Gianluca
Scarcella
21-07-2020
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Rev. 0
EPC Project No. :036909C
Page
2 of 60
SUBCON. Doc No.: PTSC-TPSKD31-010029
DOCUMENT INFORMATION/THÔNG TIN TÀI LIỆU
The following required information is minimum requirement which need to be updated
each time the document is changed.
Các thông tin đã được yêu cầu tối thiểu như bên dưới phải được cập nhật mỗi khi thay
tài liệu được thay đổi.
Created by
: Ngo Xuan Thao
Review Frequency
: As required
File Name
: PTSC-TPSK-D31-010029_Method statement for
steel structure erection
List of Qualified Approvers
: Refer to Cover Page
Locations of Controlled Copies: LSP EDMS
•
•
Master
Document
☐ CV
☐ CO
☐ CM
☐ EE
☐ EM
☐ ES
☐ FT
☐ FF
☐ IE
☐ IF
☐ LE
☐ ME
☐ PE
☐ PL
☐ PC
☐ PM
☐ QM
☐ SE
☐ ……
Copied
Document
☐ CV
☐ CO
☐ CM
☐ EE
☐ EM
☐ ES
☐ FT
☐ FF
☐ IE
☐ IF
☐ LE
☐ ME
☐ PE
☐ PL
☐ PC
☐ PM
☐ QM
☐ SE
☐ ……
(Efile)
: ☐ Internal (MOC No.)
Management of Change
☐ External (Project Correspondence No.)
☒ New issue
Related Documents
:
Document Number
Document Title
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
Doc.No.: OL1-2D31-010029
Rev. 0
Rev.
Date
(dd/mm/yyyy)
A
A
A
0
6/Apr/2020
4/May/2020
26/May/2020
11/July/2020
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Item
Page
Article
Page
3 of 60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
REVISION LOG/THEO DÕI CHỈNH SỬA
Revised Detail
Description
Issue for Review
Issue for Review
Revise and Re-Issue for Review
Issue for Construction
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
EPC Project No. :036909C
Page
4 of 60
SUBCON. Doc No.: PTSC-TPSKD31-010029
TPSK INTERNAL DISTRIBUTION FOR APPROVAL (IF APPLICABLE)
DISCIPLINE SUPERVISOR / SPT.
APPROVED
APPROVED WITH COMMENTS
REJECTED
Gianluca Scarcella 21-07-2020
SIGNATURE/ date
FIELD ENGINEERING
APPROVED
APPROVED WITH COMMENTS
REJECTED
SIGNATURE/ date
HSSE MANAGER
APPROVED
APPROVED WITH COMMENTS
REJECTED
SIGNATURE/ date
QC MANAGER
APPROVED
APPROVED WITH COMMENTS
REJECTED
Saiful
CONSTRUCTION MANAGER
SIGNATURE/ date
APPROVED
APPROVED WITH COMMENTS
REJECTED
SIGNATURE/ date
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
EPC Project No. :036909C
Page
5 of 60
SUBCON. Doc No.: PTSC-TPSKD31-010029
TABLE OF CONTENTS/BẢNG NỘI DUNG
1.
PURPOSE/MỤC ĐÍCH .................................................................................................................................. 6
2.
SCOPE AND INTRODUCTION/PHẠM VI CÔNG VIỆC VÀ GIỚI THIỆU CHUNG ................................... 6
3.
REFERENCE DOCUMENTS/TÀI LIỆU THAM CHIẾU ............................................................................. 7
4.
DEFINITIONS & ABBREVIATIONS/ĐỊNH NGHĨA & VIẾT TẮT ............................................................. 8
5.
WORKING SCHEDULE/TIẾN ĐỘ THI CÔNG ........................................................................................... 8
6. EQUIPMENT AND TOOLS MOBILIZATION/KẾ HOẠCH HUY ĐỘNG MÁY MÓC THIẾT BỊ VÀ CÔNG
CỤ DỤNG CỤ ....................................................................................................................................................... 9
7. ORGANIZATION CHART AND MANPOWER MOBILIZATION/SƠ ĐỒ TỔ CHỨC VÀ KẾ HOẠCH
HUY ĐỘNG NHÂN SỰ ....................................................................................................................................... 10
7.1 Organization chart/Sơ đồ tổ chức .............................................................................. 10
LSP/TPSK/PTSC organization chart/Sơ đồ phối hợp giữa LSP/TPSK/PTSC .................. 10
PTSC Overall organization chart/Sơ đồ tổ chức tổng thể của PTSC ................................. 11
7.2 Manpower mobilization plan/Kế hoạch huy động nhân sự ..................................... 12
8.
8.1
8.2
9.
