Tải bản đầy đủ (.pdf) (18 trang)

Bản vẽ shop drawing chống thấm tầng hầm

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (7.69 MB, 18 trang )

CHINA CONSTRUCTION (S.E.A)
CORPORATION., Ltd

BAY WATER
COMPANY., Ltd

SUNWAH PEARL PROJECT
CONDOMINIUM BLOCKS OF WARD, BINH THANH DISTRICT, HCM CITY

SHOP DRAWING FOR WATERPROOFING FOR BASEMENT B2, B1

Aug-2017


OWNER

KEYPLAN :

ZONE 1

ZONE 2

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800



DC 1X800

DC 1X800
DC 1X800

DC 1X800

DC 1X1000 DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X800

DC 1X800
DC 1X800

ZONE 3

ZONE 4
DC 1X800

DC 1X800

DC 1X800


DC 1X800
DC 1X800

TYPICAL DETAIL :

DC 1X800

DC 1X800

DC 1X800

DC 1X800
DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X1000

DC 1X1000


DC 1X800

DC 1X800A
DC 1X800

DC 1X1000

DC 1X800

DC 1X800

DC 1X800

DC 1X1200

DC 1X1200

DC 1X1200

DC 1X1000

DC 1X1200

DC 1X1000

DC 1X1200

DC 1X1200

DC 1X1000


DC 1X1200

DC 1X1200

DC 1X1000 DC 1X1200

DC 1X1200

DC 1X1200

DC 1X1000
DC 1X1000 DC 1X1000

DC 1X1200

DC 1X1200

DC 1X1200

DC 1X1200

DC 1X1000 DC 1X1200

DC 1X1200

DC 1X1200

DC 1X1200


DC 1X1200

DC 1X1000 DC 1X1200

DC 1X1200

DC 1X1200

DC 1X1000 DC 1X1200

DC 1X1000

DC 1X1000

DC 1X1200

DC 1X800

DC 1X800

DC 1X1000

DC 1X1000

NOTE:
1 : Lean concrete/
DC 1X800 DC 1X1000

DC 1X800 DC 1X1000


DC 1X800 DC 1X1000

DC 1X1200

WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR PILE CAP AT ZONE 1PLAN LAYOUT

DC-4-P2A,P2B


OWNER

KEYPLAN :


ZONE 1

ZONE 2

DC 1X800

DC 1X800

ZONE 3

ZONE 4
DC 1X800
DC 1X800

TYPICAL DETAIL :

DC 1X800

DC 1X800
DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800


DC 1X800
DC 1X800
DC 1X800

DC 1X800

DC 1X1000

DC 1X1000
DC 1X800

DC 1X800

DC 1X1000

DC 1X1000

DC 1X800

DC 1X1000

DC 1X1000

DC 1X800A
DC-1-P4D

DC 1X1200

DC 1X1200


DC 1X800

DC 1X1200
DC 1X1000

DC 1X1000

DC 1X1200

DC 1X1200

DC 1X800

DC 1X800

DC 1X1200

NOTE:
1 : Lean concrete/
DC 1X1000

DC-4-P2A,P2B

DC 1X800

DC 1X1200

DC 1X1000


DC 1X800

DC 1X1200
DC 1X800

WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

DC 1X1000

WATERPROOFING FOR PILE CAP AT ZONE 2 PLAN LAYOUT


OWNER

KEYPLAN :


ZONE 1

ZONE 2

DC 1X800 DC 1X1000

DC 1X1200

DC 1X1200

DC 1X1000

DC 1X800

DC 1X800

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X800 DC 1X1000

DC 1X1000

DC 1X800

DC 1X800 DC 1X1000


DC 1X1200

DC 1X1200

DC 1X800

DC 1X1200

DC 1X1200

DC 1X1000

DC 1X800

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X800

DC 1X800

DC 1X800


DC 1X1200

DC 1X800

DC 1X1200

DC 1X1200

ZONE 3

DC 1X800

ZONE 4
DC 1X800 DC 1X1000

TYPICAL DETAIL :

