EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location: CONVEYANCE SEWER CONSTRUCTION
Date: 15-Sep-
07
WEIP/D/QC - 02/1994 SHIMIZU CORPORATION REPRESENTATIVE
RFI No.: CSC/CM18-CM25/2.3/232
From:
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: CSC (CM18-CM25)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection for spun pile after
delivery to site.
WILL BE READY FOR INSPECTION ON
17-Sep-07 at 2:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
Date: 17-Sep-
CONVEYANCE SEWER CONSTRUCTION
07
WEIP/D/QC - 02/1983 SHIMIZU CORPORATION REPRESENTATIVE
RFI No.: CSC/CM18-CM25/2.2/010
From:
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: CSC (CM18-CM25)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection Elevation &
Dimensions for sand bedding of segment S15 & S16.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 8:30 AM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
Date: 17-Sep-
CONVEYANCE SEWER CONSTRUCTION
07
WEIP/D/QC - 02/1995 SHIMIZU CORPORATION REPRESENTATIVE
RFI No.: CSC/CM18-CM25/2.2/011
From:
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: CSC (CM18-CM25)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection Placing & Sampling for
Leveling concrete of segment S16.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 AM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/1996
Date: 17-Sep-07
RFI No.: ECSI/L3/MC/3.2/108
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection 07 days compression
test concrete of closure box-culvert from M23 to M24,
sampling date 11/9/2007, class E.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 2:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/1997
Date: 17-Sep-07
RFI No.: ECSI/L3/MC/3.2/109
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection 07 days compression
test concrete for wall of Manhole M24 (Hole driver water),
sampling date 11/9/2007, class E.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 2:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/1998
Date: 17-Sep-07
RFI No.: ECSI/L5/MC/3.2/168
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection 07 days compression
test concrete of wall and top of Manhole M"51, sampling
date 11/9/2007, class E.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 2:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/1999
Date: 17-Sep-07
RFI No.: ECSI/L6/MC/3.2/171
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection 07 days compression
test concrete for Bottom slab of Manhole I"59, sampling
date 11/9/2007, class E.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 2:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2000
Date: 17-Sep-07
RFI No.: ECSI/L6/PC/3.2/173
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection 07 days compression
test concrete for slipper from M56 to M57, sampling date
11/9/2007, class F.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 2:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2001
Date: 17-Sep-07
RFI No.: ECSI/L3/PC/3.2/49
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection for compaction test
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 AM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
(FDT) of sand backfilling of trenches from M23 - M24.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2002
Date: 17-Sep-07
RFI No.: ECSI/L3/PC/3.2/50
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection for compaction test
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 3:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
(FDT) of sand backfilling of trenches from M23 - M24.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2003
Date: 17-Sep-07
RFI No.: ECSI/L3/PC/3.2/51
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection formwork for Belt joint
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 4:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
connection of Box culvert from M25 to M26.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2004
Date: 17-Sep-07
RFI No.: ECSI/L3/PC/3.2/52
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: Line 3 (Tran Binh
Trong St)
Name: KO SHIMOKAZE
Position: Resident Engineer
Description of Activities: Inspection placing & sampling
concrete for Belt joint connection of Box culvert from M25
to M26.
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2005
Date: 17-Sep-07
RFI No.: ECSI/L3/PC/3.2/53
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection Rebar & formwork of
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 3:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
Closure box culvert from M25 to M26.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2006
Date: 17-Sep-07
RFI No.: ECSI/L3/PC/3.2/54
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection Placing & Sampling
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
concrete of Closure Box culvert from M25 to M26.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2007
Date: 17-Sep-07
RFI No.: ECSI/L3/MC/3.2/110
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection Rebar & formwork for
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 3:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
Access of Manhole M24.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2008
Date: 17-Sep-07
RFI No.: ECSI/L3/MC/3.2/111
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection Placing & Sampling
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
concrete for Access of Manhole M24.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2009
Date: 17-Sep-07
RFI No.: ECSI/L3/MC/3.2/112
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection Rebar & formwork for
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 3:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
Access of Manhole M25.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2010
Date: 17-Sep-07
RFI No.: ECSI/L3/MC/3.2/113
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 3 (Tran Binh
Trong St)
Description of Activities: Inspection Placing & Sampling
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
concrete for Access of Manhole M25.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Ho Quang Trinh /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/1922
Date: 17-Sep-07
RFI No.: ECSI/L4/MC/3.2/269
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 4 (An Duong
Vuong St)
Description of Activities: Inspection inner formwork &
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 8:30 AM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
rebar for Wall & Top of Manhole M12.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Truong Hoang Phuc /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2011
Date: 17-Sep-07
RFI No.: ECSI/L4/MC/3.2/270
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 4 (An Duong
Vuong St)
Description of Activities: Inspection outer formwork for
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 3:30 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
Wall & Top of Manhole M12.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Truong Hoang Phuc /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2012
Date: 17-Sep-07
RFI No.: ECSI/L4/MC/3.2/271
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 4 (An Duong
Vuong St)
Description of Activities: Inspection Placing & Sampling
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
concrete for Wall & top of Manhole M12.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Truong Hoang Phuc /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2013
Date: 17-Sep-07
RFI No.: ECSI/L4/MC/3.2/272
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 4 (An Duong
Vuong St)
Description of Activities: Inspection Compaction test (FDT)
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 9:00 AM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
for sand bacfilling of Manhole M'35.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Truong Hoang Phuc /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2014
Date: 17-Sep-07
RFI No.: ECSI/L4/PC/3.2/198
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 4 (An Duong
Vuong St)
Description of Activities: Inspection Compaction test (FDT)
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 9:00 AM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
for sand bacfilling of trench from M'35 to M35.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Truong Hoang Phuc /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2015
Date: 17-Sep-07
RFI No.: ECSI/L4/PC/3.2/199
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 4 (An Duong
Vuong St)
Description of Activities: Inspection Compaction test (FDT)
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 3:00 PM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
for sand bacfilling of trench from M'35 to M35.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Truong Hoang Phuc /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5
EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT
MANAGEMENT SYSTEM AND QUALITY CONTROL
SHIMIZU CORPORATION
PLAN
REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:
EXISTING COMBINED SEWER IMPROVEMENT
WEIP/D/QC - 02/2016
Date: 17-Sep-07
RFI No.: ECSI/L5/PC/3.2/138
From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Name: KO SHIMOKAZE
Position: Resident Engineer
Location of Works: Line 5 (Huynh Man
Dat St)
Description of Activities: Inspection for compaction test
WILL BE READY FOR INSPECTION ON
18-Sep-07 at 10:00 AM
RELEVANT INSPECTION AND TEST PLANS
ATTACHED:
MS- 009- 01 ECSI AND SIS
(FDT) of sand backfilling of trenches from M52 - M53.
OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION
Nguyen Tan Hoa /
WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS
Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative
Checked by
PCI’ Inspector
Signed and Accepted
SC - Site Engineer
Signed:
Signed:
Signed:
Name:
Name:
Name:
Date:
Date:
Date:
Appendix No. 5