Design Loading
page: 0002
Design RC. Slap
page: 0013
Analysis and design 3D Model
Key plan
page: 0330
Beam
page: 0385
Wall & Column
page: 1169
Design RC. Staircase
page: 1725
Design RC. Retainging Wall
page:1601
Design Foundation
page: 1602
Review wall & column
page: 1668
Analysis and design RC.roof of penthouse
page:1757
Analysis and design roof Elervator
page: 1729
Analysis and design Steel roof
page: 1777
Appendix
page:
index report structure-Block B.mmap - 9/30/2010 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
M cl c
1. Mô t công trình ........................................................................................................... 3
thi t k : .................................................................................. 3
2. Tiêu chu n áp d
3. Lo i v t li u k t c
c s d ng ............................................................................. 3
3.1. Bê tông .................................................................................................................. 3
3.2. C t thép ................................................................................................................. 4
nh hình ...................................................................................................... 4
3.4. Bê tông ti n áp ...................................................................................................... 4
4. T i tr ng thi t k .......................................................................................................... 4
4.1. T nh t i trên sàn .................................................................................................... 4
4.2. Ho t t i s d ng:................................................................................................... 7
4.3. T i tr ng gió .......................................................................................................... 8
4.4. T
t ......................................................................................................... 8
b nv
à kh
c v .............................................................................. 8
ch ng cháy ...................................................................................................... 8
u ki n bên ngoài ....................................................... 8
5.2. Tình tr ng ti p xúc v
6. Tính toán thi t k ......................................................................................................... 9
ình ph n m
tính toán và thi t k ........................................ 9
nh t ng th theo t i tr ng ngang ............................................ 9
6.2. Tính toán s
6.3. T i tr ng và thi t k c t ..................................................................................... 10
6.4. T i tr ng và thi t k
ng ch u c t ................................................................... 10
6.5. Thi t k sàn nhà ............................................................................................... 10
6.6. Thi t k sàn t ng tr t .......................................................................................... 10
6.7. Thi t k sàn t ng h m......................................................................................... 11
CÔNG TY C PH
N VITA
page:2
- 2/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
1. Mô t công trình
CAO C P
THE OCEAN VISTA RESIDENTIAL
M
- PHAN THI T - BÌNH THU N-VI T NAM
,
7 t ng
, mái và 1 t ng h m.
Tên d án:
V trí xây d ng:
:
Qui mô:
2. Tiêu chu n áp d
thi t k :
Các tiêu chu n chính s
c áp d ng trong thi t k k t c u bao g m:
• TCVN2737 – T i tr ng cho công trình
• TCVN 2737– Tiêu chu n t i tr ng gió Vietnam.
• BS 8110 – Tính toán bê tông c t thép
3. Lo i v t li u k t c
Các v t li
c s d ng
c s d ng trong k t c u bao g m:
3.1. Bê tông
Lo i
C30, fc=30 N/mm2
C30, fc=30 N/mm2
C30, fc=30 N/mm2
C40, fc=40 N/mm2
Bê tông C30, fc=30 N/mm2
C30, fc=30 N/mm2
**
Lo i c u ki n
Móng
c
T ng h
ng h thang.
ng ch u c t, C t và h khung ch u l c.
t thép / Sàn và sàn ph ng
Bê tông c u t o
bê tông kh i tr (150*150*150) 28 ngày.
CÔNG TY C PH
N VITA
page:3
- 3/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
3.2. C t thép
Lo i
Thép ch u l c chính
Thép m m
i thép hàn
Thép hình
3.3.
Fy
390N/mm2
235 N/mm2
460 N/mm2
235N/mm2
Lo i c u ki n
Thép s d ng
K t c u thép
nh hình
Lo i
nh hình
Bulon 6.6
Bulon 8.8
Que hàn (E42)
Lo i c u ki n
fy=235N/mm2 H k t c u ch u l c
fy=320N/mm2
fy=400N/mm2
fy=180N/mm2
3.4. Bê tông ti n áp
giãn dài th p v i l c phá ho i nh nh t là 184 kN.
• 12.7 mm
• Kh
ul
u neo = 138 kN (75%)
4. T i tr ng thi t k
Công trình s
c thi t k theo các lo i t i tr ng sau
ng b n thân k t c u
• T nh t i – tr
• T nh t i trên sàn.