9.1
9.2
9.3
9.4
9.5
9.6
WORK METHOD/BIỆN PHÁP TRIỂN KHAI ............................................................................................ 12
Erection Sequence/Trình tự lắp đặt ............................................................................ 12
Material Receiving, Preservation, Handling/Nhận vật tư, bảo quản, bàn giao .... 13
DETAIL ERECTION/LẮP ĐẶT CHI TIẾT ................................................................................................... 19
Survey of Foundation and top column of PC pipe rack/Khảo sát nền móng ở vị trí
lắp đặt dưới đất và trên đỉnh của kết cấu bê tông ....................................................... 19
Chipping& Padding/Đục nhám bề mặt bê tơng và chèn đệm lót ............................. 21
Assembly and Scaffolding Work/Công tác tổ hợp và lắp đặt giàn giáo ở dưới đất. 24
Step Frame Erection/Các bước thực hiện lắp khung ................................................ 25
Alignment & Bolt Tightening/Căn chỉnh và siết bu lông ........................................ 42
Site Welding/Hàn ở công trường ............................................................................... 49
10. TOUCH-UP OF PAINTING/SƠN DẶM ........................................................................................................ 49
11. INSPECTION/NGHIỆM THU ...................................................................................................................... 50
12. PUNCH LIST CLOSING & FINAL INSPECTION/HOÀN THIỆN CÁC TỒN ĐỌNG VÀ NGHIỆM THU .... 50
13. QUALITY CONTROL/KIỂM SOÁT CHẤT LƯỢNG .................................................................................. 51
14. HSSE CONTROL/KIỂM SỐT AN TỒN .................................................................................................. 52
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
1.
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
EPC Project No. :036909C
Page
6 of 60
SUBCON. Doc No.: PTSC-TPSKD31-010029
PURPOSE/MỤC ĐÍCH
This method statement is established to be applied for steel structure installation of pipe rack &
steel structure, platform, handrail, leaders, case, grating, and floor deck plate.
Mục đích của tài liệu là dùng để hướng dẫn công tác lắp đặt kết cấu thép của dạng giá đỡ ống,
sàn, tay vịn, cầu thang, sàn thao tác.
This procedure provides the general requirement of pipe rack steel structure to be erected in
accordance with code and standards, design drawing, shop drawing and specification.
Đây là quy trình cung cấp các yêu cầu chung của việc lắp đặt kết cấu thép dạng gối đỡ ống phù
hợp với các tiêu chuẩn, bản vẽ thiết kế, bản vẽ gia công chế tạo và các tiêu chuẩn kỹ thuật khác.
It shall be applied at the Long Son Petrochemicals Co., Ltd (LSP) site for structure steel erection.
Tài liệu này được áp dụng tại công trường nhà Nhà máy lọc hoá dầu Long Sơn cho việc lắp đặt
kết cấu thép.
2.
SCOPE AND INTRODUCTION/PHẠM VI CÔNG VIỆC VÀ GIỚI THIỆU CHUNG
2.1 SCOPE/PHẠM VI CÔNG VIỆC
The scope of erection works includes, but is not limited to, the receipt, handling, storage, assembly at grade (if necessary) and subsequent installation of structure, QC inspection and testing
of steel structure. Detail scope shall be followed as split on document OL1-2R02-0104-0-MS1800: Technical Specification for Steel Structure Erection.
Phạm vi công việc lắp đặt bao gồm, nhưng không giới hạn như giao nhận, lưu kho, tổ hợp tại
công trường (nếu cần thiết) và tuần tự các bước lắp đặt, kiểm tra và nghiệm thu kết cấu thép.
Chi tiết phạm vi công việc sẽ được nêu trong tài liệu số OL1-2R02-0104-0-MS-1800: Tiêu chuẩn
kỹ thuật lắp đặt kết cấu thép.
Please refer to:
Attachment 1: Technical Specification for Steel Structure Erection
Attachment 2: Layout working location and priority for the work
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
EPC Project No. :036909C
Page
7 of 60
SUBCON. Doc No.: PTSC-TPSKD31-010029
2.2 INTRODUCTION/GIỚI THIỆU CHUNG
Erection work of steel structure for package A1 – Olefins plant including these are area and
quantity volume as below.
Khối lượng kết cấu thép của gói thầu A1 – Nhà máy olefins bao gồm các khu vực và khối lượng
như sau.
3.
REFERENCE DOCUMENTS/TÀI LIỆU THAM CHIẾU
QCVN 02:2009
The Vietnam Construction Standard.
OL1-2R02-0104-0-MS-1800
Technical Specification for Steel Structure
Erection
OL1-2R02-0004 (036909C-1000-JSD1700-0001)
Job Design Specification forFoundations and
Structures
OL1-2R04-0005 (036909C-1000-JDS2300-0001)
Job Design Specification for Painting
OL1-2K21-0001 (036909C-1000-STC1890-0001)
Construction Standards for Steel Structures
OL1-2K20-0001 (036909C-1000-STC1790-0001)
Construction Standards for Reinforced Concrete Works
036909C-1000-MS-6890-0001-0
Technical specification for scaffolding
works
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
4.
