BUILDING A BETTER FUTURE
TENDER DOCUMENT
BAY WATER
APRIL 2017
GENERAL METHOD STATEMENT
COFICO Copyright © 2017
PROJECT :
SUNWAH PEARL
PACKAGE :
MAIN CONTRACTOR PACKEGE
LOCATION
:
OWNER
BAY WATER COMPANY LIMITED
:
90 NGUYEN HUU CANH STREET, WARD 22, BINH THANH DISTRICT, HCMC , VIETNAM
2
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
FORMWORK PLAN
1.
NON – TYPICAL FLOOR
[B2 BASEMENT FLOOR UP TO L7 FLOOR]
COLUMN & WALL
BEAM & SLAB
:
CONVENTIONAL FORMWORK
STAIR
:
CONVENTIONAL FORMWORK
:
CONVENTIONAL FORMWORK
[BLOCK 1 - ROOF UP TO UPER ROOF]
BLOCK 1
[BLOCK 2 - ROOF UP TO UPER ROOF]
BLOCK 3
[BLOCK 3 – 46 FLOOR UP TO UPER ROOF]
BLOCK 2
COLUMN & WALL
BEAM & SLAB
:
CONVENTIONAL FORMWORK
STAIR
:
CONVENTIONAL FORMWORK
2.
TYPICAL FLOOR
:
CONVENTIONAL FORMWORK
[TOWER 1: L8 FLOOR UP TO L50 FLOOR]
[TOWER 2: L8 FLOOR UP TO L45 FLOOR]
[TOWER 3: L8 FLOOR UP TO L45 FLOOR]
COLUMN & WALL
BEAM & SLAB
:
ALUMINUM FORMWORK
:
OPTION 2: CONVENTIONAL FORMWORK
PODIUM
BASEMENT
COFICO Copyright © 2017
OPTION 1: ALUMINUM FORMWORK
STAIR
:
ALUMINUM FORMWORK
3
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
NON - TYPICAL FLOORS – COLUMN & COREWALL
PLATFORM SCAFFOLDING
CONVENTIONAL FORMWORK FOR COLUMN
ADDITION PLYWOOD 18mm thk.
STEEL BOX 50x50x1.8mm
SUPPORT
COFICO Copyright © 2017
STEEL BOX (2)x100x50x1.8mm
CONVENTIONAL FORMWORK FOR WALL
4
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
NON - TYPICAL FLOORS – BEAM & SLAB
CONVENTIONAL FORMWORK FOR BEAM & SLAB
CONVENTIONAL FORMWORK FOR BEAM & SLAB
COFICO Copyright © 2017
5
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
NON - TYPICAL FLOORS – STAIRCASE
CONVENTIONAL FORM FOR STAIR
CONVENTIONAL FORM FOR STAIR
COFICO Copyright © 2017
6
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
NON - TYPICAL FLOORS – TRANSFER BEAM
PLYWOOD
1220x2440x18mm
CONVENTIONAL FORMWORK FOR TRANSFER BEAM
STEEL BOX 50x50x1.8mm
SCAFFOLDING SYSTEM
@ = 900 mm
STEEL BOX 100x50x1.8mm
SCAFFOLDING SYSTEM
@ = 1200 mm
CONVENTIONAL FORMWORK FOR TRANSFER BEAM
COFICO Copyright © 2017
7
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
TYPICAL FLOORS – COLUMN & WALL : ALU FORM
COLUMN - WALL
ALUMINUM FORM FOR COLUMN & WALL
ALUMINUM FORM FOR COLUMN & WALL
COFICO Copyright © 2017
8
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
TYPICAL FLOORS – BEAM & SLAB :
OPTION 1: ALU FORM
BEAM - SLAB
ALUMINUM FORM FOR BEAM & SLAB
ALUMINUM FORM FOR BEAM & SLAB
COFICO Copyright © 2017
9
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
TYPICAL FLOORS – BEAM & SLAB :
OPTION 2: CONVENTIONAL FORM
BEAM - SLAB
CONVENTIONAL FORMWORK FOR BEAM & SLAB
CONVENTIONAL FORMWORK FOR BEAM & SLAB
COFICO Copyright © 2017
10
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
FORMWORK APPLICATION FOR TYPICAL FLOORS
EDGE BEAM
EDGE BEAM
ALUMINUM FORM FOR EDGE BEAM
COFICO Copyright © 2017
11
5.
SUNWAH PEARL
CONSTRUCTION METHOD STATEMENT
BUILDING A BETTER FUTURE
5.1.5 FORMWORK METHOD
FORMWORK APPLICATION FOR TYPICAL FLOORS
ALUMINUM FORM FOR STAIRCASE
ALUMINUM FORM FOR STAIRCASE
COFICO Copyright © 2017
ALUMINUM FORM FOR STAIRCASE
ALUMINUM FORM FOR STAIRCASE