Tải bản đầy đủ (.pdf) (25 trang)

METHOD STATMENT FOR STONE WORK

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (7.03 MB, 25 trang )

RIVIERA POINT CONDOMINIUM DEVELOPMENT
DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)
FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,
HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

Riviera Point Project

METHOD STATMENT
FOR
STONE WORK

Relevant part reviewed by

Checked by

Prepared by
Dept.
JY Lee

QC/QA

Safety.

Construction.

Engineering.

H Thu

A Duc


OJ Cho

YC An

Approved (by)
Rev

S1

Date

07-Nov-2013

Description

Issue for Acceptance

Project : Riviera Point Condominium Development
Produced by : Ssangyong E&C
Assessment Duration : 7days
Document No. : Refer to the submital list.

Ssangyong

ICIC

KLV Safety

RPLLC


SC Park

M.Tan

Bernarrd

CM Leong


RIVERA POINT CONDOMINIUM DEVELOPMENT
DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)
FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,
HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

CONTENTS

Please! Refer to the MS for tiling work (General)

* ANNEXS

1 …. Overview Drawings
1.1 …. The process of the coating sealer at the factory.
1.2 …. The process of the screeding.
1.3 …. The process of the stone tiling.
2 …. Certification.

Project:Rivera Point Condominium Development
Produced by:Ssangyong E&C
Assessment Duration : 7days
Document No. : Refer to the submital list.



RIVIERA POINT CONDOMINIUM DEVELOPMENT
DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)
FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,
HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

ANNEX 1
Overview Drawings

Project : Rivera Point Condominium Development
Produced by : Ssangyong E&C
Assessment Duration : 7days
Document No. : Refer to the submital list.

SsangYong E&C

3/25

07.11.2013


RIVIERA POINT CONDOMINIUM DEVELOPMENT
DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)
FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,
HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

ANNEX 1.1
The process of
the coating sealer at the factory


Project : Rivera Point Condominium Development
Produced by : Ssangyong E&C
Assessment Duration : 7days
Document No. : Refer to the submital list.

SsangYong E&C

4/25

07.11.2013


A
B
C

DEVELOPER / LANDOWNER:

brush
CONCEPT ARCHITECTS

STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW


J. ROGER PRESTON (Vietnam) Co. ltd

Stone ( Granite ,marble)
LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS

STRUCTURE - ME

At Factory

MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

1st STEP: CLEANING STONE SURFACE

CÔNG TRÌNH:

PROJECT TITLE :

5/25

Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C

KHU DÂN CƯ RIVIERA POINT

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A


S-125 (1st layer)

A
B
C

Stone THK 20mm

DEVELOPER / LANDOWNER:

CONCEPT ARCHITECTS

S - 125
STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

1
INTERIOR DESIGN

SUYING DESIGN

1

PTE LTD


LOCAL ARCHITECTS

STRUCTURE - ME

At Factory

Note: Apply S-125 for
- Granite Stone (15m2/L)
- Marble Stone (10m2/1L)
- Curing time 45 minute

MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

2nd STEP: COATING 1st LAYER OF SEALER S - 125

CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C


6/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A


A

S-125 (2nd layer)

B
C

S-125 (1st layer)
Stone THK 20mm

DEVELOPER / LANDOWNER:

CONCEPT ARCHITECTS

S - 125
STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD


civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS

STRUCTURE - ME

Note: Apply S-125 for
- Granite Stone (15m2/L)
- Marble Stone (10m2/1L)
- Curing time 45 minute

MAIN CONTRACTOR


SUBCONTRACTOR

KEY PLAN

3rd STEP: COATING 2nd LAYER OF SEALER S - 125
CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C

7/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A


A
B

C

DEVELOPER / LANDOWNER:

CONCEPT ARCHITECTS

STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS


STRUCTURE - ME

MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

4th STEP: CURING THE SEALER
CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C

8/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A



RIVIERA POINT CONDOMINIUM DEVELOPMENT
DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)
FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,
HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

ANNEX 1.2
The process
of the screeding

Project : Rivera Point Condominium Development
Produced by : Ssangyong E&C
Assessment Duration : 7days
Document No. : Refer to the submital list.

