Tải bản đầy đủ (.pdf) (17 trang)

P(MW) UONG BI NINH BINHNa Duong Cao Ngan Pha Lai Uong Bi Hai Phong Ninh Binh Q. Ninh Cam pps

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (2.68 MB, 17 trang )

17
Uong Bi
Ninh Binh
Pha Lai
Q. Ninh
Mong
Duong
Nghi Son
Cam
Pha
Hai Phong
Na Duong
Cao Ngan
OPERATION1040PHA LAI
OPERATION100NINH BINH
OPERATION405UONG BI
OPERATION110NA DUONG
SITUATIONP(MW)
2010-20132,400VUNG ANG
2015-202540,000OTHERS
2011-20131,800NGHI SON
2010300NINH BINH (ext)
2011-20122,200MONG DUONG
2009-20121,200QUANG NINH
2008-20101,200HAI PHONG
2008220SON DONG
2009-2010440MAO KHE
2010300UONG BI (ext)
2009-10600CAM PHA
2007100CAO NGAN
52,415TOTAL


M.Khe
Vung Ang
18
Tra Vinh
Soc Trang
2013-184,400KIEN LUONG
2011-164,400TRA VINH
2012-152,400SON MY
2018-25
2013-17
2010-15
SITUATION
31,000OTHERS
51,000TOTAL
4,400SOC TRANG
4,400VINH TAN
P(MW)
51,000SOUTH
13,400CENTRAL CPP
52,415NORT CPP
116,815TOTAL
P(MW)
Kien Luong
Vinh Tan
Son My
19
O Mon
Ca Mau
Can Tho
Ba Ria

Phu My
Thu Duc
Nhon Trach
2012-20152,000BINH THUAN
2007-20081,500CA MAU
2008-2015
2008-2015
OPERATION
OPERATION
OPERATION
OPERATION
OPERATION
SITUATION
387BA RIA
13,386TOTAL
2,800O MON
1,950NHON TRACH
3,900PHU MY
375HIEP PHUOC
183CAN THO
291THU DUC
P(MW)
Hiep Phuoc
Binh Thuan
20
Hòa Tâm
VÜnh H¶i
Ph−íc Dinh
11,000TOTAL
20252,000NPP 10&11

20243,000NPP 7,8&9
20232,000NPP 5&6
20222,000NPP 3&4
20211,000NPP 2
20201,000NPP 1
OPERATIONP(MW)
21
JN
5
JN
3
SON LA
HANOI
HAI
PHONG
VIETNAM
2025600PSPP 6
3,600TOTAL
2024600PSPP 5
2022600PSPP 4
2021600PSPP 3
2020600PSPP 2
2019600PSPP 1
OPERATIONP(MW)
22
2024600PSPP 6
4,200TOTAL
2025600PSPP 7
2023600PSPP 5
2022600PSPP 4

2021600PSPP 3
2020600PSPP 2
2019600PSPP 1
OPERATIONP(MW)
JS 6
NHA TRANG
DA LAT
HO CHI MINH
23
24
Gen.
(TWh)
Capacity
(MW)
Catchment
Area (km2)
River
Basins
63.8715,383
11.342,81617,600Dong Nai
3.0361912,300Srepok
8.111,76811,450Sesan
3.4075214,000Ba
4.541,14010,370Vu Gia
1.5541627,200Ca
2.29552Ma-Chu
26.396,49052,500Da
3.2283017,200Lo-Gam
1
2

3
4
5
9
8
6
7
1
2
3
4
5
9
8
6
7
25
0.23661Others
Gen.
(TWh)
Capacity
(MW)
Number of
Power Plant
River
Basins
19.764,52113
5,221,2576Dong Nai
5.351,0883Sesan
0.36701Ba

8.21,9201Da
0.41201Lo-Gam
1
9
2
6
7
1
2
3
4
5
9
8
6
7
26
0.22641Others
Gen.
(TWh)
Capacity
(MW)
Number of
Power Plants
River
Basins
22.135,42217
2,898203Dong Nai
2.885863Srepok
1.824602Sesan

0.832201Ba
0.822101Vu Gia
1,113201Ca
10,232,4001Da
1.333421Lo-Gam
1
2
4
5
9
8
6
7
1
2
3
4
5
9
8
6
7
27
1.493772Ma
1.954836Others
Gen.
(TWh)
Capacity
(MW)
Number of

Power Plants
River
Basins
17.544,58027
1.043416Dong Nai
0.35801Srepok
0.942201Sesan
0.691731Ba
2.125004Vu Gia
0.44961Ca
7.962,1704Da
0.561401Lo-Gam
1
2
4
5
9
8
6
7
3
1
2
3
4
5
9
8
6
7

28
63.87
11.34
3.03
8.11
3.40
4.54
1.55
2.29
26.39
3.22
Potential
Energy (TWh)
19.76
0.23
5,22
5.35
0.36
8.2
0.4
Operating
22.13
0.22
2.89
2.88
1.82
0.83
0.82
1.11
10.23

