SOCIALIST REPUBLIC OF VIETNAM
THE PEOPLE S COMMITTEE OF HO CHI MINH CITY
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
INTERGRATED DESIGN FOR BEN THANH CENTRAL STATION
AND UNDERGROUND SHOPPING MALL
(CONTRACT PACKAGE 1a)
UNDER
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION
PROJECT LINE 1 (BEN THANH – SUOI TIEN SECTION)
MODIFIED TECHNICAL DESIGN
ARCHITECTURAL WORKS
MAY 2017
NJPT Associa on
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
LIST OF DRAWINGS OF TECHNICAL DESIGN
FOR BEN THANH CENTRAL STATION 1
DRAWING No.
DRAWING TITLE
DRAWING No.
DRG STATUS
DRAWING TITLE
DRG STATUS
DCT2
Detail of Ventilation Shaft (2)-2
TB
ACD1
Ground Level Area Estimation Diagram
TB
DCT3
Detail of Ventilation Shaft (2)-3
TB
ACD2
B1F Area Estimation Diagram
TB
DCT4
Detail of Ventilation Shaft (2)-4
TB
ACD3
B2F Area Estimation Diagram
TB
DCT5
Detail of Ventilation Shaft (2)-5
TB
PL1
GL Plan
TB
DCT6
Detail of Ventilation Shaft (2)-6
TB
PL2
B1F Plan
TB
SDD13
Standard Detail -13
TB
PL3
B2F Plan
TB
DIS1
B1F Layout Pattern of Floor Finish
TB
FBP1
B1F Foundation Beam Plan
TB
DIS2
B2F Layout Pattern of Floor Finish
TB
FBP2
B2F Foundation Beam Plan
TB
WPP
Waterproof Arrangement Plan
TB
SEC1
Whole Section
TB
FZ1
Fire Prevention Compartmen Plan B1F
TB
SEC3
Section -2
TB
FZ2
Fire Prevention Compartmen Plan B2F
TB
CP1
GL Reflected Ceiling Plan
TB
INV1
B1F List of Station Equipment
TB
CP2
B1F Reflected Ceiling Plan
TB
INV2
B2F List of Station Equipment
TB
CP3
B2F Reflected Ceiling Plan
TB
KDDF2
Detail of F-2 Entrance
TB
KDDF3
Detail of F-3 Entrance
TB
DWP1
Ground Level Door & Window Plan
TB
DWP2
B1F Door & Window Plan
TB
DWP3
B2F Door & Window Plan
TB
PDD1
B1F Plan Detail Drawing-1
TB
PDD4
B2F Plan Detail Drawing-2
TB
CPDD1
B1F Reflected Ceiling Detail Plan -1
TB
CPDD4
B2F Reflected Ceiling Detail Plan -2
TB
ELE-VT
Detail of Ventilation Tower (OA & EA)
TB
DCT1
Detail of Ventilation Shaft (2)-1
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
03.04.2017
MODIFICATION
REV
DATE
DESCRIPTION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
N.TAKAHASHI
PR. DIRECTOR
DATE OF ISSUE
SIZE
03.04.2017
K.ISOGIMI (NSC/NS)
T.MASUZAWA
List of Drawings
of Technical Design
for Ben Thanh Central Station 1
A3
SCALE
TD REV.
DRG No.
BTC-LD-T2001
FA
DRG STATUS
TECHNICAL DESIGN
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/500 A3:1/1000
Ground Level Area Estimation Diagram
TD REV.
BTC - AR - T C1 ACD1
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/500 A3:1/1000
B1F Area Estimation Diagram
TD REV.
BTC - AR - T C1 ACD2
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/500 A3:1/1000
B2F Area Estimation Diagram
TD REV.
BTC - AR - T C1 ACD3
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
for Line1
for Line1
(H=6.0m)
Top Light
(H=4.0m)
(H=3.5m)
(W=3.0m)
(H=3.5m)
(W=3.0m)
(H=3.5m)
(W=3.0m)
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DATE
DESCRIPTION
SIZE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
A1:1/500 A3:1/1000
TD REV.
DRG No.
Ground Level Plan
BTC - AR - T C1
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
SCALE
DRAWING TITLE
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
PL1
F
TB
F-3
F-2
F-1
BEN THANH STATION
BITEXCO BUILDING, THE ONE
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DATE
DESCRIPTION
SIZE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
A1:1/500 A3:1/1000
TD REV.
DRG No.
B1F Plan
BTC - AR - T C1
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
SCALE
DRAWING TITLE
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
PL2
F
TB
SS
SS
SS
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DATE
DESCRIPTION
SIZE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
A1:1/500 A3:1/1000
TD REV.
DRG No.
B2F Plan
BTC - AR - T C1
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
SCALE
DRAWING TITLE
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
PL3
F
TB
ESC Pit
EV Pit
EV Shaft
EV Shaft
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
A3
30.04.2017
SCALE
A1:1/500 A3:1/1000
TD REV.
DRG No.