SsangYong E&C

9/25

07.11.2013


A
B
C

DEVELOPER / LANDOWNER:

CONCEPT ARCHITECTS


STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS

STRUCTURE - ME

MAIN CONTRACTOR

SUBCONTRACTOR


KEY PLAN

1st STEP: CLEANING CONCRETE SURFACE
CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C

10/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A


A
B
C


DEVELOPER / LANDOWNER:

Mortar (1:3)
Slab concrete

CONCEPT ARCHITECTS

STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD


LOCAL ARCHITECTS

STRUCTURE - ME

MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

2nd STEP: SCREEDING
CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C

11/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU


A


A
B
C

Adhesive ( ABA 500T)

DEVELOPER / LANDOWNER:

Mortar (1:3)
Slab concrete

CONCEPT ARCHITECTS

STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS

SITE

CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS

STRUCTURE - ME

MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

3rd STEP: APPLYING THE ADHESIVE (ABA 500T)
CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN


SsangYong E&C

12/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A


RIVIERA POINT CONDOMINIUM DEVELOPMENT
DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)
FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,
HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

ANNEX 1.3
The process
of the stone tiling

Project : Rivera Point Condominium Development
Produced by : Ssangyong E&C
Assessment Duration : 7days
Document No. : Refer to the submital list.

SsangYong E&C

13/25


07.11.2013


A

Stone THK 20mm

B
C

Adhesive ( ABA 500T)
Mortar (1:3)
Slab concrete

DEVELOPER / LANDOWNER:

CONCEPT ARCHITECTS

STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS


SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS

STRUCTURE - ME

MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

4th STEP: APPLYING PLATE STONE THK 20MM

plication

CÔNG TRÌNH:
PROJECT TITLE :

Residential Area of Riviera Point


TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C

KHU DÂN CƯ RIVIERA POINT

14/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A


A

Stone THK 20mm

B
C

Adhesive ( ABA 500T)
Mortar (1:3)
Slab concrete


DEVELOPER / LANDOWNER:

CONCEPT ARCHITECTS

STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN

SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS

STRUCTURE - ME


MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

5th STEP: STONE THK 20MM INSTALLATION
CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

LE HONG AN

SsangYong E&C

15/25

NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A



A
B
C

DEVELOPER / LANDOWNER:

Rubber checker

CONCEPT ARCHITECTS

STRUCTURAL DESIGN REVIEW

VIETNAM CO.,LTD

civil I structural I engineers I geotechanical I electrical

M&E DESIGN REVIEW

J. ROGER PRESTON (Vietnam) Co. ltd

Stone THK 20mm
Checking the reverberation

LANDSCAPE ARCHITECTS

SITE
CONCEPTS
INTERNATIONAL

INTERIOR DESIGN


SUYING DESIGN

PTE LTD

LOCAL ARCHITECTS

STRUCTURE - ME

MAIN CONTRACTOR

SUBCONTRACTOR

KEY PLAN

CÔNG TRÌNH:
PROJECT TITLE :

KHU DÂN CƯ RIVIERA POINT
Residential Area of Riviera Point

TÊN BẢN VẼ/ DRAWING TITLE:

7th STEP: CHECKING THE HOLLOWNESS
LE HONG AN

SsangYong E&C

16/25


NGUYEN PHUONG VU

07.11.2013

NGUYEN PHUONG VU

A


RIVIERA POINT CONDOMINIUM DEVELOPMENT
DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)
FOR PROPOSED CONDOMINIUM DEVELOPMENT AT DISTRICT 7,
HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT LIMITED LIABILITY COMPANY

ANNEX 2
Certificaiton

Project : Rivera Point Condominium Development
Produced by : Ssangyong E&C
Assessment Duration : 7days
Document No. : Refer to the submital list.

