Tải bản đầy đủ (.pdf) (49 trang)

những vấn đề cơ bản về xây dựng tầng ngầm (Basement Construction)

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (86.76 MB, 49 trang )

Basement Construction


Part Ï —

General understanding about
the Construction of Basement


Construction of Deep Basement and
Large-sized Underground Structures
Examples of underground structures


Construction of Deep Basement and
Large-sized Underground Structures
Involvement/provision when constructing these
Structures




Excavation arrangement

- _

Ỷ£N

Md Fe

ES


or ba

\

a

Excavation in benched
arrangement for open site

ee

Excavation in section
as in congested site
) Dee

_á„-,.Z

`...

is

a “Wie real

4

.

7

sỹ 1 ee

aw

`

s4

?


ws =

hb

EE —



Methods for basement construction

Basement or similar underground structures
can be constructed using the following
approaches:


- suitable for site with abandon of unobstructed working space
| west
-_—"

E. Z
„.


_

es
4



ĐỘ

;


- suitable for basement of small to medium size


\
5

\

Typical arrangement
shown in section

j

$

z


:

Nie fe | |

fs

Mg

5k

Construction of basement using Bottom-up
approach


suitable for basement of very large size with complex environment


Construction of basement using Top-down approach
LEE

GARDENS

REDEVELOPMLN!
SEQUENCE

OF

TO?

TECHNIC


DOWN

- STAGE



2

Erection of Sice!
Szucture for
Tơ œe? Coru>vwetios

Cemolines

of

Exstirg R^/F

\
\

\
i

1

.

Corsirectios of

Core Wall with
-

Slip Form

VỤ 111 f1#24444/@/ X14% 114 A44

Excavz!:^^ ͜
Coenvguct:+o* of
B^/£
TY

Ceeszvctl
82

Typical

arrangemen
LF Ss

shown in section

FP


Compare the features of various
basement construction methods
Open-cut

Bottom-up


Top-down

Size of site

Very large open site |Small sized site

Large sized site

Site environment

|Unobstructed

Adaptable to most

[Adaptable to most

environment

complex environment

|Complex lateral

Limited shoring

Support required —

|support where req’d.

Not much


Temporary vertical

Protection
Special provision

Simplest protection
|Not much

support required
Machine suitable

{Large machine

Small machine

Large machine

Spoil removal

Using ramp

Staged platform or

|Ramp, vertical shaft

bucket

or bucket



Other consideration



Attributes that affect the construction of deep
basement:


“TIẾP
œ
2
‹Ð)

©.



=

lao!
ae

aa

projects — wor i HỆ
Inc

lose prox! imity




×