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
EPC Project No. :036909C
Page
8 of 60
SUBCON. Doc No.: PTSC-TPSKD31-010029
DEFINITIONS & ABBREVIATIONS/ĐỊNH NGHĨA & VIẾT TẮT
CONTRACTOR
Technip Geoproduction (M) Sdn. Bhd., Technip Stone
& Webster Process Technology, Inc. and SK Engineering and Construction Co.
5.
SUBCONTRACTOR
Petrovietnam Technical Services Corporation
QA/QC
Quality Assurance/Quality Control
MS
Method statement
JSA
Job safety analysis
WORKING SCHEDULE/TIẾN ĐỘ THI CÔNG
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
6.
EPC Project No. :036909C
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Rev. 0
Page
9 of 60
SUBCON. Doc No.: PTSC-TPSKD31-010029
EQUIPMENT AND TOOLS MOBILIZATION/KẾ HOẠCH HUY ĐỘNG MÁY MĨC
THIẾT BỊ VÀ CƠNG CỤ DỤNG CỤ
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM - TỔ HỢP HOÁ DẦU MIỀN
NAM VIỆT NAM
PACKAGE A1: OLEFINS PLANT
CONSTRUCTION EQUIPMENT MOBILIZATION PLAN
MONTH
N0. DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
[ STEEL STRUCTURE ]
Crawler Crane 150T
Crawler Crane 135T
Mobile Crane 100T
Mobile crane 50 ton
Mobile Crane 25T/35T
Manlift
Boom truck crane 10T
Trailer 40 feet
Fork lift 5 ton
Electric Welding machine
Electricial gun wrench
Turtle cutting machine
Magnetic drilling machine
Drilling machine (hand)
Hand torque wrench 0 to 500Nm
Hand Torch Wench 1200Nm
Grinding machine 100
Grinding Machine 125
Hydrawlic jack 5 ton (hoz, ver)
Hydrawlic jack 10 ton (hoz, ver)
Chainblock 1.5 ton
Chainblock 3 ton
Chainblock 5 ton
Chainblock 10 ton
Electric Impact Wrench
Wrench Set (8-36)
Span Tool (12-48)
Shackle 3t
Shackle 5t
Shackle 6t
Shackle 8t
Shackle 10t
Slings 3T
Slings 5T
Slings 8T
Slings 10T
Generator 250KVA
Generator 75 KVA
2020
Apr May Jun
M19 M20 M21
1
1
1
1
1
1
4
1
2
1
1
1
1
1
2
1
1
2
1
1
1
1
1
1
2
4
1
2
1
1
1
1
1
2
1
1
2
2
4
2
1
1
1
1
1
17
17
17
17
2
4
2
1
1
1
1
1
17
17
17
17
1
1
1
1
1
3
1
3
2
2
2
4
4
1
2
1
1
1
4
6
2
1
1
10
3
2
2
4
2
2
2
2
2
2
17
17
17
17
2
1
2021
Jul
M22
Aug
M23
Sep
M24
Oct
M25
Nov
M26
Dec
M27
Jan
M28
Feb
M29
Mar
M30
Apr
M31
May
M32
Jun
M33
1
1
1
3
1
3
4
3
2
9
6
2
3
2
2
2
5
7
3
2
2
11
3
2
3
6
4
3
3
3
3
3
33
34
34
34
2
1
1
1
1
3
1
5
4
3
2
10
6
2
3
2
2
2
5
7
3
2
2
11
3
2
3
8
8
3
3
3
3
3
33
34
34
34
2
1
1
1
1
5
1
5
4
3
2
12
6
2
3
2
3
3
6
8
4
3
3
12
3
2
4
10
8
5
5
5
5
5
36
38
39
41
2
1
1
1
1
6
1
6
4
3
3
13
12
2
4
2
3
3
6
8
4
3
3
12
3
2
4
14
8
6
6
6
6
6
37
38
40
44
2
1
1
1
1
6
1
6
4
3
3
14
12
2
4
2
6
6
9
11
8
6
3
14
3
2
6
14
12
7
7
7
7
7
44
38
42
46
2
1
1
1
1
6
1
6
4
3
3
10
12
2
4
2
6
6
11
11
8
6
3
14
3
2
6
14
12
7
7
7
7
7
44
46
44
52
2
1
1
6
1
6
4
3
3
4
12
2
4
4
6
6
11
11
8
6
3
14
3
2
6
14
12
6
6
6
6
6
52
50
52
52
2
1
1
5
1
6
4
3
3
3
12
2
4
4
6
6
11
11
8
6
3
14
3
2
6
14
12
5
5
5
5
5
52
50
52
52
2
1
1
5
1
6
4
3
3
4
6
2
4
4
6
6
11
11
8
6
3
14
3
2
6
14
12
5
5
5
5
5
52
50
52
52
2
1
1
5
1
6
4
3
3
3
6
2
2
4
6
6
11
11
8
6
3
14
3
2
6
12
12
5
5
5
5
5
52
50
52
52
2
1
1
3
1
3
3
3
3
3
6
2
2
4
4
6
11
11
8
6
3
14
3
2
6
12
12
3
3
3
3
3
10
6
8
6
2
1
1
3
1
3
3
3
3
2
4
2
2
4
4
5
9
9
4
6
3
14
3
2
6
12
8
3
3
3
3
3
8
3
3
3
2
1
Jul Aug Sep Oct
M34 M35 M36 M37
1
3
1
3
3
3
2
2
4
2
2
2
2
5
7
7
2
2
2
10
3
2
2
2
2
3
3
3
3
3
8
3
3
3
2
1
1
2
1
1
1
2
1
2
1
1
1
2
2
1
1
1
2
1
4
2
2
2
2
5
3
3
3
3
3
3
1
4
2
2
2
3
4
3
3
3
3
3
3
4
2
2
2
2
2
2
2
2
2
2
2
3
3
3
3
3
3
3
3
8
6
6
6
3
3
3
3
3
3
3
3
10
8
8
8
2
2
2
2
2
2
2
2
4
2
2
2
1
1
1
Please refer to:
Attachment 3: Method statement for assembly crawler crane 135/150Ton
Attachment 4: Job safety analysis for assembly crawler crane 135/150Ton
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
TOTAL
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
Doc.No.: OL1-2D31-010029
7.
