NATIONAL ECONOMICS UNIVERSITY
COST – BENEFIT ANALYSIS ESSAY
Topic 1: A national standard swimming pool for NEU students
Members:
Phạm Hải Anh – 11180420
Vi Thị Mai Linh – 11182938
Trần Bảo Ánh – 11180615
Nguyễn Thị Thu Hằng – 11181529
Nguyễn Huyền Huy – 11182209
Nguyễn Duy Hùng – 11182021
Trần Thị Thu Ngân - 11183581
Nguyễn Thị Phúc Phương – 11184060
Class:
Investment Economics AEP K60
Lecturer: PhD. Hoang Thu Ha
✦ HA NOI - 2021 ✦
1
CONTENTS
I.
Problem identification................................................................................................... 3
II. Alternative project 1: National 4 seasons swimming pool.......................................... 3
B/C TABLE 1...................................................................................................................... 5
A. Measure cost benefit with market price........................................................................ 5
B. Cost and benefit measurement without market price.................................................... 12
III. Alternative project 2: Complex of swimming pools combined with restaurants to
organize events.................................................................................................................... 13
B/C TABLE 2.................................................................................................................... 17
A. Measure cost & benefit with market price................................................................... 18
B. Cost benefit measurement without market price........................................................... 24
IV. Alternative project 3: Outdoor swimming pool project............................................ 26
B/C TABLE 3.................................................................................................................... 27
A. Measure cost-benefit with market price........................................................................ 28
B.
Cost-benefit measurement without a market price..................................................... 34
V. Alternative project 4: Swimming pool NEU.............................................................. 36
B/C TABLE 4.................................................................................................................... 43
A. Measure cost benefit with market price........................................................................ 43
B. Cost benefit measurement without market price......................................................... 50
VI. Conclusion.................................................................................................................... 51
I.
Problem identification
Building a complex of outdoor swimming pools combined with restaurants to organize
events of National Economic University is important and helps to meet the needs of students
for physical education more conveniently as well as increase revenue, improve the
university's reputation, the financial expenses used for renting a swimming pool elsewhere
are also reduced. The restaurant is the highlight combined with the swimming pools project
is the perfect place to organize events for the university as well as guests who come to book
a table can enjoy the beautiful scenery and delicious food here.
II.
-
Alternative project 1: National 4 seasons swimming pool
Type: 4-season swimming pool, covered indoor pool.
+ The project includes 2 types of swimming pools.
1. Basic tank: Stratify the depth from 1m2 to 1m8. Suitable for children as well.
2. Standard tank: maximum depth 1m8. Suitable for teaching and practicing for
students including 10 swimming lanes with a wide width each lane is 2.5m
-
Services offered:
+ Clean water source, swimming pool is cleaned twice a day.
+ Sale and rental of life jackets, life jackets, swimming goggles.
+ Vending machines provide products such as water, snacks.
+ Support learning and physical training for students and lecturers in the school.
+ Sell tickets to guests who need to use the swimming pool.
+ Ticket selling terms:
3. Staff and students of National Economics University: 30,000 VND/time
4. Outside customers: 45,000 VND/time
+ Partners: Stores that sell food, drinks, and home appliances that
environmentally friendly, and suitable for a healthy lifestyle. (Go Eco Hanoi,
Zero Waste Hanoi, Green Living, Clever Changes,...)
+ Customer care services:
5. Allow membership registration and monthly/yearly payment: members will receive
discount vouchers for swimming on special occasions.
6. Consulting + designing a nutritious diet / drink for members through text messages,
emails.
7. Allows scanning QR codes to accumulate points every time you go to the swimming
pool (5 points / time), exchange points for rewards,...
8. Gifts for the customers:
a. For customers who have accumulated 50 points or more: a discount voucher of VND
20,000 when shopping at stores: Go Eco Hanoi, Zero Waste Hanoi, Green Living,
Clever Changes, The Bamboo.
b. For members from 5 months or more: Send gratitude gifts on some special
occasions.
9. Customer care and support service 24/24 via fanpage, hotline.
-
Location: the project is located on campus, near the EBBA Institute of Business
Management.
-
Travel time: Save time, near the bus stop.
B/C TABLE 1
Primary benefits
Primary cost
With market price
Non market price
With market price
Non market price
- Revenue and profit
- Bringing customers
- Construction cost - Opportunity cost to
for NEU from this
closer to a green
- Operation cost
business project.
lifestyle and healthy
- Maintenance cost purposes.