• Ho t t i s d ng.
• T i tr ng gió.
4.1. T nh t i trên sàn
T nh t i trên sàn bao g m t i hoàn thi n sàn, treo tr
ng trên sàn, t
ng, h
c, t i tr ng th c t c a thi t b
n, b n tr ng cây, t t c các t i tr ng c
nh ho c di d i.
T nh t
c áp d
CÔNG TY C PH
N VITA
page:4
- 4/11 -
n và
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
Lo i t i tr ng
T i tr ng
hoàn thi n
sàn
ng g ch
sét nung
(g ch 4 l )
Di n gi i t i tr ng
N n sân tr t ( t/b n bê tông ch ng
th m)
Các t
u xe, s nh thang máy (50mm
Maximum)
B n trông cây ( d
c)
Phòng t m n hình (50mm)
S nh thang máy n hình (50mm)
Phòng c
n, phòng máy b
òng
n.
, Khách s n, và các t
phòng n hình (50mm)
H
, h t m, Jacuzzi
Ch ng th m và hoàn thi n
i (50mm)
Khu siêu th (50mm)
ng g ch sét nung dày 100mm (m t
l p)
ng dày 200mm (hai l p)
Lo i t i tr ng
/
n/
Tr n gi treo vào tr n
1.2
2.4
1.2
1.2
125mmPAD
1.2
2.4
2.4
1.2
1.2
2.5
3.8
Di n gi i t i tr ng
KN/m2
Phòng Chiller
1.25
Phòng qu t/ Phòng máy b / 0.5
n
Phòng k thu
và S
u xe
0.35
Các t
òng n hình
0.35
ng
0.25
Các t
và khách s n 0.50
n hình
Khu buôn bán/
n 0.1
hình
T i tr
CÔNG TY C PH
KN/m2
12.0
N VITA
page:5
0.5
- 5/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
Các t i tr ng trên sàn khác
Áp l
TR
t
Các t
òng
n hình
(Khung kim loai và t
khô)
và khách s
n hình
2.5
(G
t sét r ng có tô trát hoàn
thi n)
Khu v c buôn
n hình
2.0
(G
t sét r ng có tô trát hoàn
thi n)
Ghi chú:
a. B qua t i tr
nh
t t
t quá
4.0KN/m2
b. B qua t i tr
u xe, b c thang và
nh
s
òng.
H th
ng bao xung quanh
n v ki n trúc
Áp l
t lên k t c u toà nhà s
c l y theo ki n ngh
áp
a Ch t.
l cc
NG V T LI U XÂY D NG
a
b
c
d
e
f
g
h
CÔNG TY C PH
V T LI U
Bê tông c t thép
Kh i xây g
c
Kh i xây g ch r ng
t
G
K t c u thép
c
N VITA
page:6
KN/m3
24.0
20.0
14.0
18.0
10.0
78.5
27.0
10.0
- 6/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
4.2. Ho t t i s d ng:
Lo i t i tr ng
Di n gi i t i tr ng
Phòng t m
i
Ho t t i s
d ng
CÔNG TY C PH
S nh thang máy
Phòng máy thang máy
H thang máy
Phòng máy phát n
Sân t ng tr t có mái che
Khu giao nh n hàng
S nh
Siêu th
Trungtâm giúp vi c/C
Phòng c
n hình
òng
Kho l nh
C a hi u
Nhà hát
u xe
Phòng máy b
/ Phòng chiller
và khách s n
Phòng v sinh
i buôn bán
Mái
C u thang, hành lang
Kho
Khu th d c nh , Khu ch
vi n
Phòng t p th d c
Tr m ch xe
ng xe ch y
Khu dành cho xe ch a cháy
Khu b c d hàng hoá
N VITA
page:7
ng
KN/m2
2.5
4.0
4.0
7.5
7.5
12.0
8.0
10.0
4.0
10.0
2.5
5.0
2.5
30
10
7.5
2.5
7.5
2.0
2.5
4.0
1.0
3.0
6.25
5.0
7.5
16.0
10.0
20.0
10.0
- 7/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
H
, h t m, Jacuzzi
Tr
th c t
Tr
th c t
Tr ng cây
T
4.3. T i tr ng gió
c s d ng theo tiêu chu
4.4. T i
5.
c
n
t
CVN 2737
t
t theo TCVN-375.
b n v ng và kh
5.1.
ch ng cháy
T t c các c u ki n k t c
cv
c thi t k ch ng cháy 2 gi .
