LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Stung Chinit
Irrigation and Rural
Infrastructure,
Cambodia

Ministry of Water
Resources and
Meteorology,
Phnom Penh
Asian
Development
Bank (ADB),
Manila

Rehabilitation of existing
scheme to increase agricultural


productivity by improvement
of infrastructure in and around
the project area, formation and
training of water user groups,
cost recovery measures and
strengthening of government
staff. Proposal for the irrigation
in the project area comprised
the construction of a multipurpose dam (irrigation,
hydropower and flood
attenuation), a pump station
and a flood protection dike,
together with a drainage
pumping station.

Feasibility studies including:
Technical field investigations
(soils etc.) topographic survey
(orthomapping with detailed
strip survey; scale 1:5000),
farmer community organisation
and training, system operation
studies, detailed design of
irrigation and drainage works,
preparation of tender
documents, contract packaging,
construction supervision,
systems management training.

Since 2001


Provincial Power
Supply
Phnom Penh,
Cambodia

Electricité du
Cambodge (EDC)
Asian
Development
Bank
(ADB)

Consultant services to assist
EDC with the implementation
of the Provincial Power Supply
Project (PPS), funded under
ADB loan, to rehabilitate and
extend the electricity systems
in eight provincial centres of
Cambodia. LI's terms of
reference include diesel
generation, environmental and
hydrological tasks.
Small diesel power stations:
Number of locations: 5
Number of units: 20
Unit capacity: 250 to 1000 kW
Fuel: diesel oil.


Site investigation; conceptual
design; technical specification;
tendering and evaluation; site
supervision; investigation of soil
and groundwater contamination;
proposal of remedial and
disposal measures; assessment
of related environmental risks;
estimation of cost related to
remedial measures.

2002-2004

CAMBODIA

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 1 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features


Consultancy Services

Year

Poko & Bakaru II
HEPs, Update of
Studies,
Indonesia

P.T. PLN (Persero)

Poko Dam of up to 140 m
height, power conduit system
of 2.6 km length with pressure
shaft, cavern powerhouse and
2.3 km long tailrace tunnel
Bakaru extension with 5.6 km
long headrace tunnel and 1.6
km long pressure shaft to
existing powerhouse on
Mamasa River

Update of Feasibility Study for
Poko HPP,
Update of Feasibility
Study/Detailed Design for 126
MW Bakaru II HPP Extension
Project;
Condition Assessment and

rehabilitation concept for
existing 126 MW Bakaru I HPP

since 2014

Hydropower
Mamasa River
Potential Study,
Indonesia

World Bank

Pre-feasibility Study of
potential hydropower projects
on Mamasa River upstream
and downstream of existing
hydropower projects; Design of
a new hydropower project with
a 4.6 km long headrace tunnel,
600 m long pressure shaft and
2 x 70 MW capacity in shaft
powerhouse

Masterplan level analysis of
hydropower potential, prefeasibility design of two potential
hydropower projects with an
installed capacity above 100 MW
on Mamasa River, integration of
potential projects in system
extension planning study


since 2014

Update Existing
Studies Small HEPs,
Indonesia

P.T. PLN (Persero)

9 small hydropower sites,
Capacity: 0.5 MW to 4 MW
Head: 10 m to 140 m
Discharge: 0.75 m³/s to 35 m³/s
Turbine Types: Francis, Pelton,
Kaplan

Review of existing Feasibility
Studies,
Evaluation and selection of most
promising sites, Additional
topographical and geological
investigations, Update of
Feasibility Studies for 4 to 5 sites

since 2014

Pumped Storage
Power Plant,
Sumatra (Site
Selection Study),

Indonesia

P.T. PLN (Persero)

Storage power plants with
cavern powerhouses housing 2
pump turbines of 200 MW
each, with heads varying
between 400 m and 640 m

Survey of the island Sumatra for
identification of sites, which are
suitable for the development of
pumped storage plants. The
projects shall be capable of
providing at least 400 MW power
over a continuous time of four
hours to the electric grid.
Conceptual designs including
cost estimates and economic
assessments shall be elaborated
for 8 selected projects.

since 2014

INDONESIA

KfW

KfW


KfW

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 2 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Consultancy
Services of Quality
Assurance and
Quality Control for
Three Coal Fired
Power Plant
Projects, Indonesia


PT PLN (Persero),
Indonesia

Capacity:
Indramayu PP (Jawa Barat) :
3 x 330 MWel
Palabuhanratu PP (Jawa
Barat) :
3 x 330 MWel
Tanjung Awar-Awar PP (Jawa
Timur) :
2 x 350 MWel
Fuel : lignite coal

Design review and approval,
progress and design meetings,
workshop inspections and tests,
supervision and monitoring of
project execution, procurement,
construction and commissioning,
home office back up services,
guarantee period.

2007-2016

Market Study on the
Power Supply Sector
in Indonesia


ETA – Power
Projects Division,
Dubai UAE

In-depth market sector study
covering a broad field of
services with regard to
Indonesia’s overall power
sector set-up. However,
assessing in particular the
current status and expected
future development of largescale thermal power plants as
well as new power plant
projects to be implemented.
Special objective is hence to
identify promising market entry
options for potential
Independent Power Producers
(IPP).

Overview on electricity policy
and institutional setting, present
state of power supply system,
development of electricity
demand, electricity tariffs, new
power plant projects.

2008

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx


Page 3 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Bengkulu Water
Supply Project,
Training Program in
Operation and
Maintenance,
Indonesia

PDAM Water
Enterprise of
Bengkulu City,
Indonesia


Training for O & M staff
responsible for water
treatment, water resources
protection, mechanical and
electrical equipment, trunk
mains and distribution system
service connections, warehouse
and repair shops

Training included the following
topics:
Quality and strategic management
(including subjects as
documentation, monitoring,
indicators and targets, record
keeping, corrective and preventive
actions), water production (coagulation flocculation, filtration,
disinfection, chemical storage,
water quality tests), electrical mechanical equipment, instrumentation - service, operation
calibration emergency measures,
distribution network (installation
and repair, leakage control and
leak detection, metering and
meter control/testing, repair and
calibration.

2002-2004

Nam Theun

Electricity
Consortium
(private ownership
company)

Storage power plant, installed
capacity: 1,074 MW, 6 Francis
turbines, design head: 348 m,
RCC dam, height 48 m with
overflow spillway (6,900 m3/s),
pressure tunnel and 130 km
long transmission line to
Thailand.

Review of project design, tender
documents, technical and
contractual assistance to owner,
construction supervision.

Since 2000

Amcorp Power Sdn
Bhd, Malaysia

Electrical Output,
Total Plant 1,000-1,400 MW
Type Power Generation:
Combined Cycle
Plant Configuration:
multiple blocks,

multi- or single-shaft
arrangement
Gas Turbine Class:
Large Scale
Fuel: Natural Gas / Distillate

Analysis of the RfP, participation
at site visit & pre-bid conference,
thermodynamic calculations,
development of technoeconomic model, Plant
optimisation study for main GT
models, elaboration of Plant
optimization report.

2012

LAOS
Nam Theun II,
Laos

MALAYSIA
1,000-1,400 MW Prai
IPP,
Technical Advisory
Services,
Malaysia

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 4 of 17



LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Megasteel
Integrated Power
Plant,
Malaysia

Megasteel Sdn..
Bhd., Malaysia

Integrated Power Plant: 420
MW
2 Gas Fired Boilers: 2x90 MW
Fuel: BFG and COG
Boiler Turbine Generation Plant:

2 x 135 MW
Fuel: COG, coal & coke dusts
and
supplementary bituminous
(thermal) coal

Phase 1: Pre-Tendering Phase:
Data collection and review,
conceptual design and
implementation plan, grid study.

2007-2008

Phase 2: Tendering Phase:
Invitation to bid, bidding period,
evaluation of bid proposals,
contract negotiations.

MYANMAR
Upper Yeywa

Ministry of Electric
Power

Storage power plant,
open-air powerhouse,
L/H/W 102 m/57 m/38 m
installed capacity: 280 MW,
4 Francis turbines
headrace tunnels, D/L 10.0-12.5

m / 2 x 500 m
RCC dam height 90 m / crest
length 243 m

Review of existing basic design,
elaboration of construction
design, supervision and quality
control, on-the-job training of
counterpart engineers

2013-2018

Technical PPPAdvisor,
Myanmar

Deloitte Touche
Tohmatsu India
Private Limited

Capacity Building project to
allow the executing agencies to
implement and monitor largescale IPP projects in the
electricity generation sector.

