PETROVIETNAM
Energy for National Sustainable Development
Presented by: Ngo Anh Hien
Deputy General Manager
Gas Division of PetroVienam
Content
 OVERVIEW OF PIPELINE SYSTEM
 CURRENT GAS PIPELINE SYSTEMS
 DIRECTION TO DEVELOPMENT
 ON-GOING GAS PIPELINE PROJECTS
 UP-COMING GAS PIPELINE PROJECTS
PETROVIETNAM
Energy for National Sustainable Development
Overview of Gas Pipeline System
 In 1981, the first developed gas field from Tien Hai – Song
Hong basin with flowrate of 20 – 23 MMCM/year supplied
to local industry.
 In 1995, the first associated gas from Bach Ho field – Cuu
Long basin – with flowrate 1 MMCM/day supplied to Ba
Ria Power Plant.
 In 2003, a first natural gas from Lan Tay field – Nam Con
Son basin with flowrate of 2 MMCM/day supplied to Phu
My Power Complex. By October 2008, the flowrate was
increased to 20 MMCM/day.
 In 2007, a first associated gas from PM3-CAA overlapping
area supplied to Ca Mau Power Complex.
PETROVIETNAM
Energy for National Sustainable Development
Current Gas Pipeline Systems
• Northern area – Thai Binh Pipeline
• Rang Dong – Bach Ho – Phu My Pipeline


• Nam Con Son Pipeline
• PM3 – Ca Mau Pipeline
• Low Pressure Pipeline
PETROVIETNAM
Energy for National Sustainable Development
Current Gas Pipeline Systems
PETROVIETNAM
Energy for National Sustainable Development
Northern area – Thai Binh
Fields: Tien Hai C (07/1981)
D14_STL (5/2004)
Dong Quan D (2005)
Specification: Length: ~20 km
Diameter: Small (~6”)
Description: Limited gas resources
Supply gas to Tien Hai
industrial zone, Thai
Binh.
CAMBODIA
Ca Mau
Comple
x
PM3-CAA
O Mon
Hiep
Phuoc
Dinh Co
GPP
Phu My
Complex

Cuu Long
Basin
Nam Con Son
Basin
Ma Lay
Tho Chu
Basin
Bach Ho –Phu My PL:
•Capacity: 2 bcmpa
•Length: 117 km
•Diameter: 16”
Nam Con Son 1 PL:
•Capacity: 7 bcmpa
•Length: 400 km
•Diameter: 26”
PM3-Ca Mau PL:
•Capacity: 2 bcmpa
•Length: 330 km
•Diameter: 18”
Block B,
48 &52
Current Gas Pipeline Systems
PETROVIETNAM
Energy for National Sustainable Development
Current Gas Pipeline Systems
Southeast Region
PETROVIETNAM
Energy for National Sustainable Development
LÔ 06.1
LÂ NTÂ Y-

LANĐ Ỏ
LÔ 11.2
MỎ
NHÀ MÁ Y
XƯ Û LÝ KHÍ
NAM CÔ N SƠ N
NHÀ MÁ Y
XƯ Û LÝ KHÍ
DINH CỐ
TRUNG TÂ M
PHÚ MỸ
GDC
BLOCK 06.1
LAN TAY
& LAN DO
BLOCK 11.2
BACH HO
DINH CO
TERMINAL
NAM CON SON
DINH CO
GPP
BACH HO
BA RIA POWER PLANT
BACH HO
GAS
DISTRIBUTION
CENTER
PHU MY GDS
PHU MY 2.1

PHU MY 2.1 EXT.
PHU MY 1
PHU MY 3
NAM CON SON
GAS DISTRIBUTION
CENTER
PHU MY GDC
PHU MY 2.2
PHU MY FERTILIZER
LOW PRESSURE
PM – MX - GD
PHU MY INDUSTRIAL ZONE
PHU MY - HCM
OFFSHORE
DINH CO AREA
BA RIA AREA
Max. capacity: 2.0 BCM/y
Max. capacity: 7 BCM/y
PHU MY 4
PHUONG DONG
RANG DONG
PHU MY 3
NHON TRACH 1
HIEP PHUOC
CA NGU VANG
NHON TRACH 2
STD/STV
Rong
Doi Moi
Current Gas Pipeline Systems