5.2. Tình tr ng ti p xúc v
u ki n bên ngoài
u ki
ình:
Tình tr ng ti p xúc v
• Chi u dày l p bê tông b o v cho thép chính:
= 35mm (cho lo
ng 300mm và l
).
i liên t c).
B n sàn = 20mm ~ 35mm (nh
C t & Vách ch u l c = 25mm to 35mm (50% t i 100% ph
c l ra).
• Chuy n v
ng:
L/250 (t cao trình n m ngang)
T ng c ng chuy n v c
chuy n v
t li u d v = L/500, hay l n nh t là 20mm.
chuy n v
v t li u không d v = L/350, hay l n nh t là 20mm.
(Có th s d ng vi c t
v
u khi n và giãm
võng trên
ng v i tr
n thân k t c u).
• Chuy n v ngang:
t quá H/500; trên m i chi u cao t ng cho t
n hình.
T ng chuy n v cao trình mái không v t quá 1/1000.
• B r ng khe n t l n nh t:
ng k t c u c a h
c = 0.15mm b r ng khe n t cong.
n sàn khác = 0.30mm b r ng khe n t cong.
• Ch ng th m:
T t c các h
c bê tông c t thép và sàn mái ph ng bê tông c thép, b n hoa ph i
c ch ng th m v i s ki m tra và ch p thu n c a chuyên gia ch ng th m. Các
CÔNG TY C PH
N VITA
page:8
- 8/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
v
c ki m tra ph
c làm lên m t k t c
c khi ch ng th m. Ch ng
th m phòng v sinh n u c n thi t s
c mô t b i ki n trúc.
6. Tính toán thi t k
6.1.
ình ph n m
ình ph n m
cs d
tính toán và thi t k :
vi c tính toán và thi t k bao
g m:
nh h k t c u công trình d i t i trong ngang – ETABS, Orion
• Tính toán
• Tính toán Thi t k b
– SAFE, ADAPT BUILDER
• Tính toán Thi t k
ng L i C ng, C t
ng ch u c t – CSI-COL, SCONCRETE, TEDDS
nh t ng th theo t i tr ng ngang
6.2. Tính toán s
• Tính toán Hai tr ng thái
nh t ng th .
• Mô hình th nh t
c g i là SLS bao g m t
u ki n
ng. Mô hình này
cs d
ki m tra chuy n v ngang c a
công trình.
• Mô hình th
c g i là ULS, bao g m t t c các ph n t
ng
và ch nh
có liên quan mà nó s góp ph
n trong thi t k . Mô hình này
s
cs d
l y moment và n i l c ho
ng trong m i ph n t k t c u mà
nó c
tính toán kh
u l c c a c u ki n k t c u.
c tính toán n i l c theo
• Mô hình tính toán 3-D ETABS s
v i nhau (ví d 0° và 90°).
• T h p n i l c s bao g m 7 t h p và l y ra giá tr nguy hi m nh
tính toán
thi t k c u ki n bê tông c t thép.
* 1.2G + 1.2Q
* 1.2G + 1.2Q ± 1.2W
* 1.2G ± 1.2W
* 1.0G ± 1.2W
• T h p n i l c s bao g m 3 t h p và l y ra giá tr nguy hi m nh
tính toán
thi t k móng.
* 1.0G + 1.0Q
* 1.0G + 0.8Q ± 0.8W
V i G = T nh t i, Q = Ho t t i s d ng, W = T i tr ng gió
• Liên k t c a D m và b n sàn t chu vi c t, t
m gi a vách l i s
nh
là kh
ng h p nguy hi m nh t.
CÔNG TY C PH
N VITA
page:9
- 9/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
6.3. T i tr ng và thi t k c t
• T i tr ng theo tr ng l c s
n di n tích.
ng chia vùng t i tr ng s
c truy n vào d m console và d m dài.
(T i tr ng gió và T
ng)
c bao g m c t i
•N il
tr
ng và ngang và moment trong c t s
c trích xu t t k t qu tính toán c a
c c ng thêm vào t i tr ng l c c a c
thi t k .
ETABS, s
•C ts
c thi t k
c gi ng.
