D1 : Describe the Problem
8D Report Number
8D Report Issue By
8D Report Issue Date
8D Report Case Close Date
Supplier Name
Parts Number
Nhuong Do Thanh
Parts Description
Issue Type
(χ) Reject by IQC ( ) Production Line Down ( ) Failure Rate > Agreed Target
( ) Mixed or Wrong Parts ( ) Customer Complain ( ) Crack, Damaged , Burned
( ) RoHS Issue ( ) Reliability Failure ( ) Others
Lot Number
Lot Q’ty
Reject Q’ty
Please Add Good / Bad Parts Photo Here
Reject Rate
Issue Description
-
%
D2 : Team Building
Nr.
1
2
Name
Maxx Nhuong Do Thanh
Company
TTi Viet Nam
Title
IQC/ SQE Engineer
Phone
(84)982900847
E-Mail Address
請請 TTI SQE 請請請請請請請請請請
3
4
請請請請請請請 8D 請請請請請請請 請請請請請請請請請 請請
5
6
7
請請請請請 8D 請請請請請請請請請 請請 請請請 請請請請請請請
請請請請請
D3 : Containment Action
Finish Date
Where
How Many
What to Do
請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請 請請請請
D3 請請請請請請請請請請請請 , 請請請 , 請請請 請請請請請請請請請 , 請請請請請請
, 請請請請請 請請請請請請請請請請請請請請
請請請請請請請請請請請 (1) 請請 (2) 請請請請請請 (3) 請請 (4) 請請請請 … .. Etc.
Owner
F/D
Result
D4 : Identify Root Cause or Potential Cause
Q1: Why the failure escape from Quality Control Gate?
Answer:
Explanation:
Answer First 請請請請請請請 請請請請請請請請請請請請 請請請請請請請請請
請請請請請請請請請請請請請請請請請請請
Q1 : 請請請請請請請請請請請請請請請請請請請請請
Q2 : 請請請請請請請請請請請請請請請 ( 請 請請請請請請請請
, 100% 請請請請請請請 )
Q3 : 請請請請請請請請請請請請請請
Q2: Why the failure not caught by production inspector ?
Answer:
Explanation:
請請請請請請請 16 請請請請
D4 : Identify Root Cause or Potential Cause
Q3: What cause the failure
Answer:
Explanation:
11/13/19
D5 : Permanent Corrective Action Plan
Item
Failure Cause
Corrective Action
Owner
S/D
Q1
Start Date
Finish Date
Q2
請 D4 請請請請請請請請請
請請請請請請請請請 D4 請請請請請請請請請請請
請請請請請請
Q3
11/13/19
F/D
D6 : Prevent Recurrence
Item
Lesson Learned
How to Improve
Document Nr
Owner
F/D
Q1
Q2
Q3
D6 請請請請請請請請請請 請請請請請請請請請請請請請請請請請請請請請請請請請請
請請請請請請請請請請請 請 D5 請請請請請請請 ISO 請請請請 DFX , FMEA , PCP , SOP 請請
請請請請請請請請請請 請請請請請請請請請
11/13/19
7
D7 : Verification of Effectiveness
Where
Check Q’ty
Check Method
Failure Rate
Report By
Remark
D7 請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請請 請請請請請請請請請請請
請請 請請請請請請請 請請請請請請請 > 2 請請請
100% 請請
請請請請請請請 請請請請請請請請 A4 請請 請請 “ 請請請請請請請 請請請請請 "
11/13/19
8
D8 : Case Close
Total Poor Quality Lost Amount (RMB):
Quality Lose
Report By :
Amount $
Detail Explanation
Material Cost
Labor Cost
Transportation Cost
Other Cost
Main Responsibility Dept
Amount $
2nd Responsibility Dept.
This 8D Report is prepared by XXX , approved by Quality Director XXX
It has been sent to Customer SQE XXX on (Date) and wait for customer final approval .
11/13/19
8D 請請請請請請請請請請請請請請請請請請請請請請請 請請請請請 請請請請請請請
請請請請請請 請請請請 IE 請請請請 ( 請請 / 請請 / 請請 / 請請請請請請請請請請 )
請 TTI SQE 請請請請請請請請請請請 8D 請請 請請 請請請請
請 8D 請請請請 請 SQE 請請 SQE 請請請請請請請請請請請請請請請請請請
請 TTI SQE 請請請請請請請請請請請請請請 請請 TTI 請請請請請 請請請請
請請請請請請請請請請請請 請請請請請請請請請請請 請請請請請
Amount $
&
11/13/19