SsangYong E&C

17/25

07.11.2013


DESIGN AND BUILD OF MAIN TENDER (PHASE 1A)

FOR PROPOSED CONDOMINIUM DEVELOPMENT (RIVIERA POINT) AT DISTRICT 7, HO CHI MINH, VIETNAM FOR M/S RIVIERA POINT
LIMITED LIABILITY COMPANY

SEQUENCE FOR APPLY SEALER FOR EXTERNAL STONE

1. Stone substrates preparation:
♠ Stone surface shall clean and dry.
2. Material and Application method:
♠ Sealer material is S-125 (one component)
♠ Apply material by brush.
♠ Apply material for 6 sides of stone piece.
3. Material application:
♠ Apply 1st layer of S -125 by brush/roller to the prepared stone surface. The most importance is 1st layer so is
shall be applied carefully. Depend on the absorption of stone type, next one or two layers can be applied. Curing
time between two layers is ~45 minutes.

♠ 15~30 minutes after last layer applied, using dry clothes to thoroughly clean the stagnate sealer material on
finishing surface of stone to avoid the white colour layer remain.

4. Material consumption: Depend on type of stone
♠ Granite stone : ~ 15 m2 / litle
♠ Marble stone : ~ 10 m2 / little
5. Curing : next step can be proceeded after 24 hours
6. Test: After curing time, pour the liquid such as : water, coffee, sauce, tea…on treated stone surface. The liquid shape
can look like on the lotus leaf.

SsangYong E&C

18/25


07.11.2013


TAM THANH PHU COMPANY LIMITED
Add: 78/5B Phan Van Hon St., Tan Thoi Nhat Ward, Dist.12,HCMC
Tel: (84 8) 22111542 – 0903 354 234
Fax: (84 8) 62557426
Tax-code: 0308002377
E–mail:
A/c No: 58337819 Asia Commercial Bank (ACB)-Cong Hoa Branch

WATER – PROOF (S-125)
MAINTENA S-125 is formulated for water-poof based modified oganiosilicone. It penetrates into the stone and
forms a lasting film which can effectively prevent the stone from dust and water-based pollution such as water,
coffee, sauce and tea. Application of S-125 can provide the effect of lotus leaf of water-proofing.

Modified organosilione
Water

Reducing the absorption
effective to the contaminations based of water
Light odor
Economic

Applicable for caring on all kinds of natural and artificial stone and stone crafts, ceramic tiles and concrete

Liter/ctn

1 liter


5 liter

10 liter

12

20

20

Water proof – S125

SsangYong E&C

Trang 1

19/25

07.11.2013


Aspect

Colorless or light yellow transparent liquid

Main composition

Modified organosilicone

PH


12—14

Density (25℃)

0.98—1.02

Main solvent

Water

Clean the stone surface to help the penetration
Dry the stone or ceramics completely
Apply with a brush or sprayer evenly on the surface, ensure the coverage.
Clean the excess off the surface after 15-30 minutes.
Re-application should be at 45 minutes interval
Further process can be applied after 24 hours in cool and dry places.

Items

Test result

Absorption reduction

≥40%

Note:stone sample 603 slab from Fujian

Do not expose to rain in 24 hours
Do not apply under zero degree

White marks may occur on the treated surface and it will not affect the protective effect. Please clean it
with water.
Small area test is recommended before application to make sure the color change and protective effect
can be accepted.

One year if stored in cool places in original package

Water proof – S125

SsangYong E&C

Trang 2

20/25

07.11.2013


Q/ZLJG0013—2002

Clean with water immediately after application

Work place: product of weak base, please wear proper gloves. Rinse with water immediately in case of
contact. Keep way from metal, wood, cloth, it may cause color fading.
Rinse with water immediately in case of contact with skin or eyes call a specialized doctor in serious
case.

