CHINA CONSTRUCTION (S.E.A)
CORPORATION., Ltd
BAY WATER
COMPANY., Ltd
SUNWAH PEARL PROJECT
CONDOMINIUM BLOCKS OF WARD, BINH THANH DISTRICT, HCM CITY
SHOP DRAWING FOR WATERPROOFING FOR BASEMENT B2, B1
Aug-2017
OWNER
KEYPLAN :
ZONE 1
ZONE 2
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X1000 DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
ZONE 3
ZONE 4
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
TYPICAL DETAIL :
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X1000
DC 1X1000
DC 1X800
DC 1X800A
DC 1X800
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1000
DC 1X1200
DC 1X1000
DC 1X1200
DC 1X1200
DC 1X1000
DC 1X1200
DC 1X1200
DC 1X1000 DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1000
DC 1X1000 DC 1X1000
DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1000 DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1000 DC 1X1200
DC 1X1200
DC 1X1200
DC 1X1000 DC 1X1200
DC 1X1000
DC 1X1000
DC 1X1200
DC 1X800
DC 1X800
DC 1X1000
DC 1X1000
NOTE:
1 : Lean concrete/
DC 1X800 DC 1X1000
DC 1X800 DC 1X1000
DC 1X800 DC 1X1000
DC 1X1200
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR PILE CAP AT ZONE 1PLAN LAYOUT
DC-4-P2A,P2B
OWNER
KEYPLAN :
ZONE 1
ZONE 2
DC 1X800
DC 1X800
ZONE 3
ZONE 4
DC 1X800
DC 1X800
TYPICAL DETAIL :
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X1000
DC 1X1000
DC 1X800
DC 1X800
DC 1X1000
DC 1X1000
DC 1X800
DC 1X1000
DC 1X1000
DC 1X800A
DC-1-P4D
DC 1X1200
DC 1X1200
DC 1X800
DC 1X1200
DC 1X1000
DC 1X1000
DC 1X1200
DC 1X1200
DC 1X800
DC 1X800
DC 1X1200
NOTE:
1 : Lean concrete/
DC 1X1000
DC-4-P2A,P2B
DC 1X800
DC 1X1200
DC 1X1000
DC 1X800
DC 1X1200
DC 1X800
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
DC 1X1000
WATERPROOFING FOR PILE CAP AT ZONE 2 PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
DC 1X800 DC 1X1000
DC 1X1200
DC 1X1200
DC 1X1000
DC 1X800
DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800 DC 1X1000
DC 1X1000
DC 1X800
DC 1X800 DC 1X1000
DC 1X1200
DC 1X1200
DC 1X800
DC 1X1200
DC 1X1200
DC 1X1000
DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
DC 1X1200
DC 1X800
DC 1X1200
DC 1X1200
ZONE 3
DC 1X800
ZONE 4
DC 1X800 DC 1X1000
TYPICAL DETAIL :
DC-3-P1A-B2
DC 1X1000
DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X1000
DC 1X800
DC 1X1000
DC 1X1000
DC-1-P2C
DC 1X800
DC 1X800B (1)
DC 1X1000
DC 1X1000
DC 1X800
NOTE:
1 : Lean concrete/
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR PILE CAP AT ZONE 3 PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
DC 1X1200
DC 1X1200
DC 1X1000 DC 1X1000 (2)
DC 1X800
DC 1X1000
ZONE 3
ZONE 4
DC 1X800
DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800
DC 1X1000
TYPICAL DETAIL :
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800
DC 1X1000
DC 1X800
DC-2-P1A-B2
DC 1X800
DC 1X1200
DC 1X1000
DC-3-P1A-B2
DC 1X1000
DC 1X1000
DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X1000
NOTE:
1 : Lean concrete/
DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X1000
DC 1X800
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X800
DC 1X1000
DC 1X1000
DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000
DC 1X800
DC 1X800
DC 1X800
DC 1X800
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
DC 1X800
DC 1X800
DC 1X800
DC 1X800
WATERPROOFING FOR PILE CAP AT ZONE 4 PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
DC-1A-P5C
DC-2A-P3A
DC-2A-P3A
TYPICAL DETAIL :
DC-6-P4C,P3D
DC-4A-P4C
FOR THE PC ABOVE B2 BASEMENT SLAB/
DC-2A-P3B
DC-22-P3F,P4C
DC-1A-P5C
NOTE:
DC-4B-P4C
DC-3-P3C,P2B
DC-3-P3F,P2B
WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
DC-6-P4B
DC-1-P5A
DC-2-P3D
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 1PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
TYPICAL DETAIL :
FOR THE PC ABOVE B2 BASEMENT SLAB/
DC-4-P5B
DC-1-P4D
DC-3B-P3D,P4D
DC-18-P4B,P4D
NOTE:
DC-3A-P3D,P4D
WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
DC-2-P4E
WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 2 PLAN LAYOUT
OWNER
KEYPLAN :
DC-6-P4B
DC-1-P5A
ZONE 1
DC-2-P3D
ZONE 2
DC-2B-P3B
ZONE 3
ZONE 4
DC-1-P5B
DC-1-P5B
DC-2B-P3A
DC-2B-P3A
TYPICAL DETAIL :
DC-2C-P3A
DC-1-P5A
DC-1B-P5C
FOR THE PC ABOVE B2 BASEMENT SLAB/
DC-1-P5A
DC-7-P4B
DC-1A-P4A
(2)
DC-1A-P4A
DC-1-P2C
DC-4-P4B
NOTE:
WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 3 PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
DC-2-P4E
ZONE 2
DC-10-P4D,P3F
ZONE 3
ZONE 4
TYPICAL DETAIL :
DC-2C-P3A
DC-1B-P4A
DC-2C-P3A
FOR THE PC ABOVE B2 BASEMENT SLAB/
DC-1-P4C
DC-1-P3D
DC-10-P4C
DC-1-P4C
DC-1-P3D
DC-2D-P3A
DC-4C-P4C
DC-2D-P3A
DC-1-P3F
DC-1-P3F
NOTE:
WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
WATERPROOFING FOR PILE CAP
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 4 PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
NOTE:
5 : Hyperstop BD.