7.1
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
10 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
ORGANIZATION CHART AND MANPOWER MOBILIZATION/SƠ ĐỒ TỔ
CHỨC VÀ KẾ HOẠCH HUY ĐỘNG NHÂN SỰ
Organization chart/Sơ đồ tổ chức
LSP/TPSK/PTSC organization chart/Sơ đồ phối hợp giữa LSP/TPSK/PTSC
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
11 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
PTSC Overall organization chart/Sơ đồ tổ chức tổng thể của PTSC
SMP package organization chart/Sơ đồ tổ chức gói SMP
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
7.2
Rev. 0
EPC Project No. :036909C
Page
12 of
60
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
SUBCON. Doc No.: PTSC-TPSKD31-010029
Manpower mobilization plan/Kế hoạch huy động nhân sự
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM - TỔ HỢP HOÁ DẦU MIỀN NAM VIỆT NAM
PACKAGE A1: OLEFINS PLANT
SMP WORK
MANPOWER MOBILIZATION PLAN
MONTH
2021
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35
M36
M37
I DIRECT LABOR
1
[ STRUCTURAL STEEL ]
2
Mechanical Foreman
12
22
45
97
110
135
164
190
148
89
86
86
74
72
55
55
46
13
3
1
1
2
5
5
6
7
8
6
4
4
4
3
3
3
3
2
1
3
Fitter
5
11
24
48
55
66
80
92
68
34
34
34
30
31
20
20
16
3
4
3G welder
1
2
4
8
9
11
12
13
9
4
4
4
3
3
2
2
1
1
5
Helper
3
6
12
23
28
36
48
58
46
30
28
28
22
22
17
17
14
3
6
Rigger
1
1
2
9
9
11
12
13
13
12
11
11
11
9
9
9
9
3
2
7
Flagman
1
1
1
4
4
5
5
6
6
5
5
5
5
4
4
4
4
2
1
3
1
2
2
8
3
1
2
2
8
3
5
3
2
13
3
5
3
3
14
3
5
3
4
15
3
5
4
4
16
3
5
4
5
17
3
5
4
5
17
3
5
4
4
16
3
5
4
3
15
3
5
4
3
15
3
5
4
3
15
3
5
4
3
15
3
5
4
3
15
3
5
4
3
15
3
5
4
3
15
3
5
3
2
13
3
5
3
2
13
3
5
3
2
13
N0.
DESCRIPTION
2020
II INDIRECT LABOR
[ STRUCTURAL STEEL ]
1
Structure Leader
2
Structure Supervisor
3
Structure QC
4
HSE Supervisor
SUBTOTAL
8.
8.1
Remark
WORK METHOD/BIỆN PHÁP TRIỂN KHAI
Erection Sequence/Trình tự lắp đặt
- After erection, completed steel structures including miscellaneous items (such as grouting,
handrails, ladder, etc), prior to welding and final bolting, shall be totally inspected for
accuracy of construction and to ensure that all dimensions are as specified.
Sau khi lắp đặt, tất cả các chi tiết kết cấu thép đã hồn thành bao gồm các hạng mục phụ
trợ (vữa khơng ngót, tay vịn, cầu thang…), trước khi hàn và siết bu lông, phải được kiểm
tra tổng thể công tác tác thi cơng và đảm bảo rằng tất cả các kích thước đã đảm bảo theo
yêu cầu của tiêu chuẩn kỹ thuật.
- Inspection records shall be prepared by the Subcontractor and shall be submitted to
Contractor for approval.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
13 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Biên bản nghiệm thu công việc sẽ được chuẩn bị bởi Nhà thầu phụ và sẽ trình cho Tổng
thầu để phê duyệt.
