METHOD STATEMENT FOR FILLING BACK MEP SLAB OPENINGS AT LAUNDRY
(FOR ALL FLOORS)
OCT - 2018
OWNER
2
2
2
2
OWNER
2
2
2
2
2
2
OWNER
1.1
1.2
CÔNG TY TNHH BAY
WATER
1.3
General director : MIKE CHU
SUN WAH TOWER,
115 Nguyen Hue Street
Ben Nghe Ward, District 1, HCM City
Tel No : 084.8.39219190
Fax
: 084.8.38219181
Website : www.sunwahpearl.com
1
1
Examined with
no objection
□
Examined,
observation
added.
Resubmission
not required
Examined
and
resubmission
required
□
Date:
880
Signature:
□
SUPER VISION CONSULTANT
CÔNG TY CP TV-CN,TB
& KD XÂY DỰNG-CONINCO
265
1050
30
General director:
4 Ton That Tung Streer
, District Dong Da, Ha Noi City, Vietnam
Tel No
: (+84 - 24) 38523706
Fax No
: (+84 - 24) 35741231
Website :
3950
5000
1.1
1.2
MẶT BẰNG TỈ LỆ 1:15
1.3
Examined with
no objection
□
Examined,
observation
added.
Resubmissio
n not required
Examined
and
resubmission
required
□
□
Approved by:
Checked by:
CONSTRACTOR
CÔNG TY CP HỮU HẠN
XÂY DỰNG TRUNG QUỐC
6F LAWRENCE S.TING BLDG,
801 NGUYEN VAN LINH RD TAN PHU WARD,
DISTRICT 7, HCMC, VIETNAM
Tel: 084 8 5411 5988
Fax: 084 8 5411 5989
PROJECT MANAGER:
LI DUN AN
Site manager:
Checked by:
Drafter:
PROJECT:
CONDOMINIUM BLOCKS PROJECT
WARD 22, BINH THANH DISTRICT
KHU DÂN CƯ PHƯỜNG 22,
QUẬN BÌNH THẠNH
90 Nguyễn Hữu Cảnh street, 22 ward, Binh Thanh
district
FOR CONSTRUCTION
□
Architecture
□
Structure
□
M&E
Drawing Title
TẦNG 8
SFL 24.450
30
SFL 24.450
TẦNG 8
HỘP GEN PHÒNG GIẶT T1-01
VIEW PHỐI CẢNH 1
MẶT ĐỨNG TỈ LỆ 1:15
VIEW PHỐI CẢNH 2
Drafter:
DWG NO.
1
REV.
ISSUE
00
16/10/18
DRAWING
SCALE
As
indicated
OWNER
General director : MIKE CHU
SUN WAH TOWER,
115 Nguyen Hue Street
Ben Nghe Ward, District 1, HCM City
Tel No : 084.8.39219190
Fax
: 084.8.38219181
Website : www.sunwahpearl.com
530
85
CÔNG TY TNHH
BAY WATER
CLASSING
285
1050
100
Examined,
Examined and
observation
resubmission
added.
required
Resubmission
not required
□
□
Signature:
□
Date:
285
530
85
800
Examined
with no
objection
1050
SUPER VISION CONSULTANT
CÔNG TY CP TV-CN,TB
& KD XÂY DỰNG-CONINCO
4700
2.1
2.2
2.2
PLAN LAUNDRY RISER T2-L8-01: SC 1/30
General director:
4 Ton That Tung Streer
, District Dong Da, Ha Noi City, Vietnam
Tel No
: (+84 - 24) 38523706
Fax No
: (+84 - 24) 35741231
Website :
Examined
with no
objection
MEP-H CLASH ARCHITECTURE WALL: SC 1/20
Examined,
observation
added.
Resubmission
not required
□
Examined and
resubmission
required
□
□
Approved by:
Checked by:
CONSTRACTOR
CÔNG TY CP HỮU HẠN
XÂY DỰNG TRUNG QUỐC
6F LAWRENCE S.TING BLDG,
801 NGUYEN VAN LINH RD TAN PHU WARD,
DISTRICT 7, HCMC, VIETNAM
Tel: 084 8 5411 5988
Fax: 084 8 5411 5989
D150
D100
PROJECT MANAGER:
D150
LI DUN AN
Site manager:
D100
Checked by:
Drafter:
PROJECT:
CONDOMINIUM BLOCKS PROJECT
WARD 22, BINH THANH DISTRICT
KHU DÂN CƯ PHƯỜNG 22,
QUẬN BÌNH THẠNH
100
285
0
105
90 Nguyễn Hữu Cảnh street, 22 ward, Binh
Thanh district, HCM City
85
SHOP DRAWING
□
Architecture
□
Structure
□
M&E
100
Drawing Title
LAUNDRY RISER
DWG NO.