DC-3-P1A-B2

DC 1X1000

DC 1X800

DC 1X1000

DC 1X1000

DC 1X1000


DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X800


DC 1X1000

DC 1X800
DC 1X1000

DC 1X1000

DC-1-P2C
DC 1X800

DC 1X800B (1)
DC 1X1000

DC 1X1000
DC 1X800

NOTE:
1 : Lean concrete/

DC 1X1000

DC 1X800

DC 1X800

DC 1X800

DC 1X800
DC 1X800
DC 1X800


DC 1X800
DC 1X800
DC 1X800
DC 1X800

DC 1X800
DC 1X800

WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR PILE CAP AT ZONE 3 PLAN LAYOUT


OWNER


KEYPLAN :

ZONE 1

ZONE 2

DC 1X1200

DC 1X1200

DC 1X1000 DC 1X1000 (2)

DC 1X800
DC 1X1000

ZONE 3

ZONE 4

DC 1X800

DC 1X800

DC 1X1000

DC 1X1000

DC 1X1000
DC 1X800

DC 1X1000

TYPICAL DETAIL :

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X800

DC 1X1000

DC 1X800

DC-2-P1A-B2

DC 1X800

DC 1X1200
DC 1X1000

DC-3-P1A-B2
DC 1X1000

DC 1X1000


DC 1X800
DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X1000
DC 1X1000

NOTE:
1 : Lean concrete/

DC 1X800

DC 1X1000

DC 1X1000

DC 1X1000

DC 1X800

DC 1X1000
DC 1X800


DC 1X800

DC 1X800

DC 1X800

DC 1X800
DC 1X1000

DC 1X800

DC 1X1000
DC 1X800
DC 1X800
DC 1X800

DC 1X800

DC 1X800

DC 1X800

DC 1X1000

DC 1X1000

DC 1X800
DC 1X1000
DC 1X1000
DC 1X1000

DC 1X800

DC 1X800

DC 1X800
DC 1X800

WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

DC 1X800

DC 1X800

DC 1X800
DC 1X800


WATERPROOFING FOR PILE CAP AT ZONE 4 PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

DC-1A-P5C

DC-2A-P3A

DC-2A-P3A

TYPICAL DETAIL :
DC-6-P4C,P3D

DC-4A-P4C

FOR THE PC ABOVE B2 BASEMENT SLAB/

DC-2A-P3B


DC-22-P3F,P4C

DC-1A-P5C

NOTE:

DC-4B-P4C
DC-3-P3C,P2B

DC-3-P3F,P2B

WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
DC-6-P4B
DC-1-P5A

DC-2-P3D

WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/


-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 1PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

TYPICAL DETAIL :

FOR THE PC ABOVE B2 BASEMENT SLAB/

DC-4-P5B
DC-1-P4D

DC-3B-P3D,P4D


DC-18-P4B,P4D

NOTE:
DC-3A-P3D,P4D

WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

DC-2-P4E

WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 2 PLAN LAYOUT


OWNER


KEYPLAN :

DC-6-P4B
DC-1-P5A

ZONE 1

DC-2-P3D

ZONE 2
DC-2B-P3B

ZONE 3

ZONE 4
DC-1-P5B

DC-1-P5B

DC-2B-P3A

DC-2B-P3A

TYPICAL DETAIL :
DC-2C-P3A

DC-1-P5A

DC-1B-P5C


FOR THE PC ABOVE B2 BASEMENT SLAB/
DC-1-P5A
DC-7-P4B

DC-1A-P4A
(2)

DC-1A-P4A

DC-1-P2C

DC-4-P4B

NOTE:

WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-


THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 3 PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

DC-2-P4E

ZONE 2
DC-10-P4D,P3F

ZONE 3

ZONE 4

TYPICAL DETAIL :
DC-2C-P3A

DC-1B-P4A

DC-2C-P3A


FOR THE PC ABOVE B2 BASEMENT SLAB/

DC-1-P4C
DC-1-P3D
DC-10-P4C
DC-1-P4C

DC-1-P3D

DC-2D-P3A
DC-4C-P4C

DC-2D-P3A

DC-1-P3F
DC-1-P3F

NOTE:

WATERPROOFING FOR B2 SLAB
WATERPROOFING FOR BASEMENT TANK
WATERPROOFING FOR PILE CAP
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-


ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR BASEMENT SLAB B2 AT ZONE 4 PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

NOTE:

5 : Hyperstop BD.