- Cutting the rental
diet by linking with
-Equipment
-Impacts on people
costs.
stores doing business
purchase costs.
nearby the
use land for other
in this area.
construction: air
- The assurance of
pollution, noise
water quality, safety
pollution
and hygiene.
- Create more jobs for
the residents.
- Save travel time for
most of the NEU
students and lecturers.
- Promoting the spirit
of sports, specifically
swimming activities of
students and people
around the project
area.
- Improve the
reputation for NEU.
A. Measure cost benefit with market price
❖ Market-priced benefits:
- 1 year construction project (from 2021); The project is run into operation from 2022.
- The project attracts an average of 450 visitors/day; Average time using the service is 150
minutes (equivalent to 2.5 hours);
- Expected service price:
Staff and students of National Economics University: 30,000 VND/time
Outside customers: 45,000 VND/time
- Reduce the cost of renting an outdoor swimming pool for the school annually by
300,000,000 VND/year.
- Revenue from swimming pool service is 405,000,000 VND/month.
- Revenue from the project's beverage and fast food business: 10,800,000 VND/month
- Revenue from swimwear rental service: 2,700,000 VND/month
- Benefits from reducing the cost of using transportation to learn to swim in the pool outside
for students & faculty 216,000,000 VND/year
❖ Cost with market price:
Initial investment cost (it includes labor cost and is at full employment):
● Swimming pool construction cost: 1,300,000,000 VND
● Cost of facilities around the swimming pool: 200,000,000 VND
Annual operating expenses:
● The project employs 50 employees; Monthly salary 6,000,000 VND/labor/month,
including income tax.
● 10% of the workers are unemployed; The value of rest is 1,500,000 VND/worker/month
● The remaining number of employees being employed (not unemployed) is 90%; Salary is
6 000 000 VND/person/month.
* Annual operating cost: 100,000,000 VND/month
Company income tax rate: 20%
Table of annual revenue:(mil VND)
Sector
REVENUE
Revenue from swimming pool
(405+10.8+2.7+216)*12= 7 614 mil VND/year
services
Benefits from reducing school costs to
300 mil VND/year
rent an outdoor swimming pool
Benefits of reducing the cost of
216 mil VND/year
commuting to the outside swimming
pool for students & lecturers
Revenue from the project's beverage
10.8 * 12 = 129.6 mil VND/year
and fast food business
Revenue from swimwear rental
2.7 * 12 = 32.4 mil VND/year
service
Table of initial investment costs (unit: million VND)
Sectors
INITIAL INVESTMENT
COSTS
Cost of building a swimming pool
1 300
Cost of building other utilities around the swimming pool
200
Table of annual costs (unit: million VND)
Sectors
ANNUAL COST
Labor cost
50*6*12 = 3600
Cost of periodic repair
30*2 = 60
Annual operating cost
100*12 = 1 200
Table of social benefits and costs of the project on both private and social pointview
Year
Benefit Year 1-25
Sectors
Revenue from
Private pointview
Social pointview
(FA)
(CBA)
7 614
0
0
300
0
216
129.6
0
swimming pool
services
Benefits from
reducing the cost of
renting an outdoor
swimming pool
Benefits of reducing
the cost of
commuting to the
outdoor swimming
pool for
students/lecturers
Revenue from the
project's beverage
and fast food
business
Revenue from
32.4
0
swimwear rental
service
Tax income (20 %)
0
2 916 x 20%
= 583.2
Cost
Year 1
Total
7 776/year
1 099.2/year
Swimming pool
1 300
1 300
200
200
Total
1 500
1 500
Labor cost
50*6*12 = 3600
12*50*(0.9*6+0,1*
construction cost
Cost of building
utilities around the
swimming pool
Year
2 - 25
1,5)=3330
Periodic repair costs
60
60
Maintenance Cost
100*12 = 1 200
1 200
Tax income
2 916 x 20% = 583.2
0
Total
4443.2/year
4590/year
Net profit = Revenue – Labor cost – Maintenance cost – Operation cost
= 7 776 - 3 600 - 60 - 1200 = 2 916
=> net profit tax = 2 916 x 20% = 583.2 (mill VND/month)
NPV
-
Investment cost
Swimming pool construction cost: 1 300 mil VND
Cost of facilities around the swimming pool: 200
=> Total investment cost = 1 500 mil VND
-
Annual operating cost
Labor cost: 3 600 mil VND/ year
Cost of periodic repair: 60 mil VND/ year
Annual operating cost: 1 200 mil VND/year
=> Total annual operating cost = 4 860 mil CND/ year
-
Benefit
Revenue from swimming pool services : 7 614 mil VND/ year