Setting Framework Conditions
(i.e. defining key parameters,
development minimum functional
specifications, environmental
compliance specifications to be
considered in PPP ICB

documentation)
Project Screening, Evaluation and
Prioritization of Potential Project
Candidates
Support Development of
Preliminary Project Profiles (i.e.
pre-feasibility Studies of 5
candidate projects)

2014-2015

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 5 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year


Philippine
International Air
Terminals Co., Inc.
(PIATCO),
Manila

BOT of a new International
Passenger Terminal

Review of the EPC-contractors
detail design drawings,
supervision of construction of the
EPC-contract, contract
administration, claims
management, quality
management.

2000-2008

Asian Development
Bank

Technical support to the Subregional Energy Forum to
safeguard the realization of the
GMS Road Map for Expanded
Cooperation in the Energy
Sector and promote capacity
building in the GMS countries in
renewable energy, clean fuels,

and energy efficiency policy,
plan, and program formulation.

Knowledge sharing facilitation in
the GMS and SEF organization.
RE, EE, clean energy and climate
change studies.
Knowledge dissemination
Strengthening SEF capacity and
knowledge sharing.
Establishment of regional
database.
Best practice studies.
Review of national performance
targets.
Preparation of regional
performance targets.
Renewable energy and clean
energy resource assessment.
Energy efficiency potential
assessment.
Renewable energy, energy
efficiency and clean energy
resource maps.
Project pipeline preparation.
Business model concepts and
suitability.
Initiation of Pilot projects.

2011-2012


PHILIPPINES
Ninoy Aquino
International Airport,
Manila,
Philippines

THAILAND
Promoting
Renewable Energy,
Clean Fuels, and
Energy Efficiency in
the Greater Mekong
Subregion,
Thailand

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 6 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier


Main Features

Consultancy Services

Year

Rojana,
Thailand

Rojana Power Co
Ltd.

Gross Electrical Capacity:
289 MWel

Extension Phase 5:
EPC-Contract overview, Lender’s
Due Diligence Report including
review of the Plant Design and the
Performance Guarantees and
Testing provisions.

2010-2011

Gas Turbines:
5 x GE LM 6000 PC
Air inlet Chillers: 7 °C
HRSG: 5 x Dual Pressure
Steam Turbine:
2 x Dual Pressure

Process Steam: 15 bar, sat.
Cooling System:
3 x Wet Cooling Tower
Auxiliary Boiler. 41 t/h, 15 bar
After Extension Phase 5:
Gross Electrical Capacity:
344 MWe
Gas Turbine.
6 x GE LM 6000 PC

Extension Phase 4 (2007-09):
Design review, site supervision,
commissioning supervision.
Extension Phase 3 (2005-06):
Design review, site supervision,
commissioning supervision.
Extension Phase 2 (2001-03):
Negotiation, design review, site
supervision, commissioning
supervision.
Plant: (1996-99):
Review of EPC-proposal,
assistance in contract preparation,
design review and approval, site
supervision of erection,
commissioning and performance
testing.

HRSG: 6 x Dual Pressure
Bangkok Metro,

Thailand

Metropolitan Rapid
Transit
Authority (MRTA),
Bangkok

Construction of a new
underground metro system,
length 20 km

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Design and construction
supervision of civil works,
E & M equipment design,
interface co-ordination

1998-2005

Page 7 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country


Client/Financier

Main Features

Consultancy Services

Year

Wind Data Analysis
and Energy
Generation
Assessment

Landville Energy
Co., Ltd.

Technical assistance to
Landville Energy Co., Ltd. to
assess the feasibility of the
project.

Preparation of independent
bankable wind resource
assessment considering two onsite met masts; CFD flow
modelling; layout optimisation
and micro-siting for three lots,
site classification and
recommendation of suitable
wind turbine equipment.


2015

Restructuring and
Divestiture Strategy
for Electricity's
Gencos,
Vietnam

Vietnam Electricity

Development of a
comprehensive strategy for
completing the de-integration
of generation through
operational and financial
restructuring of the Gencos
and to divest its assets/share
ownership in these companies.

