3.1 Installation Flow and Expected Result 2
3.1.1 Installation Flow 2
3.1.2 Expected Result 3
3.2 Positioning the Cabinet 4
3.2.1 Positioning a Cabinet Independently 4
3.2.2 Positioning a Cabinet Close to an Installed Cabinet 5
3.2.3 Positioning Cabinets Abreast 6
3.2.4 Positioning Cabinets Back to Back 7
3.2.5 Checking the Positioning 7
3.3 Positioning the Support 8
3.3.1 Types of the Support 8
3.3.2 Positioning the Support on the Floor 9
3.4 Installing the Support 10
3.5 Installing the Cabinet on the Support 12
3.6 Checking the Cabinet Installation 15
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
i
OptiX OSN 3500
Installation Manual Figures
Figures
Installation flow of installing a cabinet on the antistatic floor 2
Cabinet installed on the antistatic floor 3
Positioning a cabinet independently 4
Positioning a cabinet close to an installed cabinet 5
Positioning cabinets abreast 6


Positioning cabinets back to back 7
S300A support 8
Mounting holes for the support (a single cabinet) 9
Installing the expansion tube and expansion nut 10
Fixing the support on the floor 11
Placing the cabinet and the insulation plates 12
Leveling the cabinet 13
Securing the cabinet on the support 14
Installing the floor pallet 15
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
iii
OptiX OSN 3500
Installation Manual Tables
Tables
Figure 1.1Types of the support 8
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
v
OptiX OSN 3500
Installation Manual
3 Installing a Cabinet on
the Antistatic Floor
3 Installing a Cabinet on
the Antistatic Floor
About This Chapter
When the installation is well prepared, install the cabinet. There are three modes
for installing the cabinet according to the floor of the equipment room.

Installation on the antistatic floor


Installation on the cement floor (see Chapter 4 "Installing a cabinet on the
Cement Floor")

Installation on the wooden floor (the same as the installation on the cement
floor)
This chapter guides you to install the cabinet on the antistatic floor. We
recommend reading OptiX OSN 3500 Intelligent Optical Transmission System
Compliance and Safety Manual. This helps you to ensure a safe and smooth
installation.
The following table lists the contents of this chapter.
Section Description
3.1Installation Flow and
Expected Result
Describes the installation flow.
3.2Positioning the Cabinet Describes operations and procedures of marking
the installation position for the cabinet.
3.3Positioning the Support Describes operations and procedures of marking
the position for the support.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
1
3 Installing a Cabinet on
the Antistatic Floor
OptiX OSN 3500
Installation Manual
Section Description
3.4Installing the Support Describes operations and procedures of installing
the support.
3.5Installing the Cabinet on the

Support
Describes operations and procedures of installing
the cabinet on the support.
3.6Checking the Cabinet
Installation
Describes the check points of the installation.
3.1 Installation Flow and Expected Result
This section describes the installation flow and expected installation result.
3.1.1 Installation Flow
Figure 1.1 shows the installation flow for cabinet installation on the antistatic
floor.
Starting
Positioning the cabinet
End
Positioning the support
Installing the support
Installing the cabinet on the
support
Checking the installation
Figure 1.1 Installation flow of installing a cabinet on the antistatic floor
2
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual
3 Installing a Cabinet on
the Antistatic Floor
3.1.2 Expected Result
Figure 1.1 shows the expected result of a cabinet installed on the antistatic floor.
Cabinet

Antistatic floor
Figure 1.1 Cabinet installed on the antistatic floor
 Note
There is no antistatic floor between the cabinet and the support.
 Note
To install multiple cabinets of the same type side by side, you only need to install
the side doors at two ends of the row of cabinets.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
3
3 Installing a Cabinet on
the Antistatic Floor
OptiX OSN 3500
Installation Manual
3.2 Positioning the Cabinet
This section guides you to mark the installation position for the cabinet on the
antistatic floor. The position varies with the number of cabinets and their layout.
3.2.1 Positioning a Cabinet Independently
Purpose
This procedure guides you to position a cabinet which is
installed independently.
Tools /Materials
Pencil
Ruler
Prerequisites
The cabinet and the accessories (including the support and
fixing pieces) have been transported to the site.
Required/As needed
Required if the cabinet is installed independently.
Caution

Read technical documents on construction before you mark the installation
position for the cabinet.
Step 1 Mark the reference point for installing the cabinet according to the construction
drawing.
Step 2 Draw a 600 mm x 300 mm rectangle according to the reference point. See Figure
1.1.
600mm
300mm
800mm

Reference point
the wall
Front of cabinet

1000mm
Figure 1.1 Positioning a cabinet independently
4
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual
3 Installing a Cabinet on
the Antistatic Floor
End
3.2.2 Positioning a Cabinet Close to an Installed Cabinet
Purpose
This procedure guides you to position a cabinet close to an
installed cabinet.
Tools /Materials
Pencil

