Tải bản đầy đủ (.doc) (14 trang)

Tài liệu Installing a Cabinet on the Cement Floor docx

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (222.11 KB, 14 trang )

OptiX OSN 3500
Installation Manual Contents
Contents
4 Installing a Cabinet on the Cement Floor 1
4.1 Installation Flow and Expected Result 2
4.1.1 Installation Flow 2
4.1.2 Expected Result 3
4.2 Positioning the Cabinet 4
4.2.1 Positioning a Cabinet Independently 4
4.2.2 Positioning a Cabinet Close to an Installed Cabinet 6
4.2.3 Positioning Cabinets Abreast 7
4.2.4 Positioning Cabinets Back to Back 8
4.3 Installing the Cabinet 9
4.4 Checking the Cabinet Installation 12
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
i
OptiX OSN 3500
Installation Manual Figures
Figures
Installation flow for the cabinet installation on the cement floor 2
Expected result of cabinets on the cement floor 3
Positioning a cabinet independently 4
Marking the installation holes with layout marking plate 5
Positioning a cabinet close to an installed cabinet 6
Positioning cabinets abreast 7
Positioning cabinets back to back 8
Installing the expansion tube and expansion nut 9
Placing the insulation plate and the cabinet 10
Leveling the cabinet 11
Inserting the bolts 11


Issue 05 (2006-11-20)
Huawei Technologies Proprietary
iii
OptiX OSN 3500
Installation Manual 4 Installing a Cabinet on the Cement Floor
4 Installing a Cabinet on the Cement
Floor
About This Chapter
When the installation is well prepared, install the cabinet. There are three modes
for installing the cabinet according to the floor of the equipment room.

Installation on the antistatic floor (refer to Chapter 3 "Installing a cabinet on
the antistatic floor")

Installation on the cement floor

Installation on the wooden floor (the same as the installation on the cement
floor)
This chapter guides you to install the cabinet on the cement floor. We recommend
reading OptiX OSN 3500 Intelligent Optical Transmission System Compliance
and Safety Manual. This helps you to ensure a safe and smooth installation.
The following table lists the contents of this chapter.
Section Description
4.1Installation Flow and
Expected Result
Describes the installation flow and expected
result.
4.2Positioning the Cabinet Marks the cabinet position for the cabinet.
4.3Installing the Cabinet Describes the operations and procedures for
installing the cabinet.

4.4Checking the Cabinet
Installation
Describes the check points of the installation.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
1
4 Installing a Cabinet on the Cement Floor
OptiX OSN 3500
Installation Manual
4.1 Installation Flow and Expected Result
This section describes the installation flow and expected installation result.
4.1.1 Installation Flow
Figure 1.1 shows the installation flow for cabinet installation on the cement floor.
Starting
Positioning the cabinet
End
Installing the cabinet on the
floor
Checking the installation
Figure 1.1 Installation flow for the cabinet installation on the cement floor
2
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 4 Installing a Cabinet on the Cement Floor
4.1.2 Expected Result
Figure 1.1 shows the expected result of the cabinets on the cement floor.
Figure 1.1 Expected result of cabinets on the cement floor
Issue 05 (2006-11-20)
Huawei Technologies Proprietary

3
4 Installing a Cabinet on the Cement Floor
OptiX OSN 3500
Installation Manual
4.2 Positioning the Cabinet
This section describes how to position the cabinet on the cement floor. The
position varies with the number of cabinets and their layout.
4.2.1 Positioning a Cabinet Independently
Purpose
This procedure guides you to position a cabinet which is
installed independently.
Tools /Materials
Pencil
Ruler
Prerequisites
The cabinet and the accessories (including the support and
fixing pieces) have been transported to the site.
Required/As needed
Required if the cabinet is installed independently.
Caution
Read technical documents on construction before you mark the installation
position for the cabinet.
Step 1 Mark the reference point for installing the cabinet according to the construction
documents.
Step 2 Draw a 600 mm x 300 mm rectangle according to the reference point, and then
mark the central lines for the cabinet. See Figure 1.1.
600mm
300mm
800mm


Reference point
the wall
Front of cabinet

1000mm
Figure 1.1 Positioning a cabinet independently
4
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 4 Installing a Cabinet on the Cement Floor
Step 3 Use the layout marking plate to mark all cabinet installation holes on the floor.
See Figure 1.1. The semicircle indent of the plate indicates the front side of the
cabinet.
304mm
600mm
300mm
208mm
Cabinet installation hole
Front
35.5 mm
Figure 1.1 Marking the installation holes with layout marking plate
End
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
5
4 Installing a Cabinet on the Cement Floor
OptiX OSN 3500
Installation Manual
4.2.2 Positioning a Cabinet Close to an Installed Cabinet

Purpose
This procedure guides you to position a cabinet close to an
installed cabinet.
Tools /Materials
Pencil
Ruler
Plummet
Prerequisites
The cabinet and the accessories (including the support and
fixing pieces) have been transported to the site.
Required/As needed
Required if the cabinet is installed close to an installed
cabinet.
Step 1 Use a plummet to determine and mark the side projective position of the cabinet
already installed.
Step 2 Draw the side outline for the cabinet to be installed according to the marks made
in step 1.
Step 3 Draw the front outline for the cabinet to be installed, according to the front outline
of the cabinet already installed. Then determine the installation reference point.
Step 4 Draw a 600 mm x 300 mm rectangle according to the installation reference point.
Then draw the central lines for the cabinet. See Figure 1.1.
600mm
300mm
1 2 3 45