Market assessment of GENCOs
(legal, regulatory, policy)
Governance assessment
(management and legal)
Organisational review
Financial assessment
Operational and technical
assessment
Preparation and implementation
of capacity building program
Development of capital

investment program specifically
for IPPs and BOTs.

2014-2015

Improvement of
Energy Efficiency in
Rural Areas Project,
Vietnam

Vietnam Electricity
(EVN)

Rehabilitate and upgrade of the
medium voltage, low voltage
distribution networks in areas
of Northern, Centre and
Southern Power Corporation.

Review/ Verification of Bid
Evaluation Reports; Assistance in
Contract Negotiations; Review/
Verification of Contracts; Review
of Test Reports of Material and
Equipment; Attendance at
Quality Tests (FAT); Check of Civil
Works and Installation; Final
Acceptance of Civil Works and
Installation; Prevention and
Mitigation Measures for the

Environmental Impact; Review of
Implementation Progress;
Reporting

2012-2015

VIETNAM

Assistance to EVN/PCs to
ensure that the tender
procedures for equipment and
civil works and the award of
contracts are in line with the
Banks guidelines.

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 8 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features


Consultancy Services

Year

Feasibility Study
Wind Energy on Phu
Quoc Island Kein
Giang,
Vietnam

Electricity of
Vietnam Power
Company No. 2

Feasibility study seeking a
possibility of building up wind
farm(s) in the Island between
2005 and 2010.
Main data:2 existing Diesel
power stations: 7 MW (total
installed capacity)
Additional DO/HFO fired
generation (end 2005): 5 MW
Existing distribution network::
OH; 22kV (MV); 0.4kV (LV)
Forecasted total demand by
the end of 2010: 50 MW

Wind Resource Assessment

(Identification of the five most
promising locations), site
selection, wind park concept and
basic calculation of specific
electricity generation
Phase II:
Conceptual design:
Power demand analysis,
electrical grid qualitative
analysis, optimization of the wind
park layout, EIA and resettlement
plan, economic and financial
analysis and implementation
plan, training and capacity
building.

2005-2007

500 kV Transmission
Line Pleiku-Phu Lam,
Vietnam

Electricity of
Vietnam, Central
Vietnam Power
Projects
Management
Board

540 km of 500 kV transmission

line, extension of two 500 kV
substations, 500 kV series
capacitor compensation, 500
kV shunt parallel
compensation, power line
carrier and fibre optical
communication.

Study, review of design,
preparation of tender
documents, bid evaluation,
factory acceptance tests,
supervision of construction and
commissioning, training.

2000-2004

Technical Advisory Services

Independent bankable wind
study and AEP assessment.

2014

SOUTH KOREA (Wind)
Hasari 2 (Baeksu)
Yeonggwang
Wind Farm,
Baeksu Wind
South Korea

Power CO.

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 9 of 17


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Feasibility Study
Support for Boseong
20MW Wind Farm

Korea Engineering
Consultants Co.,
Ltd


Feasibility Study Support

2014

Goseong Alps Wind
Farm

Goseong Alps WP

RfP preparation and tendering
support for WTG

Technical Advisory
Services for Hasari 3
(Yaksu) Wind Farm
Project, Korea

Yeonggwang
Yaksu Wind Power
CO.

Technical Advisory Services

Jeongamg Wind
Farm,
South Korea

Korea Ratings,
South Korea


Wind resource assessment and
energy yield estimation

Daegwallyeong
Wind Farm,
South Korea

Daegwallyeong
Wind Power Co.,
Ltd.,
Korea

Feasibility study

Site Survey, Measurement Mast
review,
Energy Yield Estimates review:
Review of wind resource
assessment (wind data analysis
and study based on existing onsite mast, uncertainties). Review
of wind farm layout, energy
calculations with losses and
uncertainties;
Grid Connection Concept review
(internal cabling concept, grid
integration concept), Civil Topics
review (soil type, foundation
type, access roads, transport and
installation concept); Economic
Analysis review

Tendering services including the
preparation of tender documents
for international bidding of the
Wind turbine lot, clarification
with bidders, bid evaluation and
support for contract negotiations
with the preferred bidders.
Independent bankable wind
study and AEP assessment,
Technical due diligence, review
of conceptual wind farm design
and implementation and
operation plans, review of
Turbine Supply Agreement and
O&M Agreement
Site investigation; wind data
evaluation; long-term
correlation; wind field modelling
advanced CFD; layout
optimisation and micro-siting;
Site investigation and
description; data collection and
review; wind resource
assessment; wind farm layout;
energy production calculation;
civil engineering topics;
estimation of project costs;
financial analysis