WATERPROOFING FOR SHEAR WALL
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR SHEAR WALL B2, B1 FLOOR PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
WATERPROOFING FOR SEPTIC TANK B1 PLAN LAYOUT
NOTE:
7 : Hyperstop BD.
WATERPROOFING FOR TANK SLAB
WATERPROOFING FOR TANK WALL
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
SEPTIC TANK
B2 - GREASE TRAP FOR SERVICE PLAN
LAYOUT
WATERPROOFING FOR SEPTIC TANK B2 - GREASE TRAP FOR SERVICE PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
WATERPROOFING FOR SEPTIC TANK B3 PLAN LAYOUT
NOTE:
7 : Hyperstop BD.
WATERPROOFING FOR TANK SLAB
WATERPROOFING FOR TANK WALL
-
WATERPROOFING FOR DOMESTIC WATER TANK TOWER B1, B2 PLAN LAYOUT
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
DOMESTIC WATER TANK
TOWER B1, B2, B3, SEPTIC TANK B3
WATERPROOFING FOR DOMESTIC WATER TANK TOWER B3
OWNER
KEYPLAN :
NOTE/
ZONE 1
ZONE 2
ZONE 3
ZONE 4
:
1,5kg/m2.
WATERPROOFING FOR RAMP 01 PLAN
LAYOUT/
WATERPROOFING FOR RAMP 03 PLAN
LAYOUT/
WATERPROOFING FOR RAM SLOPE/
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR RAMP 02 PLAN
LAYOUT/
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
DRY AREA
WET AREA
WATERPROOFING FOR BIN CENTER 3 PLAN LAYOUT
WATERPROOFING FOR BIN CENTER 1 PLAN LAYOUT
NOTE:
5 : Sika flex.
WATERPROOFING FOR BIN CENTER
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR BIN CENTER 2 PLAN LAYOUT
WATERPROOFING FOR BIN CENTER 4 PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
TYPICAL DETAIL :
FOR CORNER OF WALL
FOR DOWN PIPE
WATER PROOFING FOR MALE, FEMALE STAFF
DRESSING ROOM PLAN LAYOUT
FOR DOOR FOOTING
NOTE:
5 : Sika flex.
WATERPROOFING FOR WC, DRESSING ROOM
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATER PROOFING FOR MALE, FEMALE WC ROOM
PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 4
TYPICAL DETAIL :
LIFT CPL-01
FOR LIFT PIT AT B2 BASEMENT
STAIRCASE/LIFT
SP.1
LIFT PIT
EB-01
FOR LIFT PIT AT B1 BASEMENT
NOTE:
LIFT PIT
EB-02
LIFT PIT
ER-01
LIFT PIT
ER.S
LIFT PIT
EB-03
LIFT PIT
EB-04
LIFT PIT
ER-02
6 : B2 basement concrete slab/
WATERPROOFING FOR LIFT PIT
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR LIFT PIT AT BASEMENT PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
TYPICAL DETAIL :
DRY AREA
WET AREA
FOR CONCRETE SLAB
NOTE:
WATERPROOFING FOR MOTOCYCLE
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR MOTORCYCLE PARKING B1 PLAN LAYOUT
OWNER
KEYPLAN :
ZONE 1
ZONE 2
ZONE 3
ZONE 4
TYPICAL DETAIL :
NOTE:
1,5kg/m2.
LEGEND :
WATERPROOFING FOR DRAINAGE
-
ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/
-
ALL DIMENSIONS MUST BE CHECKED ON SITE/
-
THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.
WATERPROOFING FOR DRAINAGE B1 FLOOR PLAN LAYOUT