Tải bản đầy đủ (.docx) (12 trang)

Question 2 dap an dung RND

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (40.1 KB, 12 trang )

Question 2 of 20

5.0/ 5.0 Points

Which of the following stage is done to:
- Elaborate system requirements to derive software requirements ?

A. Elicit & Analyze Requirements
B. Develop SRS
C. Manage Requirement Changes
D. Validate Requirements
Question 3 of 20
Software requirement should not be

A. complete
B. consistent
C. functional
D. ambiguous

5.0/ 5.0 Points


Question 4 of 20

5.0/ 5.0 Points

What type of characteristics of good SRS describes that no conflict
between individual requirements ?

A. Unambiguous
B. Consistent


C. Complete
D. Correct
Question 5 of 20

5.0/ 5.0 Points

To validate requirement, what type of techniques describes that it
develops tests for requirements to check testability?

A. Requirements Review
B. Test-case generation
C. Prototyping
D. Model Validation


Question 6 of 20

5.0/ 5.0 Points

Which of the following stage is done to:
- Detect and resolve conflicts between requirements ?

A. Validate Requirements
B. Manage Requirement Changes
C. Develop SRS
D. Elicit & Analyze Requirements
Question 7 of 20

5.0/ 5.0 Points


Which is not a characteristic of a good SRS?

A. Complete
B. Brief
C. Correct
D. Consistent
Question 9 of 20

5.0/ 5.0 Points


To validate requirement, what type of checking answers the question of
- Does the system provide RIGHT functionalities as customer’s NEED?

A. Validity check
B. Realism check
C. Consistency check
D. Completeness check
Question 10 of 20

5.0/ 5.0 Points

It includes a set of ________ that describe all the interactions the users
will have with the software.

A. Use case
B. Unified Modeling Language
C. Ivar Jacobson
D. IBM Rational Unified Process
Question 11 of 20


0.0/ 5.0 Points


Which of the following is not one of the context-free questions that
would be used during project inception?

A. Who will use the solution?
B. Who will pay for the work?
C. What will be the economic benefit from a good solution?
D. Who is behind the request for work?
Question 12 of 20

5.0/ 5.0 Points

A Non-Functional Software testing done to check if the user interface is
easy to use and understand

A. Block Box Testing
B. Usability Testing
C. Unit testing
D. Security Testing
Question 15 of 20

5.0/ 5.0 Points


Requirements models depict software in which three domains?

A. architecture, interface, component

B. cost, risk, schedule
C. information, function, behavior
D. None of the above
Question 16 of 20

5.0/ 5.0 Points

Which of the following order stage is compatible with requirement
change process?

A. Problem analysis and change specification ->
Change analysis and costing ->
Change implementation.
B. Problem analysis and change specification ->
Change implementation ->
Change analysis and costing.
C. Change implementation ->
Problem analysis and change specification ->


Change analysis and costing.
D. Change analysis and costing ->
Problem analysis and change specification ->
Change implementation.
Question 17 of 20

5.0/ 5.0 Points

Let say that you are in the requirements gathering/analysis phase for
developing a web-based pet shop, what is considered a typical task in

this phase ?

A.You ask the clients what functionality should the website provide
to its customers
B.You ask the clients how the web interface should look like in
style and colors
C.Technical Information like hardware used would be gathered
D.Study whether the client requirements are possible to implement
Question 19 of 20

5.0/ 5.0 Points

The result of the requirements engineering task is an analysis model that
defines which of the following problem domain(s)?


A. information
B. functional
C. behavioral
D. all of the above
Question 20 of 20

5.0/ 5.0 Points

Requirements elicitation means

A. Gathering of requirements
B. Capturing of requirements
C. Understanding of requirements
D. All of the above

Question 1 of 20

5.0/ 5.0 Points

Requirements models depict software in which three domains?