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx


Page 10 of 17

2014-2015

2014-2015

2013

2013-2014


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Owners Engineering
Services for the
Chunbuk and

Gangdong Wind
Farms, Korea

Daehan Green
Energy, Korea

Wind farm development

2013

Lenders Engineering
Services for the 30
MW Gimnyung
Wind Farm, Korea

Korea Ratings,
Korea

Lender’s Technical Advisor for
the project assessment

Lenders Engineering
Services for the 40
MW Jeong-am Wind
Farm ,Korea

Korea Ratings,
Korea

Lender’s Technical Advisor for

the project assessment

Hasari Wind Farm,
South Korea

Shinhan Bank,
South Korea

Lender's engineering services

YeongYang Wind
Farm,
South Korea

STX Energy Co.,
Ltd.,
South Korea

Tendering

Site Visit, Review of project data
and documents, On-site
measurement data evaluation
and analysis, Long-term
correlation, Bankable Wind
Resource Assessment, Advanced
CFD flow modelling, Layout
optimisation and micrositing,
Energy production estimate,
Estimation of losses, Uncertainty

assessment, Reporting
Site Visit, Technical Due
Diligence, Review of project data
and documents, On-site
measurement data analysis,
Bankable Wind Resource
Assessment, Advanced CFD flow
modelling, Layout optimisation
and micrositing, Reporting
Site Visit, Technical Due
Diligence, Review of project data
and documents, On-site
measurement data analysis,
Bankable Wind Resource
Assessment, Advanced CFD flow
modelling, Layout optimisation
and micrositing, Reporting
Technical due diligence; cost
estimate and financial model
review; advisory for preparation
of EPC and O&M agreements;
assistance in elaboration of
technical specifications; review
of tender documents; contract
negotiation support;
construction monitoring; O&M
monitoring (2 years); quarterly
site inspections; reporting
Preparation of tender
documents; evaluation of the

bids; assistance during contract
negotiations

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 11 of 17

2013

2013

2012-2015

2012-2013


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year


Sumang Wind Farm,
South Korea

Doarm
Engineering Co.
Ltd.,
South Korea
Unison
Corporation Ltd.,
South Korea

Wind resource assessment;
financial analysis

Wind resource assessment;
economic appraisal; financial
analysis

2012

Wind resource assessment

2012

Preparation of
Tender Documents
for Wind Turbine
Procurement


STX Engergy
Corporation Ltd.,
Korea

Preparation of Tender
Documents

ShinChang Offshore
Wind Farm,
South Korea

Doarm
Engineering Co.
Ltd.,
South Korea

Pre-feasibility study

YeongYang Wind
Farm Project,
South Korea

STX Energy Co.,
Ltd.,
South Korea

Wind resource assessment;
AEP estimate

Site visit; basic document review;

wind data evaluation; long-term
correlation; wind flow modelling;
site classification; layout
optimisation and micro-siting;
energy yield and efficiency
calculation; estimation of losses;
uncertainty and probability of
exceedances
Tendering services including the
preparation of tender documents
for international bidding of the
Wind turbine lot, clarification
with bidders, bid evaluation and
support for contract negotiations
with the preferred bidders.
Site visit; assessment of
preferred offshore area;
preliminary wind resource
assessment based on onshore
data; preliminary wind farm
layout; determination of suitable
wind turbine types
Site visits; review of available
data and documents in order to
reach the project’s feasibility
status; optimization of micrositing; assessment of different
turbine types; hub height
optimization; bankable wind
resource assessment; estimation
of CAPEX and OPEX; financial

analysis

UiRyeong Wind
Farm,
South Korea

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 12 of 17

2012-2014

2011

2011


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services


Year

Goseong Wind
Farm,
South Korea

NECO Natural
Energy Company,
Ltd.,
South Korea

Wind resource assessment

2010-2011

Lecture at
University,
South Korea
Technical Advisory
Services,
South Korea

Jeju University,
South Korea

Giving lecture

DMS Corporation,
South Korea


Technical Advisory
Services for Detailed
Design for WTG
Type Certification,
South Korea