•
c c t nh nh t cho hàng côt biên c
c s d ng là
vuông 600mm, v
ng thép là 0.6%
ng c t c a sàn t
is
c th hi n 2
•V
m t b ng.
6.4. T i tr ng và thi t k
ng ch u c t
n di n tích. M i
• T i tr ng theo tr ng l c s
ng s
c ki m tra riêng r .
ph n t c
• Vi c áp d ng giãm ho t t i s
c áp d
n
c áp d ng cho t i c a sàn, c
i.
cho phép. 50% giãm ho t t i s
• T i tr ng ngang (t i gió), bao g m c t i tr
ng và ngang và moment trong
ng s
c trích xu t t k t qu tính toán c a ETABS (mô hình ULS),
c c ng
thi t k .
thêm vào t i tr ng l
• Ti t di
ng c
c ki m tra cho s t ng h p ng su t kéo (dù không
ch c xãy ra) t t h
ng h p t i tr ng. Nh ng ng su t kéo s
c ch u
b i c t thép.
• Chi
ng s
c gi
200mm t t ng h m lên t i mái.
ng thép nh nh t c
ng ch u l c là 0.4% c a di n tích ti t di n cho
•
ng và 0.25% tho thanh thép ngang.
6.5. Thi t k sàn nhà
n hình bao g m d m BTCT và sàn BTCT.
•B
• Vi c thi t k sàn BTCT s
c th c hi n b
ình SAFE
tính toán ph n t h u h n 3 chi u.
•D
c tính toán thi t k b i ph n m m tính toán 2 chi u ADAPT.
6.6. Thi t k sàn t ng tr t
• Sàn t ng tr
c thi t k là sàn bê tông ti n áp d
• Vi c tính toán thi t k d m và b
ADAPT.
CÔNG TY C PH
N VITA
page:10
ình
b n sàn.
c tính toán b ng ph n m m
- 10/11 -
D án:
CAO C P
THE OCEAN VISTA RESIDENTIAL
THUY T MINH K T C U – BLOCK-B
6.7. Thi t k sàn t ng h m
• Sàn t ng h
c thi t k là d m và h b n sàn
• Vi c tính toán thi t k d m và b
ADAPT.
.
c tính toán b ng ph n m m
~H T~
CÔNG TY C PH
N VITA
page:11
- 11/11 -
page:12
ADAPT - STRUCTURAL CONCRETE SOFTWARE SYSTEM
ADAPT-RC Version
"5.00" Date:
"06 - 09 - 2010" Time:
"13:33" File: Support Line 1
1 - PROJECT TITLE: "Ocean Vista"
1.1 Design Strip: Support Line 1
1.2 Load Case: Envelope
2 - MEMBER ELEVATION
[m]
3.000
1.800
3 - TOP REBAR
2 4-12mm X4200 mm
3.1 ADAPT selected
1 4-12mm X4800 mm
3.2 ADAPT selected
5 - BOTTOM REBAR
5.1 ADAPT selected
3 8-12mm X1960 mm
5.2 ADAPT selected
6 - REQUIRED & PROVIDED BARS
max
6.1 Top Bars
[ mm2]
required
provided
920
833
833
833
0
2154.
0.
460
460
920
6.2 Bottom Bars
max
7 - SHEAR STIRRUPS
7.1 ADAPT selected.
Bar Size # 12 Legs: 2
Spacing [mm]
7.2 User-selected
Bar Size # Legs:
7.3 Required area
[mm2/m]
100
24E+02
18E+02
12E+02
60E+01
00E+00
9 - DESIGN PARAMETERS
9.1 Code: British f cu = 30 N/mm2 fy = 390 N/mm2 (longitudinal)
f y = 390 N/mm2 (shear)
9.2 Rebar Cover: Top = 20 mm Bottom = 20 mm Rebar Table: Euro - BS, BPEL, DIN
10 - DESIGNER'S NOTES
page:13
page:14
page:15
page:16
-----------------------------------------------------------------------------|
ADAPT CORPORATION
|
|
STRUCTURAL CONCRETE SOFTWARE SYSTEM
|
|
1733 Woodside Road, Suite 220, Redwood City, California 94061
|
-----------------------------------------------------------------------------|
ADAPT-RC FOR REINFORCED CONCRETE BEAM/SLAB DESIGN
|
|
Version 5.00 BRITISH-BS8110 (1985)
|
|
ADAPT CORPORATION - Structural Concrete Software System
|
|
1733 Woodside Road, Suite 220, Redwood City, California 94061
|
|
Phone: (650)306-2400, Fax: (650)306-2401
|
|
Email: , Web site:
|
-----------------------------------------------------------------------------DATE AND TIME OF PROGRAM EXECUTION:
Jun 9,2010
At Time: 13:33
PROJECT FILE:
consol1100-Hwall200-ML
P R O J E C T
T I T L E:
Ocean Vista
CR-1.0-Consol1100ML
1 - USER SPECIFIED
G E N E R A L
D E S I G N
P A R A M E T E R S
==============================================================================
CONCRETE:
STRENGTH at 28 days, for BEAMS/SLABS .............
