HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 1 of___
Ho Chi Minh City Urban Railway Construction Project
PROJECT TITLE:
Ben Thanh - Suoi Tien Section (Line 1)
Construction Package 2 : Civil(Elevated & Depot)
Manufacturing QualityPlan
REVISION STATUS
REV. No.
DATE
DESCRIPTION
0
______ 2012
FIRST ISSUE
PREPARED BY
NAME
SIGNATURE
DATE
GS Neotek Vietnam
CHECKED BY
REMARKS
APPROVED BY
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
TABLEOF CONTENTS
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 2 of___
Pageno.
1
Aim...........................................................................................................................................2
2
Scopeof Works......................................................................................................................2
3
QualityControl........................................................................................................................2
3.1
Purpose/Scope..................................................................................................................2
3.2
Referencesand Standard...................................................................................................2
3.3
ProcessFlowChartfortheWorkPlanProcedure...........................................................3
4
Procedure...............................................................................................................................4
5
MaterialControl.....................................................................................................................4
6
Methodology..........................................................................................................................5
6.1
PPR PipesandFittingsInstallation..................................................................................5
6.2
uPVCPipesandFittingsInstallation...............................................................................16
6.3
HDPE PipesandFittingsInstallation...............................................................................23
6.4
UndergroundPipesInstallation.......................................................................................24
7
MachineryandTools............................................................................................................25
7.1
Machineryandtoolsforconstruction..............................................................................25
7.2
Machineryandtoolsfortesting........................................................................................25
8
TestMethodandTestPlan,TestRecordForms,InspectionForms.................................26
8.1
TestMethod........................................................................................................................26
8.2
InspectionandTestPlan...................................................................................................27
9
SafetyPlan............................................................................................................................27
10
Appendix................................................................................................................................28
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 3 of___
1. Aim
TheobjectiveistodescribetheinstallationofPlumbingWorksassociatedwithinstallationof
internalpipestoensurecompliancewithcontractrequirements, approvedshopdrawing, combine
andcoordinatedallservicesandstructuralpenetration shopdrawings, material,
specificationandqualitycontrol.
2. ScopeofWorks
ThisMethodStatement describestheworkexecutionfortheinstallation ofpipeforPlumbing
andSanitarysystempipingworks.
3. QualityControl
3.1. Purpose/Scope
ThisprocedureestablishestheinstructionsforthepreparationandcontrolofInspectionand
TestPlan(ITP)forfieldconstruction activitiesandnotificationtoOwner’sproject
managementfortheirselectedinspectionpointin atimelymanner.
3.2. ReferencesandStandard
Materials
uPVCpipeforSoil,Waste,VentandDrainSystem
PPRpipeforColdandHotWaterPipeSystem
HDPE pipe for external cold water pipe system only
GS Neotek Vietnam
Standard
SS213&SS272
DIN8077/8078
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 4 of___
3.3. ProcessFlowChartfortheWorkPlanProcedure
1. Materials
2. ShopDrawing
3.MethodStatement
Rejected
Engineer's/Consultant’sComments
Approved
Materialsprocurement &delivery to site.
Rejected
Inspection
Approved
Installationofpipeopening through
slab&walls
Rejected
Rejected
Inspection
Approved
Rejected
1. Hangers / Supports Installation
2. Pipeinstallationbasedonapproved
shopdrawings
Inspection
Approved
1. Hydraulic Test–Cold&HotWater Piping
2. Water Leak Test–Soil,Waste, Vent &Drainagepipe
Rejected
Inspection
Approved
Rejected
1. Pipeinsulation(whereapplicable)
2. Pipe penetrationseals
3. Firestopping(whereapplicable)
4. Pipesystemcleaning&flushing
Inspection
1. Installationofequipment
2. F
inalconnectiontoequipme
nt, valves
andaccessories
GS Neotek Vietnam
Approved
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 5 of___
4. Procedure
4.1. Forsiteinspection,Main-conEngineer shallpreparethe Request forInspectionandnotifytothe
Engineernotlessthanoneworkingdayinadvancefor requiredholdandwitnesspoint.
4.2. ITPshallbepreparedbyresponsibleMain-conEngineeraccordingtoconstruction detail
scheduleonthebasisoftheapplicable shopdrawings, methodstatementand/or specification.
4.3. Main-conEngineershallfollowuptheinspectionactivitiesinaccordancewiththe“ITP”.
4.4. Uponcompletionoftheworkoperation,theresponsibleMain-conEngineershallreviewitem
coveredbytheapplicableITPtoassurethattheworkhas been completedsatisfactorilyand
thattheITPandallsupplementary documentationisattachedandsubmittedtothe Engineer.
4.5. Main-conshallrequesttheEngineerforvisualcheckon site,towitnesshowthePPR,uPVC
andC.I.pipearecut,heatedandcooled,joinedtogether.