Ruler
Plummet
Prerequisites
The cabinet and the accessories (including the support and
fixing pieces) have been transported to the site.
Required/As needed
Required if the cabinet is installed close to an installed
cabinet.
Step 1 Use a plummet to determine and mark the side projective position (on the ground)
of the installed cabinet.
Step 2 Draw the side outline of the cabinet to be installed according to the marks made in
step 1.
Step 3 Draw the front outline of the cabinet to be installed according to the front outline
of the cabinet already installed.
Step 4 Mark the installation reference point.
Step 5 Draw a 600 mm x 300 mm rectangle as shown in Figure 1.1 according to the
reference point, and then draw the central lines for the cabinet.
600mm
300mm
1 2 3 45
1. Front outline of the cabinet to be installed 2. Central lines of the cabinet to be installed
3. Side outline of the cabinet to be installed 4. Layout of the cabinet already installed
5. Reference point
Figure 1.1 Positioning a cabinet close to an installed cabinet
End
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
5
3 Installing a Cabinet on
the Antistatic Floor

OptiX OSN 3500
Installation Manual
3.2.3 Positioning Cabinets Abreast
According to Figure 1.1, mark the position of cabinets.
≥ 1000mm
Inner corner
≥ 800mm
≥ 1000mm
≥ 1000mm
Cabinet
600mm
300mm
Plan view of cabinets
Figure 1.1 Positioning cabinets abreast
6
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual
3 Installing a Cabinet on
the Antistatic Floor
3.2.4 Positioning Cabinets Back to Back
According to Figure 1.1, mark the position of cabinets back to back.
≥ 1000mm
Inner corner
≥ 800mm
≥ 1000mm
≥ 1000mm
Cabinet
600mm

300mm
Plan view of cabinets
Front of cabinet
Front of cabinet
Front of cabinet
600mm
300mm
Figure 1.1 Positioning cabinets back to back
3.2.5 Checking the Positioning
Check the positioning as the following items.

The minimum distance between two rows of cabinets is 1 m.

The minimum distance between the cabinet side and the wall is 0.8 m.

The minimum distance between the front/back of the cabinet and the wall is 1
m.

An aisle at least 1 metre wide is reserved in the equipment room.

The cable outlet on the top of the cabinet is aligned with the lower part of the
cabling trough of the equipment room.

The position for installing the cabinet is correct and meets the requirements in
the construction drawing.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
7
3 Installing a Cabinet on
the Antistatic Floor

OptiX OSN 3500
Installation Manual
3.3 Positioning the Support
This section describes how to position the support in the equipment room. An
S300A support assembly is used to support the cabinet. It also facilitates floor
installation and cabling. Each cabinet needs one S300A support assembly
("support" hereinafter).
3.3.1 Types of the Support
Figure 1.1 shows the appearance of the support.
Cabinet installation hole
Height indicator
Support
installation hole
Height adjusting screw
Front of the
support
Figure 1.1 S300A support
There are four types of support: three types of height-adjustable support and one
type of fixed-height support. Figure 1.1 lists the range of the adjustable height for
each type.
Figure 1.1 Types of the support
Type Suitable floor height
(mm)
Description
I 175–235 The height of supports I, II, III can be adjusted
within their ranges, by moving the upper and lower
supports.
II 236–355
III 356–595
IV Customised to the

floor height
(minimum 100 mm)
Support IV is of fixed-height. It is applied to the
extra-high or extra-low antistatic floor. The floor for
this type of support must be at least 100 mm high.
8
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual
3 Installing a Cabinet on
the Antistatic Floor
3.3.2 Positioning the Support on the Floor
Purpose
This procedure guides you to position the support on the
floor after positioning the cabinet.
Tools /Materials
Pencil
Ruler
Prerequisites
The cabinet has been positioned.
Required/As needed
Required if the cabinet is installed on the antistatic floor.
Step 1 Draw a 460 mm x 264 mm rectangle according to the central lines (see the dotted
rectangle in Figure 1.1). One side of this rectangle is 41.5 mm away from the back
of the cabinet.
600mm
300mm
Center line
264mm

41.5mm
460mm
230mm
Front
800mm

800mm

1000mm

1000mm

Figure 1.1 Mounting holes for the support (a single cabinet)
Step 2 The four vertexes of the dotted rectangle are the mounting holes for the support.
Mark them with a marking pen.
Caution
Check whether the mounting holes are fit for the support to eliminate any possible
mistakes.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
9
3 Installing a Cabinet on
the Antistatic Floor
OptiX OSN 3500
Installation Manual
End
3.4 Installing the Support
Purpose
This procedure guides you to install the support on the floor.
Tools /Materials

Drill
Drill bit (Ф16)
Expansion bolts M12
Dust cleaner
Rubber hammer
Prerequisites
The support has been positioned.
Required/As needed
Required if the cabinet is installed on the antistatic floor.
Caution
A dust cleaner is recommended to remove the dust in the course of drilling. Clean
out the dust inside before measuring the depth of the holes.
Step 1 Drill holes on the marked positions. The depth of the four holes ranges from 52
mm to 60 mm.
Step 2 Remove the expansion tube and nut from the expansion bolt.
Step 3 Insert the guide rib on the expansion nut into the guide slot on the expansion tube.
Step 4 Put the expansion tube and nut vertically into the hole, as shown in Figure 1.1.
Bolt
Expansion tube
Guide slot on
expansion tube
Expansion nut
Guide rib on
expansion nut
Figure 1.1 Installing the expansion tube and expansion nut
10
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual

3 Installing a Cabinet on
the Antistatic Floor
Step 5 Drive the expansion tube completely into the floor with a rubber hammer.
Step 6 Repeat steps 2–5 to install the other three expansion tubes and expansion nuts.
Step 7 Use height adjusting screws to level the height indicator on the support with the
height of the antistatic floor. See 3.3.1 I. I. Step 1Figure 1.1.
Step 8 Tighten the height-locking bolt on the support.
Caution
Follow the principle of "middle first, sides later", that is, tighten the middle height
locking bolt first and then that of both sides.
Step 9 Align the support installation holes with the expansion bolt holes on the floor
Step 10 Mount the spring washer and flat washer on the bolt M12 x 60.
Step 11 Insert the bolt vertically into the expansion hole through the support installation
hole.
Step 12 Check the support position and fix the bolt M12 x 60. See Figure 1.1.
S300A support
M12 x 60 bolt
Expansion tube
Expansion nut

Figure 1.1 Fixing the support on the floor
End
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
11
3 Installing a Cabinet on
the Antistatic Floor
OptiX OSN 3500
Installation Manual
3.5 Installing the Cabinet on the Support

Purpose
This procedure guides you to install the cabinet on the
support.
Tools /Materials
Horizontal ruler
M12 x 40 bolt
Insulation plate
Washer
Prerequisites
The support has been installed.
Required/As needed
Required if the cabinet is installed on the antistatic floor.
Caution
At least three persons are required to install the cabinet on the support.
Step 1 Place the two insulation plates on the support with the holes aligned from the top
down. See Step 2Figure 1.1.
Step 2 Place the cabinet on the plates with the holes aligned from the top down. See
Figure 1.1.
Insulation
plate
Figure 1.1 Placing the cabinet and the insulation plates
12
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual
3 Installing a Cabinet on
the Antistatic Floor
Step 3 Adjust the levelness of the cabinet by adding washers between the insulation
plates and the support. See Figure 1.1.

Caution
If the washers are not inserted between the insulation plates and the support,
insulation between the cabinet and the floor cannot be guaranteed.
Washer
Figure 1.1 Leveling the cabinet
Step 4 On the top of the cabinet, place the level instrument in two perpendicular
directions to check the levelness of the cabinet.
Step 5 Vertically insert the M12 x 40 bolt assembly through the lower enclosure frame of
the cabinet, and into the connecting hole of the support. See Figure 1.1.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
13
3 Installing a Cabinet on
the Antistatic Floor
OptiX OSN 3500
Installation Manual
M12X40 bolt
Insulation washer
Figure 1.1 Securing the cabinet on the support
Step 6 Tighten the bolts alternately to reduce the stress between the bolts and the cabinet.
Step 7 Measure the resistance between the support and the cabinet. The normal resistance
should be larger than 5 megaohm.

If the measured resistance is less than 5 megaohm, demount the cabinet and
check the insulation components. Then repeat the operations from step 1.

If the measured resistance is larger than 5 megaohm, continue to the next
step.
Step 8 Fix the horizontal pallet and side pallet to the support. See Figure 1.1.


If a cabinet is separately installed (no other equipment around), it needs to fix
both the horizontal and side pallets on the support with M12 x 30 bolts

If several cabinets are installed side by side, only the leftmost and rightmost
support need side pallets.
14
Huawei Technologies Proprietary
Issue 05 (2006-11-20)
OptiX OSN 3500
Installation Manual
3 Installing a Cabinet on
the Antistatic Floor
1
4
5
3
2

1. M12 x 30 bolt 2. Side pallet 3. Support
4. Horizontal pallet 5. Cabinet
Figure 1.1 Installing the floor pallet
Step 9 Cut and restore the antistatic floor according to the circumstance around the
cabinet.
End
3.6 Checking the Cabinet Installation
The following requirements should be met when the support is installed properly.

The position of the cabinet is consistent with the engineering design drawing.

The installation position of the cabinet meets the requirements in the

engineering design drawing.

All bolts are installed correctly and firmly. The sequence for installing the
spring washer, flat washer and insulation washer is correct.

With the insulation pad shipped with the equipment, the requirement for
insulation of the cabinet and the support should be fully satisfied. Insulation
measures are taken if the user-supplied mount base is used.

The cabinet should be kept upright, and the horizontal deviation shall not be
more than 3 mm.

The main walkway in the equipment room should be lined up with a deviation
less than 5 mm. Adjacent cabinets should be in line.

All bolts on the cabinet are equipped with flat washer and spring washer, and
all are screwed tight.

No part of the cabinet is distorted.

The exterior varnish and the marks on the cabinet should be kept intact, and
the marks and signs should be correct, clear, and complete.

The cabinet label is properly pasted on the cabinet.
Issue 05 (2006-11-20)
Huawei Technologies Proprietary
15

×