Tải bản đầy đủ (.ppt) (16 trang)

PPE year end guidance powerpoint

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (1006.28 KB, 16 trang )

Property, Plant and Equipment
• Recent financial statement audits identified significant deficiencies
• Need to write-on PP&E assets that should have been capitalized in prior years.
• PP&E not moved in a timely manner from CWIP balances to completed PP&E SGLs.

• PP&E Best Practices Guide placed on the iPortal earlier in the year.
• PP&E CWIP projects accounting for 80% of allottees’ CWIP balances for
FY 2009 submitted to HQ and placed on the iPortal for subsequent
review and analysis.
• Beginning with FY 2010 3rd Quarter and Year-end, PP&E reports will be
posted on the iPortal for each allottee.
• Beginning with FY 2010 3rd Quarter and Year-end, the iPortal PP&E
reports must be reviewed, analyzed and results submitted to HQ.
• This review only applies to PP&E not covered by the EFASC’s “Annual
Fixed Asset Review” for FY 2010.






PP&E Best Practices Guide

Risks and Controls Identified.
PP&E SGL accounting scenarios presented.
Capitalization practices presented.









Managing the CWIP account.






Need to develop best practice.

Management Use of PP&E Accounting Data




Defining completion/beneficial occupancy for accounting purposes
Annual CWIP review.

Establishing useful lives
Disposition of Assets




Establishing thresholds
Object class codes
Distinguishing capitalizable betterments/improvements from maintenance
Capitalized direct funded Safeguards and Security costs

Write-on of assets vs. recording corrections of errors

Need to identify best practices demonstrating the utilization of PP&E accounting data to improve
DOE’s operational performance and stewardship responsibilities.

Deferred Maintenance Reporting
2


PP&E - CWIP for Allottee XX Template
Analysis Questions

3


PP&E - CWIP for Allottee XX Template
Analysis Questions

4


PP&E - CWIP for Allottee XX Template
Analysis Questions

5


Major PP&E CWIP Projects








List of projects for FY 2009 found on iPortal at B - Field Submissions & Data Calls; B
- PP&E - CWIP - DATA CALLS; A - FY09-Guidance-Data Calls; “iPortal PPE 80-20”.
FY 2010 list of projects needs to be developed for 3 rd and 4th Quarter using the
“CWIP Response Template 1A-D” worksheet within the “PP&E – CWIP for Allottee
XX” template found on the iPortal at B - Field Submissions & Data Calls; B - PP&E CWIP - DATA CALLS.
Please mark spreadsheet as June 30, 2010 or September 30, 2010, and save your
respective file on the iPortal.
All columns on template should be completed.
OFCR will compile the Major DOE CWIP projects list (based on allottee input) and
place on iPortal.

6


PP&E - CWIP for Allottee XX Template
CWIP Response Template 1A-1D

7


PP&E Reports
Balance Sheet PP&E Changes


Purpose: To provide Balance Sheet data by Allottee and Reporting Entity.






Use this report to answer questions 2A, 2B and 2C.
This report is filterable by Reporting Entity.
The report has Prior Year and Current Year amounts, Fluctuation amount and a
Fluctuation Percentage.
Columns G, H and I are calculations showing if answers are needed for questions
2A, 2B and 2C respectively.
Column G is using $10 Million and 15% as the criteria but this may change.
Double-click on any amount to see the entries related to that amount.





8


PP&E - CWIP for Allottee XX Template
Balance Sheet PP&E Changes 2A-2C

9


PP&E Reports
Depreciation Pivot



Purpose: To provide Depreciation data by Allottee, Program and Reporting Entity.





Use this report to answer questions 3A, 3B, 3C and 3D.
This report is filterable by Reporting Entity and Program.
The report has Prior Year and Current Year amounts, Fluctuation amount and a
Fluctuation Percentage.
Columns G, H and I are calculations showing if answers are needed for questions
3B, 3C and 3D respectively.
Column G is using $10 Million and 15% as the criteria but this may change.
Double-click on any amount to see the entries related to that amount.





10


PP&E - CWIP for Allottee XX Template
Depreciation Pivot 3A-3D

11


PP&E Reports

PP&E Roll Forward Report


Purpose: To provide the PP&E Roll Forward Report by Allottee and Reporting
Entity





Use this report to answer questions 4A, 4B and 4C.
Currently obtained from SMART Trial Balance Report.
Field Office Reporting Entities have been grouped together while the IC’s are listed
separately.
The report is filterable by Allottee and Reporting Entity.
A conditional format is on line 3 to highlight all negative amounts and on line 6 to
highlight all positive amounts in red.
Double-click on any amount to see all of the SMART Trial Balance entries related
to that amount.





12


PP&E - CWIP for Allottee XX Template
PP&E Roll Forward 4A-4C


13


PP&E Reports
PP&E Trading Partner Analysis


Purpose: To provide a Trading Partner breakdown for Line 4.





Use this report to answer question 4D.
The report is filterable by Allottee and Reporting Entity.
Double-click on any amount to see all of the SMART Trial Balance entries related
to that amount.

14


PP&E - CWIP for Allottee XX Template
PP&E Trading Partner Analysis 4D

15


PP&E Analysis and Confirmation





Using the above tools, field offices should respond to the questions found on the
iPortal.
All questions must be considered and should no response be applicable, please
answer with N/A.
Complete the statement found at the bottom of the analysis questions for the
PP&E GAAP Confirmation.

16



Tài liệu bạn tìm kiếm đã sẵn sàng tải về

Tải bản đầy đủ ngay
×