5. MaterialControl
5.1. PURPOSE
Thispurposeistoprovideinstruction forthecontrolandreceiptofmaterial,equipmentand
suppliespurchased,furnishedorcontrolledbyMain-confor HCM Metro CP-2 – Line 1Project.
5.2. SCOPE
Thisprocedureisapplicabletoreceiving,handling,storage, maintenanceandinspectionof
itemsreceivedbyMain-confortheconstructionof HCM Metro CP-2 – Line 1 Project.
5.3. RESPONSIBILITY
a) Main-conengineershallberesponsiblefortheimplementation ofreceivinginspectionand
notifyingOwner’sProjectEngineer(1 dayin advance)
materialdeliveryITPformsforthematerialsw/c Main-conpurchasedinthe localmarket;and
foroverseas,thearrivalofmaterialshallbeadvisedtoClient/Project Engineeronthe
shipmentdateandETAinHCM.Main-conEngineershallnotifytheClient/Project Engineer
uponarrival inHCMoneday inadvance forreceivinginspectiontosite. The
Client/ProjectEngineershalldesignatethelaydownareasforthebulkmaterials.
b) TheSubcontractorshallplaceitemsinthestorageareasto whichtheyareassigned.
c) TheSubcontractorshallrecordeachitemonthematerialstockinventoryreportand
shallbesubmittedto Main-conformonitoring.
5.4. GENERAL
a) MaterialControl&Receivingshallconsistprimarilyofcommercial receiptincluding
count,conditionand identification.
b) Receivingshallbe performedinconjunctionwithinspectionbyMain-conEngineer.
c) Receiving inspection shall be performed based on the requirement of the latest
approvedmaterialsandprocurementdocuments.
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 6 of___
5.5. RECEIVING
ReceivinginspectionshallbeperformedbytheMain-conengineerandClient/ProjectEngineer
formaterialandequipmentreceived
STORAGE
a) StorageArea
1. Access to storage areas shall be controlled and limited only to authorized personnel.
2. Cleanlinessandgoodhousekeepingpracticesshallbeenforcedatalltimesinthe
storageareas
3. Main-conengineershallperformtheperiodicinspectionforstorageareaeveryweek.
5.6. MARKING
The subcontractor shall ensure that material delivered to site areneatly arranged,packed and
labeledasperitem againstthepackinglistorreceiptfrom themanufacturer.
5.7. METHODS
a) Allitemsshallbestoredinsuchamannerastopermitreadyaccessforinspection and
maintenancewithoutexcessivehandlinginordertominimizerisk ordamage.
b) Itemsstackedforstorageshallbearrangedsothattheracks,cribbingorcratesare
bearingthefull weightwithoutdistortionof the item.
6. Methodology
6.1. PPRPipesandFittingsInstallation
a) AdhesiveBondingJointFor PP-RPipesandFittings
1) Cuttingofthepipe
- Markpipeaccordingtothenecessarylength.
- Cutthepipefollowingthemarking.Cutthepipeatrightanglesto thepipeaxis.
- Forbiggerpipesusecuttingmachineasshownbelow
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 7 of___
2) Heatingofpipeandfitting
- Pushtheendof thepipeupto theweldingdepthintotheweldingtool.
- Afterthestipulatedheatingtimes,quicklyremovepipe andfittingfromthewelding
tool(Seetable1)
- JointhemimmediatelyuntilthemarkedweldingdepthiscoveredbythePP-R beadfrom
thefitting.
- Beforestartingthefusion,checkifthealuminum-PP-compositelayerhasbeen
completelyremove.
- All used devices and tools must have reached the necessary operating
temperatureof 260deg.C.
- Suitablemeasuringinstrumenthavetomeasureatemperatureofupto350deg.
C
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
GS Neotek Vietnam
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 8 of___
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 9 of___
2) Weldinsaddles
- Weldinsaddlesareavailable forpipeouterdiameter of40,50,63,75,90,
110,125,160,200and250mm.Themaximum sensorwell diameter is
specifiedinthefollowingTable.2
- Weldinsaddlesareusedfor:
i. Branchconnectionsin existinginstallations.
ii. Thesubstitutionof atee.Branchconnectionsinrisers.
iii. Sensorwells,etc.
- Drillthroughthepipewallatthe intendedoutletpointbyusingthedrill.
- Inserttheheatingtoolontheconcave sideoftheweld-in saddletoolintothe
holedrilledin thepipe wall untilthetool iscompletelyin contactwith theouter wallof
thepipe.
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 10 of___
- Fusingtheweld-in saddlewiththepipetheoutersurface andthepipeinner
wallconnectionreacheshigheststability.
- Theweldingdevice/saddle weldingtoolmusthavereachedtherequired
operatingtemperatureof 260deg.C
- TheWeldingsurfaceshavetobecleananddry.