30.00 N/mm^2
MODULUS OF ELASTICITY for BEAMS/SLABS ............
24597.00 N/mm^2
CREEP factor for deflections for BEAMS/SLABS .....
CONCRETE WEIGHT ..................................
2.00
NORMAL
SELF WEIGHT ......................................
2400.00 Kg/m^3
REINFORCEMENT:
YIELD Strength ...................................
Minimum Cover at TOP .............................
Minimum Cover at BOTTOM ..........................
390.00 N/mm^2
20.00 mm
20.00 mm
ANALYSIS OPTIONS USED:
Structural system ................................
Moment of Inertia over support is ................
Moments REDUCED to face of support ...............
ONE-WAY
NOT INCREASED
YES
2 - I N P U T
G E O M E T R Y
==============================================================================
2.1.1 PRINCIPAL SPAN DATA OF UNIFORM SPANS
------------------------------------------------------------------------------
page:17
Page 2
(consol1100-Hwall200-)
ADAPT-RC V- 5.00 BS
-----------------------------------------------------------------------------S
F|
|
|
TOP
|BOTTOM/MIDDLE|
|
P
O|
|
|
FLANGE
|
FLANGE
| REF | MULTIPLIER
A
R| LENGTH| WIDTH
DEPTH| width thick.| width thick.|HEIGHT| left right
N
M|
m
|
mm
mm |
mm
mm |
mm
mm | mm |
-1-----3----4-------5-------6-------7------8------9------10----11-----12----131
1
3.00
2000
250
0
.50
.50
C
1
1.80
2000
250
0
.50
.50
-----------------------------------------------------------------------------LEGEND:
1 - SPAN
3 - FORM
C = Cantilever
1 = Rectangular section
2 = T or Inverted L section
3 = I section
4 = Extended T or L section
7 = Joist
8 = Waffle
11 - Top surface to reference line
2.2 - S U P P O R T
W I D T H
A N D
C O L U M N
D A T A
SUPPORT <------ LOWER COLUMN ------->
<------ UPPER COLUMN ------->
WIDTH
LENGTH B(DIA)
D
% CBC*
LENGTH B(DIA)
D
% CBC*
JOINT
mm
m
mm
mm
m
mm
mm
--1------2-------3-------4------5-----6----7-----8--------9-----10----11--121
.0
.0
.0
.0 100 (1)
.0
.0
.0 100 (1)
2
.0
.0
.0
.0 100 (1)
.0
.0
.0 100 (1)
*THE COLUMN BOUNDARY CONDITION CODES (CBC)
Fixed at both ends ...(STANDARD) .............................
Hinged at near end, fixed at far end .........................
Fixed at near end, hinged at far end .........................
Fixed at near end, roller with rotational fixity at far end ..