Doosan Heavy
Industries &
Construction,
Korea

Assessment of a design and
engineering company for
gearless permanent magnet
synchronous generators
Foundation and tower internal
design

Market Study,
South Korea

Hyosung
Corporation,
South Korea

Detailed analysis of four wind
energy design and engineering
companies; detailed analysis of
three wind turbine
manufacturers; strategic

advisory services

Operation &
Maintenance
Service for Gangwon
Wind Farm,
South Korea

Gangwon Wind
Power Co.,
South Korea

Project management; site
management and supervision;
HV electrical site supervision

Review of available data and
documents in order to reach the
project’s feasibility status; Site
visit; wind data evaluation; longterm correlation; wind flow
modelling; site classification;
energy yield and efficiency
calculation; estimation of losses;
uncertainty and probability of
exceedances
Subject of the lecture is
knowledge transfer about
WindPRO/WaSP
Detailed assessment of design
capability, track record and key

references; review of design
concept; contract review
Pre-design of the foundation and
tower; detailed execution design
of the foundation and tower;
data collection and conceptual
design of the tower internal
design
Screening of 6 and detailed
analysis of 4 wind energy design
and engineering companies incl.
assessment of track record and
experiences; evaluation of
capabilities and strengths and
weaknesses; assessment of 3
wind turbine manufacturers incl.
Assessment of capabilities,
strategy, turbine portfolio, track
record; strategic advisory
services
Online review of operation data;
review and verification of
guaranteed performance and
technical availability levels;
review and approval of repair
activities; technical assistance for
claim management; annual
technical inspections of each
turbine; regular reporting;
issuance of final certificate


GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 13 of 17

2010

2009

2008

2008

2007-2012


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year


Technical Advisory
Services for Taebaek
Wind Farm Project,
South Korea

Daewoo
Engineering &
Construction Co.,
Ltd.
South Korea

Feasibility study

2007-2008

Youngduk Lender's
Engineer,
South Korea
Daesung Wind
Farm,
South Korea

BNP Paribas,
Singapore

Lender's engineer

Daeasung Co.,
South Korea


Feasibility study for a wind
farm project on Jeju island

Wind Farm
Chupungryung,
South Korea

Institute of
Renewable Energy
and Environment,
South Korea

Feasibility study

Wind Farm Yanggu,
South Korea

Nordex Energy
GmbH,
Germany

Assistance during preparation
of bidding documents

Site calibration; micro-siting and
turbulence analysis; KLIMM wind
map; supervision of AEP
calculations; review of tender
documents (micro-siting and

WindPRO); site suitability
assessment; site calibration
Operation and maintenance
supervision; operation
monitoring
Wind resource assessment;
feasibility study for a selected
site; conceptual wind farm
planning (micro-siting);
environmental impact
assessment; grid integration
concept; economic analysis;
KLIMM calculation
Site investigation; supervision of
measurement campaign; KLIMM
wind study; conceptual wind
farm planning; wind farm layout;
grid interconnection; internal
cabling concept; site access;
environmental impact analysis;
financial analysis including CDMcomponent; preparation of
feasibility study report
Participation in public bidding
opening session; participation in
site visit; optimization of micrositing; recommendation for
location for power curve
performance verifications;
evaluation of site conditions
(slopes, surface roughness,
minimum temperature);

preparation of bidding
documents

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 14 of 17

2006-2011

2006-2007

2006-2007

2006


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year


Wind Farms Sinan
and Jeju,
South Korea

Dongkuk S&C,
South Korea /
Standard
Chartered Bank,
United Kingdom

Onshore BOO wind farm
planning and near shore-wind
farm development

2005-2007

Hankyung Wind
Farm Phase II,
South Korea

Korea Southern
Power
Corporation
(KOSPO), South
Korea / Korea
Power Engineering
Cooperation
(KOPEC),
South Korea

Korea Renewable
Energy Company
(KORENCO),
South Korea

Independent technical advisor
for tender preparation;
assistance during bid
evaluation; supervision of
erection commissioning