B1F Foundation Beam Plan
BTC - AR - T C1
FBP1
DESIGN MANAGER N.TAKAHASHI
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
PR. DIRECTOR
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
Waste Water Pit
EV Shaft
EV Shaft
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
A3
30.04.2017
SCALE
A1:1/500 A3:1/1000
TD REV.
DRG No.
B2F Foundation Beam Plan
BTC - AR - T C1
FBP2
DESIGN MANAGER N.TAKAHASHI
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
PR. DIRECTOR
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DATE
DESCRIPTION
SIZE
A3
30.04.2017
SCALE
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
A1:1/500 A3:1/1000
TD REV.
DRG No.
Whole Section
BTC - AR - T C1
SEC1
DESIGN MANAGER N.TAKAHASHI
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
PR. DIRECTOR
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DATE
DESCRIPTION
SIZE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
A1:1/200 A3:1/400
TD REV.
DRG No.
Section-2
BTC - AR - T C1 SEC3
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
SCALE
DRAWING TITLE
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/200 A3:1/400
GL Reflected Ceiling Plan
TD REV.
BTC - AR - T C1
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
CP1
F
TB
Maintenance Deck
Maintenance Deck
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
A3
30.04.2017
SCALE
A1:1/200 A3:1/400
TD REV.
DRG No.
B1F Reflected Ceiling Plan
BTC - AR - T C1
CP2
DESIGN MANAGER N.TAKAHASHI
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
PR. DIRECTOR
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/200 A3:1/400
B2F Reflected Ceiling Plan
TD REV.
BTC - AR - T C1 CP3
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DATE
DESCRIPTION
SIZE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
A1:1/100 A3:1/200
TD REV.
DRG No.
Detail of F-2 Entrance
BTC - AR - T C1 KDDF2
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
SCALE
DRAWING TITLE
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DATE
DESCRIPTION
SIZE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
A1:1/100 A3:1/200
TD REV.
DRG No.
Detail of F-3 Entrance
BTC - AR - T C1 KDDF3
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
SCALE
DRAWING TITLE
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/200 A3:1/400
Ground Level Door & Window Plan
TD REV.
BTC - AR - T C1 DWP1
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/200 A3:1/400
B1F Door & Window Plan
TD REV.
BTC - AR - T C1 DWP2
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/200 A3:1/400
B2F Door & Window Plan
TD REV.
BTC - AR - T C1 DWP3
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/200 A3:1/400
B1F Plan Detail Drawing -1
TD REV.
BTC - AR - T C1 PDD1
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
SCALE
A1:1/200 A3:1/400
B2F Plan Detail Drawing -2
TD REV.
BTC - AR - T C1 PDD4
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
A3
30.04.2017
DRG No.
1st Phase -Current Traffic REV
DATE OF ISSUE
K.ISOGIMI (NSC/NS)
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
REV
DATE
MODIFICATION
DESCRIPTION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
DATE OF ISSUE
SIZE
A3
30.04.2017
K.ISOGIMI (NSC/NS)
T.MASUZAWA
SCALE
A1:1/200 A3:1/400
B1F Reflected Ceiling Plan
Detail Drawings-1
1st Phase -Current Traffic -
TD REV.
DRG No.
BTC - AR - T C1 CPDD1
DRG STATUS
TECHNICAL DESIGN
F
FA
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
REV
DATE
MODIFICATION
DESCRIPTION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DESIGN MANAGER N.TAKAHASHI
PR. DIRECTOR
DATE OF ISSUE
SIZE
A3
30.04.2017
K.ISOGIMI (NSC/NS)
T.MASUZAWA
SCALE
A1:1/200 A3:1/400
B2F Reflected Ceiling Plan
Detail Drawings-2
1st Phase -Current Traffic -
TD REV.
DRG No.
BTC - AR - T C1 CPDD4
DRG STATUS
TECHNICAL DESIGN
F
FA
TB
PREPARED
OWNER
CONSULTANT
DESIGNER
NJPT Association
NK-JIC-PBJ-JTC-TEC-TEDI South-TRICC
TB
30.04.2017
MODIFICATION
HCMC PEOPLE'S COMMITTEE
MANAGEMENT AUTHORITY FOR URBAN RAILWAYS
NAME
SIGNATURE
HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
BEN THANH - SUOI TIEN SECTION (LINE 1) - PACKAGE : 1a
K.ISOGIMI (NSC/NS)
DRAWING TITLE
CHECKER
S.ITO (NSC)
TEAM LEADER
Y.HORIGUCHI
DATE
DESCRIPTION
SIZE
A3
30.04.2017
SCALE
A1:1/200 A3:1/400
TD REV.
DRG No.
Detail of Ventilation Shaft (2)-1
BTC - AR - T C1
DCT1
DESIGN MANAGER N.TAKAHASHI
1st Phase -Current Traffic REV
DATE OF ISSUE
PR. DIRECTOR
T.MASUZAWA
DRG STATUS
TECHNICAL DESIGN
F
FA
TB