VIEW 1
VIEW 2
T2-L8-01
VIEW CLASH
Rev.
00
SCALE
Issue date
08/09/2018
As
indicated
OWNER
15
800
390
15
clash
800
80
CÔNG TY TNHH
BAY WATER
390
General director : MIKE CHU
SUN WAH TOWER,
115 Nguyen Hue Street
Ben Nghe Ward, District 1, HCM City
Tel No : 084.8.39219190
Fax
: 084.8.38219181
Website : www.sunwahpearl.com
905
865
50
Examined
with no
objection
250
220
clash
15
800
390
Examined,
Examined and
observation
resubmission
added.
required
Resubmission
not required
□
□
Signature:
□
Date:
SUPER VISION CONSULTANT
50
865
CÔNG TY CP TV-CN,TB
& KD XÂY DỰNG-CONINCO
General director:
4 Ton That Tung Streer
, District Dong Da, Ha Noi City, Vietnam
Tel No
: (+84 - 24) 38523706
Fax No
: (+84 - 24) 35741231
Website :
2.F
2.F
250
Examined
with no
objection
Examined,
observation
added.
Resubmission
not required
□
Examined and
resubmission
required
□
□
Approved by:
2.4
2.4
2.4
PLAN LAUNDRY RISER: SC 1/40
PROPOSED LAYOUT PLAN LAUNDRY RISER: SC 1/40
Checked by:
DOOR CLASH STRUCTURE: SC 1/20
CONSTRACTOR
CÔNG TY CP HỮU HẠN
XÂY DỰNG TRUNG QUỐC
6F LAWRENCE S.TING BLDG,
801 NGUYEN VAN LINH RD TAN PHU WARD,
DISTRICT 7, HCMC, VIETNAM
Tel: 084 8 5411 5988
Fax: 084 8 5411 5989
PROJECT MANAGER:
LI DUN AN
Site manager:
Checked by:
Drafter:
D150
PROJECT:
D100
D150
D150
D100
CONDOMINIUM BLOCKS PROJECT
WARD 22, BINH THANH DISTRICT
KHU DÂN CƯ PHƯỜNG 22,
QUẬN BÌNH THẠNH
D150
90 Nguyễn Hữu Cảnh street, 22 ward, Binh
Thanh district, HCM City
80
220
SHOP DRAWING
□
865
100
100
50
905
250
Architecture
□
Structure
□
M&E
Drawing Title
LAUNDRY RISER
DWG NO.
T2-L8-08
VIEW 1
VIEW 2
VIEW CLASH
Rev.
00
SCALE
Issue date
08/09/2018
As
indicated
OWNER
3.1
CÔNG TY TNHH
BAY WATER
3.2
General director : MIKE CHU
SUN WAH TOWER,
115 Nguyen Hue Street
Ben Nghe Ward, District 1, HCM City
Tel No : 084.8.39219190
Fax
: 084.8.38219181
Website : www.sunwahpearl.com
950
Examined
with no
objection
455
□
D150
270
D100
□
Signature:
□
Date:
1490
100
Examined,
Examined and
observation
resubmission
added.
required
Resubmission
not required
100
70
270
SUPER VISION CONSULTANT
CÔNG TY CP TV-CN,TB
& KD XÂY DỰNG-CONINCO
455
100
General director:
4 Ton That Tung Streer
, District Dong Da, Ha Noi City, Vietnam
Tel No
: (+84 - 24) 38523706
Fax No
: (+84 - 24) 35741231
Website :
Examined
with no
objection
VIEW 2
PLAN LAUNDRY RISER: SC 1/30
Examined,
observation
added.
Resubmission
not required
□
Examined and
resubmission
required
□
□
Approved by:
Checked by:
CONSTRACTOR
CÔNG TY CP HỮU HẠN
XÂY DỰNG TRUNG QUỐC
6F LAWRENCE S.TING BLDG,
801 NGUYEN VAN LINH RD TAN PHU WARD,
DISTRICT 7, HCMC, VIETNAM
Tel: 084 8 5411 5988
Fax: 084 8 5411 5989
PROJECT MANAGER:
LI DUN AN
D150
Site manager:
D100
Checked by:
Drafter:
270
100
100
D150
D100
455
PROJECT:
CONDOMINIUM BLOCKS PROJECT
WARD 22, BINH THANH DISTRICT
KHU DÂN CƯ PHƯỜNG 22,
QUẬN BÌNH THẠNH
90 Nguyễn Hữu Cảnh street, 22 ward, Binh
Thanh district, HCM City
SHOP DRAWING
□
Architecture
□
Structure
□
M&E
100
Drawing Title
LAUNDRY RISER
DWG NO.