Benefits from reducing school costs to rent an outdoor swimming pool : 300 mil
VND / year
Benefits of reducing the cost of commuting to the outside swimming pool for
students & faculty : 216 mil VND/year
Revenue from the project's beverage and fast food business: 129.6 mil VND/ year
Revenue from swimwear rental service: 32.4 mil VND/year
=> Total benefit = 8 292 mil VND/ year
=> Net benefit = 8 292 - 4 860 = 3 432 mil VND/year
(unit: million dong)
Year
Nominal net benefit
0
CPI
Real net benefit
100
1
3 432
102
3364,71
2
3 432
104,04
3298,73
3
3 432
106,12
3234,07
4
3 432
108,24
3170,73
5
3 432
110,41
3108,41
6
3 432
112,62
3047,42
7
3 432
114,87
2987,73
8
3 432
117,17
2929,08
9
3 432
119,51
2871,73
10
3 432
121,9
2815,42
11
3 432
124,34
2760,17
12
3 432
126,83
2705,98
13
3 432
129,36
2653,06
14
3 432
131,95
2600,99
15
3 432
134,59
2549,97
16
3 432
137,28
2500,00
17
3 432
140,02
2451,08
18
3 432
142,83
2402,86
19
3 432
143,965
2383,91
20
3 432
146,34
2345,22
21
3 432
148,715
2307,76
22
3 432
151,09
2271,49
23
3 432
153,465
2236,33
24
3 432
155,841
2202,25
25
3 432
158,216
2169,19
r = 4%
=> NPV = 43 452,88 mil VND
B. Cost and benefit measurement without market price:
Benefit
Valuation methods
Value of mil VND/using
the school's swimming
pool service
Annual
Health training for students
Cost of avoidance (Evaluation
and lecturers at the school
through saving on medical
costs)
600
Once
Create comfort and
Cost of avoidance (saving the
initiative about the
cost of renting an external
arrangement of classes,
swimming pool + the cost of
class time of students and
using transportation to study
lecturers
outside)
Create peace of mind for
Contingent valuation method
750
100
students and faculty about
the quality of water in the
pool
Cost
Method
Valued by VND/time using the
swimming pool’s service
Annual
Lost potential
Opportunity cost of other
revenue
projects
III.
-
One time
4900000
Alternative project 2: Complex of swimming pools combined with
restaurants to organize events.
Describe project
Investment capital is estimated at about 50 billion VND.
-
The outdoor swimming pool system of National Economic University includes a
system of 2 swimming pools: the main swimming pool for learning, teaching, practice,
and competition activities for students and lecturers of the university, including 10
swimming lanes with a wide width. each lane is 2.5m; Secondary swimming pool with a
smaller area serves the needs of entertainment, entertainment, and serves both adults
and children. The total area of the entire swimming pool area is 1800m2 and 800m2
around the area including the bathroom and changing areas; rental service business;
warm-up area; and event restaurant area. The height of the tank wall is about 2m with a
maximum water level of 1.8m. The swimming pool has a modern trough system,
reducing waves, reducing the best chemicals for the competition pool. Disinfection
method is to use salt and chlorine.
The swimming pool project of National Economics University will provide the
following main business services:
a. Swimming service: to respond to the needs of swimming, relaxing swimming
for customers.
- Opening time: 5:30-20:00 every day of the week
- Ticket price: + For students: the entrance fee is included in the tuition fee for Physical
Education
+ For outside guests: 45000 VND/person
- Utilities :
+
10-lane swimming pool, width 2.5m/lane in accordance with competition standards
combined with swimming pool area for entertainment and recreation
+
Arrange swimming pool board, sasuke sports game area for entertainment and
training needs
+ Bathroom, changing clothes before and after swimming: providing
clean
water
system, dividing male and female areas, relaxation room after swimming: providing
sitting mattress, snacks, relaxing sound system
b. Swimming lessons
-
Swimming courses and programs are taught directly by swimming instructors of
National Economics University, including: Official swimming courses are held
regularly for all NEU students, for outside guests, for children from all over the world.
6-16 years old; emergency first aid course, drowning prevention and escape skills;
Teaching swimming to competition for students of the swimming club
-
Tuition:
+ For NEU students: tuition fees will be included in the monthly tuition fees paid to the
university.
