BIỆN PHÁP THI CÔNG ỐNG CẤP THOÁT NƯỚC

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (1.44 MB, 30 trang )

HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 1 of___

Ho Chi Minh City Urban Railway Construction Project
PROJECT TITLE:

Ben Thanh - Suoi Tien Section (Line 1)
Construction Package 2 : Civil(Elevated & Depot)

Manufacturing QualityPlan

REVISION STATUS
REV. No.

DATE

DESCRIPTION

0

______ 2012

FIRST ISSUE



PREPARED BY
NAME
SIGNATURE
DATE

GS Neotek Vietnam

CHECKED BY

REMARKS

APPROVED BY


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

TABLEOF CONTENTS

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 2 of___

Pageno.


1

Aim...........................................................................................................................................2

2

Scopeof Works......................................................................................................................2

3

QualityControl........................................................................................................................2

3.1

Purpose/Scope..................................................................................................................2

3.2

Referencesand Standard...................................................................................................2

3.3

ProcessFlowChartfortheWorkPlanProcedure...........................................................3

4

Procedure...............................................................................................................................4

5


MaterialControl.....................................................................................................................4

6

Methodology..........................................................................................................................5

6.1

PPR PipesandFittingsInstallation..................................................................................5

6.2

uPVCPipesandFittingsInstallation...............................................................................16

6.3

HDPE PipesandFittingsInstallation...............................................................................23

6.4

UndergroundPipesInstallation.......................................................................................24

7

MachineryandTools............................................................................................................25

7.1

Machineryandtoolsforconstruction..............................................................................25


7.2

Machineryandtoolsfortesting........................................................................................25

8

TestMethodandTestPlan,TestRecordForms,InspectionForms.................................26

8.1

TestMethod........................................................................................................................26

8.2

InspectionandTestPlan...................................................................................................27

9

SafetyPlan............................................................................................................................27

10

Appendix................................................................................................................................28

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y

Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 3 of___

1. Aim
TheobjectiveistodescribetheinstallationofPlumbingWorksassociatedwithinstallationof
internalpipestoensurecompliancewithcontractrequirements, approvedshopdrawing, combine
andcoordinatedallservicesandstructuralpenetration shopdrawings, material,
specificationandqualitycontrol.
2. ScopeofWorks
ThisMethodStatement describestheworkexecutionfortheinstallation ofpipeforPlumbing
andSanitarysystempipingworks.
3. QualityControl
3.1. Purpose/Scope
ThisprocedureestablishestheinstructionsforthepreparationandcontrolofInspectionand
TestPlan(ITP)forfieldconstruction activitiesandnotificationtoOwner’sproject
managementfortheirselectedinspectionpointin atimelymanner.
3.2. ReferencesandStandard
Materials
uPVCpipeforSoil,Waste,VentandDrainSystem
PPRpipeforColdandHotWaterPipeSystem
HDPE pipe for external cold water pipe system only

GS Neotek Vietnam

Standard

SS213&SS272
DIN8077/8078


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 4 of___

3.3. ProcessFlowChartfortheWorkPlanProcedure
1. Materials
2. ShopDrawing
3.MethodStatement

Rejected

Engineer's/Consultant’sComments
Approved

Materialsprocurement &delivery to site.
Rejected

Inspection
Approved


Installationofpipeopening through
slab&walls
Rejected

Rejected

Inspection
Approved

Rejected

1. Hangers / Supports Installation
2. Pipeinstallationbasedonapproved
shopdrawings
Inspection
Approved

1. Hydraulic Test–Cold&HotWater Piping
2. Water Leak Test–Soil,Waste, Vent &Drainagepipe
Rejected

Inspection
Approved

Rejected

1. Pipeinsulation(whereapplicable)
2. Pipe penetrationseals
3. Firestopping(whereapplicable)

4. Pipesystemcleaning&flushing
Inspection
1. Installationofequipment
2. F
inalconnectiontoequipme
nt, valves
andaccessories

GS Neotek Vietnam

Approved


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 5 of___

4. Procedure
4.1. Forsiteinspection,Main-conEngineer shallpreparethe Request forInspectionandnotifytothe
Engineernotlessthanoneworkingdayinadvancefor requiredholdandwitnesspoint.
4.2. ITPshallbepreparedbyresponsibleMain-conEngineeraccordingtoconstruction detail
scheduleonthebasisoftheapplicable shopdrawings, methodstatementand/or specification.
4.3. Main-conEngineershallfollowuptheinspectionactivitiesinaccordancewiththe“ITP”.

