Tải bản đầy đủ (.pdf) (38 trang)

Tài liệu KRONE - Presentation - Highband Solution - 2002 docx

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (1.02 MB, 38 trang )

KRO/99 (HIGHBAND) Slide 1
23
KRONE HIGHBAND
KRONE Communications
KRO/99 (HIGHBAND) Slide 2
23
Contact Principle
Insulation clamping ribs, on
both sides of the contact, hold
the wire firmly in position and
isolate the contact area from
vibration and other forms of
mechanical stress.
KRO/99 (HIGHBAND) Slide 3
23
Contact Principle
 Contacts angled at
45
45
°
° leave more wire between contact points
 Contacts angled at
90
90
°
° produce a point of weakness
KRO/99 (HIGHBAND) Slide 4
23
Agenda - Highband
 Highband Principle
 Performance Results


 Why Highband?
 Applications
 Reference Sites
 Next Generation
KRO/99 (HIGHBAND) Slide 5
23
Highband, the Challenge...
 Reduce NEXT
 Reduce Capacitate Coupling
Consider this...
+-
+-
+-
KRO/99 (HIGHBAND) Slide 6
23
Contact Principle
 30% reduction in
contact mass
 Transmission length
reduced from 72mm to
13mm
Series 2 HIGHBAND 8
KRO/99 (HIGHBAND) Slide 7
23
Contact Pitch
Highband
 Pitch 3mm
between
each leg of
the pair

 Highband
pitch of
12.6mm
between
each pair
Series 2
 Constant
pitch at
4.8mm
KRO/99 (HIGHBAND) Slide 8
23
Performance
Standard Performance
100MHZ
……..…
40db
…………….…..
63db
100MHZ
(db)
KRO/99 (HIGHBAND) Slide 9
23
Features and Benefits?
 Standard Compliant
– Enhanced CAT 5
– Link Class “E”
 Mounting Systems
– Backward Compatibility
– Compact Frame
– One Tool Will Do

– Range - 8, 10, 16, 20
– Compact 8
– Accessories
– Test Cords,
– Disconnect Plugs
 Patch By Exception
KRO/99 (HIGHBAND) Slide 10
23
Physical Solution
 Building Distributor
 Floor Distributors
 Consolidation Points
 Terminal/Workstation
Outlets
KRONE Building Cabling
KRO/99 (HIGHBAND) Slide 11
23
Reference Sites
 Chep Lap Kok, Hong Kong
 Ansett Australia
 Sydney Stock Exchange, Australia
 Siemens, Australia
 University of South Australia
 Skilled Engineering
 City of Port Adelaide Council
 Apin Army Base
 Deakin University
 CSIRO
 Auckland University
 Glaxo Smith Kline UK

KRO/99 (HIGHBAND) Slide 12
23
HIGHBAND…. The Next Generation
 PremisNET ULTIM 8
 AccessNET HIGHBAND 10
Ö
Ö
KRO/99 (HIGHBAND) Slide 13
23
Agenda - ULTIM 8
 Why Develop ULTIM 8?
 Mechanically - How We Did It…..
 Electrically - What We Achieved…..
 Features and Benefits
 Applications
 Reference Sites
KRO/99 (HIGHBAND) Slide 14
23
Why Develop ULTIM 8?
 HIGHBAND well exceeded the standard requirements
 HIGHBAND offered maximum headroom to the standard requirements
 HIGHBAND could support all applications - existing and on the horizon
KRO/99 (HIGHBAND) Slide 15
23
Because…..
 The BAR was raised!
 Category 6 was proposed
 Full duplex transmission systems desired
 Gigabit and Tetrabit
 Who says it won’t happen!

mbps
0
50
100
150
1960 1970 1980 1990

×