EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1296
RFI No.: ECSI/L/PC/3.3/018
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection for product
Location of Works: At (Hung


of Box culvert at Manufacturer before delivery
Vuong Factory)
to site for installation (Departement time:
8:30)..
WILL BE READY FOR INSPECTION ON
14 Aug 2007 at 8:30 AM
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved

Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:


Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT


Date: 13 Aug 2007
WEIP/D/QC02/1297
RFI
No.: CSC/CM18-CM25/2.3/040
From:
SHIMIZU CORPORATION R
EPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Location of Works: CSC (CM18Description of Activities: Inspection for spun pile
CM25)
after delivery to site.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 8:30 AM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION


WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT

PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1298
RFI
No.: CSC/CM18-CM25/2.3/041
From:
SHIMIZU CORPORATION R
EPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Location of Works: CSC (CM18Description of Activities: Inspection for spun pile

CM25)
location before driving from CM18 to CM19.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 2:00 PM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved

Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:


Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1299

RFI No.: ECSI/L4/MC/3.2/170
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection for 7 days
Location of Works: At (Thanh Tan
compressive test of concrete of manhole access
An Lab)
M37, Dated sampling: 07 August, 2007.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 2:30 PM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST

ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT


MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1300
RFI No.: ECSI/L4/MC/3.2/171
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection for 7 days
Location of Works: At (Thanh Tan
compressive test of concrete of manhole access
An Lab)
M38, Dated sampling: 07 August, 2007.

WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 2:30 PM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS


Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:


Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1301
RFI No.: ECSI/L4/MC/3.2/172
From:

SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection for 7 days
Location of Works: At (Thanh Tan
compressive test of concrete of manhole access
An Lab)
M39, Dated sampling: 07 August, 2007.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 2:30 PM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:


THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT

PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY


SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1302
RFI No.: ECSI/L3/MC/3.2/036
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection for elevation
Location of Works: Line 3 (Tran
and dimension of excavation pit of Manhole
Binh Trong St)
M25.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST

PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 10:00 AM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not

proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:


Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1303
RFI No.: ECSI/L3/PC/3.3/005
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN

Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Location of Works: Line 3 (Tran
Description of Activities: Inspection box culvert
Binh Trong St)
after delivery to Line 3.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 8:30 AM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE


TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY


SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN


REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1304
RFI No.: ECSI/L4/PC/3.2/122
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Sampling sand backfill
Location of Works: Line 4 (An
for test at Thanh Tan An Lab to define maximun
Duong Vuong St)
dry density.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS


14 Aug 2007 at 8:15 AM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted

Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:

Date:


Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1305
RFI No.: ECSI/L4/PC/3.2/123
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S

Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection compaction
Location of Works: Line 4 (An
test (FDT) of sand backfilling of trenches from
Duong Vuong St)
M37 - M38.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 9:00 AM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE


FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION


CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –

QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1306
RFI No.: ECSI/L4/PC/3.2/124
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection compaction
Location of Works: Line 4 (An
test (FDT) of sand backfilling of trenches from
Duong Vuong St)
M37 - M38.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 3:30 PM

MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s

SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN
Signed:

Signed:

Name:

Name:

Date:

Date:

Date:


Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1307
RFI No.: ECSI/L4/PC/3.2/125
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident

REPRESENTATIVE
Engineer
Description of Activities: Inspection compaction
Location of Works: Line 4 (An
test (FDT) of sand backfilling of trenches from
Duong Vuong St)
M38-M39.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 9:00 AM
MS- 009- 01 ECSI AND SIS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING


Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer
Representative

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

Signed:

Signed:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY

SHIMIZU CORPORATION

CONTROL PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) –
QC02
Works Section / Location:


EXISTING COMBINED SEWER IMPROVEMENT

Date: 13 Aug 2007
WEIP/D/QC02/1308
RFI No.: ECSI/L4/PC/3.2/126
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of
QC Engineer
TO THE ENGINEER’S
Name: KO SHIMOKAZE
Position: Resident
REPRESENTATIVE
Engineer
Description of Activities: Inspection compaction
Location of Works: Line 4 (An
test (FDT) of sand backfilling of trenches from
Duong Vuong St)
M38-M39.
WILL BE READY FOR INSPECTION ON
RELEVANT INSPECTION AND TEST
PLANS
ATTACHED:
OTHER DOCUMENTS

14 Aug 2007 at 3:30 PM
MS- 009- 01 ECSI AND SIS


REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU
CORPORATION

WE REQUEST
ELEMENTS:

THE

ENGINEER’S REPRESENTATIVE

TO INSPECT THE

FOLLOWING

Element
Approved
Not
Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not
proceed
Signed by
Signed and Accepted
Copy to
The Engineer’s
SC - Site Engineer
The Employer

Representative

Appendix No. 5