Final Inspection/Nghiệm thu hoàn thành:
- The draft final inspection shall be done between the QC engineer, Site Engineer and Team
Leader to ensure the quality compliance and planning for repair, clean and touch-up. The
record must be signed-off and documented as a part of contract.
Biên bản nghiệm thu hoàn thành sẽ được thự hiện giữa kỹ sư chất lượng, kỹ sư cơng trường
và trưởng các nhóm thi cơng để đảm bảo chất lượng phù hợp và có kế hoạch sửa chữa,
sơn dặm. Hồ sơ phải được ký xác nhận và lưu trữ như một phần của hợp đồng.
- The official final inspection shall be completed with a witness of client’s representative.
The record must be signed-off and documented as a part of the contract.
Cơng tác nghiệm thu chính thức sẽ được thực hiện với sự chứng kiến của Chủ đầu tư và
phải được ký xác nhận như một phần của hợp đồng.
8.2
Material Receiving, Preservation, Handling/Nhận vật tư, bảo quản, bàn giao
8.2.1. Material Receiving and Checking/Nhận vật tư và kiểm tra
-
Contractor receives the materials at the construction site and delivers them to the installation location by Trailer and boom Truck. During the transportation process, material is
packed, tighten and lashing permanent on Trailer or Boom truck crane 10 ton to antifalling and dropping. Materials will be arranged neatly, separated and do not get stuck
with any access way. The Crane for loading/unloading material shall be arranged base on
the weight of members that packed.
Nhà thầu nhận vật tư tại bãi chứa vật tư ở công trường và vận chuyển đến vị trí lắp đặt
bằng bằng xe rơmc và xe cẩu thùng. Trong suốt q trình vận chuyển, các vật tư đã
được đóng gói, chèn buộc cố định trên xe rơmoóc or xe cẩu thùng 10 tấn để chống ngã đổ
và rơi. Vật tư sẽ được bố trí sắp xếp gọn gàng, tách rời và khơng làm cản trở lối đi. Cẩu
kéo để nâng hạ vật tư sẽ được bố trí phù hợp dựa vào khối lượng của cấu kiện đã đóng
gói.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
14 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
- Quantities, dimensions and grades of every material which are delivered to Erection Subcontractor at Site shall be checked in accordance with the drawings, packing list, and applicable documents.
Số lượng kích thước, chủng loại của vật tư đã được bàn giao đến Nhà thầu phụ lắp đặt tại
công trường sẽ được kiểm tra theo bản vẽ danh mục đóng gói và các tài liệu liên quan.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
15 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
- The Materials Controller shall also be responsible for checking Heat Nos., Tag Nos. or
Serial Nos. to ensure that they are visible on members… and verifying Heat Nos., Serial
Nos. or Tag Nos. against the mill certificate.
Nhân viên quản lý vật tư sẽ chịu trách nhiệm kiểm tra số mã số, tên cấu kiện hoặc số lô
đảm bảo rằng các vật tư đã nhận phù hợp với chứng chỉ xuất xưởng.
- The Material Manager shall receive all steel structures in accordance with the procedure
and shall be responsible for checking quantity and type of materials indicated in the packing list and QC inspector checks for quality. The damages shall be immediately notified to
take the required measures.
Nhân viên quản lý vật tư sẽ nhận kết cấu thép phù hợp với quy trình và sẽ chịu trách nhiệm
cho việc kiểm tra số lượng và chủng loại vật tư hiển thị trên danh mục đóng gói và bộ
phận kiểm sốt chất lượng kiểm tra về mặt chất lượng. Các hư hỏng sẽ ngay lập tức được
thông báo đến các bên liên quan theo yêu cầu của quy trình bảo quản vật tư của Tổng
thầu.
- After materials have been received, all information will be recorded on the Material Receiving Inspection Report (MRIR).
Sau khi vật tư đã được nhận, tất cả các thông tin sẽ được lưu trên báo cáo kiểm tra nhận
vật tư.
Please refer to:
Attachment 5: Site storage steel structure material laydown
Attachment 6: Technical specification of Trailer
Attachment 7: Technical specification of Boom truck crane 10 ton
Attachment 8: Lifting plan for mobile crane 50 ton
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
8.2.2
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
16 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Material Storage/Bảo quản vật tư
- Storage areas are to be properly graded, flattened and made free from water. Structural
members products shall be stored off the ground on wooden or concrete blocks with rubber
padding to separate material and concrete blocks with a minimum ground clearance of 300
mm.
Khu vực lưu trữ được phân loại chính xác, bằng phẳng và khơng đọng nước. Các cấu kiện
thành phẩm đã được lưu trữ trên mặt đất có kê gỗ hoặc trên các khối bê tơng có lót tấm
cao su cao hơn bề mặt để khoảng 300mm.