=
=
=
=
1
2
3
4
% = Percentage of column stiffness included in calculations
3 - I N P U T
A P P L I E D
L O A D I N G
==============================================================================
<-------CLASS------->
D = DEAD LOAD
L = LIVE LOAD
<--------------TYPE------------------->
U = UNIFORM
P = PARTIAL UNIFORM
C = CONCENTRATED
M = APPLIED MOMENT
page:18
Page 3
(consol1100-Hwall200-)
ADAPT-RC V- 5.00 BS
-----------------------------------------------------------------------------SDL = SUPERIMPOSED DL
X = OTHER LOADING
L = LINE LOAD
V = VARIABLE
R = TRIANGLE
Z = TRAPEZOIDAL
SW= SELF WEIGHT Computed from geometry input and treated as dead loading
Unit selfweight W = 2400.0 Kg/m^3
NOTE: LIVE LOADING is SKIPPED with a skip factor of
1.00
3.1 - LOADING AS APPEARS IN USER`S INPUT SCREEN PRIOR TO PROCESSING
==============================================================================
SPAN CLASS TYPE
W
P1
P2
A
B
C
F
M
kN/m^2 kN/m
kN/m
m
m
m
kN
kN-m
-1-----2------3-----4------5------6------7------8------9-----10-----11--1
L
U
1.50
1
D
U
1.20
CANT
L
P
1.50
.00
1.10
CANT
L
P
1.50
1.10
1.80
CANT
D
P
1.20
.00
1.10
CANT
D
C
1.10
16.00
4 - C A L C U L A T E D
S E C T I O N
P R O P E R T I E S
==============================================================================
4.1
For Uniform Spans and Cantilevers only
SPAN
AREA
I
Yb
Yt
mm^2
mm^4
mm
mm
-1-------------2----------------3---------------4-------------5----1
500000.00
.2604E+10
125.00
125.00
CANT.
500000.00
.2604E+10
125.00
125.00
Note:
--- = Span/Cantilever is Nonuniform, see block 4.2
5 - M O M E N T S,
S H E A R S & R E A C T I O N S
==============================================================================
page:19
Page 4
(consol1100-Hwall200-)
ADAPT-RC V- 5.00 BS
-----------------------------------------------------------------------------5.1 - D E A D
L O A D
M O M E N T S,
S H E A R S & R E A C T I O N S
-----------------------------------------------------------------------------<5.1.1 S P A N
M O M E N T S (kNm) >
<5.1.2 SPAN SHEARS (kN) >
SPAN
M(l)*
Midspan
M(r)*
SH(l)
SH(r)
--1---------2--------------3---------------4--------------5-----------6------1
.00
-3.12
-38.12
-8.55
33.97
CANT
-38.12
---------39.83
----Note:
* = Centerline moments
JOINT
<5.1.3 REACTIONS (kN) >
<- 5.1.4 COLUMN MOMENTS
--1---------------2----------------Lower columns----Upper
1
8.55
.00
2
73.80
.00
(kNm) ->
columns----.00
.00
5.2 -
S U P E R I M P O S E D L O A D
M O M E N T S,
S H E A R S & R E A C T I O N S
-----------------------------------------------------------------------------<5.2.1 S P A N
M O M E N T S (kNm) >
<5.2.2 SPAN SHEARS (kN) >
SPAN
M(l)*
Midspan
M(r)*
SH(l)
SH(r)
--1---------2--------------3---------------4--------------5-----------6------1
.00
.00
.00
.00
.00
CANT
.00
--------.00
----Note:
* = Centerline moments
JOINT
<5.2.3 REACTIONS (kN) >
<- 5.2.4 COLUMN MOMENTS
--1---------------2----------------Lower columns----Upper
1
.00
.00
2
.00
.00
(kNm) ->
columns----.00
.00
5.3 - O T H E R
L O A D
M O M E N T S,
S H E A R S & R E A C T I O N S
-----------------------------------------------------------------------------<5.3.1 S P A N
M O M E N T S (kNm) >
<5.3.2 SPAN SHEARS (kN) >
SPAN
M(l)*
Midspan
M(r)*
SH(l)
SH(r)
--1---------2--------------3---------------4--------------5-----------6------1
.00
.00
.00
.00
.00
page:20
Page 5
(consol1100-Hwall200-)
ADAPT-RC V- 5.00 BS
-----------------------------------------------------------------------------CANT
.00
-----
-----
.00
-----
Note:
* = Centerline moments
JOINT
<5.3.3 REACTIONS (kN) >
<- 5.3.4 COLUMN MOMENTS
--1---------------2----------------Lower columns----Upper
1
.00
.00