1.33
Constructing
18.40
1.95
1.04
1.21
0.94
0.69
2.12
0.44
1.49
7.96
0.56
Starting 2008
7.04
2.19
1.52
1.60
0.80
0.93
Remain
4836466Others
5,422
820
586
460
220
210
320
2,400

342
Constructing
15,383
2,816
619
1,768
752
1,140
416
552
6,490
830
Potential
4,521
1,257
1,088
70
1,920
120
Operating
Capacity (MW)
River
Basins
Remain
Starting 2008
1,5204,753
398341D. Nai
253Srepok
220Sesan
289173Ba

430500Vu Gia
96Ca
175377Ma-Chu
2,170Da
228140Lo-Gam
29
1458.6412-4091934.5
28014.734/1828 200821/12/03
98.55.57ED
5/ Buon Kuop
1402.1215-2101191.3
36026474.13/850 20099/1/2005
5658.4RCC
4/ Se San 4
479.3239-238.5
1084 20061/2003
21.57.8CGD
3/ Se San 3a
1224.6305-304.5500.9
2603.669.5/391.3 200615/6/2002
60.53.4CGD
2/ Se San 3
417.2570-537480.06
10094871/495 200823/11/2003
3153.28RCC
1/ Pleikrong
OperationStart
Eff. Head (m)
Capacity (MW)
Energy (MWh)

Surface (Km2)
Eff. Vol. (mil.m3)
FSL-MOL (m)
Dam Type
Height/Crest (m)
Volume (m3)
Power Plant
(RCC: Roller-Compacted Concrete; CGD: Concrete Gravity Dam; ED: Earth Dam)
30
217.4480-4501273.16
6414175/498.91 200728/8/03
334.128.61RDF
10/ Quang Tri
825105-1014810.08
220165.950/1380 200818/4/2004
6254.66ED
9/ Song Ba Ha
1329.6120-904660.6
342169992.2/717.9 200722/12/02
5181.49RDF
8/ Tuyen Quang
815380-340432.73
210266.4880/240.16 200831/8/03
3009.09RCC
7/ A Vuong
358.6487.5-4655877.9
86522.674.13/850 200827/11/04
46.537.1RDC
6/ Buontuasrah
OperationStart

Eff. Head (m)
Capacity (MW)
Energy (MWh)
Surface (Km2)
Eff. Vol. (mil.m3)
FSL-MOL (m)
Dam Type
Height/Crest (m)
Volume (m3)
Power Plant
(RCC: Roller-Compacted Concrete; RDF: Rockfill Dam with Facing;
ED: Earth Dam; RDC: Rockfill Dam with Center Core Wall)
31
880-8602220
DQ
1178
880-8601630
DN
185.1958/1750
DQ
300
66.5457/415
DN
14.14RDF
DQ
200710/5/2003
627
4.73RDF
DN
14/ Dai Ninh

1103.8476-4741102.9
34016.7127.5/511 201026/12/2004
1768.5RCC
13/ Dong Nai 4
607.1590-5701100
180903108/586.43 200926/12/2004
9556RCC
12/ Dong Nai 3
1105.4200-1551650.62
3201380135/480 20097/8/2004
10645.85RCC
11/ Ban Ve
OperationStart
Eff. Head (m)
Capacity (MW)
Energy (MWh)
Surface (Km2)
Eff. Vol. (mil.m3)
FSL-MOL (m)
Dam Type
Height/Crest (m)
Volume (m3)
Power Plant
(RCC: Roller-Compacted Concrete; RDF: Rockfill Dam with Facing)
32
56
36.5
160
515-4853084
13

285.523.5/770.6
17ED
KN
638
429-427289
5.668/1261
200926/11/2005
357
3.4RDF
AK
17/ An Khe –
Kanak
1904.2370-3681000
52016.28104.4/270 20118/1/2006
1518.7RCC
16/ Huoi Quang
1158.1475-4311327
2201702.4130/424.5 20108/1/2006
9060.5RCC
15/ Ban Chat
OperationStart
Eff. Head (m)
Capacity (MW)
Energy (MWh)
Surface (Km2)
Eff. Vol. (mil.m3)
FSL-MOL (m)
Dam Type
Height/Crest (m)
Volume (m3)

Power Plant
(RCC: Roller-Compacted Concrete; RDF: Rockfill Dam with Facing)
33
175-140
521.1
21.52
272-268
62.85
17.68
200924/12/2005
60ED
18/ Srepok 3
22052.5/478.9
1060.21433
20095/3/2006
88.3RCC
19/ Song Tranh 2
19096/640
679.61150
9429215-1755500
24006504138.1/961.6 201223/10/2005
78224RCC
20/ Son La
OperationStart
Eff. Head (m)
Capacity (MW)
Energy (MWh)
Surface (Km2)
Eff. Vol. (mil.m3)
FSL-MOL (m)

Dam Type
Height/Crest (m)
Volume (m3)
Power Plant
(RCC: Roller-Compacted Concrete; RDF: Rockfill Dam with Facing;
ED: Earth Dam; RDC: Rockfill Dam with Center Core Wall)

×