Tải bản đầy đủ (.doc) (41 trang)

RFI 1994 to 2026

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (308.06 KB, 41 trang )

EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location: CONVEYANCE SEWER CONSTRUCTION

Date: 15-Sep-

07
WEIP/D/QC - 02/1994 SHIMIZU CORPORATION REPRESENTATIVE
RFI No.: CSC/CM18-CM25/2.3/232
From:
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: CSC (CM18-CM25)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection for spun pile after
delivery to site.


WILL BE READY FOR INSPECTION ON

17-Sep-07 at 2:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer


Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN


REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

Date: 17-Sep-

CONVEYANCE SEWER CONSTRUCTION

07
WEIP/D/QC - 02/1983 SHIMIZU CORPORATION REPRESENTATIVE
RFI No.: CSC/CM18-CM25/2.2/010
From:
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: CSC (CM18-CM25)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection Elevation &
Dimensions for sand bedding of segment S15 & S16.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 8:30 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:


MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:


Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

Date: 17-Sep-


CONVEYANCE SEWER CONSTRUCTION

07
WEIP/D/QC - 02/1995 SHIMIZU CORPORATION REPRESENTATIVE
RFI No.: CSC/CM18-CM25/2.2/011
From:
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: CSC (CM18-CM25)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection Placing & Sampling for
Leveling concrete of segment S16.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION

SHIMIZU CORPORATION

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:


Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1996

Date: 17-Sep-07

RFI No.: ECSI/L3/MC/3.2/108


From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection 07 days compression
test concrete of closure box-culvert from M23 to M24,
sampling date 11/9/2007, class E.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 2:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION


WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:


Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1997

Date: 17-Sep-07

RFI No.: ECSI/L3/MC/3.2/109

From:
SHIMIZU CORPORATION REPRESENTATIVE

Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection 07 days compression
test concrete for wall of Manhole M24 (Hole driver water),
sampling date 11/9/2007, class E.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 2:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element

Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:


Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1998

Date: 17-Sep-07

RFI No.: ECSI/L5/MC/3.2/168

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer

TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection 07 days compression
test concrete of wall and top of Manhole M"51, sampling
date 11/9/2007, class E.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 2:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved

Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1999

Date: 17-Sep-07

RFI No.: ECSI/L6/MC/3.2/171

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An

Lab)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection 07 days compression
test concrete for Bottom slab of Manhole I"59, sampling
date 11/9/2007, class E.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 2:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS


Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2000

Date: 17-Sep-07

RFI No.: ECSI/L6/PC/3.2/173

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: At (Thanh Tan An
Lab)


Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection 07 days compression
test concrete for slipper from M56 to M57, sampling date
11/9/2007, class F.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 2:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed

Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY

HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2001

Date: 17-Sep-07

RFI No.: ECSI/L3/PC/3.2/49

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer


Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M23 - M24.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS


Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2002

Date: 17-Sep-07

RFI No.: ECSI/L3/PC/3.2/50

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer


Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 3:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M23 - M24.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS


Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2003

Date: 17-Sep-07

RFI No.: ECSI/L3/PC/3.2/51

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE


Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection formwork for Belt joint

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 4:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

connection of Box culvert from M25 to M26.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date

RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2004

Date: 17-Sep-07

RFI No.: ECSI/L3/PC/3.2/52

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE
Location of Works: Line 3 (Tran Binh

Trong St)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection placing & sampling
concrete for Belt joint connection of Box culvert from M25
to M26.

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved

Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2005

Date: 17-Sep-07

RFI No.: ECSI/L3/PC/3.2/53

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE


Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection Rebar & formwork of

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 3:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Closure box culvert from M25 to M26.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved

Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:


Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2006

Date: 17-Sep-07

RFI No.: ECSI/L3/PC/3.2/54

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer

TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection Placing & Sampling

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

concrete of Closure Box culvert from M25 to M26.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:

Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:


Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2007

Date: 17-Sep-07

RFI No.: ECSI/L3/MC/3.2/110

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN

Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection Rebar & formwork for

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 3:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Access of Manhole M24.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /


WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:


Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2008

Date: 17-Sep-07

RFI No.: ECSI/L3/MC/3.2/111

From:

SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection Placing & Sampling

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

concrete for Access of Manhole M24.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION


Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:


Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2009

Date: 17-Sep-07

RFI No.: ECSI/L3/MC/3.2/112


From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection Rebar & formwork for

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 3:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Access of Manhole M25.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION


Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:


Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2010

Date: 17-Sep-07


RFI No.: ECSI/L3/MC/3.2/113

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection Placing & Sampling

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

concrete for Access of Manhole M25.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI

REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:


Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1922

Date: 17-Sep-07


RFI No.: ECSI/L4/MC/3.2/269

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection inner formwork &

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 8:30 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

rebar for Wall & Top of Manhole M12.

OTHER DOCUMENTS

REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:


Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2011


Date: 17-Sep-07

RFI No.: ECSI/L4/MC/3.2/270

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection outer formwork for

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 3:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Wall & Top of Manhole M12.


OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:


Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT


WEIP/D/QC - 02/2012

Date: 17-Sep-07

RFI No.: ECSI/L4/MC/3.2/271

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Placing & Sampling

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS


concrete for Wall & top of Manhole M12.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:


Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT


WEIP/D/QC - 02/2013

Date: 17-Sep-07

RFI No.: ECSI/L4/MC/3.2/272

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 9:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS


for sand bacfilling of Manhole M'35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:


Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:


EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2014

Date: 17-Sep-07

RFI No.: ECSI/L4/PC/3.2/198

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 9:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:


MS- 009- 01 ECSI AND SIS

for sand bacfilling of trench from M'35 to M35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:


Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:


EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2015

Date: 17-Sep-07

RFI No.: ECSI/L4/PC/3.2/199

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 3:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:


MS- 009- 01 ECSI AND SIS

for sand bacfilling of trench from M'35 to M35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:


Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02

Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/2016

Date: 17-Sep-07

RFI No.: ECSI/L5/PC/3.2/138

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 5 (Huynh Man
Dat St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

18-Sep-07 at 10:00 AM

RELEVANT INSPECTION AND TEST PLANS

ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M52 - M53.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Nguyen Tan Hoa /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer


Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date: