HASD GENERAL METHOD STATEMANT FORMWORK 170424 (2)

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (7.54 MB, 15 trang )

BUILDING A BETTER FUTURE

HASD

TENDER DOCUMENT
APRIL 2017

HOI AN SOUTH DEVELOPMENT LIMITED

GENERAL METHOD STATEMENT

COFICO Copyright © 2017

PROJECT :

HOI AN SOUTH DEVELOPMENT

PACKAGE :

CONDO HOTEL PACKAGE

LOCATION

:

OWNER

HOI AN SOUTH DEVELOPMENT LIMITED

:


DUY HAI COMMUNE, DUY XUYEN DISTRICT, QUANG NAM PROVINCE, VIETNAM


BUILDING A BETTER FUTURE

HASD
CONTENT

1.

2.

CONSTRUCTION EXECUTION PLAN

1.1

CONSTRUCTION SITE LAYOUT

1.2

TRAFFIC MANAGEMENT PLAN

1.3

HEAVY EQUIPMENT PLAN



TOWER CRANE LAYOUT PLAN




TOWER CRANE ELEVATION PLAN



MATERIAL AND PASSENGER HOIST LAYOUT PLAN



CONCRETE PLACING BOOM LAYOUT PLAN

1.4

HSE MANAGEMENT PLAN

1.5

TEMPORARY POWER SUPPLY AND LIGHTING LAYOUT

CONSTRUCTION METHOD FOR STRUCTURAL WORKS

2.1 ZONING PLAN

2.2 CONSTRUCTION SEQUENCE

2.3 STRUCTURAL WORKS METHOD




FORMWORK PLAN

COFICO Copyright © 2017

HOI AN SOUTH DEVELOPMENT
CONDO HOTEL PACKAGE


HOI AN CASINO PROJECT

3

1.
1.1

CONSTRUCTION EXECUTION PLAN
BUILDING A BETTER FUTURE

CONSTRUCTION SITE LAYOUT

SITE ARANGEMENT

COFICO Copyright © 2017


4

HOI AN CASINO PROJECT

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS

BUILDING A BETTER FUTURE

2.1 ZONING PLAN

PODIUM [GROUND FLOOR]

ZONE

AREA


1G

926.0

2G

867.0

3G

726.0

4G

240.0

5G

790.0



HOI AN CASINO PROJECT

5

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.1 ZONING PLAN

TOWER

PODIUM [L1 FLOOR]

ZONE

AREA


A

924.0

B

839.0

3L1


595.0

5L1

490.0

1

2

A

1191.0

B

1029.0

4L1

126.0


HOI AN CASINO PROJECT

6

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE


2.1 ZONING PLAN

TOWER

TYPICAL FLOOR

ZONE

AREA


A

619.0

B

681.0

A

752.0

B

548.0

1

2



HOI AN CASINO PROJECT

7

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.2 CONSTRUCTION SEQUENCE

TYPICAL FLOOR CYCLE (9 DAYS/ CYCLE) H = 3.65m

A.

Overall Work Sequence For Typical Floor

B.

Overall Work Sequence For Non-Typical Floor

1.

Survey

1.

Survey

2.


Column Rebar

2.

Column Rebar

3.

Column Form

3.

Column Form

4.

MEP Embedment

4.

MEP Embedment

5.

Inspection

5.

Inspection


6.

Slab Form

6.

Pour Column Concrete

7.

Survey for Slab End Line

7.

Slab Form

8.

Slab Rebar

8.

Survey for Slab End Line

9.

MEP Embedment

9.


Slab Rebar

10.

Inspection

10.

MEP Embedment

11.

Pour Concrete Column And Slab

11.

Inspection

12.

Pour Slab Concrete


HOI AN CASINO PROJECT

8

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE


2.3 STRUCTURAL WORKS METHOD

FORMWORK PLAN

TYPICAL FLOORS

NON-TYPICAL

1.

NON – TYPICAL FLOOR

[GROUND FLOOR UP TO L1 FLOOR & ROOF FLOOR]



COLUMN & WALL



BEAM & SLAB



STAIR

:

CONVENTIONAL FORMWORK


:

CONVENTIONAL FORMWORK

:

CONVENTIONAL FORMWORK


HOI AN CASINO PROJECT

9

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.3 STRUCTURAL WORKS METHOD

FORMWORK APPLICATION FOR NON - TYPICAL FLOORS

COLUMN & COREWALL: CONVENTIONAL FORMWORK

COLUMNS

COLUMNS

CONVENTIONAL FORMWORK FOR COLUMN

CONVENTIONAL FORMWORK FOR COLUMN



10

HOI AN CASINO PROJECT

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.3 STRUCTURAL WORKS METHOD

FORMWORK APPLICATION FOR NON - TYPICAL FLOORS

BEAM & SLAB: CONVENTIONAL FORMWORK

BEAM & SLAB

BEAM & SLAB

CONVENTIONAL FORMWORK FOR BEAM & SLAB

CONVENTIONAL FORMWORK FOR BEAM & SLAB


11

HOI AN CASINO PROJECT

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE


2.3 STRUCTURAL WORKS METHOD

FORMWORK APPLICATION FOR TYPICAL FLOORS

COLUMN and COREWALL: ALUMINUM FORMWORK SYSTEM

COLUMNS

COLUMNS

AL-FORM FOR COLUMN & WALL

AL-FORM FOR COLUMN & WALL


12

HOI AN CASINO PROJECT

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.3 STRUCTURAL WORKS METHOD

FORMWORK APPLICATION FOR TYPICAL FLOORS

BEAM & SLAB: CONVENTIONAL FORMWORK

BEAM & SLAB


BEAM & SLAB

CONVENTIONAL FORM FOR BEAM & SLAB

CONVENTIONAL FORM FOR BEAM & SLAB


13

HOI AN CASINO PROJECT

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.3 STRUCTURAL WORKS METHOD

FORMWORK APPLICATION FOR TYPICAL FLOORS

STAIRCASE: CONVENTIONAL FORMWORK

STAIRCASE

STAIRCASE

CONVENTIONAL FORM FOR STAIR

CONVENTIONAL FORM FOR STAIR



14

HOI AN CASINO PROJECT

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.4 SAFETY PROTECTION

SECTION VIEW

EXTERNAL SCAFFOLDING


15

HOI AN CASINO PROJECT

2. CONSTRUCTION METHOD FOR STRUCTURAL WORKS
BUILDING A BETTER FUTURE

2.4 SAFETY PROTECTION

SAFETY FACLITIES

SAFETY WALKAWAY

SAFETY RAILING

OPENING PROTECTION


PERIMETER SAFETY RAILING



×