PETROVIETNAM
Energy for National Sustainable Development
Rang Dong – Bach Ho – Phu My Pipeline
Ba Ria
GDS
Ba Ria
Power Plant
1.5 Bcm/y, 125 bar
LBV-804
SDV-805
LBV
547 MMCM/y
22.5 - 24 bar
Bach Ho
Thi Vai Terminal
Phu My
GDS
Dinh Co
GPP
Rang Dong
PM1
PM 2.2
PM 2.1
PM 3
UREA
PM 4
Phu My
GDC
STD/STV
Ca Ngu Vang

Rong Doi Moi
Current Gas Pipeline Systems
Nam Con Son Pipeline
LBV
Dinh Co
GPP
LBV
Lan Tay
Thi Vai Terminal
Dinh Co
Terminal
Hai Thach
Rong Doi
PM 2.2
PM 4
PM 3
Phu My
GDS
Phu My
GDC
PETROVIETNAM
Energy for National Sustainable Development
PM 2.1
PM 1
Current Gas Pipeline Systems
Low Pressure Gas Pipeline
PETROVIETNAM
Energy for National Sustainable Development
Design
Capacity:

1 BCMY
Specification: Length: 15 km
Description: Supply gas to the
industrial zones
along the trunk-
pipeline to Ba Ria,
Phu My area.
Direction to Development
PETROVIETNAM
Energy for National Sustainable Development
• Maximize the utilization of existing pipeline system.
• Expand gas pipeline system in Southeast and Southwest
region.
• Utilize gas reserves in the Central and Northern of
Vietnam.
• Interconnect regional/national gas pipeline systems.
• Expand gas usage in other sectors such as resident,
transportation, industry etc through low pressure and city
gas pipeline system.
PETROVIETNAM
Energy for National Sustainable Development
Master Plan For Pipeline System
On-going Gas Pipeline Projects
PETROVIETNAM
Energy for National Sustainable Development
Rong-Doi Moi – Bach Ho Pipeline
Design Capacity: 6.4 BCMY
Location: Southeast region
Description: To gather gas and then
compress associated gas

in Rong – Doi Moi gas
fields through Bach Ho –
Dinh Co pipeline.
Specification: RC1-RP2: 9,5km, 10”
RP3-RP2: 8.5km, 12”
RP3-RC4: 16km, 10”
RC4-RC5: 5.5km, 8”
RC4-RCDM: 3.5km, 8”
First gas: 12/2010
On-going Gas Pipeline Projects
PETROVIETNAM
Energy for National Sustainable Development
On-going Gas Pipeline Projects
PETROVIETNAM
Energy for National Sustainable Development
Block B – O Mon Pipeline
06-2
PETR
O
CARIGA
LI
CARI
G
O MON
PHU My
Design Capacity: 6.4 BCMY
Location: Southwest region
Specification: Length: 406 km
Onshore: 160 km, 30”
Offshore: 246 km, 28”

First gas: 2014
Customers: - O Mon Power Complex
(O Mon Power Plant
2,3,4,5)
- Gas-Power-Fertilizer
Industry Zone in Ca Mau
Province.
Up-coming Gas Pipeline Projects
PETROVIETNAM
Energy for National Sustainable Development
Nam Con Son II Gas Pipeline
Design Capacity:
7 BCMY
Location:
Southeast region
Description:
The 400 km line will be built in parallel
with the 1
st
pipeline to transport gas
from Block 05-2, 05-3 and 04-3 with
consideration of re-serving for other
potential gas fields in Nam Con Son
basin and importing gas later.
First gas:
2014
Up-coming Gas Pipeline Projects
PETROVIETNAM
Energy for National Sustainable Development
Block 102/106 & 103/107 – Thai Binh Pipeline

Distances
Hong Long - Landfall: ~55km
Hac Long - Hong Long: 10,3km
Bach Long - Hong Long: 17,4km
Dia Long - Hong Long: ~20km
Hong Long - Thai Binh: ~40km
Thai Binh – Landfall: 19,54km
THANK YOU!

×