Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (24.88 MB, 12 trang )
<span class="text_page_counter">Trang 1</span><div class="page_container" data-page="1">
1 0
001 - MD - 01
BIỆN PHÁP HẠ KINGPOST VÀO CỌC NHỒI/ BARRETTE (1)
BIỆN PHÁP THI CÔNG KHOAN CẤY THÉPBIỆN PHÁP CHỐNG GỈ THÉP
BIỆN PHÁP XỬ LÝ LỖ TI CHẾT0
<small>E-mail Website ADD </small>
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
<small>DEVELOPER/CHỦ ĐẦU TƯ:</small>
<small>STRUCTURE AND MEP CONSULTANT/TƯ VẤN KẾT CẤUVÀ CƠ ĐIỆN:</small>
<small>PHÊ DUYỆT:APPROVED BY:</small>
<small>PROJECT MANAGEMENT & SUPERVISIONCONSULTANT/QLDA & TVGS:</small>
<small>GENERAL CONTRACTOR/TỔNG THẦU:</small>
<small>GIÁM ĐỐC DỰ ÁN:PROJECT DIRECTOR:</small>
<small>CHỈ HUY TRƯỞNG:SITE MANAGER:</small>
<small>KIỂM TRA:CHECKED BY:</small>
<small>TRIỂN KHAI:PREPARED BY:</small>
<small>NGUYEN DUC THANHTRAN NGOC DUC</small>
<small>DRAWING TITLE/BẢN VẼ:</small>
<small>SCALE/TỶ LỆ:DATE/NGÀY:REV./HIỆU CHỈNH:00DRAWING NO./SỐ BẢN VẼ:</small>
ĐỤC BÊ TÔNG CỌC NHỒI/ BARRETTE
BIỆN PHÁP CHỐNG THẤM TƯỜNG VÂY - SÀN HẦMBIỆN PHÁP CỐP PHA CỘT TOPDOWN
BIỆN PHÁP CỐP PHA VÁCH TOPDOWN
BIỆN PHÁP BƠM VỮA MỐI NỐI CỘT VÁCH TOPDOWN
BIỆN PHÁP CHỐNG THẤM BỂ NƯỚC SINH HOẠT, PCCCBIỆN PHÁP CHỐNG THẤM BỂ XỬ LÝ, BỂ TỰ HOẠI
BIỆN PHÁP CHỐNG THẤM HỐ THANG MÁY
BIỆN PHÁP CHỐNG THẤM MẠCH NGỪNG THI CÔNG (1)BIỆN PHÁP CHỐNG THẤM MẠCH NGỪNG THI CÔNG (2)BIỆN PHÁP THI CÔNG CỐP PHA VÁCH TOPDOWN(BÊ TÔNG TỰ LÈN-PA1)
BIỆN PHÁP HẠ KINGPOST VÀO CỌC NHỒI/ BARRETTE (2)BIỆN PHÁP ÉP KINGPOST SỬ DỤNG BÚA RUNG THỦY LỰCBIỆN PHÁP CẮT KINGPOST
BIỆN PHÁP NHỔ KINGPOST (KÍCH NẰM Ở SÀN HẦM ĐÁY)BIỆN PHÁP NHỔ KINGPOST (KÍCH NẰM Ở CÁC SÀN BÊN TRÊN)BIỆN PHÁP XỬ LÝ LỖ KINGPOST
(TRƯỜNG HỢP 1: CÓ NƯỚC CHẢY TỪ DƯỚI LÊN QUA LỖ KINGPOST)BIỆN PHÁP XỬ LÝ LỖ KINGPOST
(TRƯỜNG HỢP 2: KHƠNG CĨ NƯỚC CHẢY TỪ DƯỚI LÊN QUA LỖ KINGPOST)
BIỆN PHÁP ÉP CỪ LARSEN BẰNG BÚA RUNGBIỆN PHÁP ÉP CỪ LARSEN BẰNG ROBOTBIỆN PHÁP NHỔ CỪ LARSEN BẰNG ROBOT
BIỆN PHÁP THI CƠNG CỌC KHOAN NHỒI TỪ CĨ ĐƯỜNG KÍNH D<=D600BIỆN PHÁP THI CƠNG CỌC KHOAN NHỒI TỪ CĨ ĐƯỜNG KÍNH D>=D800 (1)
BIỆN PHÁP KHOAN GIẾNG HẠ MỰC NƯỚC NGẦMBIỆN PHÁP CẮT GIẾNG HẠ MỰC NƯỚC NGẦM ĐIỂN HÌNHBIỆN PHÁP CẮT GIẾNG HẠ MỰC NƯỚC NGẦM SAU CÙNG
BIỆN PHÁP LẮP DỰNG CỐP PHA DẦM SÀN TRÊN NỀN ĐẤT - PA1BIỆN PHÁP LẮP DỰNG CỐP PHA DẦM SÀN TRÊN NỀN ĐẤT - PA2CỐP PHA MÓNG (CỐP PHA VÁN)
CỐP PHA MÓNG (CỐP PHA TOLE)
CỐP PHA GẠCH KHÍ CHƯNG ÁP (AAC) CHO DẦM
BIỆN PHÁP THI CÔNG CỐP PHA VÁCH TOPDOWN(BÊ TÔNG TỰ LÈN-PA2)
BIỆN PHÁP CẮT BÊ TÔNG BẰNG DÂY KIM CƯƠNG (1)BIỆN PHÁP CẮT BÊ TÔNG BẰNG DÂY KIM CƯƠNG (2)BIỆN PHÁP CẮT BÊ TÔNG BẰNG DÂY KIM CƯƠNG (3)BIỆN PHÁP CẮT ĐỤC SÀN BIỆN PHÁP (1)
BIỆN PHÁP CẮT ĐỤC SÀN BIỆN PHÁP (2)
BIỆN PHÁP THI CÔNG CỌC KHOAN NHỒI TỪ CĨ ĐƯỜNG KÍNH D>=D800 (2)BIỆN PHÁP THI CƠNG CỌC KHOAN NHỒI TỪ CĨ ĐƯỜNG KÍNH D>=D800 (3)
</div><span class="text_page_counter">Trang 3</span><div class="page_container" data-page="3">SLAB BOTTOM LEVELBEAM BOTTOM LEVEL
WOOD PURLIN []80x80XÀ GỒ GỖ []80x80
1 - INSTALL PLYWOOD FOR BEAM2 - COMPLETING FORMWORK FOR BEAM1 - ĐẶT CÁC TẤM VÁN ÉP CHO DẦM2 - HOÀN THÀNH CỐP PHA DẦM
1 - BACK FILL BY SOIL2 - INSTALL PLYWOOD FOR SLAB3 - COMPLETING FORMWORK FOR SLAB1 - LẤP ĐẤT THÀNH DẦM
2 - ĐẶT CÁC TẤM VÁN ÉP CHO SÀN3- HOÀN THÀNH CỐP PHA DẦM SÀN1 - INSTALL WOOD PURLIN []80x80 FOR BEAM
- EXISTING GROUND/ ĐẤT HIỆN HỮU- EUCALYPTUS PILE D80/ CỪ TRÀM D80- WOOD PURLIN 80x80 MM/ XÀ GỒ GỖ 80x80 mm
- POLYWOOD/ VÁN
ADJUSTING LEVELCÂN CHỈNH CAO ĐỘ
L1, L2 FOLLOW ACTUAL TESTING RESULT ON SITE BEFORE INSTALLING FORMWORK FOR B1, B2, B3, B4SUGGEST L1, L2 @ 600 FOR LOAD TESTING WITH THE AVERAGE SETTLEMENT -5MM (ACCORDING TCVN 4453-1995 )L1, L2 THEO KẾT QUẢ THÍ NGHIỆM THỰC TẾ TẠI CƠNG TRƯỜNG TRƯỚC KHI THI CÔNG CỐP PHA SÀN HẦM B1, B2, B3, B4.ĐỀ XUẤT L1,L2 @600 ĐỂ THỬ TẢI VỚI ĐỘ LÚN TRUNG BÌNH ±5MM (THEO TCVN 4453-1995. BẢNG 20).
PLYWOODVÁN ÉPBACK FILL BY SOILLẤP LẠI BẰNG ĐẤTPLYWOOD
2 - BACK FILLING WITH SAND IN 20mm Thk BELOW BOTTOM SLAB
1 - EXCAVATION/ ĐÀO ĐẤT
2 - FLATTEN SURFACE/ LÀM PHẲNG BỀ MẶT
1 - INSTALL PLYWOOD FOR SLAB2 - ĐẶT CÁC TẤM VÁN ÉP CHO SÀN
ĐẤT TỰ NHIÊN
1 - ĐẶT CÁC THANH XÀ GỒ GỖ []80x80 CHO SÀN2 - LẤP CÁT DÀY 20mm DƯỚI ĐÁY SÀN
WOOD PURLIN []80x80XÀ GỒ GỖ []80x80SAND 20mm
- WOOD PURLIN []80x80/ XÀ GỒ GỖ []80x80
<small>E-mail Website ADD </small>
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
<small>DEVELOPER/CHỦ ĐẦU TƯ:</small>
<small>STRUCTURE AND MEP CONSULTANT/TƯ VẤN KẾT CẤUVÀ CƠ ĐIỆN:</small>
<small>PHÊ DUYỆT:APPROVED BY:</small>
<small>PROJECT MANAGEMENT & SUPERVISIONCONSULTANT/QLDA & TVGS:</small>
<small>GENERAL CONTRACTOR/TỔNG THẦU:</small>
<small>GIÁM ĐỐC DỰ ÁN:PROJECT DIRECTOR:</small>
<small>CHỈ HUY TRƯỞNG:SITE MANAGER:</small>
<small>KIỂM TRA:CHECKED BY:</small>
<small>TRIỂN KHAI:PREPARED BY:</small>
<small>NGUYEN DUC THANHTRAN NGOC DUC</small>
<small>DRAWING TITLE/BẢN VẼ:</small>
<small>SCALE/TỶ LỆ:DATE/NGÀY:REV./HIỆU CHỈNH:00DRAWING NO./SỐ BẢN VẼ:</small>
<small>BIỆN PHÁP LẮP DỰNG COPPHA DẦM SÀN</small>
<small>TRÊN NỀN ĐẤT- PA1</small>
</div><span class="text_page_counter">Trang 4</span><div class="page_container" data-page="4"><small>E-mail Website ADD </small>
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
<small>DEVELOPER/CHỦ ĐẦU TƯ:</small>
<small>STRUCTURE AND MEP CONSULTANT/TƯ VẤN KẾT CẤUVÀ CƠ ĐIỆN:</small>
<small>PHÊ DUYỆT:APPROVED BY:</small>
<small>PROJECT MANAGEMENT & SUPERVISIONCONSULTANT/QLDA & TVGS:</small>
<small>GENERAL CONTRACTOR/TỔNG THẦU:</small>
<small>GIÁM ĐỐC DỰ ÁN:PROJECT DIRECTOR:</small>
<small>CHỈ HUY TRƯỞNG:SITE MANAGER:</small>
<small>KIỂM TRA:CHECKED BY:</small>
<small>TRIỂN KHAI:PREPARED BY:</small>
<small>NGUYEN DUC THANHTRAN NGOC DUC</small>
<small>DRAWING TITLE/BẢN VẼ:</small>
<small>SCALE/TỶ LỆ:DATE/NGÀY:REV./HIỆU CHỈNH:00DRAWING NO./SỐ BẢN VẼ:</small>
<small>BIỆN PHÁP LẮP DỰNG COPPHA DẦM SÀNTRÊN MẶT ĐẤT - PA2</small>
HOLLOW STEEL [ ] 50X50X1.8@300mm
D49 OR [ ]50x50 £@2000mm
CHI TIẾT 2DETAIL 2WATER SUMPS TANKTHÉP CHỜ DẦM (CHI TIẾT A/ DETAIL A)
STEP 5: INSTALLING FORMWORK OF PILE CAPBƯỚC 6: ĐỔ BÊ TƠNG MĨNG ĐẾN COTE ĐÁY SÀN HẦMSTEP 6: POURING CONCRETE TO BOTTOM OF BASEMENT SLAB
BƯỚC 7: THÁO COFFA, LẤP CÁT SAN LẤP
STEP 7: REMOVAL FORMWORK, BACKFILL BY SAND AT SITEBƯỚC 8: THI CƠNG ĐÀ KIỀNG BẰNG CỐP PHA GẠCH AAC VÀ SÀN HẦM
STEP 8: CONSTRUCTION FOUNDATION BEAM BY AAC FORMWORK AND BASEMENT SLAB
BƯỚC 1: ĐÀO XUỐNG COTE ĐÁY BÊ TƠNG LĨT MĨNG
STEP 1: EXCAVATION TO LEVEL BOTTOM OF LEAN CONCRETE OF PILE CAPBƯỚC 2: ĐÀO RÃNH THU NƯỚC MẶT
STEP 2: EXCAVATION WATERWAY
BƯỚC 3: ĐỔ BÊ TƠNG LĨT MĨNG VÀ BÊ TƠNG ĐẦU CỌCSTEP 3: POURING LEAN CONCRETE AND HEAD PILE
ÐÁY SÀN/ BOTTOM SLAB
CÂY CHỐNG/ STEEL SUPPORTD49 OR [ ]50x50 £@2000mmÐÁY MĨNG/ BOTTOM PILECAP
- BIỆN PHÁP COFFA THI CƠNG TÙY THUỘC VÀO ĐỊA HÌNH THỰC TẾ CHO PHÙ HỢP VÀ ĐÚNG KỸ THUẬT
METHOD FORMWORK CONSTRUCTION CUSTOMIZED IN THE REAL SITUATION FOR FITNESS AND TECHNICALLY CORRECT- BIỆN PHÁP THI CÔNG NEO, CHỐNG KHÔNG ĐƯỢC HÀN VÀO THÉP KẾT CẤU CHÍNH
METHOD STATEMENT OF ANCHOR, STRUD CAN NOT WELDED TO MAIN STRUCTUREÐÁY SÀN/ BOTTOM SLAB
ÐÁY SÀN/ BOTTOM OF SLAB
MAKE ROUGH BY RUGASOLTẠO NHÁM BẰNG RUGASOL
CHI TIẾT 1DETAIL 1
THÉP BIỆN PHÁP Ø14@£1000mm
BÊ TÔNGCONCRETETHÉP KẾT CẤU
MAIN REBAR
THÉP CẤU TẠO CHÂN ³Ø12CONSTRUCTIVE REBAR ³Ø12
THÉP/ REBAR Ø14@£1000mmCHI TIẾT A: COFFA GIAO DẦMDETAIL A
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
<small>DEVELOPER/CHỦ ĐẦU TƯ:</small>
<small>STRUCTURE AND MEP CONSULTANT/TƯ VẤN KẾT CẤUVÀ CƠ ĐIỆN:</small>
<small>PHÊ DUYỆT:APPROVED BY:</small>
<small>PROJECT MANAGEMENT & SUPERVISIONCONSULTANT/QLDA & TVGS:</small>
<small>GENERAL CONTRACTOR/TỔNG THẦU:</small>
<small>GIÁM ĐỐC DỰ ÁN:PROJECT DIRECTOR:</small>
<small>CHỈ HUY TRƯỞNG:SITE MANAGER:</small>
<small>KIỂM TRA:CHECKED BY:</small>
<small>TRIỂN KHAI:PREPARED BY:</small>
<small>NGUYEN DUC THANHTRAN NGOC DUC</small>
<small>DRAWING TITLE/BẢN VẼ:</small>
<small>SCALE/TỶ LỆ:DATE/NGÀY:REV./HIỆU CHỈNH:00DRAWING NO./SỐ BẢN VẼ:</small>
<small>CỐP PHA VÁN CHO MĨNG</small>
WATER SUMPS TANK
</div><span class="text_page_counter">Trang 6</span><div class="page_container" data-page="6">BƯỚC 1: ĐÀO XUỐNG COTE ĐÁY BÊ TƠNG LĨT MĨNG, DẦM MĨNG
STEP 1: EXCAVATION TO BOTTOM LEVEL OF LEAN CONCRETE OF PILECAP, FOUNDATION BEAMBƯỚC 2: ĐÀO RÃNH THU NƯỚC MẶT
STEP 2: EXCAVATION WATERWAY
BƯỚC 3: ĐỔ BÊ TƠNG LĨT MĨNG VÀ BÊ TƠNG ĐẦU CỌCSTEP 3: POURING LEAN CONCRETE AND HEAD PILE
BƯỚC 9: THI CƠNG CỐT THÉP VÀ ĐỔ BÊ TƠNG MĨNG, ĐÀ KIỀNG VÀ SÀN HẦM
STEP 9: INSTALL REBAR AND POUR CONCRETE FOR PILECAP, BEAM FOUNDATION AND BASEMENT SLAB.
