ỨNG DỤNG CAD VÀO QUÁ TRÌNH
THIẾT KẾ
July 25, 2012
page 4
THIẾT KẾ CỐP PHA TƯỜNG
THIẾT KẾ CỐP PHA DẦM
THIẾT KẾ TẤM SLAB CORNER (SC)
THIẾT KẾ MẶT BẰNG PANEL SÀN
THIẾT KẾ HỆ CỐP PHA CẦU THANG BỘ
ĐEM LẠI ĐỘ CHÍNH XÁC CAO
CHO KÍCH THƯỚC CÁC CẤU
KiỆN BÊ TÔNG
July 25, 2012
page 10
July 25, 2012
Page 11
TRC KHI THÁO CP PHA SAU KHI THÁO CP PHA
THI CÔNG VỚI CỐP PHA CỔ ĐiỂN
July 25, 2012
Page 12
THI CÔNG VỚI CỐP PHA NHÔM
TRC KHI THÁO CP PHA SAU KHI THÁO CP PHA
July 25, 2012
Page 13
PHI SA CHA
TRC KHI THÁO CP PHA SAU KHI THÁO CP PHA
THI CÔNG VỚI CỐP PHA CỔ ĐiỂN
July 25, 2012
Page 14
THI CÔNG VỚI CỐP PHA NHÔM
TRC KHI THÁO CP PHA SAU KHI THÁO CP PHA
July 25, 2012
Page 15
THI CÔNG CẦU THANG VỚI CỐP PHA CỔ ĐiỂN
TRC KHI THÁO CP PHA SAU KHI THÁO CP PHA
July 25, 2012
Page 16
THI CÔNG CẦU THANG VỚI CỐP PHA NHÔM
TRC KHI THÁO CP PHA SAU KHI THÁO CP PHA
BỀ MẶT BÊ TÔNG
PHẲNG VÀ MỊN
July 25, 2012
page 17
Giảm thiểu mạch ngừng bê tông vì khi sử dụng cốp pha
nhôm tất cả các cấu kiện cột, vách, dầm, sàn và cầu
thang được đổ đồng thời.
Khi sử dụng cốp pha gỗ, sau 1 vài lần sử dụng tấm gỗ sẽ
thấm nước và bị phồng cục bộ tại một số điểm. Vì vật
liệu nhôm cường độ cao và không bị nước ăn mòn nên
bề mặt cốp pha ít thay đổi sau nhiều lần sử dụng. Bề mặt
cốp pha tốt sẽ đem lại bề mặt bê tông tốt.
July 25, 2012
Page 18
CP PHA CỔ ĐiỂN
CP PHA NHÔM
BỀ MẶT BÊ TÔNG
July 25, 2012
Page 19
CP PHA CỔ ĐiỂN
CP PHA NHÔM
BỀ MẶT BÊ TÔNG
July 25, 2012
page 20
July 25, 2012
Page 21
*
Work schedule for Typical Floor (APT - 7days)
Activity Day
D+1 D+2 D+3 D+4 D+5 D+6 D+7
Datum Line & Chipping
Chipping Datum Line
Re-Bar
Wall
Present Floor Next Floor
Present
Floor
Slab
Day & night Shift
Formwork
Wall (Unit)
Dismantle and assemble
Wall (Core)
Dismantle and assemble
Façade
(Steel Gang Form)
Dismantle and assemble
Slab
Dismantle and assemble
M&E
Wall Slab
Concrete Pouring
Curing
ĐỐI VỚI CROWNE PLAZA
July 25, 2012
Page 22
ĐỐI VỚI CROWNE PLAZA
* Work schedule for Typical Floor (Hotel - 6days)
Activity Day
D+1 D+2 D+3 D+4 D+5 D+6
Datum Line & Chipping
Chipping Datum Line
Re-Bar
Wall
Present Floor Next Floor Present Floor
Slab
Day & night Shift
Formwork
Wall (Unit)
Dismantle and assemble
Wall (Core)
Dismantle and assemble
Façade
(Steel Gang Form)
Dismantle and assemble
Slab
Dismantle and assemble
M&E
Wall Slab
Concrete Pouring
Curing
QUÁ TRÌNH LẮP ĐẶT ĐƠN GiẢN
July 25, 2012
page 23
July 25, 2012
Page 24
LP PANEL TNG, CT
MINH HỌA QUÁ TRÌNH LẮP ĐẶT
July 25, 2012
Page 25
LP PANEL DM
MINH HỌA QUÁ TRÌNH LẮP ĐẶT