Tải bản đầy đủ (.pptx) (10 trang)

SCAR 8d report template 填寫說明

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (121.77 KB, 10 trang )

D1 : Describe the Problem
8D Report Number

8D Report Issue By

8D Report Issue Date

8D Report Case Close Date

Supplier Name

Parts Number

Nhuong Do Thanh

Parts Description
Issue Type

(χ) Reject by IQC ( ) Production Line Down ( ) Failure Rate > Agreed Target
( ) Mixed or Wrong Parts ( ) Customer Complain ( ) Crack, Damaged , Burned
( ) RoHS Issue ( ) Reliability Failure ( ) Others

Lot Number

Lot Q’ty

Reject Q’ty

Please Add Good / Bad Parts Photo Here

Reject Rate



Issue Description

-

%


D2 : Team Building

Nr.
1

2

Name
Maxx Nhuong Do Thanh

Company
TTi Viet Nam

Title
IQC/ SQE Engineer

Phone
(84)982900847

E-Mail Address



請請 TTI SQE 請請請請請請請請請請

3

4
請請請請請請請 8D 請請請請請請請 請請請請請請請請請 請請

5

6

7

請請請請請 8D 請請請請請請請請請 請請 請請請 請請請請請請請


請請請請請

D3 : Containment Action
Finish Date

Where

How Many

What to Do

請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請 請請請請
D3 請請請請請請請請請請請請 , 請請請 , 請請請 請請請請請請請請請 , 請請請請請請
, 請請請請請 請請請請請請請請請請請請請請

請請請請請請請請請請請 (1) 請請 (2) 請請請請請請 (3) 請請 (4) 請請請請 … .. Etc.

Owner

F/D

Result


D4 : Identify Root Cause or Potential Cause

Q1: Why the failure escape from Quality Control Gate?
Answer:

Explanation:

Answer First 請請請請請請請 請請請請請請請請請請請請 請請請請請請請請請
請請請請請請請請請請請請請請請請請請請
Q1 : 請請請請請請請請請請請請請請請請請請請請請
Q2 : 請請請請請請請請請請請請請請請 ( 請 請請請請請請請請

, 100% 請請請請請請請 )

Q3 : 請請請請請請請請請請請請請請

Q2: Why the failure not caught by production inspector ?
Answer:

Explanation:


請請請請請請請 16 請請請請


D4 : Identify Root Cause or Potential Cause

Q3: What cause the failure

Answer:

Explanation:

11/13/19


D5 : Permanent Corrective Action Plan
Item

Failure Cause

Corrective Action

Owner

S/D

Q1
Start Date

Finish Date


Q2

請 D4 請請請請請請請請請
請請請請請請請請請 D4 請請請請請請請請請請請
請請請請請請

Q3

11/13/19

F/D


D6 : Prevent Recurrence

Item

Lesson Learned

How to Improve

Document Nr

Owner

F/D

Q1

Q2


Q3

D6 請請請請請請請請請請 請請請請請請請請請請請請請請請請請請請請請請請請請請
請請請請請請請請請請請 請 D5 請請請請請請請 ISO 請請請請 DFX , FMEA , PCP , SOP 請請
請請請請請請請請請請 請請請請請請請請請

11/13/19

7


D7 : Verification of Effectiveness

Where

Check Q’ty

Check Method

Failure Rate

Report By

Remark

D7 請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請 請請請請請請請請請請請
請請 請請請請請請請 請請請請請請請 > 2 請請請

100% 請請


請請請請請請請 請請請請請請請請 A4 請請 請請 “ 請請請請請請請 請請請請請 "

11/13/19

8


D8 : Case Close

Total Poor Quality Lost Amount (RMB):
Quality Lose

Report By :
Amount $

Detail Explanation

Material Cost

Labor Cost

Transportation Cost

Other Cost
Main Responsibility Dept

Amount $

2nd Responsibility Dept.


This 8D Report is prepared by XXX , approved by Quality Director XXX

It has been sent to Customer SQE XXX on (Date) and wait for customer final approval .







11/13/19

8D 請請請請請請請請請請請請請請請請請請請請請請請 請請請請請 請請請請請請請
請請請請請請 請請請請 IE 請請請請 ( 請請 / 請請 / 請請 / 請請請請請請請請請請 )
請 TTI SQE 請請請請請請請請請請請 8D 請請 請請 請請請請
請 8D 請請請請 請 SQE 請請 SQE 請請請請請請請請請請請請請請請請請請
請 TTI SQE 請請請請請請請請請請請請請請 請請 TTI 請請請請請 請請請請
請請請請請請請請請請請請 請請請請請請請請請請請 請請請請請

Amount $


&

11/13/19




×