2
.00
.00
(kNm) ->
columns----.00
.00
6 - L I V E
L O A D
M O M E N T S,
S H E A R S & R E A C T I O N S
==============================================================================
<-- 6.1
L I V E
L O A D
SPAN MOMENTS (kNm)
and SHEAR FORCES (kN) -->
<----- left* -----> <--- midspan ---> <---- right* -----> <--SHEAR FORCE-->
SPAN
max
min
max
min
max
min
left
right
-1-------2---------3--------4--------5---------6---------7--------8--------9-1
.00
.00
3.37
-2.43
-4.86
.00
-4.50
6.12
CR
-4.86
---------5.40
----Note:
* = Centerline moments
<- 6.2 REACTIONS (kN) -> <-------- 6.3 COLUMN MOMENTS (kNm) -------->
<--- LOWER COLUMN ---> <--- UPPER COLUMN --->
JOINT
max
min
max
min
max
min
--1-----------2----------3------------4----------5------------6----------7---1
4.50
-1.62
.00
.00
.00
.00
2
11.52
4.50
.00
.00
.00
.00
Note:
Block 6.1 through 6.3 values are maxima of all skipped loading cases
7 M O M E N T S
REDUCED TO FACE-OF-SUPPORT
==============================================================================
7.1
R E D U C E D
DEAD LOAD MOMENTS (kNm)
SPAN
<- left* -> <- midspan ->
<- right* ->
--1---------------2-------------3-------------4------------------------------1
.00
-3.12
-38.12
CANT
-38.12
---------
page:21
Page 6
(consol1100-Hwall200-)
ADAPT-RC V- 5.00 BS
-----------------------------------------------------------------------------Note:
* = face-of-support
7.2
R E D U C E D
SUPERIMPOSED DEAD LOAD MOMENTS (kNm)
SPAN
<- left* -> <- midspan ->
<- right* ->
--1---------------2-------------3-------------4------------------------------1
.00
.00
.00
CANT
.00
--------Note:
* = face-of-support
7.3
R E D U C E D
OTHER LOAD MOMENTS (kNm)
SPAN
<- left* -> <- midspan ->
<- right* ->
--1---------------2-------------3-------------4------------------------------1
.00
.00
.00
CANT
.00
--------Note:
* = face-of-support
7.4
R E D U C E D
LIVE LOAD MOMENTS (kNm)
<----- left* ------>
<---- midspan ---->
<----- right* ----->
SPAN
max
min
max
min
max
min
-1----------2----------3-----------4----------5-----------6----------7----1
.00
.00
3.38
-2.43
-4.86
.00
CR
-4.86
--------Note:
10 - F A C T O R E D
M O M E N T S
&
R E A C T I O N S
==============================================================================
Calculated as ( 1.20D + 1.20L + 1.20SD + 1.20X)
10.1.1
FACTORED DESIGN MOMENTS (kNm)
<----- left* ------>
<---- center ------>
page:22
<----- right* ----->
Page 7
(consol1100-Hwall200-)
ADAPT-RC V- 5.00 BS
-----------------------------------------------------------------------------SPAN
max
min
max
min
max
min
-1----------2----------3-----------4----------5-----------6----------7----1
.00
.00
.31
-6.66
-51.58
-45.74
CR
-51.58
--------Note:
* = face-of-support
10.1.3 FACTORED REACTIONS
10.1.4 FACTORED COLUMN MOMENTS (kNm)
(kN)
<-- LOWER column -->
<-- UPPER column -->
JOINT
max
min
max
min
max
min
-1----------2----------3-----------4----------5-----------6----------7----1
15.66
8.32
.00
.00
.00
.00
2
102.38
93.96
.00
.00
.00
.00
Calculated as (
10.2.1
.00D +
.00L +
.00SD +
.00X)
FACTORED DESIGN MOMENTS (kNm)
<----- left* ------>
<---- center ------>
<----- right* ----->
SPAN
max
min
max
min
max
min
-1----------2----------3-----------4----------5-----------6----------7----1
.00
.00
.00
.00
.00
.00
CR
.00
--------Note:
* = face-of-support
10.2.3 FACTORED REACTIONS
10.2.4 FACTORED COLUMN MOMENTS (kNm)
(kN)
<-- LOWER column -->
<-- UPPER column -->
JOINT
max
min
max
min
max
min
-1----------2----------3-----------4----------5-----------6----------7----1
.00
.00
.00
.00
.00
.00
2
.00
.00
.00
.00
.00
.00
Calculated as (
10.3.1
.00D +
.00L +
.00SD +
FACTORED DESIGN MOMENTS (kNm)
page:23
.00X)