EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1959

Date: 15-Sep-07

RFI No.: CSC/CM18-CM25/2.3/230

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer



Location of Works: CSC (CM18-CM25)

Description of Activities: Inspection for Spun pile Driving.

WILL BE READY FOR INSPECTION ON

16-Sep-07 at 7:30 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Thach Ngoc Truong Thi /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by

The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT

PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1960

Date: 15-Sep-07

RFI No.: ECSI/L6/PC/3.2/171

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer


Location of Works: Line 6 (Chau Van
Liem St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

16-Sep-07 at 9:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M58 - M59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS


Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1961

Date: 15-Sep-07

RFI No.: ECSI/L6/PC/3.2/172

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE


Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

16-Sep-07 at 3:15 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M58 - M59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date

RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5



EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1916

Date: 15-Sep-07

RFI No.: ECSI/L3/PC/3.2/42

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE


Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection formwork for Belt joint

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 4:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

connection of Box culvert from M25 to M26.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved

Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:

Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1917

Date: 15-Sep-07

RFI No.: ECSI/L3/PC/3.2/43

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Location of Works: Line 3 (Tran Binh
Trong St)

Name: KO SHIMOKAZE

Position: Resident Engineer

Description of Activities: Inspection placing & sampling
concrete for Belt joint connection of Box culvert from M25
to M26.

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved

Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:


Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1962

Date: 15-Sep-07

RFI No.: ECSI/L3/PC/3.2/47

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE


Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 10:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M23 - M24.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element

Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:


Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1963

Date: 15-Sep-07

RFI No.: ECSI/L3/PC/3.2/48

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer

TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 3 (Tran Binh
Trong St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M23 - M24.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Ho Quang Trinh /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:

Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:


Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1964

Date: 15-Sep-07

RFI No.: ECSI/L4/MC/3.2/274

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN

Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 9:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

for sand bacfilling of Manhole M'35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /


WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:


Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1965

Date: 15-Sep-07

RFI No.: ECSI/L4/MC/3.2/275

From:
SHIMIZU CORPORATION REPRESENTATIVE

Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

for sand bacfilling of Manhole M'35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /


WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:


Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1966

Date: 15-Sep-07

RFI No.: ECSI/L4/PC/3.2/194

From:

SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 9:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

for sand bacfilling of trench from M'35 to M35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION


Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:


Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1967

Date: 15-Sep-07

RFI No.: ECSI/L4/PC/3.2/195


From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

for sand bacfilling of trench from M'35 to M35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION


Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:


Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1968

Date: 15-Sep-07


RFI No.: ECSI/L4/PC/3.2/196

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Excavation pit of

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 6:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

slipper from M34 to M35.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI

REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:


Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1969


Date: 15-Sep-07

RFI No.: ECSI/L4/PC/3.2/197

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Placing & sampling

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

concrete of slipper from M34 to M35.


OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:


Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1970


Date: 15-Sep-07

RFI No.: ECSI/L4/MC/3.2/276

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Outer formwork for

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Wall & Top of Manhole M34.


OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:


Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT


WEIP/D/QC - 02/1971

Date: 15-Sep-07

RFI No.: ECSI/L4/MC/3.2/277

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 4 (An Duong
Vuong St)

Description of Activities: Inspection Placing & Sampling

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS


Concrete for Wall & Top of Manhole M34.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Truong Hoang Phuc /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:


Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:


EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1972

Date: 15-Sep-07

RFI No.: ECSI/L5/PC/3.2/136

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 5 (Huynh Man
Dat St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 10:00 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:


MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M52 - M53.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Nguyen Tan Hoa /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:


Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:


EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1973

Date: 15-Sep-07

RFI No.: ECSI/L5/PC/3.2/137

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 5 (Huynh Man
Dat St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 4:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:


MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M52 - M53.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Nguyen Tan Hoa /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:


Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02

Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1974

Date: 15-Sep-07

RFI No.: ECSI/L5/MC/3.2/165

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 5 (Huynh Man
Dat St)

Description of Activities: Inspection Reber & inner

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:00 PM

RELEVANT INSPECTION AND TEST PLANS

ATTACHED:

MS- 009- 01 ECSI AND SIS

formwork for Wall & Top of Manhole M53.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Nguyen Tan Hoa /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer


Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN


REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1975

Date: 15-Sep-07

RFI No.: ECSI/L6/PC/3.2/169

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 9:30 AM


RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M58 - M59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer


Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN


REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1976

Date: 15-Sep-07

RFI No.: ECSI/L6/PC/3.2/170

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)

Description of Activities: Inspection for compaction test

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:15 PM


RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

(FDT) of sand backfilling of trenches from M58 - M59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted

SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION


PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1940

Date: 15-Sep-07

RFI No.: ECSI/L6/MC/3.2/166

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)

Description of Activities: Inspection Excavation Pit of

WILL BE READY FOR INSPECTION ON


17-Sep-07 at 9:30 AM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Manhole I" 59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector


Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION


PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1941

Date: 15-Sep-07

RFI No.: ECSI/L6/MC/3.2/167

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)

Description of Activities: Inspection Compaction test (FDT)

WILL BE READY FOR INSPECTION ON


17-Sep-07 at 3:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

for sand bedding of Manhole I" 59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by
PCI’ Inspector


Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL


SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1942

Date: 15-Sep-07

RFI No.: ECSI/L6/MC/3.2/168

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)

Description of Activities: Inspection Elevation &


WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:30 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Dimensions for sand bedding of Manhole I" 59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative

Checked by

PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT

MANAGEMENT SYSTEM AND QUALITY CONTROL


SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
(OVERTIME WORKS)
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1943

Date: 15-Sep-07

RFI No.: ECSI/L6/MC/3.2/168

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)


Description of Activities: Inspection Placing & Sampling for

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 10:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

Leveling concrete of Manhole I" 59.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by
The Engineer’s Representative


Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


EAST - WEST HIGHWAY AND WATER ENVIRONMENT PROJECT MANAGEMENT UNIT OF HO CHI MINH CITY
HO CHI MINH CITY WATER ENVIRONMENT IMPROVEMENT PROJECT
PACKAGE D - CONVEYANCE SEWER CONSTRUCTION AND EXISTING COMBINED SEWER IMPROVEMENT


MANAGEMENT SYSTEM AND QUALITY CONTROL

SHIMIZU CORPORATION

PLAN

REQUEST FOR INSPECTION (TO THE ENGINEER’S REPRESENTATIVE) – QC-02
Works Section / Location:

EXISTING COMBINED SEWER IMPROVEMENT

WEIP/D/QC - 02/1977

Date: 15-Sep-07

RFI No.: ECSI/L6/PC/3.2/171

From:
SHIMIZU CORPORATION REPRESENTATIVE
Name: BUI NGOC TOAN
Sign: ___________________ Position: Chief of QC Engineer
TO THE ENGINEER’S REPRESENTATIVE

Name: KO SHIMOKAZE

Position: Resident Engineer

Location of Works: Line 6 (Chau Van
Liem St)


Description of Activities: Inspection formwork for Belt joint

WILL BE READY FOR INSPECTION ON

17-Sep-07 at 3:00 PM

RELEVANT INSPECTION AND TEST PLANS
ATTACHED:

MS- 009- 01 ECSI AND SIS

connection of Box culvert from M56 - M57.

OTHER DOCUMENTS
REMARKS - PERSON IN CHARGE: PCI
REMARKS - PERSON IN CHARGE: SHIMIZU CORPORATION
SHIMIZU CORPORATION

Tran Minh Tri /

WE REQUEST THE ENGINEER’S REPRESENTATIVE TO INSPECT THE FOLLOWING ELEMENTS:
Element
Approved
Not Approved
Date
RESULTS OF INSPECTIONS (AND / OR) RE-INSPECTIONS

Based on the above comments / observations the next stage may / may not proceed
Approved by

The Engineer’s Representative

Checked by
PCI’ Inspector

Signed and Accepted
SC - Site Engineer

Signed:

Signed:

Signed:

Name:

Name:

Name:

Date:

Date:

Date:
Appendix No. 5


Tài liệu bạn tìm kiếm đã sẵn sàng tải về