BƯỚC 4: THI CƠNG LẮP DỰNG COFFA TOLESTEP 4: INSTALLING FORMWORK BY TOLE
BƯỚC 5: LẤP ĐẦM ĐẤT ĐẾN ĐÁY BÊ TƠNG LĨT SÀN HẦM
STEP 5: BACKFILL SOIL TO BOTTOM LEAN CONCRETE BASEMENT SLABBƯỚC 6: ĐỔ BÊ TƠNG LĨT CHO ĐÀ KIỀNG
STEP 6: POURING LEAN CONCRETE FOR BEAM FOUNDATIONBƯỚC 7: THÁO CÂY CHỐNG
STEP 7: REMOVAL STEEL SUPPORT
CÂY CHỐNG/ STEEL SUPPORTØ49 or [ ]50x50
FORMWORK BY TOLE (DETAIL 1)COFFA TÔN (CHI TIẾT 1)THÉP Ø8£@1000 NEO VÀO BÊ TƠNG
ÐÁY MĨNG/ BOTTOM PILECAP
GHI CHÚ: CÁC TẤM KHƠNG ĐIỂN HÌNH ĐO THEO THỰC TẾ THI CƠNGNOTE: ATYPICAL PLATE MEASURING BY ACTUAL CONSTRUCTIONGHI CHÚ:
- BIỆN PHÁP COFFA THI CÔNG TÙY THUỘC VÀO ĐỊA HÌNH THỰC TẾ CHO PHÙ HỢP VÀ ĐÚNG KỸ THUẬT
METHOD FORMWORK CONSTRUCTION CUSTOMIZED IN THE REAL SITUATION FOR FITNESS AND TECHNICALLY CORRECT- BIỆN PHÁP THI CÔNG NEO, CHỐNG KHƠNG ĐƯỢC HÀN VÀO THÉP KẾT CẤU CHÍNH
METHOD STATEMENT OF ANCHOR, STRUD CAN NOT WELDED TO MAIN REBARÐÁY SÀN/ BOTTOM SLAB
ÐÁY SÀN/ BOTTOM SLAB
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
<small>DEVELOPER/CHỦ ĐẦU TƯ:</small>
<small>STRUCTURE AND MEP CONSULTANT/TƯ VẤN KẾT CẤUVÀ CƠ ĐIỆN:</small>
<small>PHÊ DUYỆT:APPROVED BY:</small>
<small>PROJECT MANAGEMENT & SUPERVISIONCONSULTANT/QLDA & TVGS:</small>
<small>GENERAL CONTRACTOR/TỔNG THẦU:</small>
<small>GIÁM ĐỐC DỰ ÁN:PROJECT DIRECTOR:</small>
<small>CHỈ HUY TRƯỞNG:SITE MANAGER:</small>
<small>KIỂM TRA:CHECKED BY:</small>
<small>TRIỂN KHAI:PREPARED BY:</small>
<small>NGUYEN DUC THANHTRAN NGOC DUC</small>
<small>DRAWING TITLE/BẢN VẼ:</small>
<small>SCALE/TỶ LỆ:DATE/NGÀY:REV./HIỆU CHỈNH:00DRAWING NO./SỐ BẢN VẼ:</small>
<small>CỐP PHA TOLE CHO MĨNG</small>
THÉP Ø10 MĨC VÀO TẤM CỐP PHA TOLETẤM CỐP PHA TOLE
TẤM ĐAN BÊ TƠNG CỐT THÉP
*** CĨ THỂ SỬ DỤNG TẤM ĐAN BÊ TƠNG CỐT THÉP + THÉP D10 ĐỂ NEO GIỮ TẤM CỐP PHA TOLE
</div><span class="text_page_counter">Trang 7</span><div class="page_container" data-page="7">BÊ TƠNG LĨT DẦM/ LEAN CONCRETE
BƯỚC 01: ĐỔ BÊ TƠNG LĨT DẦM MĨNG
STEP 01: POURING LEAN CONCRETE FOUNDATION BEAM
COFFA AACFORMWORK AAC
BƯỚC 2: LẮP COFFA TẤM GẠCH KHÍ CHƯNG ÁP (AAC)STEP 2: INSTALLING FORMWORK AAC
CỬ NEO THÉP ³Ø12@500
CHỐNGSTRUTTÔN THÉP (1 mét/ 1 cái)
(LIÊN KẾT BẰNG VÍT HOẶC ĐINH VÀO TẤM ACC)
BƯỚC 3: LẤP ĐẤT VÀ ĐỔ BÊ TƠNG LĨT SÀN HẦM
STEP 3: BACKFILL SOIL AND POURING LEAN CONCRETE BASEMENT SLAB