4.4. Uponcompletionoftheworkoperation,theresponsibleMain-conEngineershallreviewitem
coveredbytheapplicableITPtoassurethattheworkhas been completedsatisfactorilyand
thattheITPandallsupplementary documentationisattachedandsubmittedtothe Engineer.
4.5. Main-conshallrequesttheEngineerforvisualcheckon site,towitnesshowthePPR,uPVC
andC.I.pipearecut,heatedandcooled,joinedtogether.
5. MaterialControl
5.1. PURPOSE
Thispurposeistoprovideinstruction forthecontrolandreceiptofmaterial,equipmentand
suppliespurchased,furnishedorcontrolledbyMain-confor HCM Metro CP-2 – Line 1Project.
5.2. SCOPE
Thisprocedureisapplicabletoreceiving,handling,storage, maintenanceandinspectionof
itemsreceivedbyMain-confortheconstructionof HCM Metro CP-2 – Line 1 Project.
5.3. RESPONSIBILITY
a) Main-conengineershallberesponsiblefortheimplementation ofreceivinginspectionand
notifyingOwner’sProjectEngineer(1 dayin advance)
materialdeliveryITPformsforthematerialsw/c Main-conpurchasedinthe localmarket;and
foroverseas,thearrivalofmaterialshallbeadvisedtoClient/Project Engineeronthe
shipmentdateandETAinHCM.Main-conEngineershallnotifytheClient/Project Engineer
uponarrival inHCMoneday inadvance forreceivinginspectiontosite. The
Client/ProjectEngineershalldesignatethelaydownareasforthebulkmaterials.
b) TheSubcontractorshallplaceitemsinthestorageareasto whichtheyareassigned.
c) TheSubcontractorshallrecordeachitemonthematerialstockinventoryreportand
shallbesubmittedto Main-conformonitoring.
5.4. GENERAL
a) MaterialControl&Receivingshallconsistprimarilyofcommercial receiptincluding
count,conditionand identification.
b) Receivingshallbe performedinconjunctionwithinspectionbyMain-conEngineer.
c) Receiving inspection shall be performed based on the requirement of the latest
approvedmaterialsandprocurementdocuments.


GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 6 of___

5.5. RECEIVING
ReceivinginspectionshallbeperformedbytheMain-conengineerandClient/ProjectEngineer
formaterialandequipmentreceived
STORAGE
a) StorageArea
1. Access to storage areas shall be controlled and limited only to authorized personnel.
2. Cleanlinessandgoodhousekeepingpracticesshallbeenforcedatalltimesinthe
storageareas
3. Main-conengineershallperformtheperiodicinspectionforstorageareaeveryweek.
5.6. MARKING
The subcontractor shall ensure that material delivered to site areneatly arranged,packed and
labeledasperitem againstthepackinglistorreceiptfrom themanufacturer.
5.7. METHODS
a) Allitemsshallbestoredinsuchamannerastopermitreadyaccessforinspection and
maintenancewithoutexcessivehandlinginordertominimizerisk ordamage.
b) Itemsstackedforstorageshallbearrangedsothattheracks,cribbingorcratesare

bearingthefull weightwithoutdistortionof the item.
6. Methodology
6.1. PPRPipesandFittingsInstallation
a) AdhesiveBondingJointFor PP-RPipesandFittings
1) Cuttingofthepipe
- Markpipeaccordingtothenecessarylength.
- Cutthepipefollowingthemarking.Cutthepipeatrightanglesto thepipeaxis.
- Forbiggerpipesusecuttingmachineasshownbelow

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 7 of___

2) Heatingofpipeandfitting
- Pushtheendof thepipeupto theweldingdepthintotheweldingtool.
- Afterthestipulatedheatingtimes,quicklyremovepipe andfittingfromthewelding
tool(Seetable1)
- JointhemimmediatelyuntilthemarkedweldingdepthiscoveredbythePP-R beadfrom
thefitting.
- Beforestartingthefusion,checkifthealuminum-PP-compositelayerhasbeen

completelyremove.
- All used devices and tools must have reached the necessary operating
temperatureof 260deg.C.
- Suitablemeasuringinstrumenthavetomeasureatemperatureofupto350deg.
C

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

GS Neotek Vietnam

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 8 of___


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015

Rev.No : 0
Page
: 9 of___

2) Weldinsaddles
- Weldinsaddlesareavailable forpipeouterdiameter of40,50,63,75,90,
110,125,160,200and250mm.Themaximum sensorwell diameter is
specifiedinthefollowingTable.2
- Weldinsaddlesareusedfor:
i. Branchconnectionsin existinginstallations.
ii. Thesubstitutionof atee.Branchconnectionsinrisers.
iii. Sensorwells,etc.

- Drillthroughthepipewallatthe intendedoutletpointbyusingthedrill.
- Inserttheheatingtoolontheconcave sideoftheweld-in saddletoolintothe
holedrilledin thepipe wall untilthetool iscompletelyin contactwith theouter wallof
thepipe.
GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 10 of___


- Fusingtheweld-in saddlewiththepipetheoutersurface andthepipeinner
wallconnectionreacheshigheststability.
- Theweldingdevice/saddle weldingtoolmusthavereachedtherequired
operatingtemperatureof 260deg.C
- TheWeldingsurfaceshavetobecleananddry.
- Inserttheheating toolontheconcave sideoftheweld-in saddletoolintothe
holedrilledin thepipe wall untilthetool iscompletelyin contactwith theouter
wallofthepipe.Nexttheweld-in saddletoolisinserted intotheheating
sleeveuntilthesaddle surface isupagainst theconvexsideofthewelding
tool.Theheatingtimeof theelementsis generally30 sec.
- Inserttheweld-insaddlein to theheateddrilledhole.Pressedandwaitfor15
sec.Waitfor10minutestocoolbeforeexposedtofullloading.