A. architecture, interface, component
B. cost, risk, schedule
C. information, function, behavior
D. None of the above
Question 5 of 20

5.0/ 5.0 Points

Six important characteristics of good SRS are

A. Correct, Ambiguous, Complete,
Consistent, Maintainability, Traceable.
B. Correct, Unambiguous, Complete,
Consistent, Verifiable, Usability.
C. Correct, Unambiguous, Complete,
Consistent, Verifiable, Traceable.
D. Correct, Ambiguous, Complete,
Consistent, Verifiable, Traceable.
Question 6 of 20

5.0/ 5.0 Points



Which of the following stage is done to:
- Make sure that the requirements define the system that the customer
really wants ?

A. Validate Requirements
B. Develop SRS
C. Manage Requirement Changes
D. Elicit & Analyze Requirements
Question 14 of 20

5.0/ 5.0 Points

To validate requirement, what type of the following checking action that
answers the question "Is there any requirement CONFLICT?"

A. Realism check
B. Consistency check
C. Verifiability check
Question 16 of 20

5.0/ 5.0 Points

Requirements review process is carried out to


A. Spend time in requirements gathering
B. Improve the quality of SRS
C. Document the requirements
D. None of the above
Question 20 of 20


5.0/ 5.0 Points

Which of the following stage is done to:
- Develop use cases, system requirement ?

A. Validate Requirements
B. Manage Requirement Changes
C. Elicit & Analyze Requirements
Question 4 of 20

5.0/ 5.0 Points

To validate requirement, what type of checking answers the question of
- Can requirement be IMPLEMENTED with given available budget and
technology?


A. Completeness check
B. Validity check
C. Consistency check
D. Realism check
Question 7 of 20

5.0/ 5.0 Points

Which of the following are valid reasons for collecting customer
feedback concerning delivered software?

A. Allows developers to make changes to the delivered increment

B. Delivery schedule can be revised to reflect changes
C. Developers can identify changes to incorporate into next
increment
D. All of the above
Question 13 of 20

5.0/ 5.0 Points

Which of the following order stage is compatible with requirement
process?


A. Elicit & Analyze Requirements -> Develop SRS ->
Validate Requirements ->
Manage Requirement Changes ->
Manage Traceability ->
Manage Requirement Status.
B. Elicit & Analyze Requirements -> Develop SRS ->
Validate Requirements ->
Manage Traceability ->
Manage Requirement Status -> Manage Requirement
Changes.
C. Elicit & Analyze Requirements -> Develop SRS ->
Validate Requirements ->
Manage Requirement Status ->
Manage Traceability ->
Manage Requirement Changes.
D. Elicit & Analyze Requirements -> Develop SRS ->
Manage Traceability ->
Manage Requirement Status -> Manage Requirement

Changes ->
Validate Requirements.
Question 20 of 20

5.0/ 5.0 Points

What type of characteristics of good SRS describes that it should has
only one interpretation (to both creator & user)?


A. Unambiguous
B. Correct
C. Traceable
D. Verifiable
Question 1 of 20

5.0/ 5.0 Points

In collaborative requirements gathering the facilitator

A. controls the meeting
B. arranges the meeting place
C. must be an outsider
D. can not be a customer
Question 7 of 20

3.33/ 5.0 Points

Three things that make requirements elicitation difficult are problems of



A.volatility
B.budgeting
C.understanding
D.scope
Question 8 of 20

5.0/ 5.0 Points

To validate requirement, what type of checking answers the question of
- Can requirement be TESTED?

A. Verifiability check
B. Completeness check
C. Realism check
D. Validity check
Question 13 of 20
Product features are related to:

5.0/ 5.0 Points


A. Functional requirements
B. Non functional requirements
C. Interface requirement
D. None of the above
Question 11 of 20

5.0/ 5.0 Points


Which of the following should be considered as candidate objects in a
problem space?

A. events
B. people
C. structures
D. all of the above
Question 6 of 20

5.0/ 5.0 Points

During program development, software requirements specify


A. how to divide the task into subtasks
B. how the program will accomplish the task
C. how to test the program when it is done
D. what the task is that the program must perform
Question 13 of 20
SRS stands for ?

A. Software Requirement Specification
B. Software Requirement Solution
C. System Requirement Solution
D. None of the above



Tài liệu bạn tìm kiếm đã sẵn sàng tải về

Tải bản đầy đủ ngay
×