WATERPROOFING FOR SHEAR WALL

-


ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR SHEAR WALL B2, B1 FLOOR PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4


WATERPROOFING FOR SEPTIC TANK B1 PLAN LAYOUT

NOTE:

7 : Hyperstop BD.

WATERPROOFING FOR TANK SLAB
WATERPROOFING FOR TANK WALL

-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

SEPTIC TANK
B2 - GREASE TRAP FOR SERVICE PLAN
LAYOUT

WATERPROOFING FOR SEPTIC TANK B2 - GREASE TRAP FOR SERVICE PLAN LAYOUT



OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

WATERPROOFING FOR SEPTIC TANK B3 PLAN LAYOUT

NOTE:

7 : Hyperstop BD.

WATERPROOFING FOR TANK SLAB
WATERPROOFING FOR TANK WALL

-

WATERPROOFING FOR DOMESTIC WATER TANK TOWER B1, B2 PLAN LAYOUT

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/


-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

DOMESTIC WATER TANK
TOWER B1, B2, B3, SEPTIC TANK B3

WATERPROOFING FOR DOMESTIC WATER TANK TOWER B3


OWNER

KEYPLAN :

NOTE/

ZONE 1

ZONE 2

ZONE 3

ZONE 4


:

1,5kg/m2.

WATERPROOFING FOR RAMP 01 PLAN
LAYOUT/

WATERPROOFING FOR RAMP 03 PLAN
LAYOUT/

WATERPROOFING FOR RAM SLOPE/
-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR RAMP 02 PLAN
LAYOUT/



OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

DRY AREA
WET AREA

WATERPROOFING FOR BIN CENTER 3 PLAN LAYOUT
WATERPROOFING FOR BIN CENTER 1 PLAN LAYOUT

NOTE:

5 : Sika flex.

WATERPROOFING FOR BIN CENTER

-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE

DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR BIN CENTER 2 PLAN LAYOUT

WATERPROOFING FOR BIN CENTER 4 PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

TYPICAL DETAIL :


FOR CORNER OF WALL

FOR DOWN PIPE

WATER PROOFING FOR MALE, FEMALE STAFF
DRESSING ROOM PLAN LAYOUT
FOR DOOR FOOTING
NOTE:

5 : Sika flex.

WATERPROOFING FOR WC, DRESSING ROOM

-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.


WATER PROOFING FOR MALE, FEMALE WC ROOM
PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 4

TYPICAL DETAIL :
LIFT CPL-01

FOR LIFT PIT AT B2 BASEMENT

STAIRCASE/LIFT
SP.1

LIFT PIT
EB-01

FOR LIFT PIT AT B1 BASEMENT
NOTE:

LIFT PIT
EB-02

LIFT PIT
ER-01

LIFT PIT
ER.S

LIFT PIT
EB-03
LIFT PIT
EB-04

LIFT PIT
ER-02

6 : B2 basement concrete slab/

WATERPROOFING FOR LIFT PIT

-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-


THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR LIFT PIT AT BASEMENT PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

TYPICAL DETAIL :
DRY AREA
WET AREA

FOR CONCRETE SLAB
NOTE:

WATERPROOFING FOR MOTOCYCLE

-


ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR MOTORCYCLE PARKING B1 PLAN LAYOUT


OWNER

KEYPLAN :

ZONE 1

ZONE 2

ZONE 3

ZONE 4

TYPICAL DETAIL :


NOTE:

1,5kg/m2.

LEGEND :
WATERPROOFING FOR DRAINAGE

-

ALL SURFACES MUST BE CLEAN, FREE FROM GREASE,
OIL, LOOSELY ADHERING PARTICLES AND DRY BEFORE
DOING THE WATERPROOF WORK/

-

ALL DIMENSIONS MUST BE CHECKED ON SITE/

-

THE DETAIL MATERIAL BRAND 0R SPECIFICATION CAN BE
SEEN IN THE METHOD STATEMENT OF WATERPROOFING/
TRONG BPTC.

WATERPROOFING FOR DRAINAGE B1 FLOOR PLAN LAYOUT



×