- Inserttheheating toolontheconcave sideoftheweld-in saddletoolintothe
holedrilledin thepipe wall untilthetool iscompletelyin contactwith theouter
wallofthepipe.Nexttheweld-in saddletoolisinserted intotheheating
sleeveuntilthesaddle surface isupagainst theconvexsideofthewelding
tool.Theheatingtimeof theelementsis generally30 sec.
- Inserttheweld-insaddlein to theheateddrilledhole.Pressedandwaitfor15
sec.Waitfor10minutestocoolbeforeexposedtofullloading.
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
GS Neotek Vietnam
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 11 of___
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 12 of___
4) ButtWelding
Pipesandfittingsarefused,asexplainedbelowbybuttwelding(pipedimension
160,200,and250mm)
- Cutpipeintorequiredlength.
- Plasticpipesarealignedandfixedbymeansof theclampingelements.
- Pushthepipesontotheheatingplacewithadefinedadjustingpressure.
- Whenheatingtimehasexpired,dividethemachineslide,removeheatingelement
quicklyandjointthepipes(byputtingbothpartsof theslidetogether).
- Weldedconnectioncanbe unclampedandweldingprocessis finished.
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 13 of___
5) Repair
- Damagedpipesmayberepairedbymeansof fusion.
- Inadditionto thistheoffersthepossibilityof thepiperepairstick.
- Theinstallation:samestepfor weld-insaddle.
GS Neotek Vietnam
HCMC Metro Cp-2 Project
TITLE :
c) Exposedpipes
PipeHangershall
have neoprene
pad.
GS Neotek Vietnam
Me thod Sta tem e nt fo r
Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 14 of___
HCMC Metro Cp-2 Project
TITLE :
11
Me thod Sta tem e nt fo r
Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 15 of___
PPR– PipeSupportDetailsand Schedule
2) ConcealedPP-Rpipes
- Mark locationof pipesandoutleton wallsaccordingto approvedshopdrawings.
- Afterlayouthasbeenestablished,markthepiperouteonthebrickwallwithtwo
markedlinesaccordingtoinstalledpipesize(followTable3).
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 16 of___
Note:Seeshop drawing
detailsfor variouspipe outlet
heightsasper san.fixtures
supplierrecommendation.
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 17 of___
6.2. uPVCPipesandFittingsInstallation
a) Cuttingof pipe
- Allcuttingmustbedoneinwarehouseorindesignatedareasateachfloor.All
cuttingmustnotbe doneat workarea.
- Cuttinganglemustberightangle.
- Insideedgesmustbereamedsmoothbyreamerorsandpaper.
b) AdhesiveBondingW ork(foruPVCPipe)
Zeropoint
Stopper
Swelllayer by Adhesive
(0.1-0.2mm)
Marking
PVCsocket
L
L
PVCPipe
PVCsocket
PVCPipe
DeformationsRegion
Marking
Fluidityregion
BoundaryofJoint
ActualPVCSocketLength
12
BoundaryofJoint
Figure1:DetailsofAdhesiveBondingJoint
- Ensurepipesarecorrectdiameter,approvalmaterialpriortostartworks.Plainends shall
be inspected with special attention, as these ends
arethemostsusceptibletodamage.
- Pipesshallnotberolledorskiddedagainstotherpipematerials.Make
surethatthepipesarefreefrom debrisandotherforeignmaterials.
- Markthemeasuredlengthonthepipe bypermanentmarkerpen.
CutthepipeusingapowersaworaPVCcutter.Besureto cutthepipe squarely.
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 18 of___
- Chamferthe
cornersandremoveallburrsbyreamer,fileorsandpaper,cleanawaydust,dirtandoils
withacleanrugbeforeapplyingadhesive.
- Beforejointing,insertthepipeintothejointsocketandconfirmthatthelengthfrom
zeropointtotheendof pipeis 1/3to 2/3of actualsocketlength.
- Attachmarkingon thepipesurfacebypermanentmarkerpen.
Markingpositionshallbeactualsocketlengthfrom theendof pipe.
- Applyadhesiveuniformlyandthinlywiththebrushforoutsideofpipeandinsideof
socketandinsert.Don'ttwistafter
i
nserting,butinsertstrongly,andpressitdownasitis.Standardcontroltimesis30secondsfordi
ametersof50mmorless, take60secondsfordiameterofmorethan50
GS Neotek Vietnam
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
GS Neotek Vietnam
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 19 of___
HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s
Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 20 of___
- I
mmediatelyinsertpipeintofittingsocket,givingthepipeaonequarterturnandmakingsureitgo
esallthewaytothesocketbottom.
-Holdthejointtogetheruntilatightsetis attained
- Standardcontroltimesis30secondsfordiametersof50mmorless,take
60secondsfordiameterofmorethan50mm.
GS Neotek Vietnam