If you have any question don’t hesitate to contact with Mr.Việt-0903 354 234

Water proof – S125


SsangYong E&C

Trang 3

21/25

07.11.2013


SsangYong E&C

22/25

07.11.2013


SsangYong E&C

23/25

07.11.2013


ABA 655V
Additive For Mortar & Screed
Phụ gia Latex dùng cho vữa và lớp láng
Product Description
ABA 655V is a water dispersion primer designed to improve shear
and tensile bond of sand/cement screeds, waterproofing coatings,

plasters, render mortars and paint. It is use for treating porous
substrates and materials.

Mô tả sản phẩm:
ABA 655V là chất kết dính được thiết kế nhằm tăng cường khả
năng chịu lực cắt và lực kéo căng cho bề mặt láng vữa cát/ ximăng, các lớp sơn chống thấm, thạch cao, vữa tô và sơn. Sản
phẩm được dùng để xử lý các bề mặt rỗng.

Thus, it can be used as a primer to prevents gypsum substrates from
breaking off from the chemical reaction between gypsum and
cement aluminates

Vì vậy, sản phẩm được sử dụng như lớp lót ngăn ngừa việc gãy vỡ
các hệ tấm thạch cao do phản ứng hóa học giữa thạch cao và xi
măng Aluminates

Primer Feature/Benefits
• Water resistance
• Excellent adhesive bond strength
• reduce water absorption of porous substrates
• Preventing over-rapid drying

Trộn ABA 655V với vữa dán gạch gốc xi-măng ABA, sẽ làm tăng
khả năng chống thấm nước và tăng độ kết dính cho các loại gạch
có độ hút nước thấp như gạch mosaic, gạch bóng kính. ABA 655V
dùng được cho nội thất và ngoại thất. Khi được trộn vào vữa ximăng, ABA 665V sẽ tạo ra một hệ thống polymer có điều chỉnh, có
khả năng kháng nước cao, chống mài mòn và có độ bền cao.
Những hỗn hợp trộn này không độc hại và có thể ứng dụng cho
nước sinh hoạt.


Additive Feature/Benefits
• Low water-cement ratio
• Reduces shrinkage
• Increase durability & toughness
• High water resistance, wear resistance and durability

Lớp lót - Đặc điểm/ Lợi ích:
 Chống nước
 Độ kết dính tuyệt vời
 Giảm nước ngấm vào các bề mặt rỗ
 Ngăn chặn việc rút nước làm khô nhanh

Application Range
• Primer
• As an latex additive for renders
• Abrasion resistant flooring
• Bedding tiles for external use including swimming pools
Specification Clause
The additive shall be ABA 655V – a liquid additive for use with OPC,
sand

Chỉ định sản phẩm: Chất phụ gia phải là ABA 655V – chất lỏng
phụ gia được sử dụng với xi-măng, vữa tô cát/xi-măng hoặc keo
dán gạch thông dụng ABA 500T.

Application Notes
Packaging
20 litres pail and 200 litres drum
Shelf Life
12 months when stored in the original unopened container, in a dry

o
o
warehouse with 50% relative humidity and between 10 C and 30 C.
Coverage / Dosage
Approximately coverage per 20 litres pail are:2

2

• Screed: 9 m at bed thickness of 15mm, 3 m as a self supporting
screed at 40mm
2
• Render coat; 10 m at bed thickness of 10mm
Substrate Preparation
Substrate must be clean of dust, oil, grease and all contaminating
materials. Ensure surfaces are dry, with no residue or permanent
damp. New brickwork, walls should be left at least 7 days prior to
rendering.
Mixing
Render or screed:
• Prepare a 1:0.5 ABA 655V to water dilution. (by volume)
• For renders mix 27 litres of diluted ABA 655V with 40 kg of cement
to 120 kg of clean sand.
• For screeds mix 21 litres of diluted ABA 655V with 40 kg of
cement to 120 kg of clean sand.

