Case Study 4
steel Investment Casting
_CRKEATE
=EST GROUP,
Case Study - Steel Locking
Jaws
@ Gas and shrinkage porosity were observed in
the initial design of the cast freight trailer
component.
www.esi-group.com
THE
ESI GROUP
VIRTUAL
T#Y-OUT
S%PACEF* COMPANY
Case Study - Steel Locking
ϬvAzr=¬
Mesh
www.esi-group.com
Case Study - Steel Locking
Jaws
ESI GROUP
“ee
-`
`
Ot
Beg,
*—————-
.....
`
The air cannot escape
» \
X _
Vy
'Eltlucnarune
STEP NUMBER = 132
www.esi-group.com
Animated image
from the lower castings,
because the upper ones
are filling too early.
'~EST GR0UP
Case Study - Steel
Locking
Jaws
This filling problem due to an ineffic
tree design leads to entrapped air
in the casting.
www.esi-group.com
_'
Case Study - Steel Locking
Jaws
Solidification
contour plot.
VIE
www.esi-group.com
PRACTION SOLID
STEP NUMBER = 279
Animated image
Case Study - Steel Locking
Jaws
_=ESI GROUP
Macroporosity
(shrinkage porosity)
ACRO POROSITY
SIEP NUMBER = 849
=
=
m
contour plot.
www.esi-group.com
Case Study - Steel Locking
Jaws
Macroporosity predicted by simulation, and by X-Ray analysis
IACRO POROSITY
Copyright ©
ESI Group.
2007. All rights reserved.
ake Nou:
Case Study - Steel Locking
Jaws
Change in process
design, in order to
avoid entrapped air
and reduce shrinkage
porosity.
At EMPERATURE
STEP NUMBER = 140
www.esi-group.com
|
Animated image
THE
VIRTUAL
TRY-OUT
SPACE”
www.esi-group.com
COMPANY
Case Study - Steel Locking
Jaws
THE
ESI GROUP
VIRTUAL
TRY-OUT
SPACE”
Conclusion
COMPANY
@® Selected customers in investment casting, mainly in the aerospace
industry: A/stom, PCC Airfoils, PCC Structural, Howmet, Snecma,
FHolls Royce, EMA, Doncasters, Microfusione Stellite, Centro Sviluppo
Material, Microcast, Microsteel, Precicast, AIDC, Bet Semesh,
Stryker Howmedica, MFL, GE, Pratt-Wittney, Mitsubishi,
[shikawajima Precision Casting, Starmet, Cercast, SALUT, Harbin
Donkan Engine, Shenyang Liming Aero-Engine Group, Xi'an Aero
Engine company...
"For several years, ProCAST has been used at Howmet for customer concurrent engineering,
development of new components and optimization of our investment casting processes. ProCAST
allows us to quickly optimize our gating systems in terms of filling and solidification. Simulation
results are then stored in a technical database used by our product and process development
department."
Loic CALBA, CAD & Process Modelling Manager, Howmet S.A.S., France
www.esi-group.com
THE
VIRTUAL
TRY-0UT
SPACE”
COMPANY
Case Study 5
steel Sand Casting
_CRKEATE
_=ESI GROUP
Case Study - Steel Sand
@® Production problem solved with casting simulation
@®
Primary & secondary shrink porosity in critical areas
www.esi-group.com
Casting
|Ses
GROUP
Case Study - Steel Sand
Casting
First iteration:
Initial design modification
of back shroud section.
(top view).
This concession allowed
elimination
of five top risers (bottom
view).
Copyright ©
ESI Group.
2007. All rights reserved.
WPEio.,
Case Study - Steel Sand
Casting
Exploded view of mould
assembly.
Copyright ©
ESI Group.
2007. All rights reserved.
.`>EST GR0UP
Case Study - Steel Sand
Casting
Ns
ae
Arrow shows
shrinkage
location
on front shroud.
CE tN
Noo
Suy
x
7
VÀeke ee CÀ
ma
San
tái
và”
Oe
bÓ
ASe
)
`
X%(7 V/2\ SR
Đà
K0 My tp
WP ee
EH
PK)
ReesOncu
eA KiA
BK
ieX2
Ta
os
neat
at25
:
ey
AI
đà te
. KRS
M¿}
`.
Và
.:
+
Ni
oS
7
we
ons =
Ara
-
Dos
a eae. \ ĐẠI
vi
“
VATE
al
ee:aot ly,
2, et
ee
hài 4‹l SàvệAt
Copyright ©
ESI Group.
2007. All rights reserved.
By
sacs
vase Study - steelCasSan
d
ting
v.
`
ch
t3
Hy
sea
Then solidification
progressing from
casting to risers.
¡82/27 f
Xã ma
te ie
a
Ee
vi
+ hà
| Ch
xế
a
Fee
tie
Tey
a) Pera La
A KẾ Be)
rr
ư
ener
gr
Re
Re
KS
ve
aa
5 eI
ro 0617270,
v4
Copyright ©
ESI Group.
2007. All rights reserved.
Case Study - Steel Sand
_=ESI GROUP
Casting
TLL
Ji
A
The macroporosity plot
shows shrinkage defects
at each shroud-vane
junctions.
805E+03 $,
www.esi-group.com
S00000E+01 s
"=1 €,00)0),
Case Study - Steel Sand
Casting
Secondary shrinkage at
riser-hub connection.
Not a major concern as
defect would be visible
after removal of riser, and
repaired.
RO PO
STEP NUMBE
TIME = 2
www.esi-group.com
Second iteration:
1. Chill size was
increased.
2. Riser diameter was
increased.
Copyright ©
ESI Group.
2007. All rights reserved.