- High strength bolts, mild steel bolts and electrodes are to be stored in a watertight and dry
place. Especially high strength bolts shall be stocked in vinyl bags and do not open until
they will be used. Any movement of material shall be under control at all times.
Bu lông cường độ cao, bu lơng cường độ trung bình và que hàn điện được lưu trữ ở nơi
kín nước và khơ ráo. Đặc biệt là bu lông cường độ cao sẽ được chứa trong túi ni lông và
không mở cho đến khi chúng được sử dụng. Mọi công tác di chuyển vật tư sẽ phải được
kiểm soát đầy đủ theo quy trình Dự án.
8.2.3 Preservation/Bảo quản
- All materials shall be protected against corrosion, physical damage, painting, welding arc
and any other form of deterioration during the period of storage.
Tất cả các vật tư phải được bảo vệ chống ăn mòn, hư hỏng vật lý, sơn, mối hàn và các hư
hỏng khác trong quá trình lưu kho.
- Material shall be stored in the Project dedicated steel stockyard until required for use. Steel
plates shall be stored off the ground on wooden or concrete blocks with rubber padding to
separate material and concrete blocks. A minimum of 300 mm ground clearance shall be
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
17 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
provided to keep above level of any standing water. Stacking shall be avoided where practicable and where necessary shall be done in such a manner as to avoid damage.
Vật tư sẽ được lưu trữ ở kho theo quy định cho đến khi được yêu cầu sử dụng. Thép tấm
sẽ được để trên mặt đất có kê gỗ hoặc trên các tấm bê tơng có lót cao su. Khoảng cách tối
thiểu của gối kê phải cao hơn mức nước trên mặt đất là 300mm. Việc xếp chồng phải được
tránh ở những nơi có thể thực hiện được và khi cần thiết phải được thực hiện theo cách
phù hợp để tránh thiệt hại.
- Structural Tubular products shall be stored off the ground on wooden or concrete blocks
with rubber padding to separate material and concrete blocks with a minimum ground
clearance of 100 mm. When tubular are stored in this manner care shall be taken to ensure
the items are wedged to prevent rolling. Small tubular (less than 610mm diameter) will be
stacked no more than 5 layers high, large tubular (610 mm) will be stacked no more than
3 layers high.
Các cấu kiện hình ống sẽ được lưu trữ trên mặt đất có kê gỗ hoặc trên các cấu kiện bê
tơng với kích thước tối thiểu là 100mm. Khi cấu kiện được lưu trữ theo cách này, cần phải
cẩn thận để đảm bảo các cấu kiện được nêm để tránh lăn. Các cấu kiện nhỏ (nhỏ hơn
đường kính 610mm) sẽ được xếp chồng cao khơng quá 5 lớp. Các cấu kiện lớn (lớn hơn
đường kính 610mm) sẽ được xếp chồng cao không quá 3 lớp.
8.2.4 Handling/Giao nhận
- On arrivals of critical, extra-large or important equipment, handling of such equipment
shall be carried out with witness of contractor and owner.
Các cấu kiện quan trọng, kích thước quá khổ hoặc là thiết bị quan trọng, công tác giao
nhận thiết bị sẽ được thực hiện với sự chứng kiến của Tổng thầu và Chủ đầu tư.
- Lifting equipment and vehicle shall be test and certificated by local authorities and checked
by TPSK’s Safety department before use. Any damaged equipment or equipment which
has not effective rated loads shall not be used.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
18 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Thiết bị nâng hạ và xe vận chuyển sẽ được kiểm tra và cấp chứng nhận bởi cơ quan có
thẩm quyền và được kiểm tra bởi bộ phận an toàn của TPSK trước khi sử dụng. Thiết bị
bị hỏng hoặc không đủ tải sẽ không được sử dụng.
- The weight, lifting points, or center of gravity indicated on the crate, skid, or package by
the shipper shall be utilized to ensure proper handling during loading, transferring between
carries and unloading.
Trọng lượng, điểm nâng hoặc trọng tâm được chỉ định trên thùng, máng trượt hoặc cấu
kiện đã đóng gói bởi đơn vị giao hàng sẽ được sử dụng để đảm bảo xử lý đúng trong quá
trình nâng hàng, di chuyển giữa thiết bị vận chuyển hàng và thiết bị hạ hàng.
- During handling and lifting of coated steelwork, the steelwork shall be separate from wires
and lashings by rubber padding in such manner that the coatings are not damaged or discolored. Free end shall be stiffened, measures shall be taken to prevent permanent distortion. Machined surfaces and faying shall be protected.
Trong suốt quá trình giao nhận và nâng hạ các cấu kiện đã sơn, thì các cấu kiện sẽ được
cách ly với dây buột bằng tấm lót cao su tại vị trí buộc để đảm bảo không gây hư hỏng bề
mặt sơn. Đầu tự do phải được cố định và thực hiện các biện pháp phù hợp để ngăn ngừa
biến dạng vĩnh viễn. Các bề mặt cơ khí và lớp phủ phải được bảo vệ.