SsangYong E&C

Phụ gia - Đặc điểm/ Lợi ích:
 Giảm tỉ lệ nước pha vào xi măng
 Giảm co ngót

 Tăng độ bền và độ dẻo
 Chịu nước tốt hơn, chịu mài mòn và bền vững

Những lưu ý khi thi công:
Đóng gói: Thùng 20 lít
Thời hạn sử dụng: 12 tháng lưu giữ với bao bì đóng kín, ở nơi
0
0
khô ráo với độ ẩm tương đối 50% và nhiệt độ 10 C đến 30 C.
Định mức sử dụng: (thùng 20 lít)
2
 Lớp hồ xi-măng: 100m
2
2
 Vữa láng: 9 m cho độ dày 15mm, 3 m cho hệ vữa độc lập
dày 40mm
2
 Vữa trát: 10 m cho độ dày 10mm
 Khi pha với vữa dán gạch ABA 500T, tỷ lệ trộn là 5-6 lít ABA
655V cho 1 bao ABA 500T 25 kg
Chuẩn bị bề mặt:
Bề mặt phải thật sạch bụi, dầu, mỡ và những chất làm bẩn. Đảm
bảo bề mặt khô, không ẩm ướt. Đối với tường gạch mới, phải chờ
ít nhất 7 ngày trước khi trát vữa.
Pha trộn:
- Lớp hồ xi-măng: trộn 2 phần xi-măng : 1 phần ABA 655V theo
trọng lượng (hoặc 3 phần xi-măng : 2 phần ABA 655V theo thể
tích)
- Vữa Trát và láng: Pha loãng ABA 655V với nước theo tỷ lệ 1:0.5
(theo thể tích)

 Vữa trát: 27 lít ABA 655V đã pha loãng cho 40 kg xi-măng và
120 kg cát sạch
 Vữa láng: 21 lít ABA 655V đã pha loãng cho 40 kg xi-măng
và 120 kg cát sạch
 Vữa dán gạch ABA gốc xi-măng: Thay nước bằng ABA 655V
theo hướng dẫn in trên bao bì

24/25

07.11.2013


Thao khảo tỉ lệ pha theo bảng dưới:

Below is the dosage in ratio guideline:
Dilution
ABA
Water
655V
Render mix
Screeds mix

1
1

0.5
0.5

Diluted
ABA

655V
1
1

Cement

Clean
Sand

1.48
1.9

4.44
5.71

Pha loãng
ABA
Nước
655V
Vữa trát
Vữa láng

Application
RENDER COAT
• First apply a slurry coat using a roller, brush or a flat trowel, to a
maximum thickness of 2mm. While the slurry coat is still wet, apply
render over it. Ensure firm pressure on the trowel to work with the
render into good contact with the surface.
• Renders are applied in the normal manner up to 13mm thick and
allow to take initial set. Renders in excess of 13mm should be

applied in a two coat operation.

1
1

0.5
0.5

ABA
655V đã
pha
1
1

Xi măng

Cát
sạch

1.48
1.9

4.44
5.71

Thi công:
Vữa trát

Trước tiên sử dụng cọ lăn, cọ, bay trát lớp hồ xi-măng với độ
dày tối đa là 2mm, trát lớp vữa tô khi lớp hồ còn ướt. Phải đảm

bảo lực trát thật mạnh để lớp vữa tiếp xúc với bề mặt một cách
tốt nhất.

Thông thường lớp vữa trát có độ dày là 13mm cho một lần trát
và chờ khô. Nếu dộ dày vượt quá 13mm thì cần trát làm hai
lần.

SCREED
• First apply the slurry coat using a roller, brush or a flat trowel, to a
maximum thickness of 2mm. while the slurry coat is still wet, apply
the screed mix. Using the straight edge, trowel or timber batten to
level the screed. Recommended minimum thickness of screed
15mm. Screed should be left with a good float finish to create a
key for tiling / waterproofing.