+ For external customers: ranging from 2.5 - 3.5 million VND/person/key
c. Swimwear and locker rental/selling service
-
When swimming customers need to have suitable swimwear to ensure general
hygiene standards and convenience. But not all customers have swimwear available and
some customers have unintentional swimming needs, so this service will meet the needs
of customers well. Some popular services such as: rental/sale of swimwear, swimming
goggles, swimming floats, snorkels, skateboards, lockers, etc. Prices for services range
from 10,000 VND to 200,000 VND.
d. Pool service combined with restaurant and event organization
-
The event restaurant campus is built right in the swimming pool complex with a
prime location directly opposite the swimming pool area, where one can easily observe
and admire the swimming pool. The restaurant's customers are all students, lecturers,
employees of the National Economic University and customers outside the university.
-
Fully equipped with modern facilities and techniques such as sound and light
systems; air machine; safety system, exit; portable stage system; curtain system, the
restaurant is a great place that can provide party, event, seminar, and catering services;
event decoration services, taking photos for customers inside and outside the university.
At the same time, the location opposite the swimming pool, which helps to observe the
pool area most conveniently, is a strength that helps the restaurant attract and increase
the number of diners to use the services of the swimming pool complex.
-
Specific service activities of the restaurant are as follows: during the day the
restaurant will serve food services to customers and the period from 4 pm every day will
be the time frame for organizing parties and events. The arrangement of this time frame
is for the most convenience and to avoid affecting the physical education learning of
students in the university and customers outside. To organize an event at the restaurant,
customers need to make an appointment 1-2 weeks in advance to keep up with the
preparation and arrangement progress. The outside restaurant area is arranged with
resort design chairs and tables, with the service of providing drinks at the seat so that
customers can enjoy the view of the pool when it is dark with a brilliant underwater
lighting system. of the swimming pool.
-
This complex of swimming pools and restaurants is expected to bring about the goal
of building the image of the National Economic University, enhancing the image and
position of the NEU university and being a source of profit for the university's
activities.
e. Medical services, care, first aid
-
The swimming pool provides medical care for athletes and students participating in
professional practice and competition and for first aid, first aid, and care in case of an
accident at the pool. The medical room includes a full range of first aid tools and
equipment, provided to students and customers and has medical professionals who
directly care for athletes, students or victims.
B/C TABLE 2
Primary benefits
With market price
Non market price
Primary cost
With market
price
●
To increase
●
To improve the
revenue from the
reputation of NEU
business of
university
swimming pool
●
To increase the
Non market price
● Affect the living
environment of
● Construction
cost
● Maintenance
students and
households
services such as:
initiative and
selling swimming
convenience in
tickets, swimming
organizing swimming ● Operation cost
courses,
lessons ( due to don't
renting/selling
have to depend on
● When the cold
swimwear, …
renting an outside
season comes,
swimming place)
the outdoor
●
To increase
revenue from the
●
To improve the
cost
(dust,noise
pollution,..)-but
not much
swimming pools
restaurant business,
comfort and safety of
aren’t as
organizing events in
NEU faculty and
attractive as the
the swimming pool
students (because of
warm season
complex
on-campus learning)
●
To reduce the
●
To improve the
cost of renting an
health of students,
outdoor swimming
lecturers and
university.
customers in the
●
To reduce the
surrounding area who
cost of renting place
regularly use the
for parties and
university's
events outside
swimming service
●
To minimize
●
Always
travel time costs of
ensuring the quality
students, lecturers,
and standard
outside customers
conditions of the
who want to find
swimming pool
places to eat.
(because this is a
●
To reduce the
swimming pool built
cost of advertising
by NEU university,
and communication
the interests and
for NEU university
health of the students
through events and
and lecturers in the
seminars held at the
university always
restaurant on the
come first)
university's
swimming pool
A. Measure cost & benefit with market price
❖
-
Market-priced benefits:
Construction project in 2 years (2019 & 2020); To be put into operation from the 3rd
year ( 2021)
-
The project attracts 500 visitors/day; Average time using the service -60 minutes;
Estimated service price 45000 VND/person
-
Reduce the cost of renting an outdoor swimming pool for the school every year 300 000
000 VND/year.
- Revenue from swimming pool service is 675 000 000 VND/month.
- Revenue from event and business services of the restaurant: 460,000,000 VND/month
- Other revenue (selling swimwear, rest room,...) : 150 000 000 VND/month
-
Benefits from reducing the cost of using transportation to learn to swim in the pool
outside for students & lecturers VND 450,000,000/year
❖
●
Cost with market price:
Initial investment costs (it includes labor cost and is at full employment):
Swimming pool construction cost: 25 billion VND
Cost of building other facilities around the swimming pool: 5 billion VND
Cost of building an event restaurant: 10 billion VND
Investment cost for technology 10 billion VND
●
Annual operating costs:
The project employs 60 workers ; Monthly salary 7 000 000 VND/labor/month,
including income tax.
