Tải bản đầy đủ (.pdf) (6 trang)

Mô hình Mont Saint Michel, France. P1

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (871.92 KB, 6 trang )

Sydney Opera House (Australia): Assembly Instructions

Canon ® is a registered trademark of Canon Inc. © Canon Inc.
© A & A Co., Ltd.

Before starting assembly:Writing the number of each section on its back side before
cutting out the sections is highly recommended.
(* This way, you can be sure which section is which even after cutting out the sections.)

Indicates where sections
should be glued together.

/>(1) Build the base.

2
1

View of completed model
*This model was designed for Papercraft and may differ from the original in some respects.

Assembly Instructions: Six A4 sheets (No.1 to No.6)
*Build the model by carefully reading the Assembly Instructions, in the parts sheet page order.

4
6

*Hint: Trace along the folds with a ruler
and an exhausted pen (no ink) to get a sharper, easier fold.

8


Assembly Instructions
Mountain fold(dotted line)

Make a mountain fold.
Valley fold(dashed and dotted line)

Make a valley fold.
Scissors line(solid line)

Cut along the line.
Cut in line(solid line)

Cut along the line.

Tools and materials
Assembly tip
Caution

Glue
The glue spot(colored dot)
shows where to apply the glue.

5

Glue spot(Red dot)

Glue parts with the same number together.

ouse
era H

ey Op ustralia
Sydn Sydney, A

Glue spot(Green dot)

Glue within the same part.

Insert.

7

Glue spot(Blue dot)

Glue to the rear of the other part.

Scissors, set square, glue(We recommend stick glue), pencil, used
ballpoint pen, toothpicks, tweezers, (useful for handling small parts)
Before gluing, crease the paper along mountain fold and valley
fold lines and make sure rounded sections are nice and stiff.
Glue, scissors and other tools may be dangerous to young children
so be sure to keep them out of the reach of young children.

1

3


Sydney Opera House (Australia): Assembly Instructions

Canon ® is a registered trademark of Canon Inc. © Canon Inc.

© A & A Co., Ltd.

(2) Build the fan-shaped foundation.

9
13

10

15

12
14
11

2


Sydney Opera House (Australia): Assembly Instructions
(3) Build the lower level of the structure.

Insert
between
the folded
sides.

25

Canon ® is a registered trademark of Canon Inc. © Canon Inc.
© A & A Co., Ltd.


21

Insert
between
the folded
sides.

Fold each of parts 21, 22, 24, and 25
before gluing them to part 17.

24

* Since folding these parts after gluing them
to part 17 may cause the paper on the exterior
to stick out or tear, be sure to glue these parts in
place after folding them.
Match the borders
of the coloring when
gluing these pieces together.

19
18
17
Insert
between
the folded
sides.

Match the borders

of the coloring when
gluing these pieces together.

20
22
When assembling this section, first attach parts 21, 22, 24,
and 25 to part 17, then connect the parts together by adjusting
the location of the connection between each part.

Insert between
the folded sides.

3

16


Sydney Opera House (Australia): Assembly Instructions

Canon ® is a registered trademark of Canon Inc. © Canon Inc.
© A & A Co., Ltd.

41
Glue in the same way
as on the opposite side.

34

31


30

Glue along the dotted line.

23
33
26

27
Bend this piece slightly
before gluing it.

28

41

Large hall
Glue in the same
way as part 29.

(4) Build the large and small halls and the restaurant.

32

Assemble parts 33, 35, 38, 45, 52, 55,
and 56 in the same general way.

35

40

Glue in the same
way as on the opposite
side.

39

Bend this piece slightly
before gluing it.

38
Glue together.

29

36 37

Bend this piece slightly
before gluing it.

37
40

36
Assemble parts 30, 32, 34, 39, 44,
50, 53, 54, 57, and 59 in the same general way.

Glue one side to part 38
and one side to part 32.

Glue parts 28, 29, 40, and 41 in place last,

adjusting the assembled parts while doing so.

4


Sydney Opera House (Australia): Assembly Instructions
49

47

Small hall

50

Canon ® is a registered trademark of Canon Inc. © Canon Inc.
© A & A Co., Ltd.

Glue in the same way
as on the opposite side.

Glue in the same
way as part 46.

53

59
60

54
Glue in the same way

as on the opposite side.

55

48

57

Glue in the same way
as on the opposite side.

56
52

45

44

61

Restaurant

51

Bend this piece slightly
before gluing it.
Bend this piece slightly
before gluing it.

49


46

Glue in the same way
as on the opposite side.

58

Bend this piece slightly
before gluing it.

Bend this piece slightly
before gluing it.

43

61

48

42

Glue parts 46, 47, 48, 49, and 61 in place last,
after assembling all these parts together,
adjusting the assembled parts while doing so.

Glue one side to the rear side
of part 44 and one side
to part 50.


(5) Glue the large and small halls and the restaurant
to (3) the lower section of the structure (3).

Small hall

Large hall
Restaurant

(3) Lower section of structure

5


Sydney Opera House (Australia): Assembly Instructions

Canon ® is a registered trademark of Canon Inc. © Canon Inc.
© A & A Co., Ltd.

(6) Complete the model by gluing the base assembled in step (1) to the foundation assembled
in step (2) and the structure assembled in step (5).

(5) Structure

(2) Foundation

(1) Base

Finished!

6




×