Vữa láng
Trước tiên sử dụng cọ lăn, cọ, bay trát lớp hồ xi-măng với độ dày
tối đa là 2mm, thi công lớp láng trong khi lớp hồ còn ướt. Dùng
thước thẳng, bay hoặc bàn chà gỗ làm phẳng lớp láng. Độ dày tối
thiểu của lớp láng là 15mm. Lớp láng nền phải được hoàn thiện
một cách tốt nhất trước khi chống thấm hoặc lát gạch.

Product Limitations
• If ABA 655V is to be used on heated concrete slabs, it must be
used undiluted.
• In exterior conditions, it is essential to provide protection from all
extremes of climate during the whole fixing process.
• Protect ABA 655V liquid from frost – do not allow freezing.

Tính hạn chế của sản phẩm:

 Không pha loãng ABA 655V khi dùng trên bề mặt bê-tông nóng
.
 Trong điều kiện thi công ngoài trời với điều kiện khí hậu khắc
nghiệt, phải che chắn bảo vệ trong suốt quá trình thi công.
 Giữ ABA 655V tránh sương giá và không bị đông cứng.

Safety Data
ABA 655V is non-toxic, however to avoid skin contact protective
clothing should be worn. Should it come into contact with eyes wash
immediately with plenty of water and seek medical treatment.

Sức khỏe và an toàn:
ABA 655V không độc, tuy nhiên phải mặc đồ bảo hộ để tránh tiếp
xúc với da. Nếu bị dính vào mắt phải rửa ngay bằng nước sạch và
đưa đến bệnh viện.

User Notes
The technical details and recommendations contained in this data
sheet are given in good faith and represent the best of our
knowledge and experience at time of printing. It is the responsibility
of the user to ensure that the products are used in accordance with
ABA’s instructions and in applications for which they are intended.

Lưu ý đối với người sử dụng:
Các chi tiết kỹ thuật và những hướng dẫn đáng tin cậy trong tài liệu
này là tất cả những kiến thức và kinh nghiệm chúng tôi muốn
truyền đạt đến người sử dụng. Người sử dụng phải có trách nhiệm
đảm bảo rằng sản phẩm phải được sử dụng đúng theo hướng dẫn
và những ứng dụng của ABA.


Technical Data

Thông số kỹ thuật:

Product Identity (Liquid)
Colour & Form:
Specific Density:
pH:
Inflammability:
Application Data
o
Drying Time @ 30 C
Final Performance
Damp resistance
Ageing resistance
Resistance to acids and alkalis

Đặc tính sản phẩm (chất lỏng)
Màu sắc và dạng
Chất lỏng, nhớt, màu trắng
Trọng lượng riệng
1.01 kg/ lít
Độ pH
9-11
Cháy nổ
không
Dữ liệu thi công:
0
Thời gian khô ở 30 C
Khoảng 30 phút

Hiệu quả sau cùng:
Kháng ẩm
Tốt
Chống lão hóa
Tốt
Chống muối và kiềm
Tốt

White, translucent liquid
1.01kg/L
9-11
No
Approx 30 mins
Good
Good
Good

Overseas Office / Stockist’s Stamp

ARDEX SINGAPORE PTE. LTD.
26 TUAS AVENUE 4 SINGAPORE 639376
TEL: +65 6861 7700 FAX: +65 6862 3381
EMAIL:
ABA 655V is manufactured by Ardex Singapore Pte. Ltd.
ABA 655V sản xuất bởi ARDEX Singapore Pte., Ltd.
Revision: Feb 2012 (Hiệu chỉnh tháng 02 năm 2012)

SsangYong E&C

25/25


www.ardex.com.sg

07.11.2013


Tài liệu bạn tìm kiếm đã sẵn sàng tải về

Tải bản đầy đủ ngay
×