Data processing and analysis;
feasibility study for the two
selected sites; site identification;
conceptual wind farm planning;
KLIMM wind potential
evaluation; environmental
impact assessment; economic
analysis; technical due diligence;
site Inspection; preparation of
wind prognosis for an near-shore
off the south coast of Korea;
estimation of energy output;
financial assessment
Wind potential analysis; review
of micro-siting; annual energy
production estimation;
preparation of tender
documents; assistance during bid
evaluation; witness of

commissioning test

Wind potential evaluation and
micro-siting; review of financial
input parameters; measurement
campaign; feasibility study;
participation during turbine
contract negotiations (technical /
legal-optional); basic electrical
design including specifications

2005-2006

KORENCO Wind
Farm,
South Korea

Complete feasibility study to
support the client during the
design and implementation of
a wind farm

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 15 of 17

2005-2007


LIST OF PROJECTS


Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Wind Energy Market
Study,
South Korea

Confidential

Analysis of the fifteen largest
wind turbine manufacturers;
analysis of the world wind
market

2005-2006

Gangwon Wind
Farm,
South Korea


Unison Co., Ltd.
South Korea

Wind farm development and
project management

Offshore Busan
Wind Farm Project,
South Korea

Daewoo
Engineering &
Construction Co.,
Ltd.
South Korea

Offshore wind farm
development in South Korea

Offshore technology (trends,
costs, projects); technology
analysis; evaluation of financial
status and internationalisation
strategies of the fifteen largest
wind turbine manufacturers;
institutional and regulatory
framework (China and India);
CDM-business opportunities;
listing of cost for components

and spare parts; operation and
maintenance and installation
costs; lessons learnt; assessment
of wind energy value chain;
SWOT-analysis; M&A-strategy
evaluation; business model
recommendation & definition of
steps for implementation
Overall project management;
QSE coordination; complete
detailed wind farm planning;
supervision of construction and
commissioning, taking-over
certificates, operation and
maintenance supervision;
environmental impact study;
aviation study, tendering of wind
turbines and infrastructure lots;
setting up financing structure
and identification of investors
Preparation of a wind prognosis
for an offshore region located 5
to 10 km off the coast in the site;
estimation of energy output;
financial assessment

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx

Page 16 of 17


2004-2008

2004


LIST OF PROJECTS

Experience in Southeast Asia (Last Ten Years)
Cambodia, Indonesia, Laos, Malaysia, Myanmar, Philippines, Thailand, Vietnam and
South Korea
Name/Country

Client/Financier

Main Features

Consultancy Services

Year

Wind Farm
Development for
Hyosung,
South Korea

Hyosung
Corporation,
South Korea

Wind farm development and

implementation in pre-selected
sites

2003-2009

Wind Farm
Yongdok,
South Korea

Unison Co., Ltd.
South Korea

Feasibility study

Wind Farm
Gangwon,
South Korea

Unison Co., Ltd.
Korea /
Gangwon Wind
Power Co.,
South Korea

Development of wind farm;
project management

Site identification and
evaluation; wind resource
assessment; feasibility study for

a selected site; conceptual wind
farm planning (micro-siting);
environmental impact
assessment; grid integration
concept; economic analysis;
KLIMM calculation; detailed
turbulence and site suitability
assessment
Wind data analysis; wind farm
planning; technical concept for
grid integration; micro siting with
WindPRO
Wind data analysis; long-term
correlation; wind farm planning;
technical concept for grid
integration; micro-siting with
WindPRO; environmental impact
assessment; economic analysis;
BOO(T) scheme development;
technical and financial advisory
services until financial close

Genting
International,
Malaysia

Asia Asset Package:
1 Combined Cycle Power Plant
in Thailand, 700 MW
1 Coal fired Steam Power Plant

in Indonesia, 1230 MW
4 Hydro Power Plants in the
Philippines, 792 MW

Technical and environmental due
diligence for Edison Mission
Energy Assets:
Plant reviews (conditions, performance, capabilities and
limitations).
Plant incidents and impact on
operation and maintenance.
Projection of capital and
operating expenditures.
Input for financial model.
Review of fuel supply chain.
Environmental issues and
impacts on the plants.

2004

2001-2004

2000-2004

REGIONAL
Various Thermal and
Hydro Power Plants
Asia, Australia

Australia Asset Package:

1 Combined Cycle Cogeneration Power Plant: 118 MW
1 Gas turbine Power Plant :
300 MW

GEV, Experience in Southeast Asia-Vietnam-SKorea_ last 10 years_2015.docx