BƯỚC 4: THI CÔNG CỐT THÉP VÀ ĐỔ BÊ TÔNG DẦM SÀN HẦM
STEP 4: CONSTRUCTION REBAR AND POURING BEAM, SLAB BASEMENT
COFFA AACFORMWORK AAC
TƠN THÉP
(LIÊN KẾT BẰNG VÍT HOẶC ĐINH VÀO TẤM ACC)
LẤP CÁT SAN LẤPBACKFILL AT SITE SAND
COFFA AAC (SỬ DỤNG TẤM 200/300/400/500x600 DÀY 65)FORMWORK AAC (USING PLATE 200/300/400/500x600 THICK 65)
XỬ LÝ KÍN NƯỚC BẰNG VỮATREAMENT WATERTIGHT BY MOTAR
XỬ LÝ KÍN NƯỚC BẰNG VỮA MỎNGTREAMENT WATERTIGHT BY MOTAR
TƠN THÉP(LIÊN KẾT MẶT NGỒI BẰNG VÍT HOẶC ĐINH VÀO TẤM ACC)
ĐÁY DẦM MÓNGBOTTOM BEAM
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
<small>DEVELOPER/CHỦ ĐẦU TƯ:</small>
<small>STRUCTURE AND MEP CONSULTANT/TƯ VẤN KẾT CẤUVÀ CƠ ĐIỆN:</small>
<small>PHÊ DUYỆT:APPROVED BY:</small>
<small>PROJECT MANAGEMENT & SUPERVISIONCONSULTANT/QLDA & TVGS:</small>
<small>GENERAL CONTRACTOR/TỔNG THẦU:</small>
<small>GIÁM ĐỐC DỰ ÁN:PROJECT DIRECTOR:</small>
<small>CHỈ HUY TRƯỞNG:SITE MANAGER:</small>
<small>KIỂM TRA:CHECKED BY:</small>
<small>TRIỂN KHAI:PREPARED BY:</small>
<small>NGUYEN DUC THANHTRAN NGOC DUC</small>
<small>DRAWING TITLE/BẢN VẼ:</small>
<small>SCALE/TỶ LỆ:DATE/NGÀY:REV./HIỆU CHỈNH:00DRAWING NO./SỐ BẢN VẼ:</small>
CỐP PHA GẠCH KHÍ CHƯNG ÁP (AAC) CHO DẦM
ĐÁY DẦM MĨNGBOTTOM BEAM
</div><span class="text_page_counter">Trang 8</span><div class="page_container" data-page="8">TI THÉP D16aL3
SÀN BÊ TÔNG
GÔNG NGANGCÂY CHỐNG
VÁN ÉP DÀY 18-20mm
THÉP HỘP 50x50aL1GÔNG NGANG
<small>E-mail Website ADD </small>
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
BƯỚC 01: ĐỊNH VỊ VỊ TRÍ CỘTBƯỚC 02: ĐỤC NHÁM BỀ MẶT BÊ TÔNGBƯỚC 03: LẮP ĐẶT CỐT THÉP VÀ NGHIỆM THU
BƯỚC 04: LẮP ĐẶT CỐP PHA, CÂY CHỐNG VÀ NGHIỆM THUBƯỚC 05: ĐỔ BÊ TÔNG
BƯỚC 06: KIỂM TRA LẠI ĐỘ THẲNG ĐỨNG, BỀ MẶT MẠCH NGỪNG
<small>BIỆN PHÁP CỐP PHA CỘT TOPDOWN</small>
SÀN BÊ TÔNG
BƯỚC 07: THÁO CỐP PHA VÀ CHÈN VỮA ĐẦU CỘT (VỮA KHÔNG CO NGÓT)
</div><span class="text_page_counter">Trang 9</span><div class="page_container" data-page="9">VÁN ÉPDÀY 18-20mm
THÉP HỘP
TI THÉP D16a600
GÔNG NGANGỐNG NHỰA PVC
CÂY CHỐNG CÂY CHỐNG
<small>CHI TIẾT-1</small>
<small>CHI TIẾT 2-</small>
SÀN BÊ TÔNG
CỮ ĐỊNH VỊTI THÉP GIẰNG
GÔNG NGANG
THÉP HỘPTHÉP HỘP
<small>: (84-28)3 514 6677</small>
<b>THI CƠNG PHẦN HẦM- CƠNG TÁC PHỤ</b>
<small>REV.DATEAPPRVD. BY</small>
SÀN BÊ TƠNG
BƯỚC 01: ĐỊNH VỊ VỊ TRÍ VÁCHBƯỚC 02: ĐỤC NHÁM BỀ MẶT BÊ TÔNGBƯỚC 03: LẮP ĐẶT CỐT THÉP VÀ NGHIỆM THU
BƯỚC 04: LẮP ĐẶT CỐP PHA, CÂY CHỐNG VÀ NGHIỆM THUBƯỚC 05: ĐỔ BÊ TÔNG
BƯỚC 06: KIỂM TRA LẠI ĐỘ THẲNG ĐỨNG, BỀ MẶT MẠCH NGỪNG
<small>BIỆN PHÁP CỐP PHA VÁCH TOPDOWN</small>
BƯỚC 07: THÁO CỐP PHA VÀ CHÈN VỮA ĐẦU VÁCH (VỮA KHƠNG CO NGĨT)GƠNG NGANG
TI THÉPD16aL3
SÀN BÊ TƠNG
</div><span class="text_page_counter">Trang 10</span><div class="page_container" data-page="10"><small>E-mail Website ADD </small>
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
</div><span class="text_page_counter">Trang 11</span><div class="page_container" data-page="11">PLYWOOD/VÁN 18 MMPURLIN
TIE STEELPURLIN
XÀ GỒ 2x50x100x1.8
XÀ GỒ 50x50x1.8
ỐNG BƠM BÊ TƠNG Ø125
STEP 01: MARKING POSITION COLUMNSTEP 02: CHIPPING CONCRETE SURFACE
STEP 03: INSTALLING REBAR AND FORMWORK
STEP 04: INSPECTING REBAR AND FORMWORKSTEP 05: POURING CONCRETE/ BƯỚC 05: ĐỔ BÊ TÔNGSTEP 06: CHECKING VERTICALLY AND SPECTINGBƯỚC 06: KIỂM TRA LẠI ĐỘ THẲNG ĐỨNG CỐP PHABƯỚC 04: NGHIỆM THU CỐT THÉP VÀ CỐP PHABƯỚC 03: LẮP ĐẶT CỐT THÉP VÀ CỐP PHABƯỚC 02: ĐỤC NHÁM BỀ MẶT BÊ TƠNGBƯỚC 01: ĐỊNH VỊ VỊ TRÍ CỘT
PLYWOOD/VÁN 18MMPURLIN/XÀ GỒ 50X50X1.8
PURLIN/XÀ GỒ2x50x100x1.8PURLIN/XÀ GỒ 2X50X100X1.8
DETAIL 01DETAIL 02
PROPER/CÂY CHỐNG Ø49LEVEL B4,B3,B2,B1
GIÀN GIÁO
THÉP BIỆN PHÁP
CONCRETEOVERFLOW PIPE
PROP/CÂY CHỐNG Ø49PROP/CÂY CHỐNG Ø49
<small>E-mail Website ADD </small>
<small>FAX </small>
<small>No. 60 Nguyen Dinh Chieu StrDa Kao Ward, Dist 1, HCMC: contact@ newtecons.vn: www.newtecons.vn: Floor 5th - 6th, Rosana Tower</small>
<small>DEVELOPER/CHỦ ĐẦU TƯ:</small>
<small>STRUCTURE AND MEP CONSULTANT/TƯ VẤN KẾT CẤUVÀ CƠ ĐIỆN:</small>
<small>PHÊ DUYỆT:</small><sup>APPROVED BY:</sup>
<small>PROJECT MANAGEMENT & SUPERVISIONCONSULTANT/QLDA & TVGS:</small>
<small>GENERAL CONTRACTOR/TỔNG THẦU:</small>
<small>GIÁM ĐỐC DỰ ÁN:PROJECT DIRECTOR:</small>
<small>CHỈ HUY TRƯỞNG:SITE MANAGER:</small>
<small>KIỂM TRA:CHECKED BY:</small>
<small>TRIỂN KHAI:PREPARED BY:</small>
<small>NGUYEN DUC THANHTRAN NGOC DUC</small>
<small>DRAWING TITLE/BẢN VẼ:</small>
<small>SCALE/TỶ LỆ:DATE/NGÀY:REV./HIỆU CHỈNH:00DRAWING NO./SỐ BẢN VẼ:</small>
<small>BIỆN PHÁP THI CÔNG CỘT VÁCH TOPDOWNBÊ TÔNG TỰ LÈN - PA1</small>
</div>