1. Front outline of the cabinet to be installed 2. Central lines of the cabinet to be installed
3. Side outline of the cabinet to be installed 4. Position of the cabinet already installed
5. Reference point
Figure 1.1 Positioning a cabinet close to an installed cabinet
Step 5 Use the layout marking plate mark all the four cabinet installation holes on the

floor. See 4.2.1 I. I. Step 3Figure 1.1. Make sure the semicircular gap of the plate
faces the front of the cabinet.
End
6
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 4 Installing a Cabinet on the Cement Floor
4.2.3 Positioning Cabinets Abreast
According to Figure 1.1, mark the position of cabinets abreast.
≥ 1000mm
Inner corner
≥ 800mm
≥ 1000mm
≥ 1000mm
Cabinet
600mm
300mm
Plan view of cabinets

Figure 1.1 Positioning cabinets abreast
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
7
4 Installing a Cabinet on the Cement Floor
OptiX OSN 3500
Installation Manual
4.2.4 Positioning Cabinets Back to Back
According to Figure 1.1, mark the position of cabinets back to back.
≥ 1000mm

Inner corner
≥ 800mm
≥ 1000mm
≥ 1000mm
Cabinet
600mm
300mm
Plan view of cabinets
Front of cabinet
Front of cabinet
Front of cabinet
600mm
300mm

Figure 1.1 Positioning cabinets back to back
8
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 4 Installing a Cabinet on the Cement Floor
4.3 Installing the Cabinet
Purpose
This procedure guides you to install the cabinet on the
cement floor.
Tools /Materials
Drill
Drill bit (Ф16)
Dust cleaner
Rubber hammer
M12 x 60 expansion bolts

Prerequisites
The bolt holes of cabinets are positioned.
Required/As needed
Required.
Caution
A dust catcher is recommended to remove the dust in the course of drilling. Clean
out the dust inside before measuring the depth of the holes.
Step 1 Drill holes on the marked positions. The depth of the four holes ranges from 52
mm to 60 mm.
Step 2 Remove the expansion tube and nut from the expansion bolt.
Step 3 Insert the guide rib on the expansion nut into the guide slot on the expansion tube.
Step 4 Put the expansion tube and nut vertically into the hole. See Figure 1.1.
Bolt
Expansion tube
Guide slot on
expansion tube
Expansion nut
Guide rib on
expansion nut
Figure 1.1 Installing the expansion tube and expansion nut
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
9
4 Installing a Cabinet on the Cement Floor
OptiX OSN 3500
Installation Manual
Step 5 Drive the expansion tube completely into the floor with a rubber hammer.
Step 6 Repeat steps 2–5 to install the other three expansion tubes and expansion nuts.
Step 7 Prior to the cabinet installation, lay the insulation plates on the floor. Each cabinet
needs two plates. See Step 9Figure 1.1.

Step 8 Align the holes on the insulation plate with the fixing holes on the floor. See
Step 9Figure 1.1. Insulation plates can not extrude from the cabinet.
Step 9 Put the cabinets upon the floor. See Figure 1.1.
Insulation
plate

Figure 1.1 Placing the insulation plate and the cabinet
Step 10 Place a horizontal ruler at the cabinet top plane in two perpendicular directions to
check its horizontal level. If it is not leveled, level it by inserting washers at the
lower end. See Figure 1.1.
Caution
The washers for leveling purpose should be inserted between the insulation plate
and the floor. Insulation will not be effective if these washers are inserted between
the insulation plate and the cabinet.
10
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual 4 Installing a Cabinet on the Cement Floor
Washer
Figure 1.1 Leveling the cabinet
Step 11 Put the spring washer and flat washer along with insulation covering onto the
M12 x 60 bolt.
Step 12 Insert the bolts vertically, through the lower frame of the cabinet and the hole on
the insulation plate, into the fixing hole on the floor. See Figure 1.1.
Figure 1.1 Inserting the bolts
Step 13 Tighten the bolts in turn crosswise.
Step 14 Use ground resistance metre to measure the resistance between the cabinet and the
floor.


If the measured resistance is more than 5 megaohm, it indicates an open
circuit, that is, insulation is perfect.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
11
4 Installing a Cabinet on the Cement Floor
OptiX OSN 3500
Installation Manual

If the measured resistance is less than 5 megaohm, it means that insulation is
not sufficient. Remove all installation parts, and check whether there is no
insulation plate installed or whether it is damaged. Fix the cabinet and test
insulation again.
End
4.4 Checking the Cabinet Installation
The following requirements should be met when the cabinet is installed properly.

The installation position of the cabinet meets the requirements in the
engineering design drawing.

All bolts are installed correctly and firmly. The sequence for installing the
spring washer and flat washer is correct.

The cabinet should be kept upright, and the horizontal deviation shall not be
more than 3 mm.

The main walkway in the equipment room should be lined up with a deviation
less than 5 mm. The adjacent cabinets should be in line.

All bolts on the cabinet are equipped with flat washer and spring washer, and

all are screwed tight.

No part of the cabinet is distorted.

The exterior varnish and the marks on the cabinet should be kept intact, and
the marks and signs should be correct, clear, and complete.

The cabinet label is properly pasted on the cabinet.
12
Huawei Technologies Proprietary
Issue 05 (2006-11-20)

×