Of which, how many 50% of employees are unemployed; The value of rest is 1 500
000 VND/worker/month
The remaining number of employees being employed (not unemployed) is 50%;
Salary is 7 000 000 VND/person/month.
Cost of input materials of the restaurant: 250,000,000 VND/month
●
Periodic repair cost: 50,000,000 VND/month
●
Corporate income tax rate: 20%
●
The project is expected to be exploited from year 3 to year 20.
●
Inflation = 2%, r fix= 4%
Table of annual revenue:(mil VND)
Targets
REVENUE
Revenue from swimming pool services
500x45,000x30x12=8,100 mil VND/year
Benefits from reducing school costs to rent
300 mil VND/year
an outdoor swimming pool
Benefits of reducing the cost of
450 mil VND/year
commuting to the outside swimming pool
for students & faculty
Revenue from event organization services
460,000,000x12= 5,520 mil VND/year
and restaurant business
Other revenue
150,000,000x12 = 1,800 mil VND/year
Table of initial investment costs (unit: million VND)
TARGETS
INITIAL INVESTMENT COSTS
Swimming pool construction cost
25,000 mil VND/year
Cost of building other utilities around the
5,000 mil VND/year
swimming pool
Investment costs for technical technology
10,000 mil VND/year
Cost of building an event restaurant
10,000 mil VND/year
Annual cost table
TARGETS
ANNUAL COST
Labor cost
60.7.12=5,040 mil VND/year
Cost of using periodic repair
50.12=600 mil VND/year
Cost of restaurant input materials
250.12=3,000 mil VND/year
Table of social benefits and costs of the project on both private and social aspects
Year
Benefit Year
3-20
Items
Revenue from
Private pointview (FA) Social pointview (CBA)
(mil VND/year)
(mil VND/year)
8,100
0
0
300
swimming pool
services
Benefits from
reducing the cost
of renting an
outdoor
swimming pool
Benefits of
0
450
5.520
0
Other revenue
1,800
0
Profit Tax (20 %)
0
0.2 x 6,780
reducing the cost
of commuting to
the outdoor
swimming pool
for
students/lecturers
Revenue from
event organization
services and
restaurant
business
= 1.356
Cost
total
15,420mil VND/year
2,106 mil VND/year
Year
Swimming pool
25,000
25,000
1-2
construction cost
5,000
5,000
10,000
10,000
Cost of building
utilities around the
swimming pool
Investment costs
for technical
technology
Cost of building
10,000
10,000
total
50,000
50,000
Labor cost
60x7x12
12.60.(0.5.7+0.5.1.5)=3.0
=5.040
60
Periodic repair
50x12
600
costs
=600
Cost of restaurant
250x12
input materials
= 3,000
Profit Tax
6,780 x 20%
an event restaurant
Year
3 - 20
3,000
0
= 1.356
total
9,966 mil VND/year
6660 mil VND/year
Net profit = Revenue – Labor cost – Recurring cost – Restaurant input cost
= 15,420 - 5,040 - 600 - 3,000 = 6,780
=> Profit tax = 6,780 x 20% = 1,356
NPV
Investment cost
Swimming pool construction cost: 25,000 mil VND
Cost of building other utilities around the swimming pool: 5,000 mil VND
Investment costs for technical technology: 10,000 mil VND
Cost of building an event restaurant: 10,000 mil VND
=> Total investment cost = 50,000 mil VND
Annual operating cost
Labor cost: 5040 mil VND/ year
Cost of using periodic repair: 600 mil VND/ year
Cost of restaurant input materials: 3,000 mil VND/year
=> Total annual operating cost = 8,640 mil CND/ year
Benefit
Revenue from swimming pool services : 8,100 mil VND/ year
Benefits from reducing school costs to rent an outdoor swimming pool : 300 mil
VND / year
Benefits of reducing the cost of commuting to the outside swimming pool for
students & faculty : 450 mil VND/year
Revenue from event organization services and restaurant business: 5,520 mil VND/
year
Other revenue: 1,800 mil VND/year
=> Total benefit = 16,170 mil VND/ year
=> Net benefit = 16,170 - 8,640 = 7,530 mil VND/year
Year
Nominal net benefit
0
CPI
Real net benefit
100
1
7,530
102
7382.35
2
7,530
104,04
7237.60
3
7,530
106,12
7095.74
4
7,530
108,24
6956.76