milestone
Primary Baseline
Q2
Preparation of AGI report
0%
01/03/19
21/03/19
21
01/03/19 A
29/03/19
29
-8
15
66.67%
01/03/19
21/03/19
21
01/03/19 A
29/03/19
29
-8
15
0%
15/01/19
15/03/19
60
15/01/19 A
23/03/19
68
-8
9
23/03/19, Construction(North)
98.33%
15/01/19
15/03/19
60
15/01/19 A
23/03/19
68
-8
9
Utilities Diversion(By MRB)
Page 2 of 2
Q1
PIC review
Date
22/03/2019
Revision
Checked
Approved
Q3