Tải bản đầy đủ (.pptx) (70 trang)

(Rev 02) al form installation and dismantle (english)

Bạn đang xem bản rút gọn của tài liệu. Xem và tải ngay bản đầy đủ của tài liệu tại đây (22.13 MB, 70 trang )

ASSEMBLY & DISMANTLING
Kumkang Kind’s
AL-formworks system
11/3/19

1


Part 1: Basic elements of
Kumkang’s AL-form system

11/3/19

page 2


AL-formworks’ elements
1. Pin & Wedge
2. Wall Panel
3. Slab - Corner
4. Beam - Prop head
5. Slab panel
6. Al-form Staircase system
7. Steel Box Gang Form system for Elevator
11/3/19

page 3


1. Pin & Wedge


Wedge

 To be used for to secure

and tighten the panels
together
Pin - Φ16

11/3/19

Page 4


Pin & Wedge

Pin & Wedge
11/3/19

Page 5


AL-formworks’ elements
1. Pin & Wedge
2. Wall Panel
3. Slab - Corner
4. Beam - Prop head
5. Slab panel
6. Al-form Staircase system
7. Steel Box Gang Form system for Elevator
11/3/19


page 6


2. Wall panels
 Including of standard and non-standard

size panels
 There are internal and external wall
panels

11/3/19

Page 7


Installing wall-panels

el
n
a
p
l
l
Wa

11/3/19

Page 8



Rocker:

r
e
k
c
o
R

11/3/19

Page 9


Inner wall

nel
a
p
l
l
a
rw
e
n
r
o
c
l)

Ine
e
t
s
y
l
(usual

11/3/19

Page 10


Assembled wall panels

11/3/19

Page 11


AL-formworks’ elements
1. Pin & Wedge
2. Wall Panel
3. Slab - Corner
4. Beam - Prop head
5. Slab panel
6. Al-form Staircase system
7. Steel Box Gang Form system for Elevator
11/3/19


page
12


3. Slab corner - SC
 Slab corner: for slab – wall connection

 Slab In-corner: for slab –wall connection

 Slab Out-corner: for slab –wall

connection

11/3/19

Page 13


Assembling Slab corner – SC

11/3/19

Page 14


Assembling Slab corner – SC
Slab in-corner
Slab corner
Slab out-corner


11/3/19

Page 15


AL-formworks’ elements
1. Pin & Wedge
2. Wall Panel
3. Slab - Corner
4. Beam - Prop head
5. Slab panel
6. Al-form Staircase system
7. Steel Box Gang Form system for Elevator
11/3/19

page
16


4. Beam - Prop head
a. prop head

 Connection between supports and

beam
 The supports and prop head are
connected together for supporting beam
and slab.

11/3/19


Page 17


4. Beam - Prop head
b. Beam

 Middle beam: to be fixed in the middle

of 2 prop heads

 End beam: to be fixed to the wall section

panels and prop head

11/3/19

Page 18


4. Beam - Prop head
c. Joint bar

 To connect beam and prop-head.

11/3/19

Page 19



Assembling prop - head

11/3/19

Page 20


Beam – prop head system (before assembly of slab panels)

Beam & prop head

11/3/19

Page 21


Beam– prop head (after assembly of slab panels)

End beam

11/3/19

Prop head

middle beam

Page 22


AL-formworks’ elements

1. Pin & Wedge
2. Wall Panel
3. Slab - Corner
4. Beam - Prop head
5. Slab panel
6. Al-form Staircase system
7. Steel Box Gang Form system for Elevator
11/3/19

page
23


5. Slab panel

 There are standard and non-standard

size slab panel enable the system
connected as a whole.

11/3/19

Page 24


Fixing slab panels come last of assembly process

11/3/19

Page 25



×