What is WBS
(Work Breakdown Structure)?
To classify the resources necessary to execute
Project in order to properly control Project
To systematically define the ALL activities(scopes)
of Project.
To break down all activities with MECE(mutually
exclusive collectively exhaustive) concept
1
What is WBS
(Work Breakdown Structure)?
WBS is the technique of Project control, but not
special and not new
WBS technique is breaking the work
WBS technique is to discrimination and
understanding of all activities
2
What is WBS
(Purpose of WBS technique)?
Effective operation of Project execution/ control
Define each Activity for PJ
Define all required up stream information
3
Type of WBS in JGC
(PLANT Engineering Business)
F-WBS(What)
(Functional WBS)
Definition of Work (Activity)
and Cost by Function
Universal Coding system
within JGC Group
PC-WBS(Where)
(Project Control WBS)
Geographical Plant Area
Breakdown
An unique Coding of each
Project to achieve effective
and efficient PJ control.
4
WBS Technique
Discrimination of work
5
WBS :Discrimination of work
PCWBS vs FWBS
6
FWBS CODE in JGC
JGC’s FWBS Code is specified in JGS
JGS= JGC Standard
To use JGS, you are requested to read and
confirm the SECRECY DECLARATION.
7
- SECRECY DECLARATION –
(JGS)
You agree to the following terms and conditions
whenever access and use JGS.
1.
2.
3.
4.
You shall acknowledge that JGS contain highly confidential
information and intellectual properties.
You shall disclose JGS only to personnel who need to know them
to the works instructed and/ or approved by JGC
You shall not make any use of JGS for any other purpose than
that of execution of the works instructed and/or approved JGC
You shall not make any copies or storage JGS.
8
What is FWBS CODE in JGC
CODE Structure
1 2
3 4 5
6
7 8
Supplementary Code
(2 alphanumeric characters)
Sub-code (4 alphanumeric characters)
Prime-code (2 alphanumeric characters)
9
FWBS Sample (Level-1)
FWBS
10
20
30
40
50
60
70
80
Description
Professional Service
Material
Labor Work
Transportation
Direct Expense
Financial Burden
Cost Items for Accounting Purpose
Contingency
10
FWBS Sample (Level-2)
FWBS
11
12
13
14
15
16
17
10>
Description
Project Management & Control
Basic Engineering
Detailed Engineering
Procurement Service
Quality Control
Construction MGT & Supervision
Commissioning & Operation
11
FWBS Sample (Level-3)
13X: Detail Engineering
21X: Direct Materials
31X: Direct Labor Work
Where X=
1:Civil General
2:Concrete Structure
3:Steel Structure
4:Buildding
5:Equipment
6:Piping
7:Instrumentation
8:Electrical
9:Insulation
A: Painting
B: Fireproof & Surface Protection
C: Catalysts, Chemicals &
Utilities
12
PC-WBS Sample
Plot
Plan
Area 30
FURNACE
COMPRESSOR
Area 31
VESSEL
SHELL & TUBE HEAT EXCHANGER Area
32
PIPE RACK
Area 20
Common: 00
VESSEL
AIR FIN COOLER
PUMP
VESSEL
Area 10
TOWER
Area 11
VESSEL
SHELL&TUBE HEAT
EXCHANGER
Area 12
13
How to decide PC-WBS?
Control objectives
Type of Stake Holders
Partner, Subcontractor?
Type of Project
Brand New? Revamp?
Environment for Work
Type of Plant
Process Unit? Utility?
Scale?
Schedule
Timing of Work start or
Work together, or separately?
Control Service
Reporting Level
Client
Division
Project Team
Discipline Lead Engineer
Control Purpose
Time
Cost
Volume of Work
Data Volume
14
How to decide PC-WBS?
PC-WBS
LEVEL 1
LEVEL 2
LEVEL 3
WORK PACKAGE
W.P. NO.
SCOPE OF WORK
RESPONSIBILITY
F-WBS
Work Volume
Resource
SCHEDULE
COST
PROGRESS
PLAN
FORECAST
ACTUAL
Resource
• Time
• COST
• Man Power
• Deliverables
• Materials
• Construction Equipment
WORK PACKAGE : Minimum Unit to control the Schedule and Cost
15
Work Framing Example
(P C -W B S )
10
(F -W B S )
P IL IN G
F O U N D A T IO N
S T R U C T U R E E R E C T IO N
E Q U IP M E N T E R E C T IO N
T O W E R E R E C T IO N
F U R N A C E E R E C T IO N
C O M P R E S S O R E R E C T IO N
O T H E R E Q U IP .E R E C T IO N
P IP IN G
S H O P F A B R IC A T IO N
F IE L D IN S T A L L A T IO N
T E S T & F L U S H IN G
IN S T R U M E N T /E L E C T R IC A L
F IE L D E R E C T IO N
TEST
M E C H A N IC A L C O M P L E T IO N
11
*
*
311
312
313
315
3151
3156
3158
3159
*
3161
3162
3168
3178
3179
12
*
*
00
20
20
*
*
*
30
31
*
*
32
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
316
317
31Z
16
Concept of Numbering(Coding)
Cost Account No.
PC - WBS
Schedule Activity No.
PC - WBS
F - WBS
F - WBS
Suffix
WORK PACKAGE NO.
PC - WBS
F - WBS
Requisition No.
Type
PC - WBS
Engineering Doc. No.
F - WBS
Seq.No.
F - WBS
Seq.No.
Type
PC - WBS
F - WBS
Seq.No.
R
Purchase Order No.
Type
PC - WBS
BOM/BOQ Data. ID
PC - WBS
P
F - WBS
Vendor Document No.
Type
V
PC - WBS
F - WBS
Seq.No.
Seq.No.
17