- Adequate caution shall be paid before and during rigging in order not to cause damage to
surface.
Chú ý cẩn thận trong trước và suốt quá trình chằng buộc để không là nguyên nhân làm hư
hỏng bề mặt.
- When stacking is necessary, refer to instructions from shipper or manufacturer and mark
on boxes/crates for limit of stacks. Stacks should not excess that limit.
Khi cần thiết phải xếp chồng thì tham khảo hướng dẫn của đơn vị giao hàng hoặc Nhà sản
xuất và đã đánh dấu trên hộp/thùng để biết giới hạn của xếp chồng. Việc xếp chồng sẽ
không vượt quá giới hạn cho phép.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
19 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
9.
DETAIL ERECTION/LẮP ĐẶT CHI TIẾT
9.1
Survey of Foundation and top column of PC pipe rack/Khảo sát nền móng ở vị trí lắp
đặt dưới đất và trên đỉnh của kết cấu bê tông
- Foundation connect surface and top column PC pipe rack shall be cleaned against sand
and dust before checking level as per drawing.
Bề mặt liên kết móng đưới đất và trên đỉnh của kết cấu bê tông phải được làm sạch cát và
bụi lại thêm một lần nữa trước khi kiểm tra cao độ theo bản vẽ.
- Plant Construction reference point (datum line and level) shall be confirmed and equipment centerline shall be marked on the foundation clearly.
Điểm tham chiếu xây dựng nhà máy (đường chuẩn và cao độ) phải được xác nhận và
đường tâm của thiết bị phải được đánh dấu rõ ràng trên nền móng.
- Position of centerline, anchor bolt, anchor frame and anchor bolt height shall be inspected and recorded. If these records do ot match the drawings; the civil construction
engineer has full responsibility to rectify these non-conformances with in tolerance
limit.
Vị trí đường tâm, bu lơng neo, khung neo và chiều cao bu lông neo sẽ được kiểm tra và
ghi lại. Nếu kết quả kiểm tra không phù hợp với bản vẽ thì kỹ sư thi cơng xây dựng phải
chịu hoàn toàn trách nhiệm điều chỉnh các điểm không phù hợp trong giới hạn cho
phép.
- Erection supervisor only confirms. If all of records within tolerance and erection work
can be started.
Giám sát phụ trách kỹ thuật lắp đặt chỉ xác nhận, nếu tất cả các thông số đo đạt trong
dung sai cho phép và công tác lắp đặt có thể bắt đầu.
- The foundation checks to be performed follow clause 10 of document no. OL1-2R020104_Technical Specification for Steel Structures Erection.
Cơng tác kiểm tra cao độ móng sẽ được thực hiện và tuân thủ theo mục 10 của tài liệu
số OL1-2R02-0104_Tiêu chuẩn kỹ thuật của công tác lắp đặt kết cấu thép.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
20 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Top PC Pipe rack/Đỉnh của cột bê tơng
Foundation/Móng
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
-
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
21 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Common scaffoding shall be designed and calculation base document no. 036909C-1000MS-6890-0001-0: Technical specification for scaffolding works. It is designed and calculation with load weight 150 kg/m2, 200 kg/m2 and max 250 kg/m2. PTSC shall submit
Method statement for scaffolding erection to TPSK/LSP for approval before commencing
scaffolding work.
Giàn giáo treo sẽ được thiết kế và tính tốn dựa trên tài liệu tiêu số. 036909C-1000-MS6890-0001-0: Tiêu chuẩn kỹ thuật cho công tác lắp đặt giàn giáo. Giàn giao treo được
thiết kế tính toán với tải trọng chịu đựng trên 1 m2 sàn gồm 3 mức chịu tải trọng gồm:
Chịu tải nhẹ 150 kg/m2, chịu tải trung bình 200 kg/m2 và chịu tải nặng 250 kg/m2. PTSC
sẽ đệ trình biện pháp lắp đặt giàn giáo đến TPSK/LSP phê duyệt trước khi tiến hành công
tác lắp đặt giàn giáo.
Common scaffoding shall be erected at leveling 16m and worker can access the top column of PC pipe rack. Please refer to "Document no. OL1-2D94-0032_Site access checklist for common scaffolding erection" for detail calculation.
Giàn giáo sẽ được lắp đặt ở cao độ 16m và công nhân có thể thao tác thực hiện cơng việc
trên đỉnh của kết cấu dạng bê tông đúc sẵn. Chi tiết bảng tính tham chiếu đến tài liệu
OL1-2D94-0032_Hồ sơ cơng tác lắp đặt giàn giáo.
9.2
Chipping& Padding/Đục nhám bề mặt bê tông và chèn đệm lót
- Chipping concrete: The foundation concrete surface and top column PC pipe rack will
be chipped approximately 10-15 mm and the chipped surface is cleaned.