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

GS Neotek Vietnam

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 11 of___



HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 12 of___

4) ButtWelding
Pipesandfittingsarefused,asexplainedbelowbybuttwelding(pipedimension
160,200,and250mm)
- Cutpipeintorequiredlength.
- Plasticpipesarealignedandfixedbymeansof theclampingelements.
- Pushthepipesontotheheatingplacewithadefinedadjustingpressure.
- Whenheatingtimehasexpired,dividethemachineslide,removeheatingelement
quicklyandjointthepipes(byputtingbothpartsof theslidetogether).
- Weldedconnectioncanbe unclampedandweldingprocessis finished.

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s


Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 13 of___

5) Repair
- Damagedpipesmayberepairedbymeansof fusion.
- Inadditionto thistheoffersthepossibilityof thepiperepairstick.
- Theinstallation:samestepfor weld-insaddle.

GS Neotek Vietnam


HCMC Metro Cp-2 Project
TITLE :

c) Exposedpipes

PipeHangershall
have neoprene
pad.

GS Neotek Vietnam

Me thod Sta tem e nt fo r
Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______

Rev. Date: _____2015
Rev.No : 0
Page
: 14 of___


HCMC Metro Cp-2 Project
TITLE :

11

Me thod Sta tem e nt fo r
Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 15 of___

PPR– PipeSupportDetailsand Schedule

2) ConcealedPP-Rpipes
- Mark locationof pipesandoutleton wallsaccordingto approvedshopdrawings.
- Afterlayouthasbeenestablished,markthepiperouteonthebrickwallwithtwo
markedlinesaccordingtoinstalledpipesize(followTable3).

GS Neotek Vietnam



HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 16 of___

Note:Seeshop drawing
detailsfor variouspipe outlet
heightsasper san.fixtures
supplierrecommendation.

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 17 of___


6.2. uPVCPipesandFittingsInstallation
a) Cuttingof pipe
- Allcuttingmustbedoneinwarehouseorindesignatedareasateachfloor.All
cuttingmustnotbe doneat workarea.
- Cuttinganglemustberightangle.
- Insideedgesmustbereamedsmoothbyreamerorsandpaper.
b) AdhesiveBondingW ork(foruPVCPipe)
Zeropoint
Stopper

Swelllayer by Adhesive
(0.1-0.2mm)

Marking

PVCsocket





PVCPipe

PVCsocket

PVCPipe

DeformationsRegion


Marking

Fluidityregion

BoundaryofJoint
ActualPVCSocketLength

12

BoundaryofJoint

Figure1:DetailsofAdhesiveBondingJoint

- Ensurepipesarecorrectdiameter,approvalmaterialpriortostartworks.Plainends shall
be inspected with special attention, as these ends
arethemostsusceptibletodamage.

- Pipesshallnotberolledorskiddedagainstotherpipematerials.Make
surethatthepipesarefreefrom debrisandotherforeignmaterials.
- Markthemeasuredlengthonthepipe bypermanentmarkerpen.
CutthepipeusingapowersaworaPVCcutter.Besureto cutthepipe squarely.

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s


Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 18 of___

- Chamferthe
cornersandremoveallburrsbyreamer,fileorsandpaper,cleanawaydust,dirtandoils
withacleanrugbeforeapplyingadhesive.

- Beforejointing,insertthepipeintothejointsocketandconfirmthatthelengthfrom
zeropointtotheendof pipeis 1/3to 2/3of actualsocketlength.

- Attachmarkingon thepipesurfacebypermanentmarkerpen.
Markingpositionshallbeactualsocketlengthfrom theendof pipe.
- Applyadhesiveuniformlyandthinlywiththebrushforoutsideofpipeandinsideof
socketandinsert.Don'ttwistafter
i
nserting,butinsertstrongly,andpressitdownasitis.Standardcontroltimesis30secondsfordi
ametersof50mmorless, take60secondsfordiameterofmorethan50

GS Neotek Vietnam


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

GS Neotek Vietnam


Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 19 of___


HCMC Metro Cp-2 Project
Me thod Sta tem e nt fo r
TITLE : Plum bi ng & Sa nita r y
Pipi ng wor k s

Doc.No.:______
Rev. Date: _____2015
Rev.No : 0
Page
: 20 of___

- I
mmediatelyinsertpipeintofittingsocket,givingthepipeaonequarterturnandmakingsureitgo
esallthewaytothesocketbottom.

-Holdthejointtogetheruntilatightsetis attained

- Standardcontroltimesis30secondsfordiametersof50mmorless,take
60secondsfordiameterofmorethan50mm.