POWER SYSTEM STABILITY CALCULATION TRAINING
Day
15
-
Case Study
–
IEEE 24 Bus Test System
Day
15
-
Case
Study
–
IEEE
24
Bus
Test
System
PART 3
July 24, 2013Prepared by: Frida Ceja-Gomez
eBook for You
2
OUTLINE
•
PV Analysis
PV
Analysis
• QV Analysis
• Long Term Stability
•
Small Signal Stability
•
Small
Signal
Stability
eBook for You
3
IEEE 24
–
PV
ANALYSIS
IEEE
24
–
PV
ANALYSIS
eBook for You
4
PV ANALYSIS
PV Analysis
• Remember that
PV analysis is
not part of the
dynamic
dynamic
analysis, so use
the non-
converted
saved case file
• We will study
the power
the
power
transfer from
Area 2 to Area 1
eBook for You
PV Distribution
5
PV ANALYSIS
PV
Distribution
Factor File Input
• Use the
subsystem file
created for N-1
contingency
contingency
analysis
• Prepare a
monitoring file
as shown here
•
Prepare a
•
Prepare
a
contingency file
to study the
loss of each
one of the
transformers
eBook for You
6
PV ANALYSIS
PV Analysis
• Go the PV
Analysis
window and
create the
create
the
distribution
factor file
• Make sure to
choose the
right settings
• Select the
source and sink
subsystems
eBook for You
7
PV ANALYSIS
PV Analysis Results
• Plot the
interface flow
for each
contingency
contingency
• What is the
maximum
power
transfer from
Area 2 to Area
1 for each
1
for
each
case?
eBook for You
8
PV ANALYSIS
PV Analysis Results
• Now verify the
voltage at bus 14 for
each of the studied
contingencies
contingencies
• What is the point of
voltage collapse for
each case?
• Which one seems to
be the worst
be
the
worst
contingency?
eBook for You
9
PV ANALYSIS
PV Analysis Results
• Build a case with the lowest maximum transfer between the two
areas using
“
Implement PV transfer
”
areas
using
Implement
PV
transfer
• Convert the case and prepare for dynamic simulation
• Monitor machine angles and bus voltages
• Initialize
• Run for 1 second
•
Apply a bus fault on one side of the selected transformer
Apply
a
bus
fault
on
one
side
of
the
selected
transformer
• Clear after 5 cycles by tripping the transformer
• Run for 10 seconds
eBook for You
10
IEEE 24
–
QV
ANALYSIS
IEEE
24
–
QV
ANALYSIS
eBook for You
11
QV ANALYSIS
QV Analysis
• Recall that QV
analysis is not
part of the
dynamic analysis,
so use the non
-
so
use
the
non
-
converted saved
case file
• We will perform
the QV analysis at
Bus 11
• Use the same
distribution factor
file used in PV
analysis
eBook for You
12
QV ANALYSIS
QV Analysis Results
• How much
reactive power is
needed to keep
the voltage at
1pu for each
case?
• Do the curves
have any
have
any
unstable areas
for any of the
studied
studied
contingencies?
eBook for You
QV Analysis
13
QV ANALYSIS
QV
Analysis
Results
• Now perform
QV analysis for
Bus 9
Bus
9
• Analyze the
results
• Is reactive
compensation
needed?
eBook for You
14
IEEE 24
–
LONG TERM
IEEE
24
–
LONG
TERM
STABILITY
eBook for You
On
load Tap Changer OLTC1
15
IEEE 24 – LONG TERM STABILITY
On
-
load
Tap
Changer
OLTC1
MdlOLTC1t i l l
M
o
d
e
l
OLTC1
t
yp
i
ca
l
va
l
ues
eBook for You
Maximum Excitation Limiters MAXEX1
16
IEEE 24 – LONG TERM STABILITY
Maximum
Excitation
Limiters
MAXEX1
M d l MAXEX1 t i l l
M
o
d
e
l
MAXEX1
t
yp
i
ca
l
va
l
ues
eBook for You
Steam Turbine and Boiler TGOV5
17
IEEE 24 – LONG TERM STABILITY
Steam
Turbine
and
Boiler
TGOV5
Typical data for TGOV5
eBook for You
Underfre
q
uenc
y
Load Sheddin
g
18
IEEE 24 – LONG TERM STABILITY
qy g
Models (LDSH)
Typical data for LDSHAL
eBook for You
Undervolta
g
e Load Sheddin
g
Models
19
IEEE 24 – LONG TERM STABILITY
gg
(LVSH)
Typical data for LVSHAR
eBook for You
Under/Over Fre
q
uenc
y
Rela
y
Models
20
IEEE 24 – LONG TERM STABILITY
qyy
(FRQDCAT)
Typical data for FRQDCAT
eBook for You
Under/Over Volta
g
e Rela
y
Models
21
IEEE 24 – LONG TERM STABILITY
gy
(VTGDCAT)
Typical data for VTGDCAT
eBook for You
Long
Term Frequency Stability
22
IEEE 24 – LONG TERM STABILITY
Long
-
Term
Frequency
Stability
Disable all voltage relays (loads and
t)
genera
t
ors
)
Prepare for transient simulation and
choose the following channels
choose
the
following
channels
Machine angles
Bus voltage
Bus
voltage
Frequency deviation
Pload
Initialize and run until t = 2 seconds
Trip largest generation
Trip
largest
generation
Run until t = 20 seconds
eBook for You
Long
Term Frequency Stability
23
IEEE 24 – LONG TERM STABILITY
Long
-
Term
Frequency
Stability
eBook for You
Long
Term Voltage Stability
24
IEEE 24 – LONG TERM STABILITY
Long
-
Term
Voltage
Stability
Disable all frequency relays (loads and
t)
genera
t
ors
)
Prepare for transient simulation and
choose the following channels
choose
the
following
channels
Machine angles
Bus voltage
Bus
voltage
Frequency deviation
Pload
Initialize and run until t = 2 seconds
Scale
all loads by 300 MW
Scale
all
loads
by
300
MW
Run until t = 200 seconds
eBook for You
Long
Term Voltage Stability
25
IEEE 24 – LONG TERM STABILITY
Long
-
Term
Voltage
Stability