Phá dỡ bề mặt bê tơng: Bề mặt móng bê tơng dưới đất và trên đỉnh cột kết cấu bê tông
sẽ được đục tạo nhám từ 10 mm đến 15 mm và bề mặt sau đục nhám phải được vệ sinh
sạch sẽ.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
10-15mm
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
22 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Anchor Bolt
CHIPPING SURFACE
Chipping/Đục tạo nhám bề mặt bê tông
+ Column centerline will be marked from equipment centerline.
Đường tâm cột sẽ được đánh dấu từ thiết bị đánh dấu đường tâm.
+ Set padding plate: top of this plate shall be level of base plate bottom elevation from
drawing.
Chèn tấm lót: đỉnh của tấm lót này sẽ là cao độ của đáy tấm từ bản vẽ.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
23 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
+ Dimension and location of pad plate will vary depending on the center to center distance
of anchor bolt.
Kích thước và vị trí của tấm lót sẽ thay đổi tùy thuộc vào khoảng cách từ tâm đến tâm của
bu lông neo.
(Tolerance limit shall be +1-2mm/Dung sai giới hạn sẽ là + 1mm đến 2mm)
- Setting padding plate on top PC Pipe rack column and Foundation/Chèn tấm lót trên đỉnh
kết cấu bê tơng và móng.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
9.3
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
24 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Assembly and Scaffolding Work/Công tác tổ hợp và lắp đặt giàn giáo ở dưới đất
a.
Assemble main frame columns and beams/Tổ hợp cột và dầm của khung chính
- Layout supports, level checking and adjustment.
Bố trí giá đỡ, kiểm tra cao độ và điều chỉnh.
- Using 50T Mobile Crane to lift Columns on the supports.
Sử dụng cẩu 50 tấn để nâng cột đặt lên giá đỡ.
- Lifting Beams to connect with Columns.
Nâng dầm để liên kết với cột.
- Bolt-tightening work should be done after finishing assembly work.
-
Công tác siết bu lông sẽ thực hiện sau khi hồn thành cơng tác tổ hợp.
- Every erected steel component shall be free from contamination, twist and distortion.
Mỗi cấu kiện đã được lắp đặt không được bị vấy bẩn, xoắn hoặc biến dạng.
- Correction of minor misfits and a reasonable amount of reaming and cutting shall be considered a legitimate part of erection. Reaming or cutting shall be reported immediately and
approval shall be obtained for the method of correction prior to connecting the error.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Contract No.: LSP-CA-136
The present document or drawing is issued by the Consortium of LSP for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of LSP and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2D31-010029
Rev. 0
Package A1: OLEFINS PLANT
METHOD STATEMENT FOR STEEL
STRUCTURE ERECTION
Page
25 of
60
EPC Project No. :036909C
SUBCON. Doc No.: PTSC-TPSKD31-010029
Công tác sửa chữa các lỗi nhỏ với số lượng hợp lý của việc khoan và cắt sẽ được coi là
một phần của công tác lắp đặt tổ hợp. Việc khoan hoặc cắt sẽ phải được báo cáo ngay lập
tức và phải được phê duyệt biện pháp sửa chữa trước khi sửa chữa các lỗi liên kết.
- If required, additional drilling of beams, columns or other components shall be made to
remedy fabrication mismatch/faults, magnetic base drills shall be used for such work.
Nếu được yêu cầu, việc khoan bổ sung lỗ trên dầm, cột hoặc các bộ phận khác sẽ được
thực hiện để khắc phục sự cố do lỗi gia công chế tạo, máy khoan từ sẽ được sử dụng để
thực hiện công tác khoan lỗ.
Please refer to Attachment 8: Lifting plan for mobile crane 50 ton
b.
Scaffolding work on ground/Lắp đặt giàn giáo dưới đất
- Install working platform and ladder along column to be convenient for install beam and
tighten bolts. If in case position the manlift can’t access to perform install beam and tighten
bolt.
Lắp đặt sàn thao tác và thang dọc cột để tiện lợi trong việc lắp đặt dầm và siết bu lông.
Nếu trong trường hợp ở các vị trí xe nâng người khơng truy cập vào được để thực hiện lắp
dầm và siết bu lông.
- First of all, the scaffoldings shall be arranged with platforms at 1.2m lower floor elevation. The extension scaffolding shall be done in platforms.
Đầu tiên, giàn giáo sẽ được sắp xếp với dạng sàn thao tác ở 1.2m thấp hơn cao độ sàn.
Giàn giáo mở sộng sẽ được thực hiện trên sàn thao tác.
- After finish a bay (4 columns and beams, bracings), extension parts shall be release to
moving scaffolding.
Sau khi hoàn thành 1 khung (4 cột và thanh giằng chéo), phần mở rộng của giàn giáo
sẽ được giải phóng để di chuyển đến phân đoạn tiếp theo.
Floor 5, PetroVietnam Tower, 1-5 Le Duan Street, District 1, Ho Chi Minh city, S.R Viet Nam