VIEW 2
T3-L8-01
VIEW 3
Rev.
00
SCALE
Issue date
22/09/2018
1 : 30
OWNER
CÔNG TY TNHH
BAY WATER
General director : MIKE CHU
SUN WAH TOWER,
115 Nguyen Hue Street
Ben Nghe Ward, District 1, HCM City
Tel No : 084.8.39219190
Fax
: 084.8.38219181
Website : www.sunwahpearl.com
3.C
Examined
with no
objection
Examined,
Examined and
observation
resubmission
added.
required
Resubmission
not required
□
D150
□
Signature:
D100
□
Date:
2350
SUPER VISION CONSULTANT
CÔNG TY CP TV-CN,TB
& KD XÂY DỰNG-CONINCO
510
100
25
General director:
4 Ton That Tung Streer
, District Dong Da, Ha Noi City, Vietnam
Tel No
: (+84 - 24) 38523706
Fax No
: (+84 - 24) 35741231
Website :
150
Examined
with no
objection
3.D
Examined,
observation
added.
Resubmission
not required
□
160
Examined and
resubmission
required
□
□
510
Approved by:
25
Checked by:
CLASH 2
CONSTRACTOR
CLASH 1
265
800
85
CÔNG TY CP HỮU HẠN
XÂY DỰNG TRUNG QUỐC
VIEW 1
6F LAWRENCE S.TING BLDG,
801 NGUYEN VAN LINH RD TAN PHU WARD,
DISTRICT 7, HCMC, VIETNAM
Tel: 084 8 5411 5988
Fax: 084 8 5411 5989
PROJECT MANAGER:
3.6
LAUNDRY RISER CLASH DOOR: SC 1/35
Site manager:
25
Checked by:
D150
Drafter:
150
PROJECT:
CONDOMINIUM BLOCKS PROJECT
WARD 22, BINH THANH DISTRICT
KHU DÂN CƯ PHƯỜNG 22,
QUẬN BÌNH THẠNH
150
100
25
510
100
D100
510
LI DUN AN
90 Nguyễn Hữu Cảnh street, 22 ward, Binh
Thanh district, HCM City
SHOP DRAWING
□
Architecture
□
Structure
□
M&E
Drawing Title
LAUNDRY RISER
VIEW 2
VIEW 3
DWG NO.
T3-L8-03
Rev.
00
SCALE
Issue date
22/09/2018
1 : 35
OWNER
1.1 1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9 1.10
43400
6200
7000
7000
7000
6200
3950
1050
1000
1.A
3950
1
BR.1
LRY.
2
BR.2
GIA
LOG.
GIA
LOG.
LRY.
GIA
LOG.
BR.
BR.
2
BR.2
BR.
WC. 1
WC. 1
LRY.
8900
1.B
1
BR.1
T1-01
T1-04
T1-02
2
WC. 2
LRY.
LIV.
LIV.
LRY.
2
WC. 2
SINH
WC.
SINH
WC.
LIV.
T1-05
SINH
WC.
T1-03
8900
1.B
1.A
1000
1050
GIA
LOG.
LIV.
KIT.
LIV.
KIT.
KIT.
KIT.
KIT.
ELV
THANG
S1.2
CHUNG
COR.
THANG
S1.1
2000
2000
21800
1.C
FF
LV
1.D
21800
1.C
1.D
VEST.
VEST.
PL
KIT.
RUB.
KIT.
KIT.
KIT.
2
WC. 2
KIT.
T1-09
2
WC. 2
LRY.
T1-08
LIV.
LRY.
SINH
WC.
SINH
WC.
LIV.
BR.
1
BR.1
LIV.
2
BR.2
1
BR.1
WC. 1
LRY.
1000
1.F
LRY.
3
WC. 3
LIV.
WC. 1
1.E
T1-06
T1-07
8900
T1-10
LIV.
2
BR.2
GIA
LOG.
GIA
LOG.
LRY.
BR.
BR.
GIA
LOG.
LRY.
1000
8900
STUDY
GIA
LOG.
1050
3950
6200
7000
7000
7000
6200
3950
1050
43400
1.1 1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9 1.10
MEP SLAB OPENINGS PLAN AT LAUNDRY - TOWER 1
CASTING CONCRETE FOR MEP SLAB OPENINGS AT ALL FLOORS
1.E
1.F
OWNER
MEP SLAB OPENINGS PLAN AT LAUNDRY - TOWER 2
CASTING CONCRETE FOR MEP SLAB OPENINGS AT AT ALL FLOORS
OWNER
82400
1500
950
6550
3
BR. 3
8250
8600
6600
4450
1350
6600
6600
GIA
LOG
2000
2
BR. 2
4350
P.
2
BR. 2
P.
LIV
P.
1
BR. 1
GIA
LOG
P.
LIV
2350
LRY
GIA
LOG
P.
LRY
2
BR. 2
1
BR. 1
LRY
2
BR. 2
P.
1
BR. 1
1
BR. 1
LIV
2
TOILET 2
P.
LIV
2
TOILET 2
1
BR. 1
TOILET 1
6550
TOILET 1
P.
LRY
RR
2
TOILET 2
2
TOILET 2
TOILET 1
TOILET 1
TOILET 1
2
TOILET 2
KITCHEN
RR
2000
RUB
FF
P.
P.
VEST.
KITCHEN
P.
KITCHEN
RUB
TOILET 1
FF
VEST.
KITCHEN
P.
RR
2
TOILET 2
THANG S3.2
STAIRCASE
S3.2
KITCHEN
TOILET 1
7200
LRY
P.
1
BR. 1
2
TOILET 2
TOILET 1
RR
2
TOILET 2
TOILET 1
LRY
TOILET 1
P.
LIV
P.
2
TOILET 2
P.
P.
LIV
LIV
2000
1700
LIV
2
BR. 2
GIA
LOG
3
BR. 3
2
BR. 2
2
BR. 2
1
BR. 1
1
BR. 1
1
BR. 1
P.
GIA
LOG
2
BR. 2
1
BR. 1
P.
LRY
P.
1500
26800
RC.
KITCHEN
THANG
E3.F
P.
KITCHEN
LRY
GIA
LOG
LRY
GIA
LOG
950
6550
4350
8250
8600
6600
4450
1350
6600
82400
MEP SLAB OPENINGS PLAN AT LAUNDRY- TOWER 3(1)
CASTING CONCRETE FOR MEP SLAB OPENINGS AT ALL FLOORS
6600
OWNER
82400
4450
1350
6600
6600
8600
8250
5750
5500
1500
6600
1
BR. 1
2
BR. 2
GIA
LOG
GIA
LOG
1
BR. 1
GIA
LOG
LRY
2
BR. 2
2000
P.
1
BR. 1
P.
LRY
2
BR. 2
P.
1
BR. 1
1
BR. 1
2
BR. 2
P.
3
BR. 3
P.
LRY
2350
P.
GIA
LOG
LIV
TOILET 1
LIV
LIV
P.
2
TOILET 2
TOILET 1
2
TOILET 2
RR
P.
LIV
2
TOILET 2
TOILET 1
TOILET 1
TOILET 1
KITCHEN
2
TOILET 2
KITCHEN
RR
THANG S3.3
STAIRCASE
S3.3
RR
2000
CHUNG
CORRIDOR
FF
P.
P.
TOILET 1
FF
2
TOILET 2
ELEC.
ROOM
KITCHEN
VEST.
KITCHEN
VEST.
2
TOILET 2
TOILET 1
KITCHEN
THANG S3.2
STAIRCASE
S3.2
KITCHEN
P.
LIV
P.
2
TOILET 2
TOILET 1
LRY
TOILET 1
2
TOILET 2
RR
P.
P.
LIV
2
BR. 2
1
BR. 1
1
BR. 1
1
BR. 1
2
BR. 2
P.
P.
P.
LRY
LIV
LIV
LRY
TOILET 1
2
TOILET 2
3
BR. 3
P.
P.
LRY
LRY
1
BR. 1
2
BR. 2
GIA
LOG
1
BR. 1
2
BR. 2
1500
GIA
LOG
2000
GIA
LOG
GIA
LOG
7200
P.
RUB
6600
4450
1350
6600
6600
8600
8250
5750
5500
82400
MEP SLAB OPENINGS PLAN AT LAUNDRY - TOWER 3(2)
CASTING CONCRETE FOR MEP SLAB OPENINGS AT ALL FLOORS
26800
KITCHEN
KITCHEN
1700
2
TOILET 2
GIA
LOG
6550
LRY