Case Study: Clemson Bioscience
University Scientific Research Building
Project Information
Project:
Clemson University Bioscience
Location:
Clemson, SC
Architect: Perkins + Will
GC:
DPR Construction
Completion: December 2012
Scope:
This project, with a six-month duration, called for more than 200
linear feet of our Glenlake stainless steel tube infill railing, as well as
350 feet of our Track Rail glass railing. Grade 316 stainless steel was
utilized for all exterior locations, which hold up to environmental
exposure to heat, moisture, and airborne pollutants.
Glenlake is a low-maintenance choice for
outdoor applications
